{"id":38078,"date":"2023-07-14T18:56:42","date_gmt":"2023-07-14T18:56:42","guid":{"rendered":"https:\/\/skyplanner.ai\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/cobots-cobots-%ce%b7-%ce%b1%ce%bd%ce%b1%ce%b3%ce%ad%ce%bd%ce%bd%ce%b7%cf%83%ce%b7-%cf%84%ce%b7%cf%82-%ce%bc%ce%b5%cf%84%ce%b1%cf%80%ce%bf%ce%af%ce%b7%cf%83%ce%b7%cf%82\/"},"modified":"2024-08-07T09:48:29","modified_gmt":"2024-08-07T09:48:29","slug":"cobots-cobots-%ce%b7-%ce%b1%ce%bd%ce%b1%ce%b3%ce%ad%ce%bd%ce%bd%ce%b7%cf%83%ce%b7-%cf%84%ce%b7%cf%82-%ce%bc%ce%b5%cf%84%ce%b1%cf%80%ce%bf%ce%af%ce%b7%cf%83%ce%b7%cf%82","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/cobots-cobots-%ce%b7-%ce%b1%ce%bd%ce%b1%ce%b3%ce%ad%ce%bd%ce%bd%ce%b7%cf%83%ce%b7-%cf%84%ce%b7%cf%82-%ce%bc%ce%b5%cf%84%ce%b1%cf%80%ce%bf%ce%af%ce%b7%cf%83%ce%b7%cf%82\/","title":{"rendered":"Cobots: Cobots: \u0397 \u03b1\u03bd\u03b1\u03b3\u03ad\u03bd\u03bd\u03b7\u03c3\u03b7 \u03c4\u03b7\u03c2 \u03bc\u03b5\u03c4\u03b1\u03c0\u03bf\u03af\u03b7\u03c3\u03b7\u03c2"},"content":{"rendered":"<div class=\"gb-container gb-container-bf558a89\">\n\n<h1 class=\"wp-block-heading\" id=\"h-cobots-the-manufacturing-renaissance\">Cobots: Cobots: \u0397 \u03b1\u03bd\u03b1\u03b3\u03ad\u03bd\u03bd\u03b7\u03c3\u03b7 \u03c4\u03b7\u03c2 \u03bc\u03b5\u03c4\u03b1\u03c0\u03bf\u03af\u03b7\u03c3\u03b7\u03c2<\/h1>\n\n\n<div class=\"gb-container gb-container-e8026af9\">\n\n<p><a href=\"https:\/\/skyplanner.ai\/el\/\">Home<\/a> &#8221; <a href=\"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/\">\u03a0\u03b7\u03b3\u03ad\u03c2<\/a> &#8221; Cobots: Cobots: \u0397 \u03b1\u03bd\u03b1\u03b3\u03ad\u03bd\u03bd\u03b7\u03c3\u03b7 \u03c4\u03b7\u03c2 \u03bc\u03b5\u03c4\u03b1\u03c0\u03bf\u03af\u03b7\u03c3\u03b7\u03c2<\/p>\n\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" viewbox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">\u0395\u03ba\u03c4\u03b9\u03bc\u03ce\u03bc\u03b5\u03bd\u03bf\u03c2 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c2 \u03b1\u03bd\u03ac\u03b3\u03bd\u03c9\u03c3\u03b7\u03c2: <\/span><span class=\"yoast-reading-time__reading-time\">20<\/span><span class=\"yoast-reading-time__time-unit\"> \u03bb\u03b5\u03c0\u03c4\u03ac<\/span><\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f0fd57d0\">\n\n<p>\u03a6\u03b1\u03bd\u03c4\u03b1\u03c3\u03c4\u03b5\u03af\u03c4\u03b5 \u03c4\u03b7\u03bd \u03ba\u03b1\u03b8\u03b7\u03bc\u03b5\u03c1\u03b9\u03bd\u03cc\u03c4\u03b7\u03c4\u03b1 \u03bc\u03b9\u03b1\u03c2 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ae\u03c2 \u03c3\u03c5\u03bd\u03b1\u03c1\u03bc\u03bf\u03bb\u03cc\u03b3\u03b7\u03c3\u03b7\u03c2: \u03b5\u03c1\u03b3\u03ac\u03c4\u03b5\u03c2 \u03c0\u03bf\u03c5 \u03b5\u03ba\u03c4\u03b5\u03bb\u03bf\u03cd\u03bd \u03b1\u03ba\u03bf\u03cd\u03c1\u03b1\u03c3\u03c4\u03b1 \u03b5\u03c0\u03b1\u03bd\u03b1\u03bb\u03b1\u03bc\u03b2\u03b1\u03bd\u03cc\u03bc\u03b5\u03bd\u03b5\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2.\n\u039a\u03b1\u03b8\u03ce\u03c2 \u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7 \u03b5\u03ba\u03c4\u03bf\u03be\u03b5\u03cd\u03b5\u03c4\u03b1\u03b9 \u03c3\u03c4\u03b1 \u03cd\u03c8\u03b7, \u03bf\u03b9 \u03b5\u03c1\u03b3\u03b1\u03b6\u03cc\u03bc\u03b5\u03bd\u03bf\u03b9 \u03c0\u03b1\u03c3\u03c7\u03af\u03b6\u03bf\u03c5\u03bd \u03bd\u03b1 \u03c3\u03c5\u03bc\u03b2\u03b1\u03b4\u03af\u03c3\u03bf\u03c5\u03bd.\n\u0397 \u03b4\u03c5\u03c3\u03c7\u03b5\u03c1\u03ae\u03c2 \u03b1\u03c5\u03c4\u03ae \u03ba\u03b1\u03c4\u03ac\u03c3\u03c4\u03b1\u03c3\u03b7 \u03b8\u03b1 \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03c3\u03b5 \u03bd\u03b1 \u03c0\u03c1\u03bf\u03ba\u03b1\u03bb\u03ad\u03c3\u03b5\u03b9 \u03b1\u03ba\u03cc\u03bc\u03b7 \u03ba\u03b1\u03b9 \u03bc\u03b5\u03af\u03c9\u03c3\u03b7 \u03c4\u03c9\u03bd \u03c0\u03c9\u03bb\u03ae\u03c3\u03b5\u03c9\u03bd.\n\u0391\u03bb\u03bb\u03ac \u03c0\u03b5\u03c1\u03b9\u03bc\u03ad\u03bd\u03b5\u03c4\u03b5, \u03c5\u03c0\u03ac\u03c1\u03c7\u03b5\u03b9 \u03ad\u03bd\u03b1\u03c2 \u03b9\u03c0\u03c0\u03cc\u03c4\u03b7\u03c2 \u03bc\u03b5 \u03b1\u03c3\u03c4\u03c1\u03b1\u03c6\u03c4\u03b5\u03c1\u03ae \u03c0\u03b1\u03bd\u03bf\u03c0\u03bb\u03af\u03b1 \u03c0\u03bf\u03c5 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03c3\u03ce\u03c3\u03b5\u03b9 \u03c4\u03b7\u03bd \u03ba\u03b1\u03c4\u03ac\u03c3\u03c4\u03b1\u03c3\u03b7: \u03a4\u03b1 Cobots \u03c3\u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae!\n\u0391\u03bd\u03c5\u03c0\u03bf\u03bc\u03bf\u03bd\u03b5\u03af\u03c4\u03b5 \u03bd\u03b1 \u03b1\u03bd\u03b1\u03ba\u03b1\u03bb\u03cd\u03c8\u03b5\u03c4\u03b5 \u03c4\u03bf\u03bd \u03c4\u03c1\u03cc\u03c0\u03bf;\n\u03a0\u03c1\u03bf\u03c3\u03b4\u03b5\u03b8\u03b5\u03af\u03c4\u03b5!     <\/p>\n\n\n\t\t\t\t<div class=\"wp-block-uagb-table-of-contents uagb-toc__align-left uagb-toc__columns-1  uagb-block-3a340a96      \"\n\t\t\t\t\tdata-scroll= \"1\"\n\t\t\t\t\tdata-offset= \"30\"\n\t\t\t\t\tstyle=\"\"\n\t\t\t\t>\n\t\t\t\t<div class=\"uagb-toc__wrap\">\n\t\t\t\t\t\t<div class=\"uagb-toc__title\">\n\t\t\t\t\t\t\tTable Of Contents\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"uagb-toc__list-wrap \">\n\t\t\t\t\t\t<ol class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#tldr\" class=\"uagb-toc-link__trigger\">TL;DR<\/a><li class=\"uagb-toc__list\"><a href=\"#\u03bc\u03b9\u03b1-\u03bc\u03b1\u03c4\u03b9\u03ac-\u03c3\u03c4\u03bf\u03bd-\u03ba\u03cc\u03c3\u03bc\u03bf-\u03c4\u03c9\u03bd-cobots\" class=\"uagb-toc-link__trigger\">\u039c\u03b9\u03b1 \u03bc\u03b1\u03c4\u03b9\u03ac \u03c3\u03c4\u03bf\u03bd \u03ba\u03cc\u03c3\u03bc\u03bf \u03c4\u03c9\u03bd Cobots<\/a><li class=\"uagb-toc__list\"><a href=\"#\u03b7-\u03b5\u03c6\u03b5\u03c5\u03c1\u03b5\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1-\u03c0\u03af\u03c3\u03c9-\u03b1\u03c0\u03cc-\u03c4\u03b1-cobots-\u03c3\u03c4\u03b7-\u03bc\u03b5\u03c4\u03b1\u03c0\u03bf\u03af\u03b7\u03c3\u03b7\" class=\"uagb-toc-link__trigger\">\u0397 \u03b5\u03c6\u03b5\u03c5\u03c1\u03b5\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03af\u03c3\u03c9 \u03b1\u03c0\u03cc \u03c4\u03b1 Cobots \u03c3\u03c4\u03b7 \u03bc\u03b5\u03c4\u03b1\u03c0\u03bf\u03af\u03b7\u03c3\u03b7<\/a><li class=\"uagb-toc__list\"><a href=\"#\u03bf\u03ba\u03c4\u03ce-\u03bf\u03c6\u03ad\u03bb\u03b7-\u03c4\u03c9\u03bd-cobots-\u03c3\u03c4\u03b7-\u03bc\u03b5\u03c4\u03b1\u03c0\u03bf\u03af\u03b7\u03c3\u03b7\" class=\"uagb-toc-link__trigger\">\u039f\u03ba\u03c4\u03ce \u03bf\u03c6\u03ad\u03bb\u03b7 \u03c4\u03c9\u03bd Cobots \u03c3\u03c4\u03b7 \u03bc\u03b5\u03c4\u03b1\u03c0\u03bf\u03af\u03b7\u03c3\u03b7<\/a><li class=\"uagb-toc__list\"><a href=\"#\u03b1\u03bd\u03c4\u03b9\u03bc\u03b5\u03c4\u03ce\u03c0\u03b9\u03c3\u03b7-\u03c4\u03c9\u03bd-\u03bc\u03b5\u03b9\u03bf\u03bd\u03b5\u03ba\u03c4\u03b7\u03bc\u03ac\u03c4\u03c9\u03bd\" class=\"uagb-toc-link__trigger\">\u0391\u03bd\u03c4\u03b9\u03bc\u03b5\u03c4\u03ce\u03c0\u03b9\u03c3\u03b7 \u03c4\u03c9\u03bd \u03bc\u03b5\u03b9\u03bf\u03bd\u03b5\u03ba\u03c4\u03b7\u03bc\u03ac\u03c4\u03c9\u03bd<\/a><li class=\"uagb-toc__list\"><a href=\"#\u03bf-\u03b1\u03c0\u03cc\u03bb\u03c5\u03c4\u03bf\u03c2-\u03c3\u03c5\u03bd\u03b4\u03c5\u03b1\u03c3\u03bc\u03cc\u03c2-\u03b4\u03cd\u03bd\u03b1\u03bc\u03b7\u03c2-cobots-\u03ba\u03b1\u03b9-aps\" class=\"uagb-toc-link__trigger\">\u039f \u03b1\u03c0\u03cc\u03bb\u03c5\u03c4\u03bf\u03c2 \u03c3\u03c5\u03bd\u03b4\u03c5\u03b1\u03c3\u03bc\u03cc\u03c2 \u03b4\u03cd\u03bd\u03b1\u03bc\u03b7\u03c2: Cobots \u03ba\u03b1\u03b9 APS<\/a><li class=\"uagb-toc__list\"><a href=\"#\u03c3\u03c5\u03c7\u03bd\u03ad\u03c2-\u03b5\u03c1\u03c9\u03c4\u03ae\u03c3\u03b5\u03b9\u03c2\" class=\"uagb-toc-link__trigger\">\u03a3\u03c5\u03c7\u03bd\u03ad\u03c2 \u03b5\u03c1\u03c9\u03c4\u03ae\u03c3\u03b5\u03b9\u03c2<\/a><\/ol>\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\n\n\n<h2 class=\"gb-headline gb-headline-108f6efb gb-headline-text\">TL;DR<\/h2>\n\n\n\n<p>\u039c\u03b5 \u03c4\u03b7\u03bd \u03ad\u03bb\u03b5\u03c5\u03c3\u03b7 \u03c4\u03c9\u03bd Cobots \u03ae \u03c4\u03c9\u03bd \u03c3\u03c5\u03bd\u03b5\u03c1\u03b3\u03b1\u03c4\u03b9\u03ba\u03ce\u03bd \u03c1\u03bf\u03bc\u03c0\u03cc\u03c4, \u03c4\u03bf \u03c4\u03bf\u03c0\u03af\u03bf \u03c4\u03b7\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03b2\u03b9\u03ce\u03bd\u03b5\u03b9 \u03bc\u03b9\u03b1 \u03b5\u03c0\u03b1\u03bd\u03b1\u03c3\u03c4\u03b1\u03c4\u03b9\u03ba\u03ae \u03b1\u03bb\u03bb\u03b1\u03b3\u03ae.\n\u0391\u03c5\u03c4\u03cc \u03c4\u03bf \u03ac\u03c1\u03b8\u03c1\u03bf \u03b5\u03bc\u03b2\u03b1\u03b8\u03cd\u03bd\u03b5\u03b9 \u03c3\u03c4\u03bf\u03bd \u03c4\u03c1\u03cc\u03c0\u03bf \u03bc\u03b5 \u03c4\u03bf\u03bd \u03bf\u03c0\u03bf\u03af\u03bf \u03c4\u03b1 Cobots, \u03c3\u03c7\u03b5\u03b4\u03b9\u03b1\u03c3\u03bc\u03ad\u03bd\u03b1 \u03bd\u03b1 \u03b5\u03c1\u03b3\u03ac\u03b6\u03bf\u03bd\u03c4\u03b1\u03b9 \u03c7\u03ad\u03c1\u03b9-\u03c7\u03ad\u03c1\u03b9 \u03bc\u03b5 \u03c4\u03bf\u03c5\u03c2 \u03b1\u03bd\u03b8\u03c1\u03ce\u03c0\u03b9\u03bd\u03bf\u03c5\u03c2 \u03c7\u03b5\u03b9\u03c1\u03b9\u03c3\u03c4\u03ad\u03c2, \u03b5\u03be\u03bf\u03c1\u03b8\u03bf\u03bb\u03bf\u03b3\u03af\u03b6\u03bf\u03c5\u03bd \u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae, \u03b5\u03bd\u03b9\u03c3\u03c7\u03cd\u03bf\u03c5\u03bd \u03c4\u03b7\u03bd \u03b1\u03c3\u03c6\u03ac\u03bb\u03b5\u03b9\u03b1 \u03c3\u03c4\u03bf \u03c7\u03ce\u03c1\u03bf \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2 \u03ba\u03b1\u03b9 \u03b1\u03bd\u03bf\u03af\u03b3\u03bf\u03c5\u03bd \u03c4\u03bf \u03b4\u03c1\u03cc\u03bc\u03bf \u03b3\u03b9\u03b1 \u03c4\u03b7\u03bd \u03bf\u03c1\u03b3\u03b1\u03bd\u03c9\u03c4\u03b9\u03ba\u03ae \u03b1\u03bd\u03ac\u03c0\u03c4\u03c5\u03be\u03b7.\n\u0395\u03bc\u03c6\u03b1\u03bd\u03b9\u03b6\u03cc\u03bc\u03b5\u03bd\u03b5\u03c2 \u03c3\u03c4\u03b1 \u03bc\u03ad\u03c3\u03b1 \u03c4\u03b7\u03c2 \u03b4\u03b5\u03ba\u03b1\u03b5\u03c4\u03af\u03b1\u03c2 \u03c4\u03bf\u03c5 &#8217;90, \u03b1\u03c5\u03c4\u03ad\u03c2 \u03bf\u03b9 \u03ad\u03be\u03c5\u03c0\u03bd\u03b5\u03c2 \u03bc\u03b7\u03c7\u03b1\u03bd\u03ad\u03c2 \u03ad\u03c7\u03bf\u03c5\u03bd \u03b3\u03af\u03bd\u03b5\u03b9 \u03c0\u03bb\u03ad\u03bf\u03bd \u03c3\u03c5\u03bd\u03ce\u03bd\u03c5\u03bc\u03b5\u03c2 \u03bc\u03b5 \u03c4\u03b7 \u0392\u03b9\u03bf\u03bc\u03b7\u03c7\u03b1\u03bd\u03af\u03b1 4.0, <a href=\"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/%ce%b4%ce%b9%ce%b1%ce%b4%ce%af%ce%ba%cf%84%cf%85%ce%bf-%cf%84%cf%89%ce%bd-%cf%80%cf%81%ce%b1%ce%b3%ce%bc%ce%ac%cf%84%cf%89%ce%bd-%ce%b5%ce%bd%ce%b4%cf%85%ce%bd%ce%ac%ce%bc%cf%89%cf%83%ce%b7-%cf%84\/\">\u03c4\u03bf \u0394\u03b9\u03b1\u03b4\u03af\u03ba\u03c4\u03c5\u03bf \u03c4\u03c9\u03bd \u03c0\u03c1\u03b1\u03b3\u03bc\u03ac\u03c4\u03c9\u03bd<\/a> \u03ba\u03b1\u03b9 \u03c4\u03bf\u03bd \u03c3\u03cd\u03b3\u03c7\u03c1\u03bf\u03bd\u03bf \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc \u03c4\u03b7\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2.\n\u03a4\u03bf \u03ac\u03c1\u03b8\u03c1\u03bf \u03b5\u03c0\u03b9\u03c3\u03b7\u03bc\u03b1\u03af\u03bd\u03b5\u03b9 \u03b5\u03c0\u03af\u03c3\u03b7\u03c2 \u03c4\u03b9\u03c2 \u03c0\u03bf\u03bb\u03c5\u03ac\u03c1\u03b9\u03b8\u03bc\u03b5\u03c2 \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03b7\u03c3\u03b9\u03b1\u03ba\u03ad\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2 \u03c0\u03bf\u03c5 \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03bd\u03b1 \u03b5\u03ba\u03c4\u03b5\u03bb\u03ad\u03c3\u03bf\u03c5\u03bd \u03c4\u03b1 Cobots, \u03b1\u03c0\u03cc \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2 \u03c3\u03c5\u03bd\u03b1\u03c1\u03bc\u03bf\u03bb\u03cc\u03b3\u03b7\u03c3\u03b7\u03c2 \u03ad\u03c9\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03c4\u03b7\u03c1\u03b9\u03b1\u03ba\u03ad\u03c2 \u03b1\u03bd\u03b1\u03bb\u03cd\u03c3\u03b5\u03b9\u03c2, \u03ba\u03b1\u03b9 \u03c4\u03bf\u03bd \u03c4\u03c1\u03cc\u03c0\u03bf \u03bc\u03b5 \u03c4\u03bf\u03bd \u03bf\u03c0\u03bf\u03af\u03bf \u03c3\u03c5\u03bc\u03b2\u03ac\u03bb\u03bb\u03bf\u03c5\u03bd \u03c3\u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1.\n\u0395\u03c0\u03b9\u03c0\u03bb\u03ad\u03bf\u03bd, \u03c4\u03bf \u03ac\u03c1\u03b8\u03c1\u03bf \u03b4\u03b9\u03b5\u03c1\u03b5\u03c5\u03bd\u03ac \u03c4\u03b1 \u03b5\u03c0\u03b9\u03c4\u03b1\u03ba\u03c4\u03b9\u03ba\u03ac \u03bf\u03c6\u03ad\u03bb\u03b7 \u03c4\u03b7\u03c2 \u03c5\u03b9\u03bf\u03b8\u03ad\u03c4\u03b7\u03c3\u03b7\u03c2 \u03c4\u03c9\u03bd Cobots \u03c3\u03c4\u03b7 \u03c1\u03cd\u03b8\u03bc\u03b9\u03c3\u03b7 \u03c4\u03b7\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03ba\u03b1\u03b9 \u03bf\u03c1\u03b9\u03c3\u03bc\u03ad\u03bd\u03b5\u03c2 \u03c0\u03c1\u03bf\u03ba\u03bb\u03ae\u03c3\u03b5\u03b9\u03c2 \u03c0\u03bf\u03c5 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03b8\u03ad\u03c3\u03bf\u03c5\u03bd.\n\u039c\u03b9\u03b1 \u03bb\u03cd\u03c3\u03b7 \u03c3\u03b5 \u03b1\u03c5\u03c4\u03ad\u03c2 \u03c4\u03b9\u03c2 \u03c0\u03c1\u03bf\u03ba\u03bb\u03ae\u03c3\u03b5\u03b9\u03c2 \u03c0\u03b1\u03c1\u03bf\u03c5\u03c3\u03b9\u03ac\u03b6\u03b5\u03c4\u03b1\u03b9 \u03bc\u03b5 \u03c4\u03b7 \u03bc\u03bf\u03c1\u03c6\u03ae \u03c4\u03c9\u03bd \u03c3\u03c5\u03c3\u03c4\u03b7\u03bc\u03ac\u03c4\u03c9\u03bd \u03c0\u03c1\u03bf\u03b7\u03b3\u03bc\u03ad\u03bd\u03bf\u03c5 \u03c3\u03c7\u03b5\u03b4\u03b9\u03b1\u03c3\u03bc\u03bf\u03cd \u03ba\u03b1\u03b9 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03bf\u03cd (APS), \u03c4\u03b1 \u03bf\u03c0\u03bf\u03af\u03b1, \u03cc\u03c4\u03b1\u03bd \u03c3\u03c5\u03bd\u03b4\u03c5\u03ac\u03b6\u03bf\u03bd\u03c4\u03b1\u03b9 \u03bc\u03b5 \u03c4\u03b1 Cobots, \u03b5\u03c0\u03b9\u03c6\u03ad\u03c1\u03bf\u03c5\u03bd \u03bc\u03b9\u03b1 \u03bc\u03b5\u03c4\u03b1\u03c3\u03c7\u03b7\u03bc\u03b1\u03c4\u03b9\u03c3\u03c4\u03b9\u03ba\u03ae \u03b1\u03bb\u03bb\u03b1\u03b3\u03ae \u03c3\u03c4\u03bf\u03bd \u03ba\u03bb\u03ac\u03b4\u03bf \u03c4\u03b7\u03c2 \u03bc\u03b5\u03c4\u03b1\u03c0\u03bf\u03af\u03b7\u03c3\u03b7\u03c2.     <\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-28b4b93d gb-headline-text\">  \u039c\u03b9\u03b1 \u03bc\u03b1\u03c4\u03b9\u03ac \u03c3\u03c4\u03bf\u03bd \u03ba\u03cc\u03c3\u03bc\u03bf \u03c4\u03c9\u03bd Cobots<\/h2>\n\n\n<div class=\"gb-container gb-container-d42131b8\">\n<div class=\"gb-container gb-container-ce737323\"><div class=\"gb-inside-container\">\n\n<p><strong>\u03a4\u03b1 Cobots \u03b5\u03af\u03bd\u03b1\u03b9 \u03b5\u03be\u03b5\u03bb\u03b9\u03b3\u03bc\u03ad\u03bd\u03b5\u03c2 \u03bc\u03b7\u03c7\u03b1\u03bd\u03ad\u03c2 \u03c0\u03bf\u03c5 \u03ad\u03c7\u03bf\u03c5\u03bd \u03c3\u03c7\u03b5\u03b4\u03b9\u03b1\u03c3\u03c4\u03b5\u03af \u03b3\u03b9\u03b1 \u03bd\u03b1 \u03b5\u03bd\u03b9\u03c3\u03c7\u03cd\u03bf\u03c5\u03bd \u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1, \u03c4\u03b7\u03bd \u03b1\u03c3\u03c6\u03ac\u03bb\u03b5\u03b9\u03b1 \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03b1\u03bd\u03ac\u03c0\u03c4\u03c5\u03be\u03b7 \u03c3\u03c4\u03b9\u03c2 \u03b2\u03b9\u03bf\u03bc\u03b7\u03c7\u03b1\u03bd\u03af\u03b5\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03b5 \u03c3\u03c5\u03bd\u03b4\u03c5\u03b1\u03c3\u03bc\u03cc \u03bc\u03b5 \u03c4\u03bf\u03bd \u03ac\u03bd\u03b8\u03c1\u03c9\u03c0\u03bf.