{"id":105626,"date":"2026-10-22T03:50:52","date_gmt":"2026-10-22T03:50:52","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=105626"},"modified":"2026-10-22T03:53:10","modified_gmt":"2026-10-22T03:53:10","slug":"line-balancing","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/line-balancing\/","title":{"rendered":"\u0395\u03be\u03b9\u03c3\u03bf\u03c1\u03c1\u03cc\u03c0\u03b7\u03c3\u03b7 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ae\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u03a0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03cc\u03c3\u03c4\u03b5 \u03c4\u03b7\u03bd \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1 \u03c3\u03c4\u03bf\u03bd \u03c1\u03c5\u03b8\u03bc\u03cc"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">\u0395\u03be\u03b9\u03c3\u03bf\u03c1\u03c1\u03cc\u03c0\u03b7\u03c3\u03b7 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ae\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u03a0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03cc\u03c3\u03c4\u03b5 \u03c4\u03b7\u03bd \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1 \u03c3\u03c4\u03bf\u03bd \u03c1\u03c5\u03b8\u03bc\u03cc<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/el\/\">\u0391\u03c1\u03c7\u03b9\u03ba\u03ae<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/\">\u03a0\u03cc\u03c1\u03bf\u03b9<\/a> &raquo; \u0395\u03be\u03b9\u03c3\u03bf\u03c1\u03c1\u03cc\u03c0\u03b7\u03c3\u03b7 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ae\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u03a0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03cc\u03c3\u03c4\u03b5 \u03c4\u03b7\u03bd \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1 \u03c3\u03c4\u03bf\u03bd \u03c1\u03c5\u03b8\u03bc\u03cc<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">\u0395\u03ba\u03c4\u03b9\u03bc\u03ce\u03bc\u03b5\u03bd\u03bf\u03c2 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c2 \u03b1\u03bd\u03ac\u03b3\u03bd\u03c9\u03c3\u03b7\u03c2: <\/span><span class=\"yoast-reading-time__reading-time\">11<\/span><span class=\"yoast-reading-time__time-unit\"> \u03bb\u03b5\u03c0\u03c4\u03ac<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>\u0388\u03bd\u03b1\u03c2 \u03c7\u03b5\u03b9\u03c1\u03b9\u03c3\u03c4\u03ae\u03c2 \u03b1\u03ba\u03cc\u03bc\u03b7 \u03c3\u03c4\u03b5\u03c1\u03b5\u03ce\u03bd\u03b5\u03b9 \u03c4\u03bf \u03c3\u03c5\u03bd\u03b1\u03c1\u03bc\u03bf\u03bb\u03bf\u03b3\u03b7\u03bc\u03ad\u03bd\u03bf \u03c3\u03cd\u03bd\u03bf\u03bb\u03bf, \u03b5\u03bd\u03ce \u03bf \u03b5\u03c0\u03cc\u03bc\u03b5\u03bd\u03bf\u03c2 \u03c0\u03b5\u03c1\u03b9\u03bc\u03ad\u03bd\u03b5\u03b9 \u03bd\u03b1 \u03c4\u03bf \u03c0\u03b1\u03c1\u03b1\u03bb\u03ac\u03b2\u03b5\u03b9. \u03a3\u03c4\u03bf \u03c4\u03ad\u03bb\u03bf\u03c2 \u03c4\u03b7\u03c2 \u03b2\u03ac\u03c1\u03b4\u03b9\u03b1\u03c2, \u03b7 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ae \u03b4\u03b5\u03bd \u03ad\u03c7\u03b5\u03b9 \u03c0\u03b9\u03ac\u03c3\u03b5\u03b9 \u03c4\u03bf\u03bd \u03c3\u03c4\u03cc\u03c7\u03bf \u03c4\u03b7\u03c2, \u03c0\u03b1\u03c1\u03cc\u03c4\u03b9 \u03c4\u03bf \u03c0\u03c1\u03bf\u03c3\u03c9\u03c0\u03b9\u03ba\u03cc \u03ba\u03b1\u03b9 \u03bf \u03b5\u03be\u03bf\u03c0\u03bb\u03b9\u03c3\u03bc\u03cc\u03c2 \u03c6\u03b1\u03af\u03bd\u03bf\u03bd\u03c4\u03b1\u03bd \u03b5\u03c0\u03b1\u03c1\u03ba\u03ae.<\/p>\n\n\n<p><strong>\u0397 \u03b5\u03be\u03b9\u03c3\u03bf\u03c1\u03c1\u03cc\u03c0\u03b7\u03c3\u03b7 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ae\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03b5\u03af\u03bd\u03b1\u03b9 \u03b7 \u03b1\u03bd\u03ac\u03b8\u03b5\u03c3\u03b7 \u03b5\u03c0\u03b9\u03bc\u03ad\u03c1\u03bf\u03c5\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03b9\u03ce\u03bd \u03c3\u03c4\u03bf\u03c5\u03c2 \u03c3\u03c4\u03b1\u03b8\u03bc\u03bf\u03cd\u03c2, \u03ce\u03c3\u03c4\u03b5 \u03b7 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ae \u03bd\u03b1 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03b1\u03bd\u03c4\u03b1\u03c0\u03bf\u03ba\u03c1\u03b9\u03b8\u03b5\u03af \u03c3\u03c4\u03bf\u03bd \u03b1\u03c0\u03b1\u03b9\u03c4\u03bf\u03cd\u03bc\u03b5\u03bd\u03bf \u03c1\u03c5\u03b8\u03bc\u03cc \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2, \u03bc\u03b5 \u03c3\u03b5\u03b2\u03b1\u03c3\u03bc\u03cc \u03c3\u03c4\u03b7 \u03c3\u03b5\u03b9\u03c1\u03ac \u03b5\u03ba\u03c4\u03ad\u03bb\u03b5\u03c3\u03b7\u03c2 \u03ba\u03b1\u03b9 \u03c3\u03c4\u03b9\u03c2 \u03b1\u03c3\u03c6\u03b1\u03bb\u03b5\u03af\u03c2 \u03bc\u03b5\u03b8\u03cc\u03b4\u03bf\u03c5\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2 \u03ba\u03b1\u03b9 \u03bc\u03b5 \u03b2\u03ac\u03c3\u03b7 \u03c4\u03bf\u03c5\u03c2 \u03b4\u03b9\u03b1\u03b8\u03ad\u03c3\u03b9\u03bc\u03bf\u03c5\u03c2 \u03c0\u03cc\u03c1\u03bf\u03c5\u03c2.<\/strong> \u03a3\u03c4\u03cc\u03c7\u03bf\u03c2 \u03b5\u03af\u03bd\u03b1\u03b9 \u03ad\u03bd\u03b1\u03c2 \u03b5\u03c6\u03b1\u03c1\u03bc\u03cc\u03c3\u03b9\u03bc\u03bf\u03c2 \u03ba\u03b1\u03c4\u03b1\u03bc\u03b5\u03c1\u03b9\u03c3\u03bc\u03cc\u03c2 \u03c4\u03b7\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2, \u03cc\u03c7\u03b9 \u03bf \u03af\u03b4\u03b9\u03bf\u03c2 \u03c6\u03cc\u03c1\u03c4\u03bf\u03c2 \u03b3\u03b9\u03b1 \u03cc\u03bb\u03bf\u03c5\u03c2 \u03bc\u03b5 \u03ba\u03ac\u03b8\u03b5 \u03ba\u03cc\u03c3\u03c4\u03bf\u03c2.<\/p>\n\n\n<p>\u0397 \u03c3\u03c9\u03c3\u03c4\u03ae \u03b5\u03be\u03b9\u03c3\u03bf\u03c1\u03c1\u03cc\u03c0\u03b7\u03c3\u03b7 \u03b5\u03be\u03b1\u03bb\u03b5\u03af\u03c6\u03b5\u03b9 \u03c4\u03b7\u03bd \u03b1\u03bd\u03b1\u03bc\u03bf\u03bd\u03ae \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03c5\u03c0\u03b5\u03c1\u03c6\u03cc\u03c1\u03c4\u03c9\u03c3\u03b7 \u03c0\u03bf\u03c5 \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03bd\u03b1 \u03b1\u03c0\u03bf\u03c6\u03b5\u03c5\u03c7\u03b8\u03bf\u03cd\u03bd. \u03a7\u03c1\u03b5\u03b9\u03ac\u03b6\u03b5\u03c4\u03b1\u03b9 \u03cc\u03bc\u03c9\u03c2 \u03ba\u03b1\u03b9 \u03ad\u03bd\u03b1 \u03c0\u03bb\u03ac\u03bd\u03bf \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c0\u03bf\u03c5 \u03b5\u03be\u03b1\u03c3\u03c6\u03b1\u03bb\u03af\u03b6\u03b5\u03b9 \u03c4\u03b7 \u03b4\u03b9\u03b1\u03b8\u03b5\u03c3\u03b9\u03bc\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c4\u03c9\u03bd \u03b1\u03c0\u03b1\u03b9\u03c4\u03bf\u03cd\u03bc\u03b5\u03bd\u03c9\u03bd \u03c0\u03cc\u03c1\u03c9\u03bd. \u03a4\u03bf SkyPlanner APS \u03c3\u03b1\u03c2 \u03b2\u03bf\u03b7\u03b8\u03ac \u03bd\u03b1 \u03b5\u03bd\u03c4\u03ac\u03be\u03b5\u03c4\u03b5 \u03c4\u03b9\u03c2 \u03c3\u03c5\u03bc\u03c6\u03c9\u03bd\u03b7\u03bc\u03ad\u03bd\u03b5\u03c2 \u03c6\u03ac\u03c3\u03b5\u03b9\u03c2 \u03c3\u03b5 \u03ad\u03bd\u03b1 \u03ba\u03bf\u03b9\u03bd\u03cc \u03c7\u03c1\u03bf\u03bd\u03bf\u03b4\u03b9\u03ac\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1 \u03c0\u03bf\u03c5 \u03bb\u03b1\u03bc\u03b2\u03ac\u03bd\u03b5\u03b9 \u03c5\u03c0\u03cc\u03c8\u03b7 \u03c4\u03b7 \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1. \u0388\u03c4\u03c3\u03b9, \u03b1\u03bd \u03bf \u03c3\u03c4\u03b1\u03b8\u03bc\u03cc\u03c2 \u03b4\u03bf\u03ba\u03b9\u03bc\u03ce\u03bd \u03bc\u03b9\u03b1\u03c2 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ae\u03c2 \u03c0\u03bf\u03c5 \u03c6\u03b1\u03af\u03bd\u03b5\u03c4\u03b1\u03b9 \u03b5\u03be\u03b9\u03c3\u03bf\u03c1\u03c1\u03bf\u03c0\u03b7\u03bc\u03ad\u03bd\u03b7 \u03c3\u03c4\u03b1 \u03c7\u03b1\u03c1\u03c4\u03b9\u03ac \u03b4\u03b5\u03c3\u03bc\u03b5\u03c5\u03c4\u03b5\u03af \u03b1\u03c0\u03cc \u03ac\u03bb\u03bb\u03b7 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1, \u03b7 \u03c3\u03cd\u03b3\u03ba\u03c1\u03bf\u03c5\u03c3\u03b7 \u03b8\u03b1 \u03c6\u03b1\u03bd\u03b5\u03af \u03c3\u03c4\u03bf \u03c0\u03bb\u03ac\u03bd\u03bf.