<\/strong><\/p>\n\n<\/div><\/div>\n\n\n<p>\u03a3\u03ba\u03b5\u03c6\u03c4\u03b5\u03af\u03c4\u03b5 \u03c4\u03bf\u03c5\u03c2 \u03c9\u03c2 \u03c4\u03bf\u03c5\u03c2 \u03ad\u03bc\u03c0\u03b9\u03c3\u03c4\u03bf\u03c5\u03c2 \u03b2\u03bf\u03b7\u03b8\u03bf\u03cd\u03c2 \u03c4\u03b7\u03c2 \u03b2\u03b9\u03bf\u03bc\u03b7\u03c7\u03b1\u03bd\u03af\u03b1\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2. <strong>\u03a3\u03c4\u03bf \u03c3\u03cd\u03bd\u03bf\u03bb\u03cc \u03c4\u03bf\u03c5\u03c2, \u03c4\u03b1 Cobots \u03c3\u03c4\u03b7 \u03bc\u03b5\u03c4\u03b1\u03c0\u03bf\u03af\u03b7\u03c3\u03b7 \u03b5\u03be\u03bf\u03c1\u03b8\u03bf\u03bb\u03bf\u03b3\u03af\u03b6\u03bf\u03c5\u03bd \u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae, \u03b1\u03c5\u03be\u03ac\u03bd\u03bf\u03c5\u03bd \u03c4\u03b7\u03bd \u03b1\u03c3\u03c6\u03ac\u03bb\u03b5\u03b9\u03b1 \u03c3\u03c4\u03bf \u03c7\u03ce\u03c1\u03bf \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2 \u03ba\u03b1\u03b9 \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03bf\u03cd\u03bd \u03c9\u03c2 \u03ba\u03b1\u03c4\u03b1\u03bb\u03cd\u03c4\u03b5\u03c2 \u03b3\u03b9\u03b1 \u03c4\u03b7\u03bd \u03bf\u03c1\u03b3\u03b1\u03bd\u03c9\u03c4\u03b9\u03ba\u03ae \u03b1\u03bd\u03ac\u03c0\u03c4\u03c5\u03be\u03b7.<\/strong> \u03a4\u03b1 Cobots \u03c3\u03b7\u03bc\u03b1\u03af\u03bd\u03bf\u03c5\u03bd<em>&#8220;\u03c3\u03c5\u03bd\u03b5\u03c1\u03b3\u03b1\u03c4\u03b9\u03ba\u03ac \u03c1\u03bf\u03bc\u03c0\u03cc\u03c4<\/em>&#8220;.  <br\/><br\/>\u0388\u03bd\u03b1 \u03c4\u03b1\u03be\u03af\u03b4\u03b9 \u03c3\u03c4\u03b7 \u03bc\u03bd\u03ae\u03bc\u03b7 \u03b1\u03c0\u03bf\u03ba\u03b1\u03bb\u03cd\u03c0\u03c4\u03b5\u03b9 \u03cc\u03c4\u03b9 \u03c4\u03b1 Cobots \u03ad\u03ba\u03b1\u03bd\u03b1\u03bd \u03c4\u03bf \u03bd\u03c4\u03b5\u03bc\u03c0\u03bf\u03cd\u03c4\u03bf \u03c4\u03bf\u03c5\u03c2 \u03c3\u03c4\u03b1 \u03bc\u03ad\u03c3\u03b1 \u03c4\u03b7\u03c2 \u03b4\u03b5\u03ba\u03b1\u03b5\u03c4\u03af\u03b1\u03c2 \u03c4\u03bf\u03c5 1990.\n\u0389\u03c4\u03b1\u03bd \u03c4\u03bf 1996 \u03cc\u03c4\u03b1\u03bd \u03bf\u03b9 \u03b5\u03c1\u03b5\u03c5\u03bd\u03b7\u03c4\u03ad\u03c2 Edward Colgate \u03ba\u03b1\u03b9 Michael Peshkin \u03b1\u03c0\u03cc \u03c4\u03bf \u03a0\u03b1\u03bd\u03b5\u03c0\u03b9\u03c3\u03c4\u03ae\u03bc\u03b9\u03bf Northwestern \u03b5\u03c0\u03b9\u03bd\u03cc\u03b7\u03c3\u03b1\u03bd \u03c4\u03bf\u03bd \u03cc\u03c1\u03bf &#8220;Cobot&#8221; \u03ba\u03b1\u03b9 \u03b4\u03b7\u03bc\u03b9\u03bf\u03cd\u03c1\u03b3\u03b7\u03c3\u03b1\u03bd \u03c4\u03b1 \u03c0\u03c1\u03ce\u03c4\u03b1 \u03c0\u03c1\u03c9\u03c4\u03cc\u03c4\u03c5\u03c0\u03b1.\n\u0391\u03c5\u03c4\u03bf\u03af \u03bf\u03b9 \u03c0\u03c1\u03c9\u03c4\u03bf\u03c0\u03cc\u03c1\u03bf\u03b9 \u03bf\u03c1\u03b1\u03bc\u03b1\u03c4\u03af\u03c3\u03c4\u03b7\u03ba\u03b1\u03bd \u03ad\u03bd\u03b1 \u03bc\u03ad\u03bb\u03bb\u03bf\u03bd \u03cc\u03c0\u03bf\u03c5 \u03c4\u03b1 \u03c1\u03bf\u03bc\u03c0\u03cc\u03c4 \u03b8\u03b1 \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03c3\u03b1\u03bd \u03bd\u03b1 \u03b5\u03c1\u03b3\u03ac\u03b6\u03bf\u03bd\u03c4\u03b1\u03b9 \u03bc\u03b1\u03b6\u03af \u03bc\u03b5 \u03c4\u03bf\u03c5\u03c2 \u03b1\u03bd\u03b8\u03c1\u03ce\u03c0\u03bf\u03c5\u03c2, \u03bc\u03bf\u03b9\u03c1\u03ac\u03b6\u03bf\u03bd\u03c4\u03b1\u03c2 \u03c7\u03ce\u03c1\u03bf\u03c5\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2 \u03ba\u03b1\u03b9 \u03ba\u03b1\u03b8\u03ae\u03ba\u03bf\u03bd\u03c4\u03b1.  <br\/><br\/>\u0388\u03bd\u03b1 \u03b4\u03b9\u03ac\u03c3\u03b7\u03bc\u03bf \u03c0\u03b1\u03c1\u03ac\u03b4\u03b5\u03b9\u03b3\u03bc\u03b1 \u03b5\u03bd\u03cc\u03c2 \u03c3\u03c5\u03bd\u03b5\u03c1\u03b3\u03b1\u03c4\u03b9\u03ba\u03bf\u03cd \u03c1\u03bf\u03bc\u03c0\u03cc\u03c4 \u03b5\u03af\u03bd\u03b1\u03b9 \u03c4\u03bf UR5 \u03c4\u03b7\u03c2 Universal Robots, \u03c4\u03bf \u03bf\u03c0\u03bf\u03af\u03bf \u03ba\u03ac\u03bd\u03b5\u03b9 \u03b8\u03c1\u03b1\u03cd\u03c3\u03b7 \u03c3\u03c4\u03b7 \u03bc\u03b5\u03c4\u03b1\u03c0\u03bf\u03af\u03b7\u03c3\u03b7.\n\u0395\u03c5\u03ba\u03af\u03bd\u03b7\u03c4\u03bf \u03c3\u03b1\u03bd \u03b3\u03c5\u03bc\u03bd\u03b1\u03c3\u03c4\u03ae\u03c2 \u03ba\u03b1\u03b9 \u03b1\u03ba\u03c1\u03b9\u03b2\u03ad\u03c2 \u03c3\u03b1\u03bd \u03c7\u03b5\u03b9\u03c1\u03bf\u03c5\u03c1\u03b3\u03cc\u03c2, \u03c4\u03bf UR5 \u03ad\u03c7\u03b5\u03b9 \u03c3\u03c7\u03b5\u03b4\u03b9\u03b1\u03c3\u03c4\u03b5\u03af \u03b3\u03b9\u03b1 \u03bd\u03b1 \u03c0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03cc\u03b6\u03b5\u03c4\u03b1\u03b9 \u03b1\u03c0\u03c1\u03cc\u03c3\u03ba\u03bf\u03c0\u03c4\u03b1 \u03c3\u03b5 \u03ad\u03bd\u03b1 \u03c0\u03bb\u03ae\u03b8\u03bf\u03c2 \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03b7\u03c3\u03b9\u03b1\u03ba\u03ce\u03bd \u03b5\u03c1\u03b3\u03b1\u03c3\u03b9\u03ce\u03bd.\n\u0391\u03c0\u03cc \u03c4\u03b7 \u03c3\u03c5\u03bd\u03b1\u03c1\u03bc\u03bf\u03bb\u03cc\u03b3\u03b7\u03c3\u03b7 \u03ad\u03c9\u03c2 \u03c4\u03b7 \u03c3\u03c5\u03c3\u03ba\u03b5\u03c5\u03b1\u03c3\u03af\u03b1, \u03c4\u03bf UR5 \u03c4\u03b1 \u03ba\u03ac\u03bd\u03b5\u03b9 \u03cc\u03bb\u03b1.\n\u0391\u03c5\u03c4\u03cc \u03c0\u03bf\u03c5 \u03ba\u03ac\u03bd\u03b5\u03b9 \u03c4\u03bf UR5 \u03bc\u03bf\u03bd\u03b1\u03b4\u03b9\u03ba\u03cc \u03b5\u03af\u03bd\u03b1\u03b9 \u03bf \u03b5\u03bb\u03b1\u03c6\u03c1\u03cd\u03c2 \u03c3\u03c7\u03b5\u03b4\u03b9\u03b1\u03c3\u03bc\u03cc\u03c2 \u03c4\u03bf\u03c5 \u03ba\u03b1\u03b9 \u03b7 \u03b9\u03ba\u03b1\u03bd\u03cc\u03c4\u03b7\u03c4\u03ac \u03c4\u03bf\u03c5 \u03bd\u03b1 \u03c7\u03b5\u03b9\u03c1\u03af\u03b6\u03b5\u03c4\u03b1\u03b9 \u03c6\u03bf\u03c1\u03c4\u03af\u03b1 \u03ad\u03c9\u03c2 5 kg.\n\u039f \u03b2\u03c1\u03b1\u03c7\u03af\u03bf\u03bd\u03b1\u03c2 \u03ad\u03be\u03b9 \u03b1\u03be\u03cc\u03bd\u03c9\u03bd \u03c4\u03bf\u03c5 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03c6\u03c4\u03ac\u03c3\u03b5\u03b9 \u03b1\u03b2\u03af\u03b1\u03c3\u03c4\u03b1 \u03b1\u03ba\u03cc\u03bc\u03b7 \u03ba\u03b1\u03b9 \u03c3\u03c4\u03b9\u03c2 \u03c0\u03b9\u03bf \u03b4\u03cd\u03c3\u03ba\u03bf\u03bb\u03b5\u03c2 \u03b3\u03c9\u03bd\u03af\u03b5\u03c2.    <br\/><br\/>\u0393\u03b9\u03b1 \u03c4\u03bf\u03c5\u03c2 \u03c3\u03c7\u03b5\u03b4\u03b9\u03b1\u03c3\u03c4\u03ad\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c0\u03bf\u03c5 \u03b5\u03c0\u03b9\u03b4\u03b9\u03ce\u03ba\u03bf\u03c5\u03bd \u03c4\u03b7\u03bd \u03b1\u03c5\u03c4\u03bf\u03bc\u03b1\u03c4\u03bf\u03c0\u03bf\u03af\u03b7\u03c3\u03b7 \u03ba\u03b1\u03b9 \u03c4\u03bf\u03bd \u03b5\u03be\u03bf\u03c1\u03b8\u03bf\u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03cc \u03c4\u03b7\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2, \u03b7 \u03b5\u03bd\u03c3\u03c9\u03bc\u03ac\u03c4\u03c9\u03c3\u03b7 \u03c4\u03bf\u03c5 UR5 \u03b5\u03af\u03bd\u03b1\u03b9 \u03c3\u03b1\u03bd \u03bd\u03b1 \u03c0\u03c1\u03bf\u03c3\u03bb\u03b1\u03bc\u03b2\u03ac\u03bd\u03b5\u03b9\u03c2 \u03ad\u03bd\u03b1\u03bd \u03c0\u03bf\u03bb\u03c5\u03c4\u03ac\u03bb\u03b1\u03bd\u03c4\u03bf \u03b4\u03b5\u03be\u03b9\u03bf\u03c4\u03ad\u03c7\u03bd\u03b7.\n\u0395\u03af\u03c4\u03b5 \u03b4\u03c1\u03b1\u03c3\u03c4\u03b7\u03c1\u03b9\u03bf\u03c0\u03bf\u03b9\u03b5\u03af\u03c3\u03c4\u03b5 \u03c3\u03c4\u03bf\u03bd \u03c4\u03bf\u03bc\u03ad\u03b1 \u03c4\u03c9\u03bd \u03b7\u03bb\u03b5\u03ba\u03c4\u03c1\u03bf\u03bd\u03b9\u03ba\u03ce\u03bd, \u03c4\u03b7\u03c2 \u03b1\u03c5\u03c4\u03bf\u03ba\u03b9\u03bd\u03b7\u03c4\u03bf\u03b2\u03b9\u03bf\u03bc\u03b7\u03c7\u03b1\u03bd\u03af\u03b1\u03c2 \u03ae \u03b1\u03ba\u03cc\u03bc\u03b7 \u03ba\u03b1\u03b9 \u03c4\u03b7\u03c2 \u03b2\u03b9\u03bf\u03bc\u03b7\u03c7\u03b1\u03bd\u03af\u03b1\u03c2 \u03c4\u03c1\u03bf\u03c6\u03af\u03bc\u03c9\u03bd \u03ba\u03b1\u03b9 \u03c0\u03bf\u03c4\u03ce\u03bd, \u03c4\u03bf UR5 \u03b5\u03af\u03bd\u03b1\u03b9 \u03cc\u03c3\u03bf \u03c0\u03b9\u03bf \u03b5\u03c5\u03ad\u03bb\u03b9\u03ba\u03c4\u03bf \u03b3\u03af\u03bd\u03b5\u03c4\u03b1\u03b9.\n\u0397 \u03b5\u03bd\u03c3\u03c9\u03bc\u03ac\u03c4\u03c9\u03c3\u03b7 \u03c4\u03bf\u03c5 UR5 \u03bc\u03b5 \u03c4\u03bf \u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03b9\u03ba\u03cc APS \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03bc\u03b5\u03c4\u03b1\u03c4\u03c1\u03ad\u03c8\u03b5\u03b9 \u03c4\u03b7 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03b1\u03c2 \u03c3\u03b5 \u03bc\u03b9\u03b1 \u03b5\u03c0\u03b9\u03c4\u03bf\u03bc\u03ae \u03c4\u03b7\u03c2 \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03b7\u03c2 \u03b1\u03ba\u03c1\u03af\u03b2\u03b5\u03b9\u03b1\u03c2.\n\u0391\u03c5\u03c4\u03cc \u03c4\u03bf \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc \u03b4\u03af\u03b4\u03c5\u03bc\u03bf \u03c4\u03bf\u03c5 UR5 \u03ba\u03b1\u03b9 \u03c4\u03bf\u03c5 \u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03b9\u03ba\u03bf\u03cd APS \u03b4\u03b5\u03bd \u03b5\u03af\u03bd\u03b1\u03b9 \u03b1\u03c0\u03bb\u03ce\u03c2 \u03bc\u03b9\u03b1 \u03c3\u03bf\u03c6\u03ae \u03b5\u03c0\u03ad\u03bd\u03b4\u03c5\u03c3\u03b7, \u03b1\u03bb\u03bb\u03ac \u03ad\u03bd\u03b1 \u03b5\u03b9\u03c3\u03b9\u03c4\u03ae\u03c1\u03b9\u03bf \u03b3\u03b9\u03b1 \u03c4\u03b7\u03bd \u03b5\u03ba\u03c4\u03cc\u03be\u03b5\u03c5\u03c3\u03b7 \u03c4\u03b7\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03b1\u03cd\u03be\u03b7\u03c3\u03b7 \u03c4\u03c9\u03bd \u03c0\u03c9\u03bb\u03ae\u03c3\u03b5\u03c9\u03bd.   <\/p>\n\n\n\n<h3 class=\"gb-headline gb-headline-5f4194dd gb-headline-text\">Cobots \u03b5\u03bd\u03b1\u03bd\u03c4\u03af\u03bf\u03bd \u03c1\u03bf\u03bc\u03c0\u03cc\u03c4: \u03a4\u03bf \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc \u03b4\u03af\u03b4\u03c5\u03bc\u03bf<\/h3>\n\n\n\n<p>\u0391\u03bb\u03bb\u03ac \u03c0\u03b5\u03c1\u03b9\u03bc\u03ad\u03bd\u03b5\u03c4\u03b5!\n\u03a4\u03b1 \u03c1\u03bf\u03bc\u03c0\u03cc\u03c4 \u03c5\u03c0\u03ac\u03c1\u03c7\u03bf\u03c5\u03bd \u03c3\u03c4\u03b7 \u03b2\u03b9\u03bf\u03bc\u03b7\u03c7\u03b1\u03bd\u03af\u03b1 \u03b5\u03b4\u03ce \u03ba\u03b1\u03b9 \u03b1\u03c1\u03ba\u03b5\u03c4\u03cc \u03ba\u03b1\u03b9\u03c1\u03cc, \u03c3\u03c9\u03c3\u03c4\u03ac;\n\u03a0\u03c1\u03ac\u03b3\u03bc\u03b1\u03c4\u03b9, \u03b1\u03bb\u03bb\u03ac \u03c5\u03c0\u03ac\u03c1\u03c7\u03b5\u03b9 \u03bc\u03b9\u03b1 \u03b1\u03bd\u03b1\u03c4\u03c1\u03bf\u03c0\u03ae.  <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-1aad77a0 gb-headline-text\">\u03a4\u03b9 \u03c4\u03bf\u03c5\u03c2 \u03ba\u03ac\u03bd\u03b5\u03b9 \u03bd\u03b1 \u03be\u03b5\u03c7\u03c9\u03c1\u03af\u03b6\u03bf\u03c5\u03bd;<\/h4>\n\n\n\n<p>\u03a4\u03b1 \u03c1\u03bf\u03bc\u03c0\u03cc\u03c4 \u03b5\u03af\u03bd\u03b1\u03b9 \u03b1\u03c5\u03c4\u03cc\u03bd\u03bf\u03bc\u03b1.\n\u0395\u03af\u03bd\u03b1\u03b9 \u03ba\u03b1\u03bb\u03ac \u03c3\u03c4\u03b7\u03bd \u03b1\u03c0\u03bf\u03c4\u03b5\u03bb\u03b5\u03c3\u03bc\u03b1\u03c4\u03b9\u03ba\u03ae \u03b5\u03ba\u03c4\u03ad\u03bb\u03b5\u03c3\u03b7 \u03c0\u03c1\u03bf\u03ba\u03b1\u03b8\u03bf\u03c1\u03b9\u03c3\u03bc\u03ad\u03bd\u03c9\u03bd \u03ba\u03b1\u03b8\u03b7\u03ba\u03cc\u03bd\u03c4\u03c9\u03bd, \u03b1\u03bb\u03bb\u03ac \u03b4\u03b5\u03bd \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03bd\u03b1 \u03c0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03bf\u03c3\u03c4\u03bf\u03cd\u03bd \u03c3\u03b5 \u03b1\u03bb\u03bb\u03b1\u03b3\u03ad\u03c2 \u03c7\u03c9\u03c1\u03af\u03c2 \u03c4\u03c1\u03bf\u03c0\u03bf\u03c0\u03bf\u03b9\u03ae\u03c3\u03b5\u03b9\u03c2 \u03c3\u03c4\u03bf\u03bd \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc.\n\u03a4\u03b1 Cobots, \u03b1\u03c0\u03cc \u03c4\u03b7\u03bd \u03ac\u03bb\u03bb\u03b7 \u03c0\u03bb\u03b5\u03c5\u03c1\u03ac, \u03b5\u03af\u03bd\u03b1\u03b9 \u03b5\u03c5\u03ad\u03bb\u03b9\u03ba\u03c4\u03b1.\n\u039c\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03b5\u03cd\u03ba\u03bf\u03bb\u03b1 \u03bd\u03b1 \u03b5\u03c0\u03b1\u03bd\u03b1\u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03c4\u03bf\u03cd\u03bd \u03ba\u03b1\u03b9 \u03bd\u03b1 \u03c0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03bf\u03c3\u03c4\u03bf\u03cd\u03bd \u03ce\u03c3\u03c4\u03b5 \u03bd\u03b1 \u03b1\u03bd\u03c4\u03b1\u03c0\u03bf\u03ba\u03c1\u03b9\u03b8\u03bf\u03cd\u03bd \u03c3\u03b5 \u03bd\u03ad\u03b5\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2.\n\u0395\u03ba\u03c4\u03cc\u03c2 \u03b1\u03c5\u03c4\u03bf\u03cd, \u03c4\u03b1 \u03c3\u03c5\u03bd\u03b5\u03c1\u03b3\u03b1\u03c4\u03b9\u03ba\u03ac \u03c1\u03bf\u03bc\u03c0\u03cc\u03c4 \u03b4\u03b9\u03b1\u03b8\u03ad\u03c4\u03bf\u03c5\u03bd \u03b1\u03b9\u03c3\u03b8\u03b7\u03c4\u03ae\u03c1\u03b5\u03c2 \u03c0\u03bf\u03c5 \u03c4\u03bf\u03c5\u03c2 \u03b5\u03c0\u03b9\u03c4\u03c1\u03ad\u03c0\u03bf\u03c5\u03bd \u03bd\u03b1 \u03b1\u03bd\u03c4\u03b9\u03bb\u03b1\u03bc\u03b2\u03ac\u03bd\u03bf\u03bd\u03c4\u03b1\u03b9 \u03c4\u03b7\u03bd \u03b1\u03bd\u03b8\u03c1\u03ce\u03c0\u03b9\u03bd\u03b7 \u03c0\u03b1\u03c1\u03bf\u03c5\u03c3\u03af\u03b1 \u03ba\u03b1\u03b9 \u03bd\u03b1 \u03b5\u03c1\u03b3\u03ac\u03b6\u03bf\u03bd\u03c4\u03b1\u03b9 \u03bc\u03b5 \u03b1\u03c3\u03c6\u03ac\u03bb\u03b5\u03b9\u03b1 \u03b4\u03af\u03c0\u03bb\u03b1 \u03c4\u03bf\u03c5\u03c2.\n\u03a4\u03b1 \u03c1\u03bf\u03bc\u03c0\u03cc\u03c4 \u03b4\u03b5\u03bd \u03b4\u03b9\u03b1\u03b8\u03ad\u03c4\u03bf\u03c5\u03bd \u03c4\u03ad\u03c4\u03bf\u03b9\u03b1 \u03b4\u03b9\u03b1\u03b9\u03c3\u03b8\u03b7\u03c4\u03b9\u03ba\u03ac \u03c7\u03b1\u03c1\u03b1\u03ba\u03c4\u03b7\u03c1\u03b9\u03c3\u03c4\u03b9\u03ba\u03ac.     <\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-57c2bbb8 gb-headline-text\">\u0397 \u03b5\u03c6\u03b5\u03c5\u03c1\u03b5\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03af\u03c3\u03c9 \u03b1\u03c0\u03cc \u03c4\u03b1 Cobots \u03c3\u03c4\u03b7 \u03bc\u03b5\u03c4\u03b1\u03c0\u03bf\u03af\u03b7\u03c3\u03b7<\/h2>\n\n\n\n<p>\u03a0\u03ce\u03c2 \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03bf\u03cd\u03bd \u03bb\u03bf\u03b9\u03c0\u03cc\u03bd \u03b1\u03c5\u03c4\u03ac \u03c4\u03b1 \u03c3\u03cd\u03b3\u03c7\u03c1\u03bf\u03bd\u03b1 \u03b8\u03b1\u03cd\u03bc\u03b1\u03c4\u03b1;\n\u03a4\u03b1 Cobots \u03c7\u03c1\u03b7\u03c3\u03b9\u03bc\u03bf\u03c0\u03bf\u03b9\u03bf\u03cd\u03bd \u03c0\u03c1\u03bf\u03b7\u03b3\u03bc\u03ad\u03bd\u03bf\u03c5\u03c2 \u03b1\u03bb\u03b3\u03bf\u03c1\u03af\u03b8\u03bc\u03bf\u03c5\u03c2 \u03ba\u03b1\u03b9 \u03b1\u03b9\u03c3\u03b8\u03b7\u03c4\u03ae\u03c1\u03b5\u03c2 \u03b3\u03b9\u03b1 \u03bd\u03b1 \u03c0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03cc\u03b6\u03bf\u03bd\u03c4\u03b1\u03b9 \u03c3\u03c4\u03bf \u03c0\u03b5\u03c1\u03b9\u03b2\u03ac\u03bb\u03bb\u03bf\u03bd \u03c4\u03bf\u03c5\u03c2.\n\u039c\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03bd\u03b1 \u03b5\u03ba\u03c4\u03b5\u03bb\u03bf\u03cd\u03bd \u03b4\u03b9\u03ac\u03c6\u03bf\u03c1\u03b5\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03b1 Cobots \u03b4\u03b9\u03b1\u03b8\u03ad\u03c4\u03bf\u03c5\u03bd \u03c6\u03b9\u03bb\u03b9\u03ba\u03ad\u03c2 \u03c0\u03c1\u03bf\u03c2 \u03c4\u03bf\u03bd \u03c7\u03c1\u03ae\u03c3\u03c4\u03b7 \u03b4\u03b9\u03b5\u03c0\u03b1\u03c6\u03ad\u03c2, \u03ba\u03b1\u03b8\u03b9\u03c3\u03c4\u03ce\u03bd\u03c4\u03b1\u03c2 \u03b5\u03c5\u03ba\u03bf\u03bb\u03cc\u03c4\u03b5\u03c1\u03bf \u03c4\u03bf\u03bd \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc \u03ba\u03b1\u03b9 \u03c4\u03bf\u03bd \u03ad\u03bb\u03b5\u03b3\u03c7\u03cc \u03c4\u03bf\u03c5\u03c2 \u03c3\u03b5 \u03c3\u03cd\u03b3\u03ba\u03c1\u03b9\u03c3\u03b7 \u03bc\u03b5 \u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b4\u03bf\u03c3\u03b9\u03b1\u03ba\u03ac \u03c1\u03bf\u03bc\u03c0\u03cc\u03c4.\n\u0395\u03b4\u03ce \u03b5\u03af\u03bd\u03b1\u03b9 \u03bc\u03b5\u03c1\u03b9\u03ba\u03ac \u03b1\u03c0\u03cc \u03b1\u03c5\u03c4\u03ac:   <\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>\u0395\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2 \u03c3\u03c5\u03bd\u03b1\u03c1\u03bc\u03bf\u03bb\u03cc\u03b3\u03b7\u03c3\u03b7\u03c2<\/strong>: \u03a4\u03b1 Cobots \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03bd\u03b1 \u03b5\u03ba\u03c4\u03b5\u03bb\u03bf\u03cd\u03bd \u03bc\u03b5 \u03b1\u03ba\u03c1\u03af\u03b2\u03b5\u03b9\u03b1 \u03c0\u03b5\u03c1\u03af\u03c0\u03bb\u03bf\u03ba\u03b5\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2 \u03c3\u03c5\u03bd\u03b1\u03c1\u03bc\u03bf\u03bb\u03cc\u03b3\u03b7\u03c3\u03b7\u03c2, \u03bf\u03b9 \u03bf\u03c0\u03bf\u03af\u03b5\u03c2 \u03b5\u03af\u03bd\u03b1\u03b9 \u03c3\u03c5\u03c7\u03bd\u03ac \u03ba\u03bf\u03c5\u03c1\u03b1\u03c3\u03c4\u03b9\u03ba\u03ad\u03c2 \u03ba\u03b1\u03b9 \u03b5\u03c0\u03b1\u03bd\u03b1\u03bb\u03b1\u03bc\u03b2\u03b1\u03bd\u03cc\u03bc\u03b5\u03bd\u03b5\u03c2 \u03b3\u03b9\u03b1 \u03c4\u03bf\u03c5\u03c2 \u03b1\u03bd\u03b8\u03c1\u03ce\u03c0\u03b9\u03bd\u03bf\u03c5\u03c2 \u03b5\u03c1\u03b3\u03b1\u03b6\u03cc\u03bc\u03b5\u03bd\u03bf\u03c5\u03c2.\n\u0391\u03c0\u03cc \u03bc\u03b9\u03ba\u03c1\u03ac \u03b5\u03be\u03b1\u03c1\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1 \u03c3\u03c4\u03b1 \u03b7\u03bb\u03b5\u03ba\u03c4\u03c1\u03bf\u03bd\u03b9\u03ba\u03ac \u03bc\u03ad\u03c7\u03c1\u03b9 \u03c0\u03b9\u03bf \u03b5\u03be\u03ad\u03c7\u03bf\u03bd\u03c4\u03b1 \u03b5\u03be\u03b1\u03c1\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1 \u03c3\u03c4\u03b7\u03bd \u03b1\u03c5\u03c4\u03bf\u03ba\u03b9\u03bd\u03b7\u03c4\u03bf\u03b2\u03b9\u03bf\u03bc\u03b7\u03c7\u03b1\u03bd\u03af\u03b1, \u03b5\u03af\u03bd\u03b1\u03b9 \u03b9\u03ba\u03b1\u03bd\u03ac \u03bd\u03b1 \u03c7\u03b5\u03b9\u03c1\u03af\u03b6\u03bf\u03bd\u03c4\u03b1\u03b9 \u03b4\u03b9\u03ac\u03c6\u03bf\u03c1\u03b5\u03c2 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b5\u03c2 \u03c3\u03c5\u03bd\u03b1\u03c1\u03bc\u03bf\u03bb\u03cc\u03b3\u03b7\u03c3\u03b7\u03c2. <\/li>\n\n\n\n<li><strong>\u03a6\u03c1\u03bf\u03bd\u03c4\u03af\u03b4\u03b1 \u03bc\u03b7\u03c7\u03b1\u03bd\u03b7\u03bc\u03ac\u03c4\u03c9\u03bd<\/strong>: Cobots \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03bd\u03b1 \u03c6\u03bf\u03c1\u03c4\u03ce\u03bd\u03bf\u03c5\u03bd \u03ba\u03b1\u03b9 \u03bd\u03b1 \u03be\u03b5\u03c6\u03bf\u03c1\u03c4\u03ce\u03bd\u03bf\u03c5\u03bd \u03bc\u03b7\u03c7\u03b1\u03bd\u03ae\u03bc\u03b1\u03c4\u03b1, \u03cc\u03c0\u03c9\u03c2 \u03bc\u03b7\u03c7\u03b1\u03bd\u03ad\u03c2 CNC.\n\u0394\u03b9\u03b1\u03c7\u03b5\u03b9\u03c1\u03af\u03b6\u03bf\u03bd\u03c4\u03b1\u03b9 \u03b1\u03c0\u03bf\u03c4\u03b5\u03bb\u03b5\u03c3\u03bc\u03b1\u03c4\u03b9\u03ba\u03ac \u03b1\u03c5\u03c4\u03ad\u03c2 \u03c4\u03b9\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2, \u03b5\u03c0\u03b9\u03c4\u03c1\u03ad\u03c0\u03bf\u03bd\u03c4\u03b1\u03c2 \u03c3\u03c4\u03bf\u03c5\u03c2 \u03b1\u03bd\u03b8\u03c1\u03ce\u03c0\u03b9\u03bd\u03bf\u03c5\u03c2 \u03b5\u03c1\u03b3\u03b1\u03b6\u03cc\u03bc\u03b5\u03bd\u03bf\u03c5\u03c2 \u03bd\u03b1 \u03b5\u03c0\u03b9\u03ba\u03b5\u03bd\u03c4\u03c1\u03c9\u03b8\u03bf\u03cd\u03bd \u03c3\u03b5 \u03c0\u03b9\u03bf \u03c3\u03cd\u03bd\u03b8\u03b5\u03c4\u03b5\u03c2 \u03b1\u03c1\u03bc\u03bf\u03b4\u03b9\u03cc\u03c4\u03b7\u03c4\u03b5\u03c2. <\/li>\n\n\n\n<li><strong>\u0394\u03b9\u03b1\u03bb\u03ad\u03be\u03c4\u03b5 \u03ba\u03b1\u03b9 \u03c4\u03bf\u03c0\u03bf\u03b8\u03b5\u03c4\u03ae\u03c3\u03c4\u03b5<\/strong>: \u0391\u03c5\u03c4\u03cc \u03c0\u03b5\u03c1\u03b9\u03bb\u03b1\u03bc\u03b2\u03ac\u03bd\u03b5\u03b9 \u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03bb\u03b1\u03b2\u03ae \u03b5\u03be\u03b1\u03c1\u03c4\u03b7\u03bc\u03ac\u03c4\u03c9\u03bd \u03ae \u03b5\u03c1\u03b3\u03b1\u03bb\u03b5\u03af\u03c9\u03bd \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03c4\u03bf\u03c0\u03bf\u03b8\u03ad\u03c4\u03b7\u03c3\u03ae \u03c4\u03bf\u03c5\u03c2 \u03c3\u03b5 \u03ba\u03b1\u03b8\u03bf\u03c1\u03b9\u03c3\u03bc\u03ad\u03bd\u03b5\u03c2 \u03b8\u03ad\u03c3\u03b5\u03b9\u03c2.\n\u03a4\u03b1 Cobots \u03b5\u03af\u03bd\u03b1\u03b9 \u03b9\u03b4\u03b9\u03b1\u03af\u03c4\u03b5\u03c1\u03b1 \u03c7\u03c1\u03ae\u03c3\u03b9\u03bc\u03b1 \u03c3\u03b5 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2 \u03b4\u03b9\u03b1\u03bb\u03bf\u03b3\u03ae\u03c2, \u03c3\u03c5\u03c3\u03ba\u03b5\u03c5\u03b1\u03c3\u03af\u03b1\u03c2 \u03ba\u03b1\u03b9 \u03bf\u03c1\u03b3\u03ac\u03bd\u03c9\u03c3\u03b7\u03c2 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ce\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2. <\/li>\n\n\n\n<li><strong>\u0395\u03c0\u03b9\u03b8\u03b5\u03ce\u03c1\u03b7\u03c3\u03b7 \u03c0\u03bf\u03b9\u03cc\u03c4\u03b7\u03c4\u03b1\u03c2<\/strong>: Cobots \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03bd\u03b1 \u03b4\u03b9\u03b5\u03be\u03ac\u03b3\u03bf\u03c5\u03bd \u03c0\u03bf\u03b9\u03bf\u03c4\u03b9\u03ba\u03ad\u03c2 \u03b5\u03c0\u03b9\u03b8\u03b5\u03c9\u03c1\u03ae\u03c3\u03b5\u03b9\u03c2.\n\u039c\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03bd\u03b1 \u03b5\u03bb\u03ad\u03b3\u03c7\u03bf\u03c5\u03bd \u03b3\u03b9\u03b1 \u03b5\u03bb\u03b1\u03c4\u03c4\u03ce\u03bc\u03b1\u03c4\u03b1 \u03ae \u03b1\u03bd\u03c9\u03bc\u03b1\u03bb\u03af\u03b5\u03c2 \u03c4\u03bf\u03c5 \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03bf\u03c2, \u03b4\u03b9\u03b1\u03c3\u03c6\u03b1\u03bb\u03af\u03b6\u03bf\u03bd\u03c4\u03b1\u03c2 \u03cc\u03c4\u03b9 \u03bc\u03cc\u03bd\u03bf \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03b1 \u03c5\u03c8\u03b7\u03bb\u03ae\u03c2 \u03c0\u03bf\u03b9\u03cc\u03c4\u03b7\u03c4\u03b1\u03c2 \u03c0\u03b5\u03c1\u03bd\u03bf\u03cd\u03bd \u03b1\u03c0\u03cc \u03c4\u03b7 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2. <\/li>\n\n\n\n<li><strong>\u03a3\u03c5\u03b3\u03ba\u03cc\u03bb\u03bb\u03b7\u03c3\u03b7<\/strong>: \u03a4\u03b1 Cobots \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03bd\u03b1 \u03b5\u03ba\u03c4\u03b5\u03bb\u03bf\u03cd\u03bd \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2 \u03c3\u03c5\u03b3\u03ba\u03cc\u03bb\u03bb\u03b7\u03c3\u03b7\u03c2 \u03c0\u03bf\u03c5 \u03b5\u03af\u03bd\u03b1\u03b9 \u03c3\u03c5\u03c7\u03bd\u03ac \u03b5\u03c0\u03b9\u03ba\u03af\u03bd\u03b4\u03c5\u03bd\u03b5\u03c2 \u03b3\u03b9\u03b1 \u03c4\u03bf\u03c5\u03c2 \u03b1\u03bd\u03b8\u03c1\u03ce\u03c0\u03b9\u03bd\u03bf\u03c5\u03c2 \u03b5\u03c1\u03b3\u03b1\u03b6\u03cc\u03bc\u03b5\u03bd\u03bf\u03c5\u03c2 \u03bb\u03cc\u03b3\u03c9 \u03c4\u03c9\u03bd \u03c3\u03c0\u03b9\u03bd\u03b8\u03ae\u03c1\u03c9\u03bd, \u03c4\u03c9\u03bd \u03b1\u03bd\u03b1\u03b8\u03c5\u03bc\u03b9\u03ac\u03c3\u03b5\u03c9\u03bd \u03ba\u03b1\u03b9 \u03c4\u03c9\u03bd \u03c5\u03bb\u03b9\u03ba\u03ce\u03bd \u03c0\u03bf\u03c5 \u03b5\u03bc\u03c0\u03bb\u03ad\u03ba\u03bf\u03bd\u03c4\u03b1\u03b9.<\/li>\n\n\n\n<li><strong>\u039a\u03cc\u03bb\u03bb\u03b7\u03c3\u03b7 \u03ba\u03b1\u03b9 \u03b2\u03b1\u03c6\u03ae<\/strong>: \u039c\u03b5 \u03ac\u03c8\u03bf\u03b3\u03b7 \u03b1\u03ba\u03c1\u03af\u03b2\u03b5\u03b9\u03b1, \u03c4\u03b1 \u03c3\u03c5\u03bd\u03b5\u03c1\u03b3\u03b1\u03b6\u03cc\u03bc\u03b5\u03bd\u03b1 \u03c1\u03bf\u03bc\u03c0\u03cc\u03c4 \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03bd\u03b1 \u03b5\u03c6\u03b1\u03c1\u03bc\u03cc\u03b6\u03bf\u03c5\u03bd \u03ba\u03cc\u03bb\u03bb\u03b1 \u03ae \u03bc\u03c0\u03bf\u03b3\u03b9\u03ac \u03c3\u03c4\u03b1 \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03b1.\n\u0391\u03c5\u03c4\u03cc \u03b5\u03af\u03bd\u03b1\u03b9 \u03b9\u03b4\u03b9\u03b1\u03af\u03c4\u03b5\u03c1\u03b1 \u03c7\u03c1\u03ae\u03c3\u03b9\u03bc\u03bf \u03c3\u03c4\u03b7\u03bd \u03b1\u03c5\u03c4\u03bf\u03ba\u03b9\u03bd\u03b7\u03c4\u03bf\u03b2\u03b9\u03bf\u03bc\u03b7\u03c7\u03b1\u03bd\u03af\u03b1 \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03b1\u03b5\u03c1\u03bf\u03b4\u03b9\u03b1\u03c3\u03c4\u03b7\u03bc\u03b9\u03ba\u03ae \u03b2\u03b9\u03bf\u03bc\u03b7\u03c7\u03b1\u03bd\u03af\u03b1, \u03cc\u03c0\u03bf\u03c5 \u03b7 \u03b2\u03b1\u03c6\u03ae \u03b1\u03ba\u03c1\u03b9\u03b2\u03b5\u03af\u03b1\u03c2 \u03b5\u03af\u03bd\u03b1\u03b9 \u03ba\u03c1\u03af\u03c3\u03b9\u03bc\u03b7. <\/li>\n\n\n\n<li><strong>\u03a7\u03b5\u03b9\u03c1\u03b9\u03c3\u03bc\u03cc\u03c2 \u03c5\u03bb\u03b9\u03ba\u03ce\u03bd<\/strong>: Cobots \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03bd\u03b1 \u03bc\u03b5\u03c4\u03b1\u03ba\u03b9\u03bd\u03bf\u03cd\u03bd \u03c5\u03bb\u03b9\u03ba\u03ac \u03bc\u03b5\u03c4\u03b1\u03be\u03cd \u03b4\u03b9\u03b1\u03c6\u03bf\u03c1\u03b5\u03c4\u03b9\u03ba\u03ce\u03bd \u03c4\u03bc\u03b7\u03bc\u03ac\u03c4\u03c9\u03bd \u03c4\u03b7\u03c2 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ae\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2.\n\u0391\u03bd \u03ba\u03b1\u03b9 \u03b7 \u03c7\u03c9\u03c1\u03b7\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03ac \u03c4\u03bf\u03c5\u03c2 \u03c3\u03b5 \u03c6\u03bf\u03c1\u03c4\u03af\u03bf \u03b5\u03af\u03bd\u03b1\u03b9 \u03c0\u03b5\u03c1\u03b9\u03bf\u03c1\u03b9\u03c3\u03bc\u03ad\u03bd\u03b7 \u03c3\u03b5 \u03c3\u03cd\u03b3\u03ba\u03c1\u03b9\u03c3\u03b7 \u03bc\u03b5 \u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b4\u03bf\u03c3\u03b9\u03b1\u03ba\u03ac \u03c1\u03bf\u03bc\u03c0\u03cc\u03c4, \u03b5\u03af\u03bd\u03b1\u03b9 \u03b9\u03b4\u03b9\u03b1\u03af\u03c4\u03b5\u03c1\u03b1 \u03b1\u03c0\u03bf\u03c4\u03b5\u03bb\u03b5\u03c3\u03bc\u03b1\u03c4\u03b9\u03ba\u03ac \u03b3\u03b9\u03b1 \u03c4\u03bf \u03c7\u03b5\u03b9\u03c1\u03b9\u03c3\u03bc\u03cc \u03bc\u03b9\u03ba\u03c1\u03cc\u03c4\u03b5\u03c1\u03c9\u03bd \u03c5\u03bb\u03b9\u03ba\u03ce\u03bd. <\/li>\n\n\n\n<li><strong>\u03a3\u03c4\u03af\u03bb\u03b2\u03c9\u03c3\u03b7 \u03ba\u03b1\u03b9 \u03b1\u03c0\u03bf\u03be\u03b5\u03af\u03b4\u03c9\u03c3\u03b7<\/strong>: \u0393\u03b9\u03b1 \u03c4\u03b7\u03bd \u03ba\u03b1\u03c4\u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1 \u03bc\u03b5\u03c4\u03ac\u03bb\u03bb\u03c9\u03bd \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03ba\u03b1\u03c4\u03b1\u03c3\u03ba\u03b5\u03c5\u03ae, \u03c4\u03b1 Cobots \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03bd\u03b1 \u03b5\u03ba\u03c4\u03b5\u03bb\u03bf\u03cd\u03bd \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2 \u03cc\u03c0\u03c9\u03c2 \u03b7 \u03c3\u03c4\u03af\u03bb\u03b2\u03c9\u03c3\u03b7 \u03ba\u03b1\u03b9 \u03b7 \u03b1\u03c0\u03bf\u03b3\u03cd\u03bc\u03bd\u03c9\u03c3\u03b7 \u03b3\u03b9\u03b1 \u03bd\u03b1 \u03b4\u03b9\u03b1\u03c3\u03c6\u03b1\u03bb\u03af\u03c3\u03bf\u03c5\u03bd \u03cc\u03c4\u03b9 \u03c4\u03b1 \u03c4\u03b5\u03bb\u03b9\u03ba\u03ac \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03b1 \u03b5\u03af\u03bd\u03b1\u03b9 \u03bb\u03b5\u03af\u03b1 \u03ba\u03b1\u03b9 \u03c7\u03c9\u03c1\u03af\u03c2 \u03b1\u03b9\u03c7\u03bc\u03b7\u03c1\u03ad\u03c2 \u03b1\u03ba\u03bc\u03ad\u03c2.<\/li>\n\n\n\n<li><strong>\u0395\u03c1\u03b3\u03b1\u03c3\u03c4\u03b7\u03c1\u03b9\u03b1\u03ba\u03ae \u03b1\u03bd\u03ac\u03bb\u03c5\u03c3\u03b7 \u03ba\u03b1\u03b9 \u03b4\u03bf\u03ba\u03b9\u03bc\u03ad\u03c2<\/strong>: Cobots \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03bd\u03b1 \u03c7\u03b5\u03b9\u03c1\u03af\u03b6\u03bf\u03bd\u03c4\u03b1\u03b9 \u03b4\u03b5\u03af\u03b3\u03bc\u03b1\u03c4\u03b1 \u03ba\u03b1\u03b9 \u03bd\u03b1 \u03b5\u03ba\u03c4\u03b5\u03bb\u03bf\u03cd\u03bd \u03b5\u03c1\u03b3\u03b1\u03c3\u03c4\u03b7\u03c1\u03b9\u03b1\u03ba\u03ad\u03c2 \u03b1\u03bd\u03b1\u03bb\u03cd\u03c3\u03b5\u03b9\u03c2 \u03ba\u03b1\u03b9 \u03b4\u03bf\u03ba\u03b9\u03bc\u03ad\u03c2, \u03bf\u03b9 \u03bf\u03c0\u03bf\u03af\u03b5\u03c2 \u03b1\u03c0\u03b1\u03b9\u03c4\u03bf\u03cd\u03bd \u03c5\u03c8\u03b7\u03bb\u03ae \u03b1\u03ba\u03c1\u03af\u03b2\u03b5\u03b9\u03b1 \u03ba\u03b1\u03b9 \u03b1\u03ba\u03c1\u03af\u03b2\u03b5\u03b9\u03b1.<\/li>\n\n\n\n<li><strong>\u039f\u03b4\u03ae\u03b3\u03b7\u03c3\u03b7 \u03ba\u03b1\u03b9 \u03c3\u03c4\u03b5\u03c1\u03ad\u03c9\u03c3\u03b7 \u03b2\u03b9\u03b4\u03ce\u03bd<\/strong>: \u03a4\u03b1 Cobots \u03b5\u03af\u03bd\u03b1\u03b9 \u03b9\u03ba\u03b1\u03bd\u03ac \u03bd\u03b1 \u03b5\u03ba\u03c4\u03b5\u03bb\u03bf\u03cd\u03bd \u03b5\u03c0\u03b1\u03bd\u03b1\u03bb\u03b1\u03bc\u03b2\u03b1\u03bd\u03cc\u03bc\u03b5\u03bd\u03b5\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2, \u03cc\u03c0\u03c9\u03c2 \u03b7 \u03bf\u03b4\u03ae\u03b3\u03b7\u03c3\u03b7 \u03b2\u03b9\u03b4\u03ce\u03bd \u03ae \u03b7 \u03c3\u03c4\u03b5\u03c1\u03ad\u03c9\u03c3\u03b7 \u03b5\u03be\u03b1\u03c1\u03c4\u03b7\u03bc\u03ac\u03c4\u03c9\u03bd, \u03bf\u03b9 \u03bf\u03c0\u03bf\u03af\u03b5\u03c2 \u03b5\u03af\u03bd\u03b1\u03b9 \u03c3\u03c5\u03bd\u03b7\u03b8\u03b9\u03c3\u03bc\u03ad\u03bd\u03b5\u03c2 \u03c3\u03c4\u03b7\u03bd \u03ba\u03b1\u03c4\u03b1\u03c3\u03ba\u03b5\u03c5\u03ae \u03b7\u03bb\u03b5\u03ba\u03c4\u03c1\u03bf\u03bd\u03b9\u03ba\u03ce\u03bd \u03ba\u03b1\u03b9 \u03b1\u03c5\u03c4\u03bf\u03ba\u03b9\u03bd\u03ae\u03c4\u03c9\u03bd.<\/li>\n<\/ul>\n\n\n\n<p>\u039c\u03b5 \u03c4\u03b7\u03bd \u03b5\u03bd\u03c3\u03c9\u03bc\u03ac\u03c4\u03c9\u03c3\u03b7 \u03c4\u03c9\u03bd Cobots \u03c3\u03c4\u03b9\u03c2 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b5\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2, \u03bf\u03b9 \u03b5\u03c4\u03b1\u03b9\u03c1\u03b5\u03af\u03b5\u03c2 \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03bd\u03b1 \u03b1\u03c5\u03be\u03ae\u03c3\u03bf\u03c5\u03bd \u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1, \u03bd\u03b1 \u03bc\u03b5\u03b9\u03ce\u03c3\u03bf\u03c5\u03bd \u03c4\u03bf\u03c5\u03c2 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c5\u03c2 \u03c0\u03b1\u03c1\u03ac\u03b4\u03bf\u03c3\u03b7\u03c2 \u03ba\u03b1\u03b9 \u03bd\u03b1 \u03b5\u03be\u03b1\u03c3\u03c6\u03b1\u03bb\u03af\u03c3\u03bf\u03c5\u03bd \u03ad\u03bd\u03b1 \u03b1\u03c3\u03c6\u03b1\u03bb\u03ad\u03c3\u03c4\u03b5\u03c1\u03bf \u03c0\u03b5\u03c1\u03b9\u03b2\u03ac\u03bb\u03bb\u03bf\u03bd \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2.\n\u0395\u03c0\u03b9\u03c0\u03bb\u03ad\u03bf\u03bd, \u03b7 \u03c0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03bf\u03c3\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03ba\u03b1\u03b9 \u03b7 \u03b5\u03c5\u03ba\u03bf\u03bb\u03af\u03b1 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03bf\u03cd \u03ba\u03b1\u03b8\u03b9\u03c3\u03c4\u03bf\u03cd\u03bd \u03c4\u03b1 Cobots \u03bc\u03b9\u03b1 \u03ad\u03be\u03c5\u03c0\u03bd\u03b7 \u03b5\u03c0\u03ad\u03bd\u03b4\u03c5\u03c3\u03b7 \u03b3\u03b9\u03b1 \u03c4\u03b9\u03c2 \u03c3\u03cd\u03b3\u03c7\u03c1\u03bf\u03bd\u03b5\u03c2 \u03ba\u03b1\u03c4\u03b1\u03c3\u03ba\u03b5\u03c5\u03b1\u03c3\u03c4\u03b9\u03ba\u03ad\u03c2 \u03b5\u03b3\u03ba\u03b1\u03c4\u03b1\u03c3\u03c4\u03ac\u03c3\u03b5\u03b9\u03c2. <\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"536\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1024x536.png\" alt=\"\" class=\"wp-image-6463\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1024x536.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-300x157.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-768x402.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1536x804.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-2048x1072.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-4208cf22 gb-headline-text\">\u039f\u03ba\u03c4\u03ce \u03bf\u03c6\u03ad\u03bb\u03b7 \u03c4\u03c9\u03bd Cobots \u03c3\u03c4\u03b7 \u03bc\u03b5\u03c4\u03b1\u03c0\u03bf\u03af\u03b7\u03c3\u03b7<\/h2>\n\n\n\n<p>\u03a4\u03ce\u03c1\u03b1, \u03b1\u03c2 \u03b2\u03bf\u03c5\u03c4\u03ae\u03be\u03bf\u03c5\u03bc\u03b5 \u03c3\u03c4\u03bf\u03bd \u03b8\u03b7\u03c3\u03b1\u03c5\u03c1\u03cc \u03c4\u03c9\u03bd \u03c0\u03bb\u03b5\u03bf\u03bd\u03b5\u03ba\u03c4\u03b7\u03bc\u03ac\u03c4\u03c9\u03bd \u03c0\u03bf\u03c5 \u03c0\u03c1\u03bf\u03c3\u03c6\u03ad\u03c1\u03bf\u03c5\u03bd \u03c4\u03b1 Cobots.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-6f2bff75 gb-headline-text\">\u0388\u03bd\u03b1 \u03c4\u03b5\u03c1\u03ac\u03c3\u03c4\u03b9\u03bf \u03ac\u03bb\u03bc\u03b1 \u03c0\u03c1\u03bf\u03c2 \u03c4\u03b7 \u03b2\u03b9\u03bf\u03bc\u03b7\u03c7\u03b1\u03bd\u03af\u03b1 4.0<\/h4>\n\n\n\n<p>\u03a4\u03b1 Cobots \u03b2\u03c1\u03af\u03c3\u03ba\u03bf\u03bd\u03c4\u03b1\u03b9 \u03c3\u03c4\u03bf \u03b5\u03c0\u03af\u03ba\u03b5\u03bd\u03c4\u03c1\u03bf \u03c4\u03b7\u03c2 <a href=\"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/%cf%84%ce%b9-%ce%b5%ce%af%ce%bd%ce%b1%ce%b9-%ce%b7-%ce%b2%ce%b9%ce%bf%ce%bc%ce%b7%cf%87%ce%b1%ce%bd%ce%af%ce%b1-4-0-%ce%ba%ce%b1%ce%b9-%cf%80%cf%8e%cf%82-%ce%bb%ce%b5%ce%b9%cf%84%ce%bf%cf%85%cf%81\/\">\u03b5\u03c0\u03b1\u03bd\u03ac\u03c3\u03c4\u03b1\u03c3\u03b7\u03c2 Industry 4.0<\/a>.