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u03a4\u03b9 \u03b5\u03be\u03b9\u03c3\u03bf\u03c1\u03c1\u03bf\u03c0\u03b5\u03af\u03c4\u03b5: \u03b5\u03c0\u03b9\u03bc\u03ad\u03c1\u03bf\u03c5\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2, \u03cc\u03c7\u03b9 \u03b1\u03c0\u03bb\u03ce\u03c2 \u03bf\u03c5\u03c1\u03ad\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03b9\u03ce\u03bd \u03c3\u03c4\u03b9\u03c2 \u03bc\u03b7\u03c7\u03b1\u03bd\u03ad\u03c2<\/h2>\n\n\n<p>\u039c\u03b9\u03b1 \u03b5\u03c0\u03b9\u03bc\u03ad\u03c1\u03bf\u03c5\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1 \u03b5\u03af\u03bd\u03b1\u03b9 \u03ad\u03bd\u03b1 \u03c3\u03b1\u03c6\u03ce\u03c2 \u03bf\u03c1\u03b9\u03c3\u03bc\u03ad\u03bd\u03bf \u03c4\u03bc\u03ae\u03bc\u03b1 \u03c4\u03b7\u03c2 \u03c3\u03c5\u03bd\u03bf\u03bb\u03b9\u03ba\u03ae\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2, \u03cc\u03c0\u03c9\u03c2 \u03b7 \u03c4\u03bf\u03c0\u03bf\u03b8\u03ad\u03c4\u03b7\u03c3\u03b7 \u03b5\u03bd\u03cc\u03c2 \u03c0\u03b5\u03c1\u03b9\u03b2\u03bb\u03ae\u03bc\u03b1\u03c4\u03bf\u03c2, \u03b7 \u03c3\u03c5\u03bd\u03b1\u03c1\u03bc\u03bf\u03bb\u03cc\u03b3\u03b7\u03c3\u03b7 \u03b5\u03bd\u03cc\u03c2 \u03b5\u03be\u03b1\u03c1\u03c4\u03ae\u03bc\u03b1\u03c4\u03bf\u03c2 \u03ae \u03b7 \u03b5\u03ba\u03c4\u03ad\u03bb\u03b5\u03c3\u03b7 \u03b5\u03bd\u03cc\u03c2 \u03b5\u03bb\u03ad\u03b3\u03c7\u03bf\u03c5. \u0397 \u03b5\u03be\u03b9\u03c3\u03bf\u03c1\u03c1\u03cc\u03c0\u03b7\u03c3\u03b7 \u03c4\u03b7\u03c2 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ae\u03c2 \u03ba\u03b1\u03b8\u03bf\u03c1\u03af\u03b6\u03b5\u03b9 \u03c0\u03bf\u03b9\u03bf\u03c2 \u03c3\u03c4\u03b1\u03b8\u03bc\u03cc\u03c2 \u03b5\u03ba\u03c4\u03b5\u03bb\u03b5\u03af \u03ba\u03ac\u03b8\u03b5 \u03b5\u03c0\u03b9\u03bc\u03ad\u03c1\u03bf\u03c5\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1 \u03ba\u03b1\u03b9 \u03b1\u03bd \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03bf\u03bb\u03bf\u03ba\u03bb\u03b7\u03c1\u03ce\u03c3\u03b5\u03b9 \u03cc\u03c3\u03b1 \u03c4\u03bf\u03c5 \u03ad\u03c7\u03bf\u03c5\u03bd \u03b1\u03bd\u03b1\u03c4\u03b5\u03b8\u03b5\u03af \u03c3\u03c4\u03bf\u03bd \u03b4\u03b9\u03b1\u03b8\u03ad\u03c3\u03b9\u03bc\u03bf \u03c7\u03c1\u03cc\u03bd\u03bf.<\/p>\n\n\n<p>\u0393\u03b9\u03b1 \u03bd\u03b1 \u03b3\u03af\u03bd\u03b5\u03b9 \u03c3\u03b1\u03c6\u03ad\u03c2 \u03c4\u03bf \u03c0\u03bb\u03b1\u03af\u03c3\u03b9\u03bf, \u03b1\u03c2 \u03b4\u03bf\u03cd\u03bc\u03b5 \u03c4\u03c1\u03b5\u03b9\u03c2 \u03c3\u03c5\u03bd\u03b1\u03c6\u03b5\u03af\u03c2 \u03ad\u03bd\u03bd\u03bf\u03b9\u03b5\u03c2:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>\u039f <strong><a href=\"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/takt-time\/\">\u03c7\u03c1\u03cc\u03bd\u03bf\u03c2 takt<\/a><\/strong> \u03c0\u03b5\u03c1\u03b9\u03b3\u03c1\u03ac\u03c6\u03b5\u03b9 \u03c4\u03bf\u03bd \u03c1\u03c5\u03b8\u03bc\u03cc \u03c0\u03bf\u03c5 \u03b1\u03c0\u03b1\u03b9\u03c4\u03b5\u03af \u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7 \u03c4\u03c9\u03bd \u03c0\u03b5\u03bb\u03b1\u03c4\u03ce\u03bd.<\/li><li>\u0397 <strong>\u03b5\u03be\u03b9\u03c3\u03bf\u03c1\u03c1\u03cc\u03c0\u03b7\u03c3\u03b7 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ae\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2<\/strong> \u03ba\u03b1\u03c4\u03b1\u03bd\u03ad\u03bc\u03b5\u03b9 \u03c3\u03c4\u03bf\u03c5\u03c2 \u03c3\u03c4\u03b1\u03b8\u03bc\u03bf\u03cd\u03c2 \u03c4\u03b7\u03bd \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1 \u03c0\u03bf\u03c5 \u03b1\u03c0\u03b1\u03b9\u03c4\u03b5\u03af\u03c4\u03b1\u03b9 \u03b3\u03b9\u03b1 \u03ba\u03ac\u03b8\u03b5 \u03bc\u03bf\u03bd\u03ac\u03b4\u03b1.<\/li><li>\u039f <strong><a href=\"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/production-scheduling\/\">\u03c7\u03c1\u03bf\u03bd\u03bf\u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2<\/a><\/strong> \u03b1\u03bd\u03b1\u03b8\u03ad\u03c4\u03b5\u03b9 \u03c4\u03b9\u03c2 \u03c6\u03ac\u03c3\u03b5\u03b9\u03c2 \u03c4\u03c9\u03bd \u03c0\u03c1\u03b1\u03b3\u03bc\u03b1\u03c4\u03b9\u03ba\u03ce\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03b9\u03ce\u03bd \u03c3\u03b5 \u03c0\u03cc\u03c1\u03bf\u03c5\u03c2 \u03ba\u03b1\u03b9 \u03c7\u03c1\u03bf\u03bd\u03b9\u03ba\u03ac \u03b4\u03b9\u03b1\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1, \u03bc\u03b1\u03b6\u03af \u03bc\u03b5 \u03c4\u03b9\u03c2 \u03c5\u03c0\u03cc\u03bb\u03bf\u03b9\u03c0\u03b5\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2 \u03c4\u03bf\u03c5 \u03b5\u03c1\u03b3\u03bf\u03c3\u03c4\u03b1\u03c3\u03af\u03bf\u03c5.