\n\u039c\u03b5 \u03c4\u03b7\u03bd \u03b9\u03ba\u03b1\u03bd\u03cc\u03c4\u03b7\u03c4\u03ac \u03c4\u03bf\u03c5\u03c2 \u03bd\u03b1 \u03b5\u03c0\u03b9\u03ba\u03bf\u03b9\u03bd\u03c9\u03bd\u03bf\u03cd\u03bd \u03bc\u03b5 \u03ac\u03bb\u03bb\u03b5\u03c2 \u03bc\u03b7\u03c7\u03b1\u03bd\u03ad\u03c2 \u03bc\u03ad\u03c3\u03c9 \u03c4\u03bf\u03c5 \u0394\u03b9\u03b1\u03b4\u03b9\u03ba\u03c4\u03cd\u03bf\u03c5 \u03c4\u03c9\u03bd \u03a0\u03c1\u03b1\u03b3\u03bc\u03ac\u03c4\u03c9\u03bd (IoT), \u03b1\u03bd\u03bf\u03af\u03b3\u03bf\u03c5\u03bd \u03c4\u03bf \u03b4\u03c1\u03cc\u03bc\u03bf \u03b3\u03b9\u03b1 \u03c0\u03b9\u03bf \u03ad\u03be\u03c5\u03c0\u03bd\u03b5\u03c2, \u03c0\u03b9\u03bf \u03c3\u03c5\u03bd\u03b4\u03b5\u03b4\u03b5\u03bc\u03ad\u03bd\u03b5\u03c2 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b5\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2.\n\u03a3\u03c5\u03bb\u03bb\u03ad\u03b3\u03bf\u03c5\u03bd \u03ba\u03b1\u03b9 \u03b1\u03bd\u03b1\u03bb\u03cd\u03bf\u03c5\u03bd \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03b1, \u03b2\u03bf\u03b7\u03b8\u03ce\u03bd\u03c4\u03b1\u03c2 \u03c3\u03b1\u03c2 \u03bd\u03b1 \u03bb\u03b1\u03bc\u03b2\u03ac\u03bd\u03b5\u03c4\u03b5 \u03c0\u03b9\u03bf \u03ad\u03be\u03c5\u03c0\u03bd\u03b5\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03b5\u03ba\u03bc\u03b7\u03c1\u03b9\u03c9\u03bc\u03ad\u03bd\u03b5\u03c2 \u03b1\u03c0\u03bf\u03c6\u03ac\u03c3\u03b5\u03b9\u03c2 \u03ba\u03b1\u03b9 \u03bd\u03b1 \u03bc\u03ad\u03bd\u03b5\u03c4\u03b5 \u03bc\u03c0\u03c1\u03bf\u03c3\u03c4\u03ac \u03b1\u03c0\u03cc \u03c4\u03bf\u03bd \u03b1\u03bd\u03c4\u03b1\u03b3\u03c9\u03bd\u03b9\u03c3\u03bc\u03cc.  <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-314d8400 gb-headline-text\">\u03a5\u03c0\u03b5\u03c1\u03b1\u03c5\u03be\u03b7\u03bc\u03ad\u03bd\u03b7 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1<\/h4>\n\n\n\n<p>\u03a4\u03b1 Cobots \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03bd\u03b1 \u03b5\u03c1\u03b3\u03ac\u03b6\u03bf\u03bd\u03c4\u03b1\u03b9 24 \u03ce\u03c1\u03b5\u03c2 \u03c4\u03bf 24\u03c9\u03c1\u03bf \u03c7\u03c9\u03c1\u03af\u03c2 \u03b4\u03b9\u03b1\u03bb\u03b5\u03af\u03bc\u03bc\u03b1\u03c4\u03b1.\n\u0397 \u03b1\u03b4\u03b9\u03ac\u03ba\u03bf\u03c0\u03b7 \u03c0\u03c1\u03bf\u03c3\u03c0\u03ac\u03b8\u03b5\u03b9\u03b1 \u03bc\u03b5\u03c4\u03b1\u03c6\u03c1\u03ac\u03b6\u03b5\u03c4\u03b1\u03b9 \u03c3\u03b5 \u03c5\u03c8\u03b7\u03bb\u03cc\u03c4\u03b5\u03c1\u03bf\u03c5\u03c2 \u03c1\u03c5\u03b8\u03bc\u03bf\u03cd\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2.\n\u0395\u03c0\u03b9\u03c0\u03bb\u03ad\u03bf\u03bd, \u03c4\u03b1 \u03c3\u03c5\u03bd\u03b5\u03c1\u03b3\u03b1\u03c4\u03b9\u03ba\u03ac \u03c1\u03bf\u03bc\u03c0\u03cc\u03c4 \u03b5\u03bd\u03c3\u03c9\u03bc\u03b1\u03c4\u03ce\u03bd\u03bf\u03bd\u03c4\u03b1\u03b9 \u03b5\u03cd\u03ba\u03bf\u03bb\u03b1 \u03c3\u03c4\u03b9\u03c2 \u03c5\u03c0\u03ac\u03c1\u03c7\u03bf\u03c5\u03c3\u03b5\u03c2 \u03c1\u03bf\u03ad\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2, \u03b5\u03be\u03b1\u03c3\u03c6\u03b1\u03bb\u03af\u03b6\u03bf\u03bd\u03c4\u03b1\u03c2 \u03b1\u03c0\u03c1\u03cc\u03c3\u03ba\u03bf\u03c0\u03c4\u03bf \u03c3\u03c5\u03bd\u03c4\u03bf\u03bd\u03b9\u03c3\u03bc\u03cc.  <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-47e2c335 gb-headline-text\">\u0395\u03bd\u03b9\u03c3\u03c7\u03cd\u03c3\u03c4\u03b5 \u03c4\u03b7\u03bd \u03b1\u03c3\u03c6\u03ac\u03bb\u03b5\u03b9\u03b1 \u03c3\u03c4\u03bf \u03c7\u03ce\u03c1\u03bf \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2<\/h4>\n\n\n\n<p>\u039f\u03b9 \u03ad\u03be\u03c5\u03c0\u03bd\u03bf\u03b9 \u03b1\u03b9\u03c3\u03b8\u03b7\u03c4\u03ae\u03c1\u03b5\u03c2 \u03c4\u03c9\u03bd Cobots \u03b4\u03b9\u03b1\u03c3\u03c6\u03b1\u03bb\u03af\u03b6\u03bf\u03c5\u03bd \u03cc\u03c4\u03b9 \u03bf\u03c0\u03bf\u03b9\u03b1\u03b4\u03ae\u03c0\u03bf\u03c4\u03b5 \u03c4\u03c5\u03c7\u03b1\u03af\u03b1 \u03b5\u03c0\u03b1\u03c6\u03ae \u03b5\u03af\u03bd\u03b1\u03b9 \u03ae\u03c0\u03b9\u03b1 \u03ba\u03b1\u03b9 \u03b1\u03ba\u03af\u03bd\u03b4\u03c5\u03bd\u03b7 \u03ba\u03b1\u03c4\u03ac \u03c4\u03b7 \u03b4\u03b9\u03ac\u03c1\u03ba\u03b5\u03b9\u03b1 \u03c4\u03b7\u03c2 \u03b1\u03bb\u03bb\u03b7\u03bb\u03b5\u03c0\u03af\u03b4\u03c1\u03b1\u03c3\u03b7\u03c2 \u03bc\u03b5 \u03c4\u03bf\u03bd \u03ac\u03bd\u03b8\u03c1\u03c9\u03c0\u03bf.\n\u0391\u03bd\u03b1\u03bb\u03b1\u03bc\u03b2\u03ac\u03bd\u03bf\u03c5\u03bd \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2 \u03c0\u03bf\u03c5 \u03b8\u03b1 \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03c3\u03b1\u03bd \u03bd\u03b1 \u03b5\u03af\u03bd\u03b1\u03b9 \u03b5\u03c0\u03b9\u03ba\u03af\u03bd\u03b4\u03c5\u03bd\u03b5\u03c2 \u03b3\u03b9\u03b1 \u03c4\u03bf\u03bd \u03ac\u03bd\u03b8\u03c1\u03c9\u03c0\u03bf, \u03bc\u03b5 \u03b1\u03c0\u03bf\u03c4\u03ad\u03bb\u03b5\u03c3\u03bc\u03b1 \u03bb\u03b9\u03b3\u03cc\u03c4\u03b5\u03c1\u03bf\u03c5\u03c2 \u03c4\u03c1\u03b1\u03c5\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03bf\u03cd\u03c2 \u03c3\u03c4\u03bf \u03c7\u03ce\u03c1\u03bf \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-97a3b041 gb-headline-text\">\u0395\u03bd\u03af\u03c3\u03c7\u03c5\u03c3\u03b7 \u03c4\u03c9\u03bd \u03c0\u03c9\u03bb\u03ae\u03c3\u03b5\u03c9\u03bd<\/h4>\n\n\n\n<p>\u0397 \u03b1\u03c5\u03be\u03b7\u03bc\u03ad\u03bd\u03b7 \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03ba\u03b1\u03b9 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c3\u03b7\u03bc\u03b1\u03af\u03bd\u03b5\u03b9 \u03c4\u03b7\u03bd \u03b9\u03ba\u03b1\u03bd\u03cc\u03c4\u03b7\u03c4\u03b1 \u03b5\u03ba\u03c0\u03bb\u03ae\u03c1\u03c9\u03c3\u03b7\u03c2 \u03c0\u03b5\u03c1\u03b9\u03c3\u03c3\u03cc\u03c4\u03b5\u03c1\u03c9\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03b9\u03ce\u03bd \u03c3\u03b5 \u03bb\u03b9\u03b3\u03cc\u03c4\u03b5\u03c1\u03bf \u03c7\u03c1\u03cc\u03bd\u03bf.\n\u0395\u03c6\u03cc\u03c3\u03bf\u03bd \u03c4\u03b1 Cobots \u03b5\u03bd\u03c3\u03c9\u03bc\u03b1\u03c4\u03ce\u03bd\u03bf\u03bd\u03c4\u03b1\u03b9 \u03b1\u03c0\u03bf\u03c4\u03b5\u03bb\u03b5\u03c3\u03bc\u03b1\u03c4\u03b9\u03ba\u03ac, \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03bd\u03b1 \u03b1\u03c5\u03be\u03ae\u03c3\u03bf\u03c5\u03bd \u03c3\u03b7\u03bc\u03b1\u03bd\u03c4\u03b9\u03ba\u03ac \u03c4\u03b9\u03c2 \u03c0\u03c9\u03bb\u03ae\u03c3\u03b5\u03b9\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03b1 \u03ad\u03c3\u03bf\u03b4\u03b1. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-ca5c47ca gb-headline-text\">\u0395\u03be\u03bf\u03c1\u03b8\u03bf\u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03cc\u03c2 \u03c4\u03b7\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03ba\u03b1\u03b9 \u03b1\u03c0\u03bf\u03c6\u03c5\u03b3\u03ae \u03b5\u03bc\u03c0\u03bb\u03bf\u03ba\u03ce\u03bd<\/h4>\n\n\n\n<p>\u03a4\u03b1 \u03c3\u03c5\u03bd\u03b5\u03c1\u03b3\u03b1\u03b6\u03cc\u03bc\u03b5\u03bd\u03b1 \u03c1\u03bf\u03bc\u03c0\u03cc\u03c4 \u03b4\u03b9\u03b1\u03c3\u03c6\u03b1\u03bb\u03af\u03b6\u03bf\u03c5\u03bd \u03c4\u03b7\u03bd \u03bf\u03bc\u03b1\u03bb\u03ae \u03c1\u03bf\u03ae \u03c4\u03b7\u03c2 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b1\u03c2 \u03ba\u03b1\u03c4\u03b1\u03c3\u03ba\u03b5\u03c5\u03ae\u03c2.\n\u039c\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03bd\u03b1 \u03b1\u03bd\u03b1\u03ba\u03b1\u03c4\u03b1\u03bd\u03ad\u03bc\u03bf\u03bd\u03c4\u03b1\u03b9 \u03b3\u03c1\u03ae\u03b3\u03bf\u03c1\u03b1 \u03c3\u03b5 \u03b4\u03b9\u03b1\u03c6\u03bf\u03c1\u03b5\u03c4\u03b9\u03ba\u03ac \u03c4\u03bc\u03ae\u03bc\u03b1\u03c4\u03b1 \u03c4\u03b7\u03c2 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ae\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2, \u03c3\u03c5\u03bc\u03b2\u03ac\u03bb\u03bb\u03bf\u03bd\u03c4\u03b1\u03c2 \u03c3\u03c4\u03b7\u03bd \u03b1\u03c0\u03bf\u03c6\u03c5\u03b3\u03ae \u03c3\u03c5\u03bc\u03c6\u03bf\u03c1\u03ae\u03c3\u03b5\u03c9\u03bd \u03ba\u03b1\u03b9 \u03b4\u03b9\u03b1\u03c3\u03c6\u03b1\u03bb\u03af\u03b6\u03bf\u03bd\u03c4\u03b1\u03c2 \u03cc\u03c4\u03b9 \u03ba\u03b1\u03bd\u03ad\u03bd\u03b1 \u03c3\u03c4\u03ac\u03b4\u03b9\u03bf \u03b4\u03b5\u03bd \u03b8\u03b1 \u03b1\u03c0\u03bf\u03c4\u03b5\u03bb\u03ad\u03c3\u03b5\u03b9 \u03b5\u03bc\u03c0\u03cc\u03b4\u03b9\u03bf. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-81d62ac4 gb-headline-text\">\u039c\u03b5\u03af\u03c9\u03c3\u03b7 \u03c4\u03bf\u03c5 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c5 \u03c0\u03b1\u03c1\u03ac\u03b4\u03bf\u03c3\u03b7\u03c2<\/h4>\n\n\n\n<p>\u039c\u03b5 \u03c4\u03b1 Cobots, \u03bf \u03c7\u03c1\u03cc\u03bd\u03bf\u03c2 \u03bc\u03b5\u03c4\u03b1\u03be\u03cd \u03c4\u03b7\u03c2 \u03ad\u03bd\u03b1\u03c1\u03be\u03b7\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03b7\u03c2 \u03bf\u03bb\u03bf\u03ba\u03bb\u03ae\u03c1\u03c9\u03c3\u03b7\u03c2 \u03bc\u03b9\u03b1\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03b9\u03ba\u03ae\u03c2 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b1\u03c2 \u03bc\u03b5\u03b9\u03ce\u03bd\u03b5\u03c4\u03b1\u03b9.\n\u039f\u03b9 \u03c0\u03b5\u03bb\u03ac\u03c4\u03b5\u03c2 \u03bb\u03b1\u03bc\u03b2\u03ac\u03bd\u03bf\u03c5\u03bd \u03c4\u03b1 \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03b1 \u03c4\u03bf\u03c5\u03c2 \u03c4\u03b1\u03c7\u03cd\u03c4\u03b5\u03c1\u03b1, \u03b3\u03b5\u03b3\u03bf\u03bd\u03cc\u03c2 \u03c0\u03bf\u03c5 \u03b5\u03bd\u03b9\u03c3\u03c7\u03cd\u03b5\u03b9 \u03c4\u03b7\u03bd \u03b9\u03ba\u03b1\u03bd\u03bf\u03c0\u03bf\u03af\u03b7\u03c3\u03b7 \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03b1\u03c6\u03bf\u03c3\u03af\u03c9\u03c3\u03b7 \u03c4\u03c9\u03bd \u03c0\u03b5\u03bb\u03b1\u03c4\u03ce\u03bd.   <a href=\"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/%cf%80%cf%8e%cf%82-%ce%bd%ce%b1-%ce%b2%ce%b5%ce%bb%cf%84%ce%b9%cf%83%cf%84%ce%bf%cf%80%ce%bf%ce%b9%ce%ae%cf%83%ce%b5%cf%84%ce%b5-%cf%84%ce%bf%ce%bd-%cf%87%cf%81%cf%8c%ce%bd%ce%bf-%cf%80%ce%b1%cf%81\/\"><\/a><a href=\"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/%cf%80%cf%8e%cf%82-%ce%bd%ce%b1-%ce%b2%ce%b5%ce%bb%cf%84%ce%b9%cf%83%cf%84%ce%bf%cf%80%ce%bf%ce%b9%ce%ae%cf%83%ce%b5%cf%84%ce%b5-%cf%84%ce%bf%ce%bd-%cf%87%cf%81%cf%8c%ce%bd%ce%bf-%cf%80%ce%b1%cf%81\/\">\u0391\u03bd\u03b1\u03ba\u03b1\u03bb\u03cd\u03c8\u03c4\u03b5 \u03c0\u03ce\u03c2 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af\u03c4\u03b5 \u03bd\u03b1 \u03b2\u03b5\u03bb\u03c4\u03b9\u03c3\u03c4\u03bf\u03c0\u03bf\u03b9\u03ae\u03c3\u03b5\u03c4\u03b5 \u03c4\u03bf Lead Time.<\/a><\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-1435015f gb-headline-text\">\u0392\u03b5\u03bb\u03c4\u03af\u03c9\u03c3\u03b7 \u03c4\u03b7\u03c2 \u03b4\u03b9\u03b1\u03c7\u03b5\u03af\u03c1\u03b9\u03c3\u03b7\u03c2 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03c9\u03bd \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03c9\u03bd<\/h4>\n\n\n\n<p>\u03a4\u03b1 \u03c1\u03bf\u03bc\u03c0\u03cc\u03c4 \u03c3\u03c5\u03bb\u03bb\u03ad\u03b3\u03bf\u03c5\u03bd \u03b2\u03b1\u03c3\u03b9\u03ba\u03ac \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03b1 \u03ba\u03b1\u03c4\u03ac \u03c4\u03b7 \u03b4\u03b9\u03ac\u03c1\u03ba\u03b5\u03b9\u03b1 \u03c4\u03b7\u03c2 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b1\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2.\n\u039f\u03b9 \u03c0\u03bb\u03b7\u03c1\u03bf\u03c6\u03bf\u03c1\u03af\u03b5\u03c2 \u03b1\u03c5\u03c4\u03ad\u03c2 \u03b5\u03af\u03bd\u03b1\u03b9 \u03b6\u03c9\u03c4\u03b9\u03ba\u03ae\u03c2 \u03c3\u03b7\u03bc\u03b1\u03c3\u03af\u03b1\u03c2 \u03b3\u03b9\u03b1 \u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03ba\u03bf\u03bb\u03bf\u03cd\u03b8\u03b7\u03c3\u03b7 \u03c4\u03c9\u03bd \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03c9\u03bd \u03ba\u03b1\u03c4\u03ac \u03c4\u03b7 \u03b4\u03b9\u03ac\u03c1\u03ba\u03b5\u03b9\u03b1 \u03c4\u03bf\u03c5 \u03ba\u03cd\u03ba\u03bb\u03bf\u03c5 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2, \u03b4\u03b9\u03b1\u03c3\u03c6\u03b1\u03bb\u03af\u03b6\u03bf\u03bd\u03c4\u03b1\u03c2 \u03c4\u03b7\u03bd \u03c0\u03bf\u03b9\u03cc\u03c4\u03b7\u03c4\u03b1 \u03ba\u03b1\u03b9 \u03c4\u03b7 \u03c3\u03c5\u03bd\u03ad\u03c0\u03b5\u03b9\u03b1.   <a href=\"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/diaxeirisi-dedomenon-proiontos-pdm\/\"><\/a><a href=\"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/diaxeirisi-dedomenon-proiontos-pdm\/\">\u0393\u03bd\u03c9\u03c1\u03af\u03c3\u03c4\u03b5 \u03c4\u03b1 \u03c0\u03bb\u03b5\u03bf\u03bd\u03b5\u03ba\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1 \u03c4\u03b7\u03c2 \u0394\u03b9\u03b1\u03c7\u03b5\u03af\u03c1\u03b9\u03c3\u03b7\u03c2 \u0394\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03c9\u03bd \u03a0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03bf\u03c2. <\/a> <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-e97b664c gb-headline-text\">\u039f\u03b9\u03ba\u03bf\u03bd\u03bf\u03bc\u03b9\u03ba\u03ae \u03ba\u03b1\u03b9 \u03ad\u03be\u03c5\u03c0\u03bd\u03b7 \u03b5\u03c0\u03ad\u03bd\u03b4\u03c5\u03c3\u03b7<\/h4>\n\n\n\n<p>\u03a4\u03b1 Cobots \u03b5\u03af\u03bd\u03b1\u03b9 \u03bf\u03b9\u03ba\u03bf\u03bd\u03bf\u03bc\u03b9\u03ba\u03ac \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03ac \u03c3\u03b5 \u03c3\u03cd\u03b3\u03ba\u03c1\u03b9\u03c3\u03b7 \u03bc\u03b5 \u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b4\u03bf\u03c3\u03b9\u03b1\u03ba\u03ac \u03c1\u03bf\u03bc\u03c0\u03cc\u03c4.\n\u0397 \u03b5\u03c5\u03b5\u03bb\u03b9\u03be\u03af\u03b1 \u03c4\u03bf\u03c5\u03c2, \u03b7 \u03b5\u03c5\u03ba\u03bf\u03bb\u03af\u03b1 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03bf\u03cd \u03ba\u03b1\u03b9 \u03b7 \u03b9\u03ba\u03b1\u03bd\u03cc\u03c4\u03b7\u03c4\u03ac \u03c4\u03bf\u03c5\u03c2 \u03bd\u03b1 \u03b5\u03ba\u03c4\u03b5\u03bb\u03bf\u03cd\u03bd \u03c0\u03bf\u03bb\u03bb\u03b1\u03c0\u03bb\u03ad\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2 \u03c3\u03b7\u03bc\u03b1\u03af\u03bd\u03bf\u03c5\u03bd \u03cc\u03c4\u03b9 \u03ad\u03bd\u03b1 \u03bc\u03cc\u03bd\u03bf Cobot \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03b5\u03ba\u03c4\u03b5\u03bb\u03ad\u03c3\u03b5\u03b9 \u03c4\u03b7 \u03b4\u03bf\u03c5\u03bb\u03b5\u03b9\u03ac \u03c0\u03bf\u03bb\u03bb\u03ce\u03bd \u03bc\u03b7\u03c7\u03b1\u03bd\u03b7\u03bc\u03ac\u03c4\u03c9\u03bd. <\/p>\n\n<\/div>\n<\/div>\n\n<div class=\"gb-container gb-container-f7e777f3\">\n<div class=\"gb-container gb-container-0a56c9fa sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-eed176fc\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-1b2f16ae\">\n<div class=\"gb-grid-column gb-grid-column-be655727\"><div class=\"gb-container gb-container-be655727\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"685\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png\" alt=\"SkyPlanner APS - Production planning and scheduling product image straight view\" class=\"wp-image-4339\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-300x201.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-768x514.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1536x1027.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-2048x1370.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-0821f9a0\"><div class=\"gb-container gb-container-0821f9a0\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-advanced-production-planning-with-ai-skyplanner-aps\" style=\"font-size:24px\">Advanced production planning with AI &#8211; SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">Read more about our approach to production planning and optimization leveraging the power of AI.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-690cb95e\">\n\n<a class=\"gb-button gb-button-7b87a903 gb-button-text\" href=\"https:\/\/skyplanner.ai\/\" aria-label=\"Book a demo\">Production planning with AI<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n<\/div>\n\n<div class=\"gb-container gb-container-33d6b196\">\n\n<h2 class=\"gb-headline gb-headline-2af1d6bc gb-headline-text\">\u0391\u03bd\u03c4\u03b9\u03bc\u03b5\u03c4\u03ce\u03c0\u03b9\u03c3\u03b7 \u03c4\u03c9\u03bd \u03bc\u03b5\u03b9\u03bf\u03bd\u03b5\u03ba\u03c4\u03b7\u03bc\u03ac\u03c4\u03c9\u03bd<\/h2>\n\n\n\n<p>\u0395\u03bd\u03ce \u03c4\u03b1 \u03c3\u03c5\u03bd\u03b5\u03c1\u03b3\u03b1\u03c4\u03b9\u03ba\u03ac \u03c1\u03bf\u03bc\u03c0\u03cc\u03c4 \u03b4\u03b9\u03b1\u03b8\u03ad\u03c4\u03bf\u03c5\u03bd \u03c0\u03bb\u03b7\u03b8\u03ce\u03c1\u03b1 \u03c0\u03bb\u03b5\u03bf\u03bd\u03b5\u03ba\u03c4\u03b7\u03bc\u03ac\u03c4\u03c9\u03bd, \u03b5\u03af\u03bd\u03b1\u03b9 \u03c3\u03c5\u03bd\u03b5\u03c4\u03cc \u03bd\u03b1 \u03b5\u03be\u03b5\u03c4\u03ac\u03c3\u03b5\u03c4\u03b5 \u03ba\u03b1\u03b9 \u03bf\u03c1\u03b9\u03c3\u03bc\u03ad\u03bd\u03b1 \u03bc\u03b5\u03b9\u03bf\u03bd\u03b5\u03ba\u03c4\u03ae\u03bc\u03b1\u03c4\u03ac \u03c4\u03bf\u03c5\u03c2.\n\u039c\u03b5 \u03c4\u03b7\u03bd \u03ba\u03b1\u03c4\u03b1\u03bd\u03cc\u03b7\u03c3\u03b7 \u03b1\u03c5\u03c4\u03ce\u03bd, \u03bc\u03c0\u03bf\u03c1\u03b5\u03af\u03c4\u03b5 \u03bd\u03b1 \u03bb\u03ac\u03b2\u03b5\u03c4\u03b5 \u03c0\u03b9\u03bf \u03c4\u03b5\u03ba\u03bc\u03b7\u03c1\u03b9\u03c9\u03bc\u03ad\u03bd\u03b5\u03c2 \u03b1\u03c0\u03bf\u03c6\u03ac\u03c3\u03b5\u03b9\u03c2 \u03ba\u03b1\u03b9 \u03bd\u03b1 \u03c7\u03c1\u03b7\u03c3\u03b9\u03bc\u03bf\u03c0\u03bf\u03b9\u03ae\u03c3\u03b5\u03c4\u03b5 \u03c4\u03b1 \u03ba\u03b1\u03c4\u03ac\u03bb\u03bb\u03b7\u03bb\u03b1 \u03b5\u03c1\u03b3\u03b1\u03bb\u03b5\u03af\u03b1 \u03b3\u03b9\u03b1 \u03c4\u03b7\u03bd \u03b1\u03bd\u03c4\u03b9\u03bc\u03b5\u03c4\u03ce\u03c0\u03b9\u03c3\u03b7 \u03c4\u03c9\u03bd \u03c0\u03c1\u03bf\u03b2\u03bb\u03b7\u03bc\u03ac\u03c4\u03c9\u03bd, \u03cc\u03c0\u03c9\u03c2 \u03b7 \u03b5\u03bd\u03c3\u03c9\u03bc\u03ac\u03c4\u03c9\u03c3\u03b7 \u03b5\u03bd\u03cc\u03c2 \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03bf\u03c2 APS. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-154c0906 gb-headline-text\">\u0395\u03be\u03ac\u03c1\u03c4\u03b7\u03c3\u03b7 \u03b1\u03c0\u03cc \u03b5\u03be\u03b5\u03b9\u03b4\u03b9\u03ba\u03b5\u03c5\u03bc\u03ad\u03bd\u03bf\u03c5\u03c2 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03c4\u03ad\u03c2<\/h4>\n\n\n\n<p>\u0388\u03bd\u03b1 \u03b1\u03c0\u03cc \u03c4\u03b1 \u03c3\u03b7\u03bc\u03b1\u03bd\u03c4\u03b9\u03ba\u03cc\u03c4\u03b5\u03c1\u03b1 \u03bc\u03b5\u03b9\u03bf\u03bd\u03b5\u03ba\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1 \u03b5\u03af\u03bd\u03b1\u03b9 \u03cc\u03c4\u03b9 \u03c4\u03b1 Cobots \u03b1\u03c0\u03b1\u03b9\u03c4\u03bf\u03cd\u03bd \u03b5\u03be\u03b5\u03b9\u03b4\u03b9\u03ba\u03b5\u03c5\u03bc\u03ad\u03bd\u03bf\u03c5\u03c2 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03c4\u03ad\u03c2 \u03b3\u03b9\u03b1 \u03c4\u03b7 \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03af\u03b1 \u03ba\u03b1\u03b9 \u03c4\u03b7 \u03c3\u03c5\u03bd\u03c4\u03ae\u03c1\u03b7\u03c3\u03ae \u03c4\u03bf\u03c5\u03c2.\n\u0394\u03b5\u03bd \u03ad\u03c7\u03b5\u03b9 \u03c0\u03c1\u03cc\u03c3\u03b2\u03b1\u03c3\u03b7 \u03c3\u03b5 \u03b1\u03c5\u03c4\u03cc \u03c4\u03bf \u03c4\u03b1\u03bb\u03ad\u03bd\u03c4\u03bf \u03ba\u03ac\u03b8\u03b5 \u03bc\u03bf\u03bd\u03ac\u03b4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-5d00d616 gb-headline-text\">\u03a0\u03b5\u03c1\u03b9\u03bf\u03c1\u03b9\u03c3\u03bc\u03ad\u03bd\u03b7 \u03c7\u03c9\u03c1\u03b7\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c6\u03bf\u03c1\u03c4\u03af\u03bf\u03c5<\/h4>\n\n\n\n<p>\u03a4\u03b1 Cobots \u03b5\u03af\u03bd\u03b1\u03b9 \u03c3\u03c5\u03bd\u03ae\u03b8\u03c9\u03c2 \u03c3\u03c7\u03b5\u03b4\u03b9\u03b1\u03c3\u03bc\u03ad\u03bd\u03b1 \u03b3\u03b9\u03b1 \u03b1\u03ba\u03c1\u03af\u03b2\u03b5\u03b9\u03b1 \u03ba\u03b1\u03b9 \u03cc\u03c7\u03b9 \u03b3\u03b9\u03b1 \u03b2\u03b1\u03c1\u03b9\u03ac \u03b1\u03bd\u03cd\u03c8\u03c9\u03c3\u03b7.\n\u0397 \u03c0\u03b5\u03c1\u03b9\u03bf\u03c1\u03b9\u03c3\u03bc\u03ad\u03bd\u03b7 \u03c7\u03c9\u03c1\u03b7\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03ac \u03c4\u03bf\u03c5\u03c2 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03bc\u03b7\u03bd \u03b5\u03af\u03bd\u03b1\u03b9 \u03ba\u03b1\u03c4\u03ac\u03bb\u03bb\u03b7\u03bb\u03b7 \u03b3\u03b9\u03b1 \u03b2\u03b9\u03bf\u03bc\u03b7\u03c7\u03b1\u03bd\u03af\u03b5\u03c2 \u03c0\u03bf\u03c5 \u03b1\u03c3\u03c7\u03bf\u03bb\u03bf\u03cd\u03bd\u03c4\u03b1\u03b9 \u03bc\u03b5 \u03b2\u03b1\u03c1\u03b9\u03ac \u03c5\u03bb\u03b9\u03ba\u03ac. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-9eb3b44e gb-headline-text\">\u0391\u03c1\u03c7\u03b9\u03ba\u03cc \u03ba\u03cc\u03c3\u03c4\u03bf\u03c2 \u03b5\u03c0\u03ad\u03bd\u03b4\u03c5\u03c3\u03b7\u03c2<\/h4>\n\n\n\n<p>\u0391\u03bd \u03ba\u03b1\u03b9 \u03c4\u03b1 Cobots \u03b5\u03af\u03bd\u03b1\u03b9 \u03bf\u03b9\u03ba\u03bf\u03bd\u03bf\u03bc\u03b9\u03ba\u03ac \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03ac \u03bc\u03b1\u03ba\u03c1\u03bf\u03c0\u03c1\u03cc\u03b8\u03b5\u03c3\u03bc\u03b1, \u03b7 \u03b1\u03c1\u03c7\u03b9\u03ba\u03ae \u03b5\u03c0\u03ad\u03bd\u03b4\u03c5\u03c3\u03b7 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03b1\u03c0\u03bf\u03c4\u03b5\u03bb\u03ad\u03c3\u03b5\u03b9 \u03b5\u03bc\u03c0\u03cc\u03b4\u03b9\u03bf \u03b3\u03b9\u03b1 \u03c4\u03b9\u03c2 \u03bc\u03b9\u03ba\u03c1\u03ad\u03c2 \u03ba\u03b1\u03b9 \u03bc\u03b5\u03c3\u03b1\u03af\u03b5\u03c2 \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03ae\u03c3\u03b5\u03b9\u03c2.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-47e84243 gb-headline-text\">\u039a\u03af\u03bd\u03b4\u03c5\u03bd\u03bf\u03b9 \u03b1\u03c3\u03c6\u03b1\u03bb\u03b5\u03af\u03b1\u03c2<\/h4>\n\n\n\n<p>\u039a\u03b1\u03b8\u03ce\u03c2 \u03c4\u03b1 Cobots \u03b1\u03c0\u03bf\u03c4\u03b5\u03bb\u03bf\u03cd\u03bd \u03bc\u03ad\u03c1\u03bf\u03c2 \u03c4\u03bf\u03c5 \u0394\u03b9\u03b1\u03b4\u03b9\u03ba\u03c4\u03cd\u03bf\u03c5 \u03c4\u03c9\u03bd \u03a0\u03c1\u03b1\u03b3\u03bc\u03ac\u03c4\u03c9\u03bd (IoT), \u03c5\u03c0\u03ac\u03c1\u03c7\u03b5\u03b9 \u03ba\u03af\u03bd\u03b4\u03c5\u03bd\u03bf\u03c2 \u03ba\u03c5\u03b2\u03b5\u03c1\u03bd\u03bf\u03b5\u03c0\u03b9\u03b8\u03ad\u03c3\u03b5\u03c9\u03bd \u03c0\u03bf\u03c5 \u03b8\u03b1 \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03c3\u03b1\u03bd \u03b5\u03bd\u03b4\u03b5\u03c7\u03bf\u03bc\u03ad\u03bd\u03c9\u03c2 \u03bd\u03b1 \u03c0\u03b1\u03c1\u03b5\u03bc\u03c0\u03bf\u03b4\u03af\u03c3\u03bf\u03c5\u03bd \u03c4\u03b7 \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03ac \u03c4\u03bf\u03c5\u03c2 \u03ae \u03bd\u03b1 \u03b4\u03b9\u03b1\u03c1\u03c1\u03b5\u03cd\u03c3\u03bf\u03c5\u03bd \u03b5\u03c5\u03b1\u03af\u03c3\u03b8\u03b7\u03c4\u03b1 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03b1.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-94c2d49e gb-headline-text\">\u03a0\u03b5\u03c1\u03b9\u03bf\u03c1\u03b9\u03c3\u03bc\u03ad\u03bd\u03b7 \u03c4\u03b1\u03c7\u03cd\u03c4\u03b7\u03c4\u03b1<\/h4>\n\n\n\n<p>\u0393\u03b9\u03b1 \u03bd\u03b1 \u03b5\u03be\u03b1\u03c3\u03c6\u03b1\u03bb\u03b9\u03c3\u03c4\u03b5\u03af \u03b7 \u03b1\u03c3\u03c6\u03b1\u03bb\u03ae\u03c2 \u03b1\u03bb\u03bb\u03b7\u03bb\u03b5\u03c0\u03af\u03b4\u03c1\u03b1\u03c3\u03b7 \u03bc\u03b5 \u03c4\u03bf\u03bd \u03ac\u03bd\u03b8\u03c1\u03c9\u03c0\u03bf, \u03c4\u03b1 Cobots \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03bf\u03cd\u03bd \u03c3\u03c5\u03c7\u03bd\u03ac \u03c3\u03b5 \u03c7\u03b1\u03bc\u03b7\u03bb\u03cc\u03c4\u03b5\u03c1\u03b5\u03c2 \u03c4\u03b1\u03c7\u03cd\u03c4\u03b7\u03c4\u03b5\u03c2 \u03b1\u03c0\u03cc \u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b4\u03bf\u03c3\u03b9\u03b1\u03ba\u03ac \u03c1\u03bf\u03bc\u03c0\u03cc\u03c4, \u03b3\u03b5\u03b3\u03bf\u03bd\u03cc\u03c2 \u03c0\u03bf\u03c5 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bc\u03b5\u03c1\u03b9\u03ba\u03ad\u03c2 \u03c6\u03bf\u03c1\u03ad\u03c2 \u03bd\u03b1 \u03b5\u03c0\u03b7\u03c1\u03b5\u03ac\u03c3\u03b5\u03b9 \u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1.<\/p>\n\n\n\n<h3 class=\"gb-headline gb-headline-b48e87f7 gb-headline-text\">\u03a4\u03bf \u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03b9\u03ba\u03cc APS \u03c3\u03c4\u03b7 \u03b4\u03b9\u03ac\u03c3\u03c9\u03c3\u03b7!<\/h3>\n\n\n\n<p>\u039c\u03b5\u03c4\u03b1\u03be\u03cd \u03c4\u03c9\u03bd \u03c0\u03c1\u03bf\u03ba\u03bb\u03ae\u03c3\u03b5\u03c9\u03bd \u03c0\u03bf\u03c5 \u03b1\u03c0\u03b1\u03c1\u03b9\u03b8\u03bc\u03bf\u03cd\u03bd\u03c4\u03b1\u03b9, \u03b7 \u03b5\u03be\u03ac\u03c1\u03c4\u03b7\u03c3\u03b7 \u03b1\u03c0\u03cc \u03b5\u03be\u03b5\u03b9\u03b4\u03b9\u03ba\u03b5\u03c5\u03bc\u03ad\u03bd\u03bf\u03c5\u03c2 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03c4\u03ad\u03c2 \u03b5\u03af\u03bd\u03b1\u03b9 \u03c4\u03bf \u03c3\u03b7\u03bc\u03b5\u03af\u03bf \u03cc\u03c0\u03bf\u03c5 \u03c4\u03bf \u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03b9\u03ba\u03cc APS \u03b1\u03bb\u03bb\u03ac\u03b6\u03b5\u03b9 \u03c4\u03b1 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03b1.\n\u0388\u03bd\u03b1 \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1 \u03c0\u03c1\u03bf\u03b7\u03b3\u03bc\u03ad\u03bd\u03bf\u03c5 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03bf\u03cd \u03ba\u03b1\u03b9 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03bf\u03cd (APS) \u03b1\u03c5\u03c4\u03bf\u03bc\u03b1\u03c4\u03bf\u03c0\u03bf\u03b9\u03b5\u03af \u03c0\u03bf\u03bb\u03bb\u03ad\u03c2 \u03b1\u03c0\u03cc \u03c4\u03b9\u03c2 \u03c0\u03bf\u03bb\u03cd\u03c0\u03bb\u03bf\u03ba\u03b5\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03bf\u03cd \u03c0\u03bf\u03c5 \u03b4\u03b9\u03b1\u03c6\u03bf\u03c1\u03b5\u03c4\u03b9\u03ba\u03ac \u03b8\u03b1 \u03b1\u03c0\u03b1\u03b9\u03c4\u03bf\u03cd\u03c3\u03b1\u03bd \u03b5\u03be\u03b5\u03b9\u03b4\u03b9\u03ba\u03b5\u03c5\u03bc\u03ad\u03bd\u03bf \u03c0\u03c1\u03bf\u03c3\u03c9\u03c0\u03b9\u03ba\u03cc.\n\u039c\u03b5 \u03ad\u03bd\u03b1 \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1 APS, \u03c4\u03b1 Cobots \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03bd\u03b1 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03af\u03b6\u03bf\u03bd\u03c4\u03b1\u03b9 \u03ba\u03b1\u03b9 \u03bd\u03b1 \u03b1\u03bd\u03b1\u03ba\u03b1\u03c4\u03b1\u03bd\u03ad\u03bc\u03bf\u03bd\u03c4\u03b1\u03b9 \u03b1\u03c0\u03bf\u03c4\u03b5\u03bb\u03b5\u03c3\u03bc\u03b1\u03c4\u03b9\u03ba\u03ac \u03bc\u03b5 \u03b2\u03ac\u03c3\u03b7 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03b5 \u03c0\u03c1\u03b1\u03b3\u03bc\u03b1\u03c4\u03b9\u03ba\u03cc \u03c7\u03c1\u03cc\u03bd\u03bf.\n\u0391\u03c5\u03c4\u03cc \u03bc\u03b5\u03b9\u03ce\u03bd\u03b5\u03b9 \u03c4\u03b7\u03bd \u03b5\u03be\u03ac\u03c1\u03c4\u03b7\u03c3\u03b7 \u03b1\u03c0\u03cc \u03b5\u03c0\u03b1\u03b3\u03b3\u03b5\u03bb\u03bc\u03b1\u03c4\u03af\u03b5\u03c2 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03c4\u03ad\u03c2 \u03ba\u03b1\u03b9 \u03bc\u03b5\u03b3\u03b9\u03c3\u03c4\u03bf\u03c0\u03bf\u03b9\u03b5\u03af \u03c4\u03b7\u03bd \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c4\u03c9\u03bd Cobots \u03c3\u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae.\n\u039c\u03ad\u03c3\u03c9 \u03c4\u03bf\u03c5 \u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03b9\u03ba\u03bf\u03cd APS, \u03bf\u03b9 \u03bc\u03bf\u03bd\u03ac\u03b4\u03b5\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03bd\u03b1 \u03b1\u03c0\u03bf\u03bb\u03b1\u03bc\u03b2\u03ac\u03bd\u03bf\u03c5\u03bd \u03c4\u03b1 \u03ba\u03b1\u03bb\u03cd\u03c4\u03b5\u03c1\u03b1 \u03b1\u03c0\u03cc \u03cc\u03c3\u03b1 \u03c0\u03c1\u03bf\u03c3\u03c6\u03ad\u03c1\u03bf\u03c5\u03bd \u03c4\u03b1 Cobots, \u03b5\u03bb\u03b1\u03c7\u03b9\u03c3\u03c4\u03bf\u03c0\u03bf\u03b9\u03ce\u03bd\u03c4\u03b1\u03c2 \u03c4\u03bf\u03c5\u03c2 \u03c0\u03b5\u03c1\u03b9\u03bf\u03c1\u03b9\u03c3\u03bc\u03bf\u03cd\u03c2 \u03c4\u03bf\u03c5\u03c2.    <\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-56a90720 gb-headline-text\">\u039f \u03b1\u03c0\u03cc\u03bb\u03c5\u03c4\u03bf\u03c2 \u03c3\u03c5\u03bd\u03b4\u03c5\u03b1\u03c3\u03bc\u03cc\u03c2 \u03b4\u03cd\u03bd\u03b1\u03bc\u03b7\u03c2: Cobots \u03ba\u03b1\u03b9 APS<\/h2>\n\n\n\n<p>\u03a3\u03c4\u03bf\u03bd \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc \u03ba\u03cc\u03c3\u03bc\u03bf \u03c4\u03b7\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2, \u03c4\u03b1 \u03c3\u03c5\u03bd\u03b5\u03c1\u03b3\u03b1\u03c4\u03b9\u03ba\u03ac \u03c1\u03bf\u03bc\u03c0\u03cc\u03c4 \u03ba\u03b1\u03b9 \u03ad\u03bd\u03b1 <a href=\"https:\/\/skyplanner.ai\/el\/\">\u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03b9\u03ba\u03cc APS \u03cc\u03c0\u03c9\u03c2 \u03b1\u03c5\u03c4\u03cc \u03c4\u03b7\u03c2 Skyplanner<\/a> \u03b1\u03c0\u03bf\u03c4\u03b5\u03bb\u03bf\u03cd\u03bd \u03c4\u03b7\u03bd \u03bf\u03bd\u03b5\u03b9\u03c1\u03b9\u03ba\u03ae \u03bf\u03bc\u03ac\u03b4\u03b1 \u03c0\u03bf\u03c5 \u03c6\u03ad\u03c1\u03bd\u03b5\u03b9 \u03c4\u03b7\u03bd \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1, \u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03b1\u03c3\u03c6\u03ac\u03bb\u03b5\u03b9\u03b1 \u03c3\u03b5 \u03b1\u03c0\u03b1\u03c1\u03ac\u03bc\u03b9\u03bb\u03bb\u03b1 \u03cd\u03c8\u03b7.<br\/><br\/><a href=\"https:\/\/skyplanner.ai\/el\/%ce%b5%cf%80%ce%b9%ce%ba%ce%bf%ce%b9%ce%bd%cf%89%ce%bd%ce%af%ce%b1-%cf%80%cf%89%ce%bb%ce%ae%cf%83%ce%b5%cf%89%ce%bd\/\">\u0397 \u03b5\u03c0\u03b1\u03b3\u03b3\u03b5\u03bb\u03bc\u03b1\u03c4\u03b9\u03ba\u03ae \u03bc\u03b1\u03c2 \u03bf\u03bc\u03ac\u03b4\u03b1 \u03b5\u03af\u03bd\u03b1\u03b9 \u03ad\u03c4\u03bf\u03b9\u03bc\u03b7 \u03bd\u03b1 \u03c3\u03b1\u03c2 \u03b2\u03bf\u03b7\u03b8\u03ae\u03c3\u03b5\u03b9 \u03bd\u03b1 \u03b2\u03b5\u03bb\u03c4\u03b9\u03ce\u03c3\u03b5\u03c4\u03b5 \u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c4\u03b7\u03c2 \u03b5\u03c4\u03b1\u03b9\u03c1\u03b5\u03af\u03b1\u03c2 \u03c3\u03b1\u03c2 <\/a>\u03bc\u03b5 \u03c4\u03b9\u03c2 \u03c0\u03c1\u03c9\u03c4\u03bf\u03c0\u03bf\u03c1\u03b9\u03b1\u03ba\u03ad\u03c2 \u03bb\u03cd\u03c3\u03b5\u03b9\u03c2 APS \u03c0\u03bf\u03c5 \u03b5\u03bd\u03c3\u03c9\u03bc\u03b1\u03c4\u03ce\u03bd\u03bf\u03c5\u03bc\u03b5 \u03c3\u03c4\u03b7\u03bd \u03c4\u03b5\u03c7\u03bd\u03bf\u03bb\u03bf\u03b3\u03af\u03b1 Cobot.\n\u0391\u03b4\u03c1\u03ac\u03be\u03c4\u03b5 \u03c4\u03b7\u03bd \u03b5\u03c5\u03ba\u03b1\u03b9\u03c1\u03af\u03b1 \u03bd\u03b1 \u03b1\u03c6\u03ae\u03c3\u03b5\u03c4\u03b5 \u03c4\u03bf \u03c3\u03c4\u03af\u03b3\u03bc\u03b1 \u03c3\u03b1\u03c2 \u03c3\u03c4\u03bf\u03bd \u03ba\u03bb\u03ac\u03b4\u03bf \u03c4\u03b7\u03c2 \u03bc\u03b5\u03c4\u03b1\u03c0\u03bf\u03af\u03b7\u03c3\u03b7\u03c2 \u03bc\u03b5 \u03b1\u03c5\u03c4\u03cc\u03bd \u03c4\u03bf\u03bd \u03b5\u03c0\u03b9\u03c4\u03c5\u03c7\u03b7\u03bc\u03ad\u03bd\u03bf \u03c3\u03c5\u03bd\u03b4\u03c5\u03b1\u03c3\u03bc\u03cc.\n\u03a4\u03bf \u03b1\u03bd\u03c4\u03b1\u03b3\u03c9\u03bd\u03b9\u03c3\u03c4\u03b9\u03ba\u03cc \u03c3\u03b1\u03c2 \u03c0\u03bb\u03b5\u03bf\u03bd\u03ad\u03ba\u03c4\u03b7\u03bc\u03b1 \u03b5\u03af\u03bd\u03b1\u03b9 \u03bc\u03cc\u03bd\u03bf \u03ad\u03bd\u03b1 \u03c4\u03b7\u03bb\u03b5\u03c6\u03ce\u03bd\u03b7\u03bc\u03b1 \u03bc\u03b1\u03ba\u03c1\u03b9\u03ac!  <\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"302\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1024x302.png\" alt=\"SkyPlanner \u03a0\u03c1\u03bf\u03b7\u03b3\u03bc\u03ad\u03bd\u03bf\u03c2 \u03c3\u03c7\u03b5\u03b4\u03b9\u03b1\u03c3\u03bc\u03cc\u03c2 \u03ba\u03b1\u03b9 \u03c7\u03c1\u03bf\u03bd\u03bf\u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc\u03c2 &#x39B;&#x3CD;&#x3C3;&#x3B5;&#x3B9;&#x3C2; &#x3C3;&#x3B5; &#x3C0;&#x3C1;&#x3BF;&#x3B2;&#x3BB;&#x3AE;&#x3BC;&#x3B1;&#x3C4;&#x3B1; &#x3C0;&#x3B1;&#x3C1;&#x3B1;&#x3B3;&#x3C9;&#x3B3;&#x3AE;&#x3C2;\" class=\"wp-image-4232\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1024x302.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-300x88.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-768x226.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1536x452.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-2048x603.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<p><\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-484caba7 gb-headline-text\">\u03a3\u03c5\u03c7\u03bd\u03ad\u03c2 \u03b5\u03c1\u03c9\u03c4\u03ae\u03c3\u03b5\u03b9\u03c2<\/h2>\n\n\n\n<p>\u0391\u03c5\u03c4\u03cc \u03c4\u03bf \u03c4\u03bc\u03ae\u03bc\u03b1 \u03b5\u03be\u03b5\u03c4\u03ac\u03b6\u03b5\u03b9 \u03c4\u03b9\u03c2 \u03c3\u03c5\u03bd\u03ae\u03b8\u03b5\u03b9\u03c2 \u03b5\u03c1\u03c9\u03c4\u03ae\u03c3\u03b5\u03b9\u03c2 \u03c0\u03bf\u03c5 \u03c3\u03c7\u03b5\u03c4\u03af\u03b6\u03bf\u03bd\u03c4\u03b1\u03b9 \u03bc\u03b5 \u03c4\u03b1 Cobots \u03c3\u03c4\u03b7 \u03bc\u03b5\u03c4\u03b1\u03c0\u03bf\u03af\u03b7\u03c3\u03b7 \u03ba\u03b1\u03b9 \u03c5\u03c0\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03af\u03b6\u03b5\u03b9 \u03c0\u03ce\u03c2 \u03c4\u03bf \u03c0\u03c1\u03bf\u03b7\u03b3\u03bc\u03ad\u03bd\u03bf \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1 \u03c3\u03c7\u03b5\u03b4\u03b9\u03b1\u03c3\u03bc\u03bf\u03cd \u03c4\u03b7\u03c2 Skyplanner \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03b5\u03bd\u03b9\u03c3\u03c7\u03cd\u03c3\u03b5\u03b9 \u03c4\u03b7\u03bd \u03b5\u03c0\u03b9\u03c7\u03b5\u03af\u03c1\u03b7\u03c3\u03ae \u03c3\u03b1\u03c2.<\/p>\n\n\n\n<p><br\/>\u0391\u03c5\u03c4\u03cc \u03c4\u03bf \u03c4\u03bc\u03ae\u03bc\u03b1 \u03b5\u03be\u03b5\u03c4\u03ac\u03b6\u03b5\u03b9 \u03c4\u03b9\u03c2 \u03c3\u03c5\u03bd\u03ae\u03b8\u03b5\u03b9\u03c2 \u03b5\u03c1\u03c9\u03c4\u03ae\u03c3\u03b5\u03b9\u03c2 \u03c0\u03bf\u03c5 \u03c3\u03c7\u03b5\u03c4\u03af\u03b6\u03bf\u03bd\u03c4\u03b1\u03b9 \u03bc\u03b5 \u03c4\u03b1 Cobots \u03c3\u03c4\u03b7 \u03bc\u03b5\u03c4\u03b1\u03c0\u03bf\u03af\u03b7\u03c3\u03b7 \u03ba\u03b1\u03b9 \u03c5\u03c0\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03af\u03b6\u03b5\u03b9 \u03c0\u03ce\u03c2 \u03c4\u03bf \u03c0\u03c1\u03bf\u03b7\u03b3\u03bc\u03ad\u03bd\u03bf \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1 \u03c3\u03c7\u03b5\u03b4\u03b9\u03b1\u03c3\u03bc\u03bf\u03cd \u03c4\u03b7\u03c2 Skyplanner \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03b5\u03bd\u03b9\u03c3\u03c7\u03cd\u03c3\u03b5\u03b9 \u03c4\u03b7\u03bd \u03b5\u03c0\u03b9\u03c7\u03b5\u03af\u03c1\u03b7\u03c3\u03ae \u03c3\u03b1\u03c2.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-89d960e9 gb-headline-text\">\u03a4\u03b9 \u03b5\u03af\u03bd\u03b1\u03b9 \u03c4\u03b1 Cobots \u03c3\u03c4\u03b7 \u03bc\u03b5\u03c4\u03b1\u03c0\u03bf\u03af\u03b7\u03c3\u03b7;<\/h4>\n\n\n\n<p>\u03a4\u03b1 Cobots, \u03ae \u03c3\u03c5\u03bd\u03b5\u03c1\u03b3\u03b1\u03c4\u03b9\u03ba\u03ac \u03c1\u03bf\u03bc\u03c0\u03cc\u03c4, \u03b5\u03af\u03bd\u03b1\u03b9 \u03b5\u03be\u03b5\u03bb\u03b9\u03b3\u03bc\u03ad\u03bd\u03b5\u03c2 \u03bc\u03b7\u03c7\u03b1\u03bd\u03ad\u03c2 \u03c0\u03bf\u03c5 \u03ad\u03c7\u03bf\u03c5\u03bd \u03c3\u03c7\u03b5\u03b4\u03b9\u03b1\u03c3\u03c4\u03b5\u03af \u03b3\u03b9\u03b1 \u03bd\u03b1 \u03c3\u03c5\u03bd\u03b5\u03c1\u03b3\u03ac\u03b6\u03bf\u03bd\u03c4\u03b1\u03b9 \u03bc\u03b5 \u03c4\u03bf\u03bd \u03ac\u03bd\u03b8\u03c1\u03c9\u03c0\u03bf \u03b3\u03b9\u03b1 \u03c4\u03bf\u03bd \u03b5\u03be\u03bf\u03c1\u03b8\u03bf\u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03cc \u03c4\u03b7\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2, \u03c4\u03b7\u03bd \u03b1\u03cd\u03be\u03b7\u03c3\u03b7 \u03c4\u03b7\u03c2 \u03b1\u03c3\u03c6\u03ac\u03bb\u03b5\u03b9\u03b1\u03c2 \u03c3\u03c4\u03bf \u03c7\u03ce\u03c1\u03bf \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03b7 \u03b4\u03c1\u03ac\u03c3\u03b7 \u03c4\u03bf\u03c5\u03c2 \u03c9\u03c2 \u03ba\u03b1\u03c4\u03b1\u03bb\u03cd\u03c4\u03b5\u03c2 \u03b3\u03b9\u03b1 \u03c4\u03b7\u03bd \u03bf\u03c1\u03b3\u03b1\u03bd\u03c9\u03c4\u03b9\u03ba\u03ae \u03b1\u03bd\u03ac\u03c0\u03c4\u03c5\u03be\u03b7.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-e7639fc4 gb-headline-text\">\u03a0\u03bf\u03b9\u03bf\u03c2 \u03b5\u03c6\u03b7\u03cd\u03c1\u03b5 \u03c4\u03bf Cobot \u03ba\u03b1\u03b9 \u03c0\u03cc\u03c4\u03b5;<\/h4>\n\n\n\n<p>\u039f\u03b9 Edward Colgate \u03ba\u03b1\u03b9 Michael Peshkin \u03b1\u03c0\u03cc \u03c4\u03bf \u03a0\u03b1\u03bd\u03b5\u03c0\u03b9\u03c3\u03c4\u03ae\u03bc\u03b9\u03bf Northwestern \u03b5\u03c0\u03b9\u03bd\u03cc\u03b7\u03c3\u03b1\u03bd \u03c4\u03bf\u03bd \u03cc\u03c1\u03bf &#8220;Cobot&#8221; \u03ba\u03b1\u03b9 \u03b4\u03b7\u03bc\u03b9\u03bf\u03cd\u03c1\u03b3\u03b7\u03c3\u03b1\u03bd \u03c4\u03b1 \u03c0\u03c1\u03ce\u03c4\u03b1 \u03c0\u03c1\u03c9\u03c4\u03cc\u03c4\u03c5\u03c0\u03b1 \u03c4\u03bf 1996.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-9407bf10 gb-headline-text\">\u039c\u03c0\u03bf\u03c1\u03b5\u03af\u03c4\u03b5 \u03bd\u03b1 \u03b4\u03ce\u03c3\u03b5\u03c4\u03b5 \u03ad\u03bd\u03b1 \u03c0\u03b1\u03c1\u03ac\u03b4\u03b5\u03b9\u03b3\u03bc\u03b1 \u03b5\u03bd\u03cc\u03c2 Cobot;<\/h4>\n\n\n\n<p>\u0388\u03bd\u03b1 \u03b4\u03b9\u03ac\u03c3\u03b7\u03bc\u03bf \u03c0\u03b1\u03c1\u03ac\u03b4\u03b5\u03b9\u03b3\u03bc\u03b1 Cobot \u03b5\u03af\u03bd\u03b1\u03b9 \u03c4\u03bf UR5 \u03c4\u03b7\u03c2 Universal Robots, \u03c4\u03bf \u03bf\u03c0\u03bf\u03af\u03bf \u03ba\u03ac\u03bd\u03b5\u03b9 \u03b8\u03c1\u03b1\u03cd\u03c3\u03b7 \u03c3\u03c4\u03b7 \u03b2\u03b9\u03bf\u03bc\u03b7\u03c7\u03b1\u03bd\u03af\u03b1 \u03bc\u03b5 \u03c4\u03bf\u03bd \u03b5\u03c5\u03ad\u03bb\u03b9\u03ba\u03c4\u03bf \u03c3\u03c7\u03b5\u03b4\u03b9\u03b1\u03c3\u03bc\u03cc \u03c4\u03bf\u03c5 \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03b9\u03ba\u03b1\u03bd\u03cc\u03c4\u03b7\u03c4\u03ac \u03c4\u03bf\u03c5 \u03bd\u03b1 \u03c0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03cc\u03b6\u03b5\u03c4\u03b1\u03b9 \u03c3\u03b5 \u03c0\u03bf\u03bb\u03bb\u03ad\u03c2 \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03b7\u03c3\u03b9\u03b1\u03ba\u03ad\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-7fb9c560 gb-headline-text\">\u03a0\u03ce\u03c2 \u03b4\u03b9\u03b1\u03c6\u03ad\u03c1\u03bf\u03c5\u03bd \u03c4\u03b1 Cobots \u03b1\u03c0\u03cc \u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b4\u03bf\u03c3\u03b9\u03b1\u03ba\u03ac \u03c1\u03bf\u03bc\u03c0\u03cc\u03c4;<\/h4>\n\n\n\n<p>\u03a4\u03b1 \u03c1\u03bf\u03bc\u03c0\u03cc\u03c4 \u03b5\u03af\u03bd\u03b1\u03b9 \u03b1\u03c5\u03c4\u03cc\u03bd\u03bf\u03bc\u03b1 \u03ba\u03b1\u03b9 \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03bd\u03b1 \u03b5\u03ba\u03c4\u03b5\u03bb\u03bf\u03cd\u03bd \u03b1\u03c0\u03bf\u03c4\u03b5\u03bb\u03b5\u03c3\u03bc\u03b1\u03c4\u03b9\u03ba\u03ac \u03c0\u03c1\u03bf\u03ba\u03b1\u03b8\u03bf\u03c1\u03b9\u03c3\u03bc\u03ad\u03bd\u03b5\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2, \u03b1\u03bb\u03bb\u03ac \u03b4\u03b5\u03bd \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03bd\u03b1 \u03c0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03bf\u03c3\u03c4\u03bf\u03cd\u03bd \u03c3\u03c4\u03b9\u03c2 \u03b1\u03bb\u03bb\u03b1\u03b3\u03ad\u03c2 \u03c7\u03c9\u03c1\u03af\u03c2 \u03c4\u03c1\u03bf\u03c0\u03bf\u03c0\u03bf\u03b9\u03ae\u03c3\u03b5\u03b9\u03c2 \u03c3\u03c4\u03bf\u03bd \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc.\n\u03a4\u03b1 \u03c3\u03c5\u03bd\u03b5\u03c1\u03b3\u03b1\u03c4\u03b9\u03ba\u03ac \u03c1\u03bf\u03bc\u03c0\u03cc\u03c4, \u03c9\u03c3\u03c4\u03cc\u03c3\u03bf, \u03b5\u03af\u03bd\u03b1\u03b9 \u03b5\u03c5\u03ad\u03bb\u03b9\u03ba\u03c4\u03b1, \u03b5\u03cd\u03ba\u03bf\u03bb\u03b1 \u03b5\u03c0\u03b1\u03bd\u03b1\u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03b6\u03cc\u03bc\u03b5\u03bd\u03b1 \u03ba\u03b1\u03b9 \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03bd\u03b1 \u03c0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03bf\u03c3\u03c4\u03bf\u03cd\u03bd \u03b3\u03b9\u03b1 \u03bd\u03b1 \u03c6\u03b9\u03bb\u03bf\u03be\u03b5\u03bd\u03ae\u03c3\u03bf\u03c5\u03bd \u03bd\u03ad\u03b5\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2.\n\u0394\u03b9\u03b1\u03b8\u03ad\u03c4\u03bf\u03c5\u03bd \u03b5\u03c0\u03af\u03c3\u03b7\u03c2 \u03b1\u03b9\u03c3\u03b8\u03b7\u03c4\u03ae\u03c1\u03b5\u03c2 \u03c0\u03bf\u03c5 \u03c4\u03bf\u03c5\u03c2 \u03b5\u03c0\u03b9\u03c4\u03c1\u03ad\u03c0\u03bf\u03c5\u03bd \u03bd\u03b1 \u03b1\u03bd\u03c4\u03b9\u03bb\u03b1\u03bc\u03b2\u03ac\u03bd\u03bf\u03bd\u03c4\u03b1\u03b9 \u03c4\u03b7\u03bd \u03b1\u03bd\u03b8\u03c1\u03ce\u03c0\u03b9\u03bd\u03b7 \u03c0\u03b1\u03c1\u03bf\u03c5\u03c3\u03af\u03b1 \u03ba\u03b1\u03b9 \u03bd\u03b1 \u03b5\u03c1\u03b3\u03ac\u03b6\u03bf\u03bd\u03c4\u03b1\u03b9 \u03bc\u03b5 \u03b1\u03c3\u03c6\u03ac\u03bb\u03b5\u03b9\u03b1 \u03b4\u03af\u03c0\u03bb\u03b1 \u03c4\u03bf\u03c5\u03c2.  <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-12055abb gb-headline-text\">\u03a0\u03bf\u03b9\u03b5\u03c2 \u03b5\u03af\u03bd\u03b1\u03b9 \u03bf\u03c1\u03b9\u03c3\u03bc\u03ad\u03bd\u03b5\u03c2 \u03b5\u03c6\u03b1\u03c1\u03bc\u03bf\u03b3\u03ad\u03c2 \u03c4\u03c9\u03bd Cobots \u03c3\u03c4\u03b7 \u03bc\u03b5\u03c4\u03b1\u03c0\u03bf\u03af\u03b7\u03c3\u03b7;<\/h4>\n\n\n\n<p>\u03a4\u03b1 Cobots \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03bd\u03b1 \u03b5\u03ba\u03c4\u03b5\u03bb\u03bf\u03cd\u03bd \u03b4\u03b9\u03ac\u03c6\u03bf\u03c1\u03b5\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2, \u03cc\u03c0\u03c9\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2 \u03c3\u03c5\u03bd\u03b1\u03c1\u03bc\u03bf\u03bb\u03cc\u03b3\u03b7\u03c3\u03b7\u03c2, \u03b4\u03b9\u03b1\u03c7\u03b5\u03af\u03c1\u03b9\u03c3\u03b7 \u03bc\u03b7\u03c7\u03b1\u03bd\u03ce\u03bd, \u03b5\u03c0\u03b9\u03bb\u03bf\u03b3\u03ae \u03ba\u03b1\u03b9 \u03c4\u03bf\u03c0\u03bf\u03b8\u03ad\u03c4\u03b7\u03c3\u03b7, \u03c0\u03bf\u03b9\u03bf\u03c4\u03b9\u03ba\u03ae \u03b5\u03c0\u03b9\u03b8\u03b5\u03ce\u03c1\u03b7\u03c3\u03b7, \u03c3\u03c5\u03b3\u03ba\u03cc\u03bb\u03bb\u03b7\u03c3\u03b7, \u03c3\u03c5\u03b3\u03ba\u03cc\u03bb\u03bb\u03b7\u03c3\u03b7 \u03ba\u03b1\u03b9 \u03b2\u03b1\u03c6\u03ae, \u03c7\u03b5\u03b9\u03c1\u03b9\u03c3\u03bc\u03cc \u03c5\u03bb\u03b9\u03ba\u03ce\u03bd, \u03c3\u03c4\u03af\u03bb\u03b2\u03c9\u03c3\u03b7 \u03ba\u03b1\u03b9 \u03b1\u03c0\u03bf\u03b3\u03cd\u03bc\u03bd\u03c9\u03c3\u03b7, \u03b5\u03c1\u03b3\u03b1\u03c3\u03c4\u03b7\u03c1\u03b9\u03b1\u03ba\u03ae \u03b1\u03bd\u03ac\u03bb\u03c5\u03c3\u03b7 \u03ba\u03b1\u03b9 \u03b4\u03bf\u03ba\u03b9\u03bc\u03ad\u03c2, \u03ba\u03b1\u03b8\u03ce\u03c2 \u03ba\u03b1\u03b9 \u03bf\u03b4\u03ae\u03b3\u03b7\u03c3\u03b7 \u03ba\u03b1\u03b9 \u03c3\u03c4\u03b5\u03c1\u03ad\u03c9\u03c3\u03b7 \u03b2\u03b9\u03b4\u03ce\u03bd.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-65e51881 gb-headline-text\">\u03a0\u03bf\u03b9\u03b1 \u03b5\u03af\u03bd\u03b1\u03b9 \u03c4\u03b1 \u03bf\u03c6\u03ad\u03bb\u03b7 \u03b1\u03c0\u03cc \u03c4\u03b7 \u03c7\u03c1\u03ae\u03c3\u03b7 \u03c4\u03c9\u03bd Cobots \u03c3\u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae;<\/h4>\n\n\n\n<p>\u03a3\u03c4\u03b1 \u03bf\u03c6\u03ad\u03bb\u03b7 \u03c0\u03b5\u03c1\u03b9\u03bb\u03b1\u03bc\u03b2\u03ac\u03bd\u03bf\u03bd\u03c4\u03b1\u03b9 \u03b7 \u03bc\u03b5\u03c4\u03ac\u03b2\u03b1\u03c3\u03b7 \u03c0\u03c1\u03bf\u03c2 \u03c4\u03b7 \u03b2\u03b9\u03bf\u03bc\u03b7\u03c7\u03b1\u03bd\u03af\u03b1 4.0, \u03b7 \u03b1\u03c5\u03be\u03b7\u03bc\u03ad\u03bd\u03b7 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1, \u03b7 \u03b2\u03b5\u03bb\u03c4\u03b9\u03c9\u03bc\u03ad\u03bd\u03b7 \u03b1\u03c3\u03c6\u03ac\u03bb\u03b5\u03b9\u03b1 \u03c3\u03c4\u03bf \u03c7\u03ce\u03c1\u03bf \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2, \u03b7 \u03b1\u03cd\u03be\u03b7\u03c3\u03b7 \u03c4\u03c9\u03bd \u03c0\u03c9\u03bb\u03ae\u03c3\u03b5\u03c9\u03bd, \u03bf \u03b5\u03be\u03bf\u03c1\u03b8\u03bf\u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03cc\u03c2 \u03c4\u03b7\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2, \u03b7 \u03bc\u03b5\u03af\u03c9\u03c3\u03b7 \u03c4\u03c9\u03bd \u03c7\u03c1\u03cc\u03bd\u03c9\u03bd \u03c0\u03b1\u03c1\u03ac\u03b4\u03bf\u03c3\u03b7\u03c2, \u03b7 \u03b2\u03b5\u03bb\u03c4\u03af\u03c9\u03c3\u03b7 \u03c4\u03b7\u03c2 \u03b4\u03b9\u03b1\u03c7\u03b5\u03af\u03c1\u03b9\u03c3\u03b7\u03c2 \u03c4\u03c9\u03bd \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03c9\u03bd \u03c4\u03c9\u03bd \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03c9\u03bd \u03ba\u03b1\u03b9 \u03b7 \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-b814b8cc gb-headline-text\">\u03a0\u03bf\u03b9\u03b1 \u03b5\u03af\u03bd\u03b1\u03b9 \u03bf\u03c1\u03b9\u03c3\u03bc\u03ad\u03bd\u03b1 \u03bc\u03b5\u03b9\u03bf\u03bd\u03b5\u03ba\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1 \u03c4\u03b7\u03c2 \u03c7\u03c1\u03ae\u03c3\u03b7\u03c2 Cobots;<\/h4>\n\n\n\n<p>\u03a3\u03c4\u03b1 \u03bc\u03b5\u03b9\u03bf\u03bd\u03b5\u03ba\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1 \u03c0\u03b5\u03c1\u03b9\u03bb\u03b1\u03bc\u03b2\u03ac\u03bd\u03bf\u03bd\u03c4\u03b1\u03b9 \u03b7 \u03b5\u03be\u03ac\u03c1\u03c4\u03b7\u03c3\u03b7 \u03b1\u03c0\u03cc \u03b5\u03be\u03b5\u03b9\u03b4\u03b9\u03ba\u03b5\u03c5\u03bc\u03ad\u03bd\u03bf\u03c5\u03c2 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03c4\u03ad\u03c2, \u03b7 \u03c0\u03b5\u03c1\u03b9\u03bf\u03c1\u03b9\u03c3\u03bc\u03ad\u03bd\u03b7 \u03c7\u03c9\u03c1\u03b7\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c6\u03bf\u03c1\u03c4\u03af\u03bf\u03c5, \u03c4\u03bf \u03c5\u03c8\u03b7\u03bb\u03cc \u03b1\u03c1\u03c7\u03b9\u03ba\u03cc \u03ba\u03cc\u03c3\u03c4\u03bf\u03c2 \u03b5\u03c0\u03ad\u03bd\u03b4\u03c5\u03c3\u03b7\u03c2, \u03bf\u03b9 \u03ba\u03af\u03bd\u03b4\u03c5\u03bd\u03bf\u03b9 \u03b1\u03c3\u03c6\u03ac\u03bb\u03b5\u03b9\u03b1\u03c2 \u03bb\u03cc\u03b3\u03c9 \u03c4\u03b7\u03c2 \u03c3\u03c5\u03bd\u03b4\u03b5\u03c3\u03b9\u03bc\u03cc\u03c4\u03b7\u03c4\u03ac\u03c2 \u03c4\u03bf\u03c5\u03c2 \u03bc\u03b5 \u03c4\u03bf \u0394\u03b9\u03b1\u03b4\u03af\u03ba\u03c4\u03c5\u03bf \u03c4\u03c9\u03bd \u03c0\u03c1\u03b1\u03b3\u03bc\u03ac\u03c4\u03c9\u03bd (IoT) \u03ba\u03b1\u03b9 \u03b7 \u03c0\u03b5\u03c1\u03b9\u03bf\u03c1\u03b9\u03c3\u03bc\u03ad\u03bd\u03b7 \u03c4\u03b1\u03c7\u03cd\u03c4\u03b7\u03c4\u03b1 \u03b3\u03b9\u03b1 \u03b1\u03c3\u03c6\u03b1\u03bb\u03ae \u03b1\u03bd\u03b8\u03c1\u03ce\u03c0\u03b9\u03bd\u03b7 \u03b1\u03bb\u03bb\u03b7\u03bb\u03b5\u03c0\u03af\u03b4\u03c1\u03b1\u03c3\u03b7.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-68076bb8 gb-headline-text\">\u03a0\u03ce\u03c2 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03c4\u03bf \u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03b9\u03ba\u03cc APS \u03bd\u03b1 \u03b2\u03bf\u03b7\u03b8\u03ae\u03c3\u03b5\u03b9 \u03c3\u03c4\u03b7 \u03b4\u03b9\u03b1\u03c7\u03b5\u03af\u03c1\u03b9\u03c3\u03b7 \u03c4\u03c9\u03bd Cobots;<\/h4>\n\n\n\n<p>\u0388\u03bd\u03b1 \u03c0\u03c1\u03bf\u03b7\u03b3\u03bc\u03ad\u03bd\u03bf \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03bf\u03cd \u03ba\u03b1\u03b9 \u03c3\u03c7\u03b5\u03b4\u03b9\u03b1\u03c3\u03bc\u03bf\u03cd (APS) \u03b1\u03c5\u03c4\u03bf\u03bc\u03b1\u03c4\u03bf\u03c0\u03bf\u03b9\u03b5\u03af \u03c0\u03bf\u03bb\u03bb\u03ad\u03c2 \u03b1\u03c0\u03cc \u03c4\u03b9\u03c2 \u03c0\u03bf\u03bb\u03cd\u03c0\u03bb\u03bf\u03ba\u03b5\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03bf\u03cd \u03c0\u03bf\u03c5 \u03b4\u03b9\u03b1\u03c6\u03bf\u03c1\u03b5\u03c4\u03b9\u03ba\u03ac \u03b8\u03b1 \u03b1\u03c0\u03b1\u03b9\u03c4\u03bf\u03cd\u03c3\u03b1\u03bd \u03b5\u03be\u03b5\u03b9\u03b4\u03b9\u03ba\u03b5\u03c5\u03bc\u03ad\u03bd\u03bf \u03c0\u03c1\u03bf\u03c3\u03c9\u03c0\u03b9\u03ba\u03cc.