<\/li><\/ul>\n\n\n<p>\u0397 <a href=\"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/heijunka\/\">\u03b5\u03be\u03bf\u03bc\u03ac\u03bb\u03c5\u03bd\u03c3\u03b7 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2<\/a> \u03b5\u03af\u03bd\u03b1\u03b9 \u03ba\u03ac\u03c4\u03b9 \u03b4\u03b9\u03b1\u03c6\u03bf\u03c1\u03b5\u03c4\u03b9\u03ba\u03cc: \u03b5\u03be\u03bf\u03bc\u03b1\u03bb\u03cd\u03bd\u03b5\u03b9 \u03c4\u03bf\u03bd \u03cc\u03b3\u03ba\u03bf \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03bf \u03bc\u03b5\u03af\u03b3\u03bc\u03b1 \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03c9\u03bd \u03bc\u03b5 \u03c4\u03b7\u03bd \u03c0\u03ac\u03c1\u03bf\u03b4\u03bf \u03c4\u03bf\u03c5 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c5. \u0397 \u03b1\u03bb\u03bb\u03b1\u03b3\u03ae \u03c4\u03bf\u03c5 \u03bc\u03b5\u03af\u03b3\u03bc\u03b1\u03c4\u03bf\u03c2 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03b4\u03b9\u03b5\u03c5\u03ba\u03bf\u03bb\u03cd\u03bd\u03b5\u03b9 \u03c4\u03b7 \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03af\u03b1 \u03c4\u03b7\u03c2 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ae\u03c2, \u03b1\u03bb\u03bb\u03ac \u03b1\u03c0\u03cc \u03bc\u03cc\u03bd\u03b7 \u03c4\u03b7\u03c2 \u03b4\u03b5\u03bd \u03bb\u03cd\u03bd\u03b5\u03b9 \u03c4\u03bf \u03c0\u03c1\u03cc\u03b2\u03bb\u03b7\u03bc\u03b1 \u03b5\u03bd\u03cc\u03c2 \u03c3\u03c4\u03b1\u03b8\u03bc\u03bf\u03cd \u03c3\u03c4\u03bf\u03bd \u03bf\u03c0\u03bf\u03af\u03bf \u03ad\u03c7\u03b5\u03b9 \u03b1\u03bd\u03b1\u03c4\u03b5\u03b8\u03b5\u03af \u03c0\u03b5\u03c1\u03b9\u03c3\u03c3\u03cc\u03c4\u03b5\u03c1\u03b7 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1 \u03b1\u03c0\u03cc \u03cc\u03c3\u03b7 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03bf\u03bb\u03bf\u03ba\u03bb\u03b7\u03c1\u03ce\u03c3\u03b5\u03b9.<\/p>\n\n\n<p>\u03a3\u03c5\u03bd\u03b4\u03ad\u03c3\u03c4\u03b5 \u03b1\u03c5\u03c4\u03ad\u03c2 \u03c4\u03b9\u03c2 \u03b1\u03c0\u03bf\u03c6\u03ac\u03c3\u03b5\u03b9\u03c2 \u03bc\u03b5\u03c4\u03b1\u03be\u03cd \u03c4\u03bf\u03c5\u03c2, \u03c7\u03c9\u03c1\u03af\u03c2 \u03bd\u03b1 \u03c4\u03b9\u03c2 \u03b8\u03b5\u03c9\u03c1\u03b5\u03af\u03c4\u03b5 \u03c4\u03b1\u03c5\u03c4\u03cc\u03c3\u03b7\u03bc\u03b5\u03c2. \u03a4\u03bf \u03cc\u03c4\u03b9 \u03c5\u03c0\u03ac\u03c1\u03c7\u03bf\u03c5\u03bd \u03b5\u03bb\u03b5\u03cd\u03b8\u03b5\u03c1\u03b5\u03c2 \u03ce\u03c1\u03b5\u03c2 \u03c3\u03c4\u03bf \u03c0\u03c1\u03cc\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1 \u03bc\u03b9\u03b1\u03c2 \u03bc\u03b7\u03c7\u03b1\u03bd\u03ae\u03c2 \u03b4\u03b5\u03bd \u03b1\u03c0\u03bf\u03b4\u03b5\u03b9\u03ba\u03bd\u03cd\u03b5\u03b9 \u03cc\u03c4\u03b9 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03bc\u03b5\u03c4\u03b1\u03c6\u03b5\u03c1\u03b8\u03b5\u03af \u03b5\u03ba\u03b5\u03af \u03bc\u03b9\u03b1 \u03b5\u03c0\u03b9\u03bc\u03ad\u03c1\u03bf\u03c5\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1. \u0397 \u03b4\u03b9\u03ac\u03c4\u03b1\u03be\u03b7 \u03c3\u03c5\u03b3\u03ba\u03c1\u03ac\u03c4\u03b7\u03c3\u03b7\u03c2, \u03b7 \u03c4\u03c1\u03bf\u03c6\u03bf\u03b4\u03bf\u03c3\u03af\u03b1 \u03b5\u03be\u03b1\u03c1\u03c4\u03b7\u03bc\u03ac\u03c4\u03c9\u03bd, \u03bf\u03b9 \u03b4\u03b5\u03be\u03b9\u03cc\u03c4\u03b7\u03c4\u03b5\u03c2 \u03ba\u03b1\u03b9 \u03bf\u03b9 \u03b5\u03be\u03b1\u03c1\u03c4\u03ae\u03c3\u03b5\u03b9\u03c2 \u03bc\u03b5\u03c4\u03b1\u03be\u03cd \u03b5\u03c1\u03b3\u03b1\u03c3\u03b9\u03ce\u03bd \u03c0\u03c1\u03ad\u03c0\u03b5\u03b9 \u03bd\u03b1 \u03b5\u03c0\u03b9\u03c4\u03c1\u03ad\u03c0\u03bf\u03c5\u03bd \u03b1\u03c5\u03c4\u03ae \u03c4\u03b7 \u03bc\u03b5\u03c4\u03b1\u03c6\u03bf\u03c1\u03ac.