\n\u03a0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03af\u03b6\u03b5\u03b9 \u03b1\u03c0\u03bf\u03c4\u03b5\u03bb\u03b5\u03c3\u03bc\u03b1\u03c4\u03b9\u03ba\u03ac \u03ba\u03b1\u03b9 \u03b1\u03bd\u03b1\u03ba\u03b1\u03c4\u03b1\u03bd\u03ad\u03bc\u03b5\u03b9 \u03c4\u03b1 Cobots \u03bc\u03b5 \u03b2\u03ac\u03c3\u03b7 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03b5 \u03c0\u03c1\u03b1\u03b3\u03bc\u03b1\u03c4\u03b9\u03ba\u03cc \u03c7\u03c1\u03cc\u03bd\u03bf, \u03bc\u03b5\u03b9\u03ce\u03bd\u03bf\u03bd\u03c4\u03b1\u03c2 \u03c4\u03b7\u03bd \u03b5\u03be\u03ac\u03c1\u03c4\u03b7\u03c3\u03b7 \u03b1\u03c0\u03cc \u03b5\u03c0\u03b1\u03b3\u03b3\u03b5\u03bb\u03bc\u03b1\u03c4\u03af\u03b5\u03c2 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03c4\u03ad\u03c2 \u03ba\u03b1\u03b9 \u03bc\u03b5\u03b3\u03b9\u03c3\u03c4\u03bf\u03c0\u03bf\u03b9\u03ce\u03bd\u03c4\u03b1\u03c2 \u03c4\u03b7\u03bd \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03ac \u03c4\u03bf\u03c5\u03c2. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-32124667 gb-headline-text\">\u0393\u03b9\u03b1\u03c4\u03af \u03c4\u03bf UR5 \u03b5\u03af\u03bd\u03b1\u03b9 \u03ad\u03bd\u03b1 \u03c3\u03b7\u03bc\u03b1\u03bd\u03c4\u03b9\u03ba\u03cc Cobot \u03c3\u03c4\u03b7 \u03bc\u03b5\u03c4\u03b1\u03c0\u03bf\u03b9\u03b7\u03c4\u03b9\u03ba\u03ae \u03b2\u03b9\u03bf\u03bc\u03b7\u03c7\u03b1\u03bd\u03af\u03b1;<\/h4>\n\n\n\n<p>\u03a4\u03bf UR5 \u03b4\u03b9\u03b1\u03ba\u03c1\u03af\u03bd\u03b5\u03c4\u03b1\u03b9 \u03b3\u03b9\u03b1 \u03c4\u03bf\u03bd \u03b5\u03bb\u03b1\u03c6\u03c1\u03cd \u03c3\u03c7\u03b5\u03b4\u03b9\u03b1\u03c3\u03bc\u03cc \u03c4\u03bf\u03c5 \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03b9\u03ba\u03b1\u03bd\u03cc\u03c4\u03b7\u03c4\u03ac \u03c4\u03bf\u03c5 \u03bd\u03b1 \u03c7\u03b5\u03b9\u03c1\u03af\u03b6\u03b5\u03c4\u03b1\u03b9 \u03c6\u03bf\u03c1\u03c4\u03af\u03b1 \u03ad\u03c9\u03c2 5 kg.\n\u0388\u03c7\u03b5\u03b9 \u03c3\u03c7\u03b5\u03b4\u03b9\u03b1\u03c3\u03c4\u03b5\u03af \u03b3\u03b9\u03b1 \u03bd\u03b1 \u03c0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03cc\u03b6\u03b5\u03c4\u03b1\u03b9 \u03c3\u03b5 \u03b4\u03b9\u03ac\u03c6\u03bf\u03c1\u03b5\u03c2 \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03b7\u03c3\u03b9\u03b1\u03ba\u03ad\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2, \u03b1\u03c0\u03cc \u03c4\u03b7 \u03c3\u03c5\u03bd\u03b1\u03c1\u03bc\u03bf\u03bb\u03cc\u03b3\u03b7\u03c3\u03b7 \u03ad\u03c9\u03c2 \u03c4\u03b7 \u03c3\u03c5\u03c3\u03ba\u03b5\u03c5\u03b1\u03c3\u03af\u03b1, \u03b1\u03ba\u03cc\u03bc\u03b7 \u03ba\u03b1\u03b9 \u03c3\u03c4\u03b9\u03c2 \u03c0\u03b9\u03bf \u03b4\u03cd\u03c3\u03ba\u03bf\u03bb\u03b5\u03c2 \u03b3\u03c9\u03bd\u03af\u03b5\u03c2.\n\u039c\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03b5\u03bd\u03b9\u03c3\u03c7\u03cd\u03c3\u03b5\u03b9 \u03c3\u03b7\u03bc\u03b1\u03bd\u03c4\u03b9\u03ba\u03ac \u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03ba\u03b1\u03b9 \u03c4\u03b9\u03c2 \u03c0\u03c9\u03bb\u03ae\u03c3\u03b5\u03b9\u03c2 \u03cc\u03c4\u03b1\u03bd \u03b5\u03bd\u03c3\u03c9\u03bc\u03b1\u03c4\u03ce\u03bd\u03b5\u03c4\u03b1\u03b9 \u03bc\u03b5 \u03c4\u03bf \u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03b9\u03ba\u03cc APS.  <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-26a9f34a gb-headline-text\">\u03a0\u03ce\u03c2 \u03c3\u03c5\u03bc\u03b2\u03ac\u03bb\u03bb\u03bf\u03c5\u03bd \u03c4\u03b1 Cobots \u03c3\u03c4\u03b7 \u03b2\u03b9\u03bf\u03bc\u03b7\u03c7\u03b1\u03bd\u03af\u03b1 4.0;<\/h4>\n\n\n\n<p>\u03a4\u03b1 Cobots \u03b5\u03af\u03bd\u03b1\u03b9 \u03ba\u03b5\u03bd\u03c4\u03c1\u03b9\u03ba\u03ae\u03c2 \u03c3\u03b7\u03bc\u03b1\u03c3\u03af\u03b1\u03c2 \u03b3\u03b9\u03b1 \u03c4\u03b7\u03bd \u03b5\u03c0\u03b1\u03bd\u03ac\u03c3\u03c4\u03b1\u03c3\u03b7 \u03c4\u03b7\u03c2 \u0392\u03b9\u03bf\u03bc\u03b7\u03c7\u03b1\u03bd\u03af\u03b1\u03c2 4.0.\n\u039c\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03bd\u03b1 \u03b5\u03c0\u03b9\u03ba\u03bf\u03b9\u03bd\u03c9\u03bd\u03bf\u03cd\u03bd \u03bc\u03b5 \u03ac\u03bb\u03bb\u03b5\u03c2 \u03bc\u03b7\u03c7\u03b1\u03bd\u03ad\u03c2 \u03bc\u03ad\u03c3\u03c9 \u03c4\u03bf\u03c5 \u0394\u03b9\u03b1\u03b4\u03b9\u03ba\u03c4\u03cd\u03bf\u03c5 \u03c4\u03c9\u03bd \u03a0\u03c1\u03b1\u03b3\u03bc\u03ac\u03c4\u03c9\u03bd (IoT), \u03b1\u03bd\u03bf\u03af\u03b3\u03bf\u03bd\u03c4\u03b1\u03c2 \u03c4\u03bf \u03b4\u03c1\u03cc\u03bc\u03bf \u03b3\u03b9\u03b1 \u03c0\u03b9\u03bf \u03ad\u03be\u03c5\u03c0\u03bd\u03b5\u03c2, \u03c3\u03c5\u03bd\u03b4\u03b5\u03b4\u03b5\u03bc\u03ad\u03bd\u03b5\u03c2 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b5\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2.\n\u03a3\u03c5\u03bb\u03bb\u03ad\u03b3\u03bf\u03c5\u03bd \u03ba\u03b1\u03b9 \u03b1\u03bd\u03b1\u03bb\u03cd\u03bf\u03c5\u03bd \u03b5\u03c0\u03af\u03c3\u03b7\u03c2 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03b1, \u03b2\u03bf\u03b7\u03b8\u03ce\u03bd\u03c4\u03b1\u03c2 \u03c4\u03b9\u03c2 \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03ae\u03c3\u03b5\u03b9\u03c2 \u03bd\u03b1 \u03bb\u03b1\u03bc\u03b2\u03ac\u03bd\u03bf\u03c5\u03bd \u03c0\u03b9\u03bf \u03ad\u03be\u03c5\u03c0\u03bd\u03b5\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03b5\u03ba\u03bc\u03b7\u03c1\u03b9\u03c9\u03bc\u03ad\u03bd\u03b5\u03c2 \u03b1\u03c0\u03bf\u03c6\u03ac\u03c3\u03b5\u03b9\u03c2.  <\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-92545123\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-0a61546f\">\n<div class=\"gb-grid-column gb-grid-column-e4183086\"><div class=\"gb-container gb-container-e4183086\">\n\n<\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-84ccbb5d\"><div class=\"gb-container gb-container-84ccbb5d\">\n\n<\/div><\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Cobots: Cobots: \u0397 \u03b1\u03bd\u03b1\u03b3\u03ad\u03bd\u03bd\u03b7\u03c3\u03b7 \u03c4\u03b7\u03c2 \u03bc\u03b5\u03c4\u03b1\u03c0\u03bf\u03af\u03b7\u03c3\u03b7\u03c2 Home &#8221; \u03a0\u03b7\u03b3\u03ad\u03c2 &#8221; Cobots: Cobots: \u0397 \u03b1\u03bd\u03b1\u03b3\u03ad\u03bd\u03bd\u03b7\u03c3\u03b7 \u03c4\u03b7\u03c2 \u03bc\u03b5\u03c4\u03b1\u03c0\u03bf\u03af\u03b7\u03c3\u03b7\u03c2 \u03a6\u03b1\u03bd\u03c4\u03b1\u03c3\u03c4\u03b5\u03af\u03c4\u03b5 \u03c4\u03b7\u03bd \u03ba\u03b1\u03b8\u03b7\u03bc\u03b5\u03c1\u03b9\u03bd\u03cc\u03c4\u03b7\u03c4\u03b1 \u03bc\u03b9\u03b1\u03c2 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ae\u03c2 \u03c3\u03c5\u03bd\u03b1\u03c1\u03bc\u03bf\u03bb\u03cc\u03b3\u03b7\u03c3\u03b7\u03c2: \u03b5\u03c1\u03b3\u03ac\u03c4\u03b5\u03c2 \u03c0\u03bf\u03c5 \u03b5\u03ba\u03c4\u03b5\u03bb\u03bf\u03cd\u03bd \u03b1\u03ba\u03bf\u03cd\u03c1\u03b1\u03c3\u03c4\u03b1 \u03b5\u03c0\u03b1\u03bd\u03b1\u03bb\u03b1\u03bc\u03b2\u03b1\u03bd\u03cc\u03bc\u03b5\u03bd\u03b5\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2. \u039a\u03b1\u03b8\u03ce\u03c2 \u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7 \u03b5\u03ba\u03c4\u03bf\u03be\u03b5\u03cd\u03b5\u03c4\u03b1\u03b9 \u03c3\u03c4\u03b1 \u03cd\u03c8\u03b7, \u03bf\u03b9 \u03b5\u03c1\u03b3\u03b1\u03b6\u03cc\u03bc\u03b5\u03bd\u03bf\u03b9 \u03c0\u03b1\u03c3\u03c7\u03af\u03b6\u03bf\u03c5\u03bd \u03bd\u03b1 \u03c3\u03c5\u03bc\u03b2\u03b1\u03b4\u03af\u03c3\u03bf\u03c5\u03bd. \u0397 \u03b4\u03c5\u03c3\u03c7\u03b5\u03c1\u03ae\u03c2 \u03b1\u03c5\u03c4\u03ae \u03ba\u03b1\u03c4\u03ac\u03c3\u03c4\u03b1\u03c3\u03b7 \u03b8\u03b1 \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03c3\u03b5 \u03bd\u03b1 \u03c0\u03c1\u03bf\u03ba\u03b1\u03bb\u03ad\u03c3\u03b5\u03b9 \u03b1\u03ba\u03cc\u03bc\u03b7 \u03ba\u03b1\u03b9 \u03bc\u03b5\u03af\u03c9\u03c3\u03b7 \u03c4\u03c9\u03bd \u03c0\u03c9\u03bb\u03ae\u03c3\u03b5\u03c9\u03bd. \u0391\u03bb\u03bb\u03ac \u03c0\u03b5\u03c1\u03b9\u03bc\u03ad\u03bd\u03b5\u03c4\u03b5, \u03c5\u03c0\u03ac\u03c1\u03c7\u03b5\u03b9 &#8230; <a title=\"Cobots: Cobots: \u0397 \u03b1\u03bd\u03b1\u03b3\u03ad\u03bd\u03bd\u03b7\u03c3\u03b7 \u03c4\u03b7\u03c2 \u03bc\u03b5\u03c4\u03b1\u03c0\u03bf\u03af\u03b7\u03c3\u03b7\u03c2\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/cobots-cobots-%ce%b7-%ce%b1%ce%bd%ce%b1%ce%b3%ce%ad%ce%bd%ce%bd%ce%b7%cf%83%ce%b7-%cf%84%ce%b7%cf%82-%ce%bc%ce%b5%cf%84%ce%b1%cf%80%ce%bf%ce%af%ce%b7%cf%83%ce%b7%cf%82\/\" aria-label=\"Read more about Cobots: Cobots: \u0397 \u03b1\u03bd\u03b1\u03b3\u03ad\u03bd\u03bd\u03b7\u03c3\u03b7 \u03c4\u03b7\u03c2 \u03bc\u03b5\u03c4\u03b1\u03c0\u03bf\u03af\u03b7\u03c3\u03b7\u03c2\">Read more<\/a><\/p>\n","protected":false},"author":6,"featured_media":38080,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2553,477],"tags":[],"class_list":["post-38078","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-2553","category-477","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Cobots: Cobots: \u0397 \u03b1\u03bd\u03b1\u03b3\u03ad\u03bd\u03bd\u03b7\u03c3\u03b7 \u03c4\u03b7\u03c2 \u03bc\u03b5\u03c4\u03b1\u03c0\u03bf\u03af\u03b7\u03c3\u03b7\u03c2 &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"\u03a4\u03b1 Cobots \u03b5\u03af\u03bd\u03b1\u03b9 \u03b5\u03be\u03b5\u03bb\u03b9\u03b3\u03bc\u03ad\u03bd\u03b5\u03c2 \u03bc\u03b7\u03c7\u03b1\u03bd\u03ad\u03c2 \u03c0\u03bf\u03c5 \u03ad\u03c7\u03bf\u03c5\u03bd \u03c3\u03c7\u03b5\u03b4\u03b9\u03b1\u03c3\u03c4\u03b5\u03af \u03b3\u03b9\u03b1 \u03bd\u03b1 \u03b5\u03bd\u03b9\u03c3\u03c7\u03cd\u03bf\u03c5\u03bd \u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1, \u03c4\u03b7\u03bd \u03b1\u03c3\u03c6\u03ac\u03bb\u03b5\u03b9\u03b1 \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03b1\u03bd\u03ac\u03c0\u03c4\u03c5\u03be\u03b7 \u03c3\u03c4\u03b9\u03c2 \u03b2\u03b9\u03bf\u03bc\u03b7\u03c7\u03b1\u03bd\u03af\u03b5\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03b5 \u03c3\u03c5\u03bd\u03b4\u03c5\u03b1\u03c3\u03bc\u03cc \u03bc\u03b5 \u03c4\u03bf\u03bd \u03ac\u03bd\u03b8\u03c1\u03c9\u03c0\u03bf.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/cobots-cobots-%ce%b7-%ce%b1%ce%bd%ce%b1%ce%b3%ce%ad%ce%bd%ce%bd%ce%b7%cf%83%ce%b7-%cf%84%ce%b7%cf%82-%ce%bc%ce%b5%cf%84%ce%b1%cf%80%ce%bf%ce%af%ce%b7%cf%83%ce%b7%cf%82\/\" \/>\n<meta property=\"og:locale\" content=\"el_GR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Cobots: Cobots: \u0397 \u03b1\u03bd\u03b1\u03b3\u03ad\u03bd\u03bd\u03b7\u03c3\u03b7 \u03c4\u03b7\u03c2 \u03bc\u03b5\u03c4\u03b1\u03c0\u03bf\u03af\u03b7\u03c3\u03b7\u03c2\" \/>\n<meta property=\"og:description\" content=\"\u03a4\u03b1 Cobots \u03b5\u03af\u03bd\u03b1\u03b9 \u03b5\u03be\u03b5\u03bb\u03b9\u03b3\u03bc\u03ad\u03bd\u03b5\u03c2 \u03bc\u03b7\u03c7\u03b1\u03bd\u03ad\u03c2 \u03c0\u03bf\u03c5 \u03ad\u03c7\u03bf\u03c5\u03bd \u03c3\u03c7\u03b5\u03b4\u03b9\u03b1\u03c3\u03c4\u03b5\u03af \u03b3\u03b9\u03b1 \u03bd\u03b1 \u03b5\u03bd\u03b9\u03c3\u03c7\u03cd\u03bf\u03c5\u03bd \u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1, \u03c4\u03b7\u03bd \u03b1\u03c3\u03c6\u03ac\u03bb\u03b5\u03b9\u03b1 \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03b1\u03bd\u03ac\u03c0\u03c4\u03c5\u03be\u03b7 \u03c3\u03c4\u03b9\u03c2 \u03b2\u03b9\u03bf\u03bc\u03b7\u03c7\u03b1\u03bd\u03af\u03b5\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03b5 \u03c3\u03c5\u03bd\u03b4\u03c5\u03b1\u03c3\u03bc\u03cc \u03bc\u03b5 \u03c4\u03bf\u03bd \u03ac\u03bd\u03b8\u03c1\u03c9\u03c0\u03bf.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/cobots-cobots-%ce%b7-%ce%b1%ce%bd%ce%b1%ce%b3%ce%ad%ce%bd%ce%bd%ce%b7%cf%83%ce%b7-%cf%84%ce%b7%cf%82-%ce%bc%ce%b5%cf%84%ce%b1%cf%80%ce%bf%ce%af%ce%b7%cf%83%ce%b7%cf%82\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2023-07-14T18:56:42+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-08-07T09:48:29+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/COBOTS_IN_MANUFACTURING-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1707\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u03a3\u03c5\u03bd\u03c4\u03ac\u03c7\u03b8\u03b7\u03ba\u03b5 \u03b1\u03c0\u03cc\" \/>\n\t<meta name=\"twitter:data1\" content=\"SkyPlanner\" \/>\n\t<meta name=\"twitter:label2\" content=\"\u0395\u03ba\u03c4\u03b9\u03bc\u03ce\u03bc\u03b5\u03bd\u03bf\u03c2 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c2 \u03b1\u03bd\u03ac\u03b3\u03bd\u03c9\u03c3\u03b7\u03c2\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 \u03bb\u03b5\u03c0\u03c4\u03cc\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/cobots-cobots-%ce%b7-%ce%b1%ce%bd%ce%b1%ce%b3%ce%ad%ce%bd%ce%bd%ce%b7%cf%83%ce%b7-%cf%84%ce%b7%cf%82-%ce%bc%ce%b5%cf%84%ce%b1%cf%80%ce%bf%ce%af%ce%b7%cf%83%ce%b7%cf%82\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/cobots-cobots-%ce%b7-%ce%b1%ce%bd%ce%b1%ce%b3%ce%ad%ce%bd%ce%bd%ce%b7%cf%83%ce%b7-%cf%84%ce%b7%cf%82-%ce%bc%ce%b5%cf%84%ce%b1%cf%80%ce%bf%ce%af%ce%b7%cf%83%ce%b7%cf%82\\\/\"},\"author\":{\"name\":\"SkyPlanner\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\"},\"headline\":\"Cobots: Cobots: \u0397 \u03b1\u03bd\u03b1\u03b3\u03ad\u03bd\u03bd\u03b7\u03c3\u03b7 \u03c4\u03b7\u03c2 \u03bc\u03b5\u03c4\u03b1\u03c0\u03bf\u03af\u03b7\u03c3\u03b7\u03c2\",\"datePublished\":\"2023-07-14T18:56:42+00:00\",\"dateModified\":\"2024-08-07T09:48:29+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/cobots-cobots-%ce%b7-%ce%b1%ce%bd%ce%b1%ce%b3%ce%ad%ce%bd%ce%bd%ce%b7%cf%83%ce%b7-%cf%84%ce%b7%cf%82-%ce%bc%ce%b5%cf%84%ce%b1%cf%80%ce%bf%ce%af%ce%b7%cf%83%ce%b7%cf%82\\\/\"},\"wordCount\":128,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/cobots-cobots-%ce%b7-%ce%b1%ce%bd%ce%b1%ce%b3%ce%ad%ce%bd%ce%bd%ce%b7%cf%83%ce%b7-%cf%84%ce%b7%cf%82-%ce%bc%ce%b5%cf%84%ce%b1%cf%80%ce%bf%ce%af%ce%b7%cf%83%ce%b7%cf%82\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/COBOTS_IN_MANUFACTURING-scaled.jpg\",\"articleSection\":[\"\u0391\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2\",\"\u03c0\u03cc\u03c1\u03bf\u03b9\"],\"inLanguage\":\"el\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/cobots-cobots-%ce%b7-%ce%b1%ce%bd%ce%b1%ce%b3%ce%ad%ce%bd%ce%bd%ce%b7%cf%83%ce%b7-%cf%84%ce%b7%cf%82-%ce%bc%ce%b5%cf%84%ce%b1%cf%80%ce%bf%ce%af%ce%b7%cf%83%ce%b7%cf%82\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/cobots-cobots-%ce%b7-%ce%b1%ce%bd%ce%b1%ce%b3%ce%ad%ce%bd%ce%bd%ce%b7%cf%83%ce%b7-%cf%84%ce%b7%cf%82-%ce%bc%ce%b5%cf%84%ce%b1%cf%80%ce%bf%ce%af%ce%b7%cf%83%ce%b7%cf%82\\\/\",\"name\":\"Cobots: Cobots: \u0397 \u03b1\u03bd\u03b1\u03b3\u03ad\u03bd\u03bd\u03b7\u03c3\u03b7 \u03c4\u03b7\u03c2 \u03bc\u03b5\u03c4\u03b1\u03c0\u03bf\u03af\u03b7\u03c3\u03b7\u03c2 &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/cobots-cobots-%ce%b7-%ce%b1%ce%bd%ce%b1%ce%b3%ce%ad%ce%bd%ce%bd%ce%b7%cf%83%ce%b7-%cf%84%ce%b7%cf%82-%ce%bc%ce%b5%cf%84%ce%b1%cf%80%ce%bf%ce%af%ce%b7%cf%83%ce%b7%cf%82\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/cobots-cobots-%ce%b7-%ce%b1%ce%bd%ce%b1%ce%b3%ce%ad%ce%bd%ce%bd%ce%b7%cf%83%ce%b7-%cf%84%ce%b7%cf%82-%ce%bc%ce%b5%cf%84%ce%b1%cf%80%ce%bf%ce%af%ce%b7%cf%83%ce%b7%cf%82\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/COBOTS_IN_MANUFACTURING-scaled.jpg\",\"datePublished\":\"2023-07-14T18:56:42+00:00\",\"dateModified\":\"2024-08-07T09:48:29+00:00\",\"description\":\"\u03a4\u03b1 Cobots \u03b5\u03af\u03bd\u03b1\u03b9 \u03b5\u03be\u03b5\u03bb\u03b9\u03b3\u03bc\u03ad\u03bd\u03b5\u03c2 \u03bc\u03b7\u03c7\u03b1\u03bd\u03ad\u03c2 \u03c0\u03bf\u03c5 \u03ad\u03c7\u03bf\u03c5\u03bd \u03c3\u03c7\u03b5\u03b4\u03b9\u03b1\u03c3\u03c4\u03b5\u03af \u03b3\u03b9\u03b1 \u03bd\u03b1 \u03b5\u03bd\u03b9\u03c3\u03c7\u03cd\u03bf\u03c5\u03bd \u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1, \u03c4\u03b7\u03bd \u03b1\u03c3\u03c6\u03ac\u03bb\u03b5\u03b9\u03b1 \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03b1\u03bd\u03ac\u03c0\u03c4\u03c5\u03be\u03b7 \u03c3\u03c4\u03b9\u03c2 \u03b2\u03b9\u03bf\u03bc\u03b7\u03c7\u03b1\u03bd\u03af\u03b5\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03b5 \u03c3\u03c5\u03bd\u03b4\u03c5\u03b1\u03c3\u03bc\u03cc \u03bc\u03b5 \u03c4\u03bf\u03bd \u03ac\u03bd\u03b8\u03c1\u03c9\u03c0\u03bf.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/cobots-cobots-%ce%b7-%ce%b1%ce%bd%ce%b1%ce%b3%ce%ad%ce%bd%ce%bd%ce%b7%cf%83%ce%b7-%cf%84%ce%b7%cf%82-%ce%bc%ce%b5%cf%84%ce%b1%cf%80%ce%bf%ce%af%ce%b7%cf%83%ce%b7%cf%82\\\/#breadcrumb\"},\"inLanguage\":\"el\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/cobots-cobots-%ce%b7-%ce%b1%ce%bd%ce%b1%ce%b3%ce%ad%ce%bd%ce%bd%ce%b7%cf%83%ce%b7-%cf%84%ce%b7%cf%82-%ce%bc%ce%b5%cf%84%ce%b1%cf%80%ce%bf%ce%af%ce%b7%cf%83%ce%b7%cf%82\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"el\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/cobots-cobots-%ce%b7-%ce%b1%ce%bd%ce%b1%ce%b3%ce%ad%ce%bd%ce%bd%ce%b7%cf%83%ce%b7-%cf%84%ce%b7%cf%82-%ce%bc%ce%b5%cf%84%ce%b1%cf%80%ce%bf%ce%af%ce%b7%cf%83%ce%b7%cf%82\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/COBOTS_IN_MANUFACTURING-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/COBOTS_IN_MANUFACTURING-scaled.jpg\",\"width\":2560,\"height\":1707,\"caption\":\"Cobots in Manufacturing\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/cobots-cobots-%ce%b7-%ce%b1%ce%bd%ce%b1%ce%b3%ce%ad%ce%bd%ce%bd%ce%b7%cf%83%ce%b7-%cf%84%ce%b7%cf%82-%ce%bc%ce%b5%cf%84%ce%b1%cf%80%ce%bf%ce%af%ce%b7%cf%83%ce%b7%cf%82\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Cobots: Cobots: \u0397 \u03b1\u03bd\u03b1\u03b3\u03ad\u03bd\u03bd\u03b7\u03c3\u03b7 \u03c4\u03b7\u03c2 \u03bc\u03b5\u03c4\u03b1\u03c0\u03bf\u03af\u03b7\u03c3\u03b7\u03c2\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"el\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"el\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\",\"name\":\"SkyPlanner\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"el\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"caption\":\"SkyPlanner\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Cobots: Cobots: \u0397 \u03b1\u03bd\u03b1\u03b3\u03ad\u03bd\u03bd\u03b7\u03c3\u03b7 \u03c4\u03b7\u03c2 \u03bc\u03b5\u03c4\u03b1\u03c0\u03bf\u03af\u03b7\u03c3\u03b7\u03c2 &#8211; SkyPlanner","description":"\u03a4\u03b1 Cobots \u03b5\u03af\u03bd\u03b1\u03b9 \u03b5\u03be\u03b5\u03bb\u03b9\u03b3\u03bc\u03ad\u03bd\u03b5\u03c2 \u03bc\u03b7\u03c7\u03b1\u03bd\u03ad\u03c2 \u03c0\u03bf\u03c5 \u03ad\u03c7\u03bf\u03c5\u03bd \u03c3\u03c7\u03b5\u03b4\u03b9\u03b1\u03c3\u03c4\u03b5\u03af \u03b3\u03b9\u03b1 \u03bd\u03b1 \u03b5\u03bd\u03b9\u03c3\u03c7\u03cd\u03bf\u03c5\u03bd \u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1, \u03c4\u03b7\u03bd \u03b1\u03c3\u03c6\u03ac\u03bb\u03b5\u03b9\u03b1 \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03b1\u03bd\u03ac\u03c0\u03c4\u03c5\u03be\u03b7 \u03c3\u03c4\u03b9\u03c2 \u03b2\u03b9\u03bf\u03bc\u03b7\u03c7\u03b1\u03bd\u03af\u03b5\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03b5 \u03c3\u03c5\u03bd\u03b4\u03c5\u03b1\u03c3\u03bc\u03cc \u03bc\u03b5 \u03c4\u03bf\u03bd \u03ac\u03bd\u03b8\u03c1\u03c9\u03c0\u03bf.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/cobots-cobots-%ce%b7-%ce%b1%ce%bd%ce%b1%ce%b3%ce%ad%ce%bd%ce%bd%ce%b7%cf%83%ce%b7-%cf%84%ce%b7%cf%82-%ce%bc%ce%b5%cf%84%ce%b1%cf%80%ce%bf%ce%af%ce%b7%cf%83%ce%b7%cf%82\/","og_locale":"el_GR","og_type":"article","og_title":"Cobots: Cobots: \u0397 \u03b1\u03bd\u03b1\u03b3\u03ad\u03bd\u03bd\u03b7\u03c3\u03b7 \u03c4\u03b7\u03c2 \u03bc\u03b5\u03c4\u03b1\u03c0\u03bf\u03af\u03b7\u03c3\u03b7\u03c2","og_description":"\u03a4\u03b1 Cobots \u03b5\u03af\u03bd\u03b1\u03b9 \u03b5\u03be\u03b5\u03bb\u03b9\u03b3\u03bc\u03ad\u03bd\u03b5\u03c2 \u03bc\u03b7\u03c7\u03b1\u03bd\u03ad\u03c2 \u03c0\u03bf\u03c5 \u03ad\u03c7\u03bf\u03c5\u03bd \u03c3\u03c7\u03b5\u03b4\u03b9\u03b1\u03c3\u03c4\u03b5\u03af \u03b3\u03b9\u03b1 \u03bd\u03b1 \u03b5\u03bd\u03b9\u03c3\u03c7\u03cd\u03bf\u03c5\u03bd \u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1, \u03c4\u03b7\u03bd \u03b1\u03c3\u03c6\u03ac\u03bb\u03b5\u03b9\u03b1 \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03b1\u03bd\u03ac\u03c0\u03c4\u03c5\u03be\u03b7 \u03c3\u03c4\u03b9\u03c2 \u03b2\u03b9\u03bf\u03bc\u03b7\u03c7\u03b1\u03bd\u03af\u03b5\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03b5 \u03c3\u03c5\u03bd\u03b4\u03c5\u03b1\u03c3\u03bc\u03cc \u03bc\u03b5 \u03c4\u03bf\u03bd \u03ac\u03bd\u03b8\u03c1\u03c9\u03c0\u03bf.","og_url":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/cobots-cobots-%ce%b7-%ce%b1%ce%bd%ce%b1%ce%b3%ce%ad%ce%bd%ce%bd%ce%b7%cf%83%ce%b7-%cf%84%ce%b7%cf%82-%ce%bc%ce%b5%cf%84%ce%b1%cf%80%ce%bf%ce%af%ce%b7%cf%83%ce%b7%cf%82\/","og_site_name":"SkyPlanner","article_published_time":"2023-07-14T18:56:42+00:00","article_modified_time":"2024-08-07T09:48:29+00:00","og_image":[{"width":2560,"height":1707,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/COBOTS_IN_MANUFACTURING-scaled.jpg","type":"image\/jpeg"}],"author":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"\u03a3\u03c5\u03bd\u03c4\u03ac\u03c7\u03b8\u03b7\u03ba\u03b5 \u03b1\u03c0\u03cc":"SkyPlanner","\u0395\u03ba\u03c4\u03b9\u03bc\u03ce\u03bc\u03b5\u03bd\u03bf\u03c2 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c2 \u03b1\u03bd\u03ac\u03b3\u03bd\u03c9\u03c3\u03b7\u03c2":"1 \u03bb\u03b5\u03c0\u03c4\u03cc"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/cobots-cobots-%ce%b7-%ce%b1%ce%bd%ce%b1%ce%b3%ce%ad%ce%bd%ce%bd%ce%b7%cf%83%ce%b7-%cf%84%ce%b7%cf%82-%ce%bc%ce%b5%cf%84%ce%b1%cf%80%ce%bf%ce%af%ce%b7%cf%83%ce%b7%cf%82\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/cobots-cobots-%ce%b7-%ce%b1%ce%bd%ce%b1%ce%b3%ce%ad%ce%bd%ce%bd%ce%b7%cf%83%ce%b7-%cf%84%ce%b7%cf%82-%ce%bc%ce%b5%cf%84%ce%b1%cf%80%ce%bf%ce%af%ce%b7%cf%83%ce%b7%cf%82\/"},"author":{"name":"SkyPlanner","@id":"https:\/\/skyplanner.ai\/el\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a"},"headline":"Cobots: Cobots: \u0397 \u03b1\u03bd\u03b1\u03b3\u03ad\u03bd\u03bd\u03b7\u03c3\u03b7 \u03c4\u03b7\u03c2 \u03bc\u03b5\u03c4\u03b1\u03c0\u03bf\u03af\u03b7\u03c3\u03b7\u03c2","datePublished":"2023-07-14T18:56:42+00:00","dateModified":"2024-08-07T09:48:29+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/cobots-cobots-%ce%b7-%ce%b1%ce%bd%ce%b1%ce%b3%ce%ad%ce%bd%ce%bd%ce%b7%cf%83%ce%b7-%cf%84%ce%b7%cf%82-%ce%bc%ce%b5%cf%84%ce%b1%cf%80%ce%bf%ce%af%ce%b7%cf%83%ce%b7%cf%82\/"},"wordCount":128,"publisher":{"@id":"https:\/\/skyplanner.ai\/el\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/cobots-cobots-%ce%b7-%ce%b1%ce%bd%ce%b1%ce%b3%ce%ad%ce%bd%ce%bd%ce%b7%cf%83%ce%b7-%cf%84%ce%b7%cf%82-%ce%bc%ce%b5%cf%84%ce%b1%cf%80%ce%bf%ce%af%ce%b7%cf%83%ce%b7%cf%82\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/COBOTS_IN_MANUFACTURING-scaled.jpg","articleSection":["\u0391\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2","\u03c0\u03cc\u03c1\u03bf\u03b9"],"inLanguage":"el"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/cobots-cobots-%ce%b7-%ce%b1%ce%bd%ce%b1%ce%b3%ce%ad%ce%bd%ce%bd%ce%b7%cf%83%ce%b7-%cf%84%ce%b7%cf%82-%ce%bc%ce%b5%cf%84%ce%b1%cf%80%ce%bf%ce%af%ce%b7%cf%83%ce%b7%cf%82\/","url":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/cobots-cobots-%ce%b7-%ce%b1%ce%bd%ce%b1%ce%b3%ce%ad%ce%bd%ce%bd%ce%b7%cf%83%ce%b7-%cf%84%ce%b7%cf%82-%ce%bc%ce%b5%cf%84%ce%b1%cf%80%ce%bf%ce%af%ce%b7%cf%83%ce%b7%cf%82\/","name":"Cobots: Cobots: \u0397 \u03b1\u03bd\u03b1\u03b3\u03ad\u03bd\u03bd\u03b7\u03c3\u03b7 \u03c4\u03b7\u03c2 \u03bc\u03b5\u03c4\u03b1\u03c0\u03bf\u03af\u03b7\u03c3\u03b7\u03c2 &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/el\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/cobots-cobots-%ce%b7-%ce%b1%ce%bd%ce%b1%ce%b3%ce%ad%ce%bd%ce%bd%ce%b7%cf%83%ce%b7-%cf%84%ce%b7%cf%82-%ce%bc%ce%b5%cf%84%ce%b1%cf%80%ce%bf%ce%af%ce%b7%cf%83%ce%b7%cf%82\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/cobots-cobots-%ce%b7-%ce%b1%ce%bd%ce%b1%ce%b3%ce%ad%ce%bd%ce%bd%ce%b7%cf%83%ce%b7-%cf%84%ce%b7%cf%82-%ce%bc%ce%b5%cf%84%ce%b1%cf%80%ce%bf%ce%af%ce%b7%cf%83%ce%b7%cf%82\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/COBOTS_IN_MANUFACTURING-scaled.jpg","datePublished":"2023-07-14T18:56:42+00:00","dateModified":"2024-08-07T09:48:29+00:00","description":"\u03a4\u03b1 Cobots \u03b5\u03af\u03bd\u03b1\u03b9 \u03b5\u03be\u03b5\u03bb\u03b9\u03b3\u03bc\u03ad\u03bd\u03b5\u03c2 \u03bc\u03b7\u03c7\u03b1\u03bd\u03ad\u03c2 \u03c0\u03bf\u03c5 \u03ad\u03c7\u03bf\u03c5\u03bd \u03c3\u03c7\u03b5\u03b4\u03b9\u03b1\u03c3\u03c4\u03b5\u03af \u03b3\u03b9\u03b1 \u03bd\u03b1 \u03b5\u03bd\u03b9\u03c3\u03c7\u03cd\u03bf\u03c5\u03bd \u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1, \u03c4\u03b7\u03bd \u03b1\u03c3\u03c6\u03ac\u03bb\u03b5\u03b9\u03b1 \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03b1\u03bd\u03ac\u03c0\u03c4\u03c5\u03be\u03b7 \u03c3\u03c4\u03b9\u03c2 \u03b2\u03b9\u03bf\u03bc\u03b7\u03c7\u03b1\u03bd\u03af\u03b5\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03b5 \u03c3\u03c5\u03bd\u03b4\u03c5\u03b1\u03c3\u03bc\u03cc \u03bc\u03b5 \u03c4\u03bf\u03bd \u03ac\u03bd\u03b8\u03c1\u03c9\u03c0\u03bf.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/cobots-cobots-%ce%b7-%ce%b1%ce%bd%ce%b1%ce%b3%ce%ad%ce%bd%ce%bd%ce%b7%cf%83%ce%b7-%cf%84%ce%b7%cf%82-%ce%bc%ce%b5%cf%84%ce%b1%cf%80%ce%bf%ce%af%ce%b7%cf%83%ce%b7%cf%82\/#breadcrumb"},"inLanguage":"el","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/cobots-cobots-%ce%b7-%ce%b1%ce%bd%ce%b1%ce%b3%ce%ad%ce%bd%ce%bd%ce%b7%cf%83%ce%b7-%cf%84%ce%b7%cf%82-%ce%bc%ce%b5%cf%84%ce%b1%cf%80%ce%bf%ce%af%ce%b7%cf%83%ce%b7%cf%82\/"]}]},{"@type":"ImageObject","inLanguage":"el","@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/cobots-cobots-%ce%b7-%ce%b1%ce%bd%ce%b1%ce%b3%ce%ad%ce%bd%ce%bd%ce%b7%cf%83%ce%b7-%cf%84%ce%b7%cf%82-%ce%bc%ce%b5%cf%84%ce%b1%cf%80%ce%bf%ce%af%ce%b7%cf%83%ce%b7%cf%82\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/COBOTS_IN_MANUFACTURING-scaled.jpg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/COBOTS_IN_MANUFACTURING-scaled.jpg","width":2560,"height":1707,"caption":"Cobots in Manufacturing"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/cobots-cobots-%ce%b7-%ce%b1%ce%bd%ce%b1%ce%b3%ce%ad%ce%bd%ce%bd%ce%b7%cf%83%ce%b7-%cf%84%ce%b7%cf%82-%ce%bc%ce%b5%cf%84%ce%b1%cf%80%ce%bf%ce%af%ce%b7%cf%83%ce%b7%cf%82\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/el\/"},{"@type":"ListItem","position":2,"name":"Cobots: Cobots: \u0397 \u03b1\u03bd\u03b1\u03b3\u03ad\u03bd\u03bd\u03b7\u03c3\u03b7 \u03c4\u03b7\u03c2 \u03bc\u03b5\u03c4\u03b1\u03c0\u03bf\u03af\u03b7\u03c3\u03b7\u03c2"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/el\/#website","url":"https:\/\/skyplanner.ai\/el\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/el\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/el\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"el"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/el\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/el\/","logo":{"@type":"ImageObject","inLanguage":"el","@id":"https:\/\/skyplanner.ai\/el\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/el\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/el\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a","name":"SkyPlanner","image":{"@type":"ImageObject","inLanguage":"el","@id":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","caption":"SkyPlanner"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/COBOTS_IN_MANUFACTURING-scaled.jpg",2560,1707,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/COBOTS_IN_MANUFACTURING-150x150.jpg",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/COBOTS_IN_MANUFACTURING-300x200.jpg",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/COBOTS_IN_MANUFACTURING-768x512.jpg",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/COBOTS_IN_MANUFACTURING-1024x683.jpg",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/COBOTS_IN_MANUFACTURING-1536x1024.jpg",1536,1024,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/COBOTS_IN_MANUFACTURING-2048x1365.jpg",2048,1365,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/COBOTS_IN_MANUFACTURING-scaled.jpg",360,240,false]},"uagb_author_info":{"display_name":"SkyPlanner","author_link":"https:\/\/skyplanner.ai\/el\/author\/bettina\/"},"uagb_comment_info":0,"uagb_excerpt":"Cobots: Cobots: \u0397 \u03b1\u03bd\u03b1\u03b3\u03ad\u03bd\u03bd\u03b7\u03c3\u03b7 \u03c4\u03b7\u03c2 \u03bc\u03b5\u03c4\u03b1\u03c0\u03bf\u03af\u03b7\u03c3\u03b7\u03c2 Home &#8221; \u03a0\u03b7\u03b3\u03ad\u03c2 &#8221; Cobots: Cobots: \u0397 \u03b1\u03bd\u03b1\u03b3\u03ad\u03bd\u03bd\u03b7\u03c3\u03b7 \u03c4\u03b7\u03c2 \u03bc\u03b5\u03c4\u03b1\u03c0\u03bf\u03af\u03b7\u03c3\u03b7\u03c2 \u03a6\u03b1\u03bd\u03c4\u03b1\u03c3\u03c4\u03b5\u03af\u03c4\u03b5 \u03c4\u03b7\u03bd \u03ba\u03b1\u03b8\u03b7\u03bc\u03b5\u03c1\u03b9\u03bd\u03cc\u03c4\u03b7\u03c4\u03b1 \u03bc\u03b9\u03b1\u03c2 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ae\u03c2 \u03c3\u03c5\u03bd\u03b1\u03c1\u03bc\u03bf\u03bb\u03cc\u03b3\u03b7\u03c3\u03b7\u03c2: \u03b5\u03c1\u03b3\u03ac\u03c4\u03b5\u03c2 \u03c0\u03bf\u03c5 \u03b5\u03ba\u03c4\u03b5\u03bb\u03bf\u03cd\u03bd \u03b1\u03ba\u03bf\u03cd\u03c1\u03b1\u03c3\u03c4\u03b1 \u03b5\u03c0\u03b1\u03bd\u03b1\u03bb\u03b1\u03bc\u03b2\u03b1\u03bd\u03cc\u03bc\u03b5\u03bd\u03b5\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2. \u039a\u03b1\u03b8\u03ce\u03c2 \u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7 \u03b5\u03ba\u03c4\u03bf\u03be\u03b5\u03cd\u03b5\u03c4\u03b1\u03b9 \u03c3\u03c4\u03b1 \u03cd\u03c8\u03b7, \u03bf\u03b9 \u03b5\u03c1\u03b3\u03b1\u03b6\u03cc\u03bc\u03b5\u03bd\u03bf\u03b9 \u03c0\u03b1\u03c3\u03c7\u03af\u03b6\u03bf\u03c5\u03bd \u03bd\u03b1 \u03c3\u03c5\u03bc\u03b2\u03b1\u03b4\u03af\u03c3\u03bf\u03c5\u03bd. \u0397 \u03b4\u03c5\u03c3\u03c7\u03b5\u03c1\u03ae\u03c2 \u03b1\u03c5\u03c4\u03ae \u03ba\u03b1\u03c4\u03ac\u03c3\u03c4\u03b1\u03c3\u03b7 \u03b8\u03b1 \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03c3\u03b5 \u03bd\u03b1 \u03c0\u03c1\u03bf\u03ba\u03b1\u03bb\u03ad\u03c3\u03b5\u03b9 \u03b1\u03ba\u03cc\u03bc\u03b7 \u03ba\u03b1\u03b9 \u03bc\u03b5\u03af\u03c9\u03c3\u03b7 \u03c4\u03c9\u03bd \u03c0\u03c9\u03bb\u03ae\u03c3\u03b5\u03c9\u03bd. \u0391\u03bb\u03bb\u03ac \u03c0\u03b5\u03c1\u03b9\u03bc\u03ad\u03bd\u03b5\u03c4\u03b5, \u03c5\u03c0\u03ac\u03c1\u03c7\u03b5\u03b9&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/posts\/38078","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/comments?post=38078"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/posts\/38078\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/media\/38080"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/media?parent=38078"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/categories?post=38078"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/tags?post=38078"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}