<\/p>\n\n\n<h2 class=\"wp-block-heading\">1. \u039a\u03b1\u03b8\u03bf\u03c1\u03af\u03c3\u03c4\u03b5 \u03c4\u03bf\u03bd \u03b1\u03c0\u03b1\u03b9\u03c4\u03bf\u03cd\u03bc\u03b5\u03bd\u03bf \u03c1\u03c5\u03b8\u03bc\u03cc \u03c0\u03c1\u03b9\u03bd \u03bc\u03b5\u03c4\u03b1\u03c6\u03ad\u03c1\u03b5\u03c4\u03b5 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2<\/h2>\n\n\n<p>\u03a7\u03c1\u03b7\u03c3\u03b9\u03bc\u03bf\u03c0\u03bf\u03b9\u03ae\u03c3\u03c4\u03b5 \u03c4\u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7 \u03c4\u03c9\u03bd \u03c0\u03b5\u03bb\u03b1\u03c4\u03ce\u03bd \u03ba\u03b1\u03b9 \u03c4\u03bf\u03bd \u03ba\u03b1\u03b8\u03b1\u03c1\u03cc \u03b4\u03b9\u03b1\u03b8\u03ad\u03c3\u03b9\u03bc\u03bf \u03c7\u03c1\u03cc\u03bd\u03bf \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03b3\u03b9\u03b1 \u03c4\u03b7\u03bd \u03af\u03b4\u03b9\u03b1 \u03c0\u03b5\u03c1\u03af\u03bf\u03b4\u03bf:<\/p>\n\n\n<p><strong>\u03a7\u03c1\u03cc\u03bd\u03bf\u03c2 takt = \u03ba\u03b1\u03b8\u03b1\u03c1\u03cc\u03c2 \u03b4\u03b9\u03b1\u03b8\u03ad\u03c3\u03b9\u03bc\u03bf\u03c2 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u00f7 \u03b1\u03c0\u03b1\u03b9\u03c4\u03bf\u03cd\u03bc\u03b5\u03bd\u03b5\u03c2 \u03bc\u03bf\u03bd\u03ac\u03b4\u03b5\u03c2.<\/strong><\/p>\n\n\n<p>\u0391\u03c2 \u03c5\u03c0\u03bf\u03b8\u03ad\u03c3\u03bf\u03c5\u03bc\u03b5 \u03cc\u03c4\u03b9 \u03bc\u03b9\u03b1 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ae \u03b5\u03c0\u03b1\u03bd\u03b1\u03bb\u03b1\u03bc\u03b2\u03b1\u03bd\u03cc\u03bc\u03b5\u03bd\u03b7\u03c2 \u03c3\u03c5\u03bd\u03b1\u03c1\u03bc\u03bf\u03bb\u03cc\u03b3\u03b7\u03c3\u03b7\u03c2 \u03b4\u03b9\u03b1\u03b8\u03ad\u03c4\u03b5\u03b9 420 \u03bb\u03b5\u03c0\u03c4\u03ac \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03b1\u03bd\u03ac \u03b2\u03ac\u03c1\u03b4\u03b9\u03b1 \u03ba\u03b1\u03b9 \u03c0\u03c1\u03ad\u03c0\u03b5\u03b9 \u03bd\u03b1 \u03ba\u03b1\u03bb\u03cd\u03c8\u03b5\u03b9 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7 \u03b3\u03b9\u03b1 420 \u03bc\u03bf\u03bd\u03ac\u03b4\u03b5\u03c2 \u03c7\u03c9\u03c1\u03af\u03c2 \u03b5\u03bb\u03b1\u03c4\u03c4\u03ce\u03bc\u03b1\u03c4\u03b1. \u039f \u03c7\u03c1\u03cc\u03bd\u03bf\u03c2 takt \u03b5\u03af\u03bd\u03b1\u03b9 1 \u03bb\u03b5\u03c0\u03c4\u03cc, \u03b4\u03b7\u03bb\u03b1\u03b4\u03ae <strong>60 \u03b4\u03b5\u03c5\u03c4\u03b5\u03c1\u03cc\u03bb\u03b5\u03c0\u03c4\u03b1 \u03b1\u03bd\u03ac \u03bc\u03bf\u03bd\u03ac\u03b4\u03b1<\/strong>. \u038c\u03c4\u03b1\u03bd \u03b7 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ae \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03b5\u03af, \u03c0\u03c1\u03ad\u03c0\u03b5\u03b9 \u03bd\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b4\u03af\u03b4\u03b5\u03b9 \u03bc\u03bf\u03bd\u03ac\u03b4\u03b5\u03c2 \u03c7\u03c9\u03c1\u03af\u03c2 \u03b5\u03bb\u03b1\u03c4\u03c4\u03ce\u03bc\u03b1\u03c4\u03b1 \u03bc\u03b5 \u03b1\u03c5\u03c4\u03cc\u03bd \u03c4\u03bf\u03bd \u03bc\u03ad\u03c3\u03bf \u03c1\u03c5\u03b8\u03bc\u03cc \u03b3\u03b9\u03b1 \u03bd\u03b1 \u03ba\u03b1\u03bb\u03cd\u03c8\u03b5\u03b9 \u03c4\u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7.<\/p>\n\n\n<p>\u03a5\u03c0\u03bf\u03bb\u03bf\u03b3\u03af\u03c3\u03c4\u03b5 \u03c4\u03bf\u03bd \u03b4\u03b9\u03b1\u03b8\u03ad\u03c3\u03b9\u03bc\u03bf \u03c7\u03c1\u03cc\u03bd\u03bf \u03bc\u03b5 \u03c3\u03c5\u03bd\u03ad\u03c0\u03b5\u03b9\u03b1. \u0395\u03be\u03b1\u03b9\u03c1\u03ad\u03c3\u03c4\u03b5 \u03c4\u03b9\u03c2 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03ad\u03bd\u03b5\u03c2 \u03c0\u03b5\u03c1\u03b9\u03cc\u03b4\u03bf\u03c5\u03c2 \u03c7\u03c9\u03c1\u03af\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae, \u03cc\u03c0\u03c9\u03c2 \u03c4\u03b1 \u03b4\u03b9\u03b1\u03bb\u03b5\u03af\u03bc\u03bc\u03b1\u03c4\u03b1 \u03ba\u03b1\u03c4\u03ac \u03c4\u03b1 \u03bf\u03c0\u03bf\u03af\u03b1 \u03c3\u03c4\u03b1\u03bc\u03b1\u03c4\u03ac \u03b7 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ae. \u039b\u03ac\u03b2\u03b5\u03c4\u03b5 \u03c5\u03c0\u03cc\u03c8\u03b7 \u03c4\u03b9\u03c2 \u03b1\u03bb\u03bb\u03b1\u03b3\u03ad\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2, \u03c4\u03b9\u03c2 \u03b4\u03b9\u03b1\u03ba\u03bf\u03c0\u03ad\u03c2 \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03af\u03b1\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03b9\u03c2 \u03b1\u03c0\u03ce\u03bb\u03b5\u03b9\u03b5\u03c2 \u03c0\u03bf\u03b9\u03cc\u03c4\u03b7\u03c4\u03b1\u03c2 \u03c3\u03c4\u03b9\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b4\u03bf\u03c7\u03ad\u03c2 \u03c3\u03b1\u03c2 \u03b3\u03b9\u03b1 \u03c4\u03b7 \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1. \u039c\u03b7 \u03b8\u03b5\u03c9\u03c1\u03ae\u03c3\u03b5\u03c4\u03b5 \u03b1\u03c5\u03b8\u03b1\u03af\u03c1\u03b5\u03c4\u03b1 \u03cc\u03c4\u03b9 \u03b1\u03c5\u03c4\u03ad\u03c2 \u03bf\u03b9 \u03b1\u03c0\u03ce\u03bb\u03b5\u03b9\u03b5\u03c2 \u03b5\u03be\u03b1\u03c6\u03b1\u03bd\u03af\u03b6\u03bf\u03bd\u03c4\u03b1\u03b9 \u03b5\u03c0\u03b5\u03b9\u03b4\u03ae \u03bf\u03b9 \u03b1\u03c1\u03b9\u03b8\u03bc\u03bf\u03af \u03c3\u03c4\u03bf\u03bd \u03c5\u03c0\u03bf\u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03cc \u03b5\u03be\u03b9\u03c3\u03bf\u03c1\u03c1\u03cc\u03c0\u03b7\u03c3\u03b7\u03c2 \u03c4\u03b1\u03b9\u03c1\u03b9\u03ac\u03b6\u03bf\u03c5\u03bd, \u03ba\u03b1\u03b9 \u03bc\u03b7\u03bd \u03b1\u03c6\u03b1\u03b9\u03c1\u03ad\u03c3\u03b5\u03c4\u03b5 \u03c4\u03b7\u03bd \u03af\u03b4\u03b9\u03b1 \u03b1\u03c0\u03ce\u03bb\u03b5\u03b9\u03b1 \u03b4\u03cd\u03bf \u03c6\u03bf\u03c1\u03ad\u03c2.<\/p>\n\n\n<p>\u0395\u03c0\u03b9\u03bb\u03ad\u03be\u03c4\u03b5 \u03c7\u03c1\u03cc\u03bd\u03bf \u03ba\u03cd\u03ba\u03bb\u03bf\u03c5 \u03c3\u03c7\u03b5\u03b4\u03b9\u03b1\u03c3\u03bc\u03bf\u03cd \u03af\u03c3\u03bf \u03ae \u03bc\u03b9\u03ba\u03c1\u03cc\u03c4\u03b5\u03c1\u03bf \u03b1\u03c0\u03cc \u03c4\u03bf\u03bd \u03c7\u03c1\u03cc\u03bd\u03bf takt, \u03b1\u03c6\u03ae\u03bd\u03bf\u03bd\u03c4\u03b1\u03c2 \u03b5\u03c0\u03b1\u03c1\u03ba\u03ad\u03c2 \u03c0\u03b5\u03c1\u03b9\u03b8\u03ce\u03c1\u03b9\u03bf \u03b3\u03b9\u03b1 \u03c4\u03b7 \u03bc\u03b5\u03c4\u03b1\u03b2\u03bb\u03b7\u03c4\u03cc\u03c4\u03b7\u03c4\u03b1 \u03ba\u03b1\u03b9 \u03c4\u03b9\u03c2 \u03b1\u03c0\u03ce\u03bb\u03b5\u03b9\u03b5\u03c2 \u03c0\u03bf\u03c5 \u03c0\u03c1\u03ad\u03c0\u03b5\u03b9 \u03bd\u03b1 \u03b1\u03c0\u03bf\u03c1\u03c1\u03bf\u03c6\u03ac \u03b7 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b1 \u03c3\u03b1\u03c2. \u039f \u03c7\u03c1\u03cc\u03bd\u03bf\u03c2 takt \u03b5\u03ba\u03c6\u03c1\u03ac\u03b6\u03b5\u03b9 \u03c4\u03b7\u03bd \u03b1\u03c0\u03b1\u03af\u03c4\u03b7\u03c3\u03b7 \u03c0\u03bf\u03c5 \u03c0\u03c1\u03bf\u03ba\u03cd\u03c0\u03c4\u03b5\u03b9 \u03b1\u03c0\u03cc \u03c4\u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7. \u039f \u03c7\u03c1\u03cc\u03bd\u03bf\u03c2 \u03ba\u03cd\u03ba\u03bb\u03bf\u03c5 \u03c3\u03c7\u03b5\u03b4\u03b9\u03b1\u03c3\u03bc\u03bf\u03cd \u03b1\u03bd\u03c4\u03b9\u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af \u03c3\u03c4\u03bf\u03bd \u03c1\u03c5\u03b8\u03bc\u03cc \u03c0\u03bf\u03c5 \u03c3\u03c7\u03b5\u03b4\u03b9\u03ac\u03b6\u03b5\u03c4\u03b5 \u03bd\u03b1 \u03c5\u03c0\u03bf\u03c3\u03c4\u03b7\u03c1\u03af\u03b6\u03b5\u03b9 \u03b7 \u03ba\u03b1\u03c4\u03b1\u03bd\u03bf\u03bc\u03ae \u03c4\u03b7\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2. \u039f\u03b9 \u03c0\u03b1\u03c1\u03b1\u03c4\u03b7\u03c1\u03bf\u03cd\u03bc\u03b5\u03bd\u03bf\u03b9 \u03c7\u03c1\u03cc\u03bd\u03bf\u03b9 \u03ba\u03cd\u03ba\u03bb\u03bf\u03c5 \u03b4\u03b5\u03af\u03c7\u03bd\u03bf\u03c5\u03bd \u03c4\u03b9 \u03b5\u03c0\u03b9\u03c4\u03c5\u03b3\u03c7\u03ac\u03bd\u03b5\u03b9 \u03c0\u03c1\u03b1\u03b3\u03bc\u03b1\u03c4\u03b9\u03ba\u03ac \u03b7 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ae.<\/p>\n\n\n<p>\u03a3\u03b5 \u03bc\u03b9\u03b1 \u03c5\u03c6\u03b9\u03c3\u03c4\u03ac\u03bc\u03b5\u03bd\u03b7 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ae, \u03be\u03b5\u03ba\u03b1\u03b8\u03b1\u03c1\u03af\u03c3\u03c4\u03b5 \u03b5\u03c0\u03af\u03c3\u03b7\u03c2 \u03c4\u03b9 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03b1\u03bb\u03bb\u03ac\u03be\u03b5\u03b9. \u0395\u03af\u03bd\u03b1\u03b9 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03bf\u03c2 \u03bf \u03b1\u03c1\u03b9\u03b8\u03bc\u03cc\u03c2 \u03c4\u03c9\u03bd \u03c3\u03c4\u03b1\u03b8\u03bc\u03ce\u03bd \u03ba\u03b1\u03b9 \u03bf \u03b4\u03b9\u03b1\u03b8\u03ad\u03c3\u03b9\u03bc\u03bf\u03c2 \u03c7\u03ce\u03c1\u03bf\u03c2; \u039c\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03bc\u03b5\u03c4\u03b1\u03ba\u03b9\u03bd\u03b7\u03b8\u03b5\u03af \u03bf \u03b5\u03c1\u03b3\u03b1\u03bb\u03b5\u03b9\u03b1\u03ba\u03cc\u03c2 \u03b5\u03be\u03bf\u03c0\u03bb\u03b9\u03c3\u03bc\u03cc\u03c2; \u03a5\u03c0\u03ac\u03c1\u03c7\u03b5\u03b9 \u03ba\u03ac\u03c0\u03bf\u03b9\u03b1 \u03c6\u03ac\u03c3\u03b7 \u03c0\u03bf\u03c5 \u03b5\u03c0\u03b9\u03c4\u03c1\u03ad\u03c0\u03b5\u03c4\u03b1\u03b9 \u03bd\u03b1 \u03b5\u03ba\u03c4\u03b5\u03bb\u03b5\u03af\u03c4\u03b1\u03b9 \u03bc\u03cc\u03bd\u03bf \u03b1\u03c0\u03cc \u03ac\u03c4\u03bf\u03bc\u03b1 \u03bc\u03b5 \u03c4\u03b1 \u03b1\u03c0\u03b1\u03b9\u03c4\u03bf\u03cd\u03bc\u03b5\u03bd\u03b1 \u03c0\u03c1\u03bf\u03c3\u03cc\u03bd\u03c4\u03b1; \u0391\u03c5\u03c4\u03bf\u03af \u03bf\u03b9 \u03c0\u03b5\u03c1\u03b9\u03bf\u03c1\u03b9\u03c3\u03bc\u03bf\u03af \u03ba\u03b1\u03b8\u03bf\u03c1\u03af\u03b6\u03bf\u03c5\u03bd \u03c0\u03bf\u03b9\u03b5\u03c2 \u03ba\u03b1\u03c4\u03b1\u03bd\u03bf\u03bc\u03ad\u03c2 \u03b5\u03af\u03bd\u03b1\u03b9 \u03c7\u03c1\u03ae\u03c3\u03b9\u03bc\u03b5\u03c2 \u03c3\u03c4\u03b7\u03bd \u03c0\u03c1\u03ac\u03be\u03b7 \u03ba\u03b1\u03b9 \u03cc\u03c7\u03b9 \u03b1\u03c0\u03bb\u03ce\u03c2 \u03bc\u03b1\u03b8\u03b7\u03bc\u03b1\u03c4\u03b9\u03ba\u03ac \u03b5\u03c6\u03b9\u03ba\u03c4\u03ad\u03c2.<\/p>\n\n\n<h2 class=\"wp-block-heading\">2. \u039c\u03b5\u03c4\u03c1\u03ae\u03c3\u03c4\u03b5 \u03c4\u03b9\u03c2 \u03b5\u03c0\u03b9\u03bc\u03ad\u03c1\u03bf\u03c5\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2 \u03ba\u03b1\u03b9 \u03ba\u03b1\u03c4\u03b1\u03b3\u03c1\u03ac\u03c8\u03c4\u03b5 \u03c0\u03bf\u03b9\u03b5\u03c2 \u03c0\u03c1\u03ad\u03c0\u03b5\u03b9 \u03bd\u03b1 \u03c0\u03b1\u03c1\u03b1\u03bc\u03b5\u03af\u03bd\u03bf\u03c5\u03bd \u03bc\u03b1\u03b6\u03af<\/h2>\n\n\n<p>\u03a0\u03b1\u03c1\u03b1\u03c4\u03b7\u03c1\u03ae\u03c3\u03c4\u03b5 \u03c4\u03b7\u03bd \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1 \u03bc\u03b1\u03b6\u03af \u03bc\u03b5 \u03c4\u03bf\u03c5\u03c2 \u03c7\u03b5\u03b9\u03c1\u03b9\u03c3\u03c4\u03ad\u03c2 \u03c0\u03bf\u03c5 \u03c4\u03b7\u03bd \u03b5\u03ba\u03c4\u03b5\u03bb\u03bf\u03cd\u03bd. \u03a7\u03c9\u03c1\u03af\u03c3\u03c4\u03b5 \u03c4\u03b7 \u03c3\u03b5 \u03b5\u03c0\u03b9\u03bc\u03ad\u03c1\u03bf\u03c5\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2 \u03bc\u03b5 \u03c3\u03b1\u03c6\u03ae \u03b1\u03c1\u03c7\u03ae \u03ba\u03b1\u03b9 \u03c4\u03ad\u03bb\u03bf\u03c2, \u03b1\u03c1\u03ba\u03b5\u03c4\u03ac \u03bc\u03b9\u03ba\u03c1\u03ad\u03c2 \u03ce\u03c3\u03c4\u03b5 \u03bd\u03b1 \u03ad\u03c7\u03b5\u03b9 \u03c0\u03c1\u03b1\u03ba\u03c4\u03b9\u03ba\u03cc \u03bd\u03cc\u03b7\u03bc\u03b1 \u03b7 \u03b1\u03bd\u03ac\u03b8\u03b5\u03c3\u03ae \u03c4\u03bf\u03c5\u03c2 \u03c3\u03b5 \u03ac\u03bb\u03bb\u03bf\u03bd \u03c3\u03c4\u03b1\u03b8\u03bc\u03cc. \u03a3\u03b5 \u03ba\u03ac\u03b8\u03b5 \u03c0\u03b1\u03c1\u03b1\u03c4\u03ae\u03c1\u03b7\u03c3\u03b7, \u03ba\u03b1\u03c4\u03b1\u03b3\u03c1\u03ac\u03c8\u03c4\u03b5 \u03c4\u03b7 \u03bc\u03ad\u03b8\u03bf\u03b4\u03bf, \u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03bb\u03bb\u03b1\u03b3\u03ae \u03c4\u03bf\u03c5 \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03bf\u03c2, \u03c4\u03b7 \u03b4\u03b9\u03ac\u03c1\u03ba\u03b5\u03b9\u03b1 \u03ba\u03b1\u03b9 \u03c4\u03b9\u03c2 \u03c3\u03c5\u03bd\u03b8\u03ae\u03ba\u03b5\u03c2 \u03b5\u03ba\u03c4\u03ad\u03bb\u03b5\u03c3\u03b7\u03c2.<\/p>\n\n\n<p>\u03a3\u03c5\u03bc\u03c0\u03b5\u03c1\u03b9\u03bb\u03ac\u03b2\u03b5\u03c4\u03b5 \u03c4\u03bf\u03c5\u03c2 \u03c7\u03b5\u03b9\u03c1\u03b9\u03c3\u03bc\u03bf\u03cd\u03c2 \u03c5\u03bb\u03b9\u03ba\u03ce\u03bd, \u03c4\u03b9\u03c2 \u03bc\u03b5\u03c4\u03b1\u03ba\u03b9\u03bd\u03ae\u03c3\u03b5\u03b9\u03c2, \u03c4\u03bf\u03c5\u03c2 \u03b5\u03bb\u03ad\u03b3\u03c7\u03bf\u03c5\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03b1\u03bd\u03b1\u03c4\u03c1\u03bf\u03c6\u03bf\u03b4\u03bf\u03c3\u03af\u03b1 \u03c5\u03bb\u03b9\u03ba\u03ce\u03bd, \u03cc\u03c4\u03b1\u03bd \u03ba\u03b1\u03c4\u03b1\u03bb\u03b1\u03bc\u03b2\u03ac\u03bd\u03bf\u03c5\u03bd \u03c7\u03c1\u03cc\u03bd\u03bf \u03c3\u03c4\u03bf\u03bd \u03ba\u03cd\u03ba\u03bb\u03bf \u03c4\u03bf\u03c5 \u03c7\u03b5\u03b9\u03c1\u03b9\u03c3\u03c4\u03ae. \u039f \u03c7\u03c1\u03cc\u03bd\u03bf\u03c2 \u03c0\u03bf\u03c5 \u03b4\u03b1\u03c0\u03b1\u03bd\u03ac \u03bf \u03c7\u03b5\u03b9\u03c1\u03b9\u03c3\u03c4\u03ae\u03c2 \u03c0\u03b7\u03b3\u03b1\u03af\u03bd\u03bf\u03bd\u03c4\u03b1\u03c2 \u03b5\u03c0\u03b1\u03bd\u03b5\u03b9\u03bb\u03b7\u03bc\u03bc\u03ad\u03bd\u03b1 \u03bd\u03b1 \u03c6\u03ad\u03c1\u03b5\u03b9 \u03ad\u03bd\u03b1 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03bf \u03c3\u03c4\u03b5\u03c1\u03ad\u03c9\u03c3\u03b7\u03c2 \u03c0\u03bf\u03c5 \u03bb\u03b5\u03af\u03c0\u03b5\u03b9 \u03b4\u03b5\u03bd \u03b1\u03c0\u03bf\u03c4\u03b5\u03bb\u03b5\u03af \u03b4\u03b9\u03b1\u03b8\u03ad\u03c3\u03b9\u03bc\u03b7 \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1. \u039a\u03b1\u03c4\u03b1\u03b3\u03c1\u03ac\u03c8\u03c4\u03b5 \u03b1\u03c1\u03ba\u03b5\u03c4\u03bf\u03cd\u03c2 \u03b1\u03bd\u03c4\u03b9\u03c0\u03c1\u03bf\u03c3\u03c9\u03c0\u03b5\u03c5\u03c4\u03b9\u03ba\u03bf\u03cd\u03c2 \u03ba\u03cd\u03ba\u03bb\u03bf\u03c5\u03c2 \u03b1\u03bd\u03c4\u03af \u03bd\u03b1 \u03b2\u03b1\u03c3\u03af\u03c3\u03b5\u03c4\u03b5 \u03c4\u03bf\u03bd \u03c3\u03c7\u03b5\u03b4\u03b9\u03b1\u03c3\u03bc\u03cc \u03c3\u03c4\u03bf\u03bd \u03c4\u03b1\u03c7\u03cd\u03c4\u03b5\u03c1\u03bf.<\/p>\n\n\n<p>\u039e\u03b5\u03c7\u03c9\u03c1\u03af\u03c3\u03c4\u03b5 \u03c4\u03b7 \u03c7\u03b5\u03b9\u03c1\u03c9\u03bd\u03b1\u03ba\u03c4\u03b9\u03ba\u03ae \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1 \u03b1\u03c0\u03cc \u03c4\u03bf\u03bd \u03c7\u03c1\u03cc\u03bd\u03bf \u03b1\u03c5\u03c4\u03cc\u03bc\u03b1\u03c4\u03b7\u03c2 \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03af\u03b1\u03c2 \u03c4\u03b7\u03c2 \u03bc\u03b7\u03c7\u03b1\u03bd\u03ae\u03c2. \u0391\u03bd \u03bf \u03c7\u03b5\u03b9\u03c1\u03b9\u03c3\u03c4\u03ae\u03c2 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03c6\u03bf\u03c1\u03c4\u03ce\u03c3\u03b5\u03b9 \u03bc\u03b9\u03b1 \u03c3\u03c5\u03c3\u03ba\u03b5\u03c5\u03ae \u03b4\u03bf\u03ba\u03b9\u03bc\u03ce\u03bd \u03ba\u03b1\u03b9 \u03bd\u03b1 \u03b5\u03ba\u03c4\u03b5\u03bb\u03ad\u03c3\u03b5\u03b9 \u03ac\u03bb\u03bb\u03b7 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1 \u03cc\u03c3\u03bf \u03b1\u03c5\u03c4\u03ae \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03b5\u03af, \u03bf\u03b9 \u03c7\u03c1\u03cc\u03bd\u03bf\u03b9 \u03b1\u03c5\u03c4\u03bf\u03af \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03bd\u03b1 \u03b5\u03c0\u03b9\u03ba\u03b1\u03bb\u03cd\u03c0\u03c4\u03bf\u03bd\u03c4\u03b1\u03b9. \u0391\u03bd \u03c0\u03c1\u03ad\u03c0\u03b5\u03b9 \u03bd\u03b1 \u03c0\u03b1\u03c1\u03b1\u03ba\u03bf\u03bb\u03bf\u03c5\u03b8\u03b5\u03af \u03c4\u03b7 \u03b4\u03bf\u03ba\u03b9\u03bc\u03ae, \u03b1\u03c5\u03c4\u03cc \u03b4\u03b5\u03bd \u03b5\u03af\u03bd\u03b1\u03b9 \u03b5\u03c6\u03b9\u03ba\u03c4\u03cc. \u0397 \u03b1\u03c0\u03bb\u03ae \u03c0\u03c1\u03cc\u03c3\u03b8\u03b5\u03c3\u03b7 \u03cc\u03bb\u03c9\u03bd \u03c4\u03c9\u03bd \u03ba\u03b1\u03c4\u03b1\u03b3\u03b5\u03b3\u03c1\u03b1\u03bc\u03bc\u03ad\u03bd\u03c9\u03bd \u03b4\u03b9\u03b1\u03c1\u03ba\u03b5\u03b9\u03ce\u03bd \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03b4\u03ce\u03c3\u03b5\u03b9 \u03bb\u03b1\u03bd\u03b8\u03b1\u03c3\u03bc\u03ad\u03bd\u03b7 \u03b5\u03b9\u03ba\u03cc\u03bd\u03b1 \u03c4\u03cc\u03c3\u03bf \u03b3\u03b9\u03b1 \u03c4\u03bf\u03bd \u03c6\u03cc\u03c1\u03c4\u03bf \u03c4\u03bf\u03c5 \u03c7\u03b5\u03b9\u03c1\u03b9\u03c3\u03c4\u03ae \u03cc\u03c3\u03bf \u03ba\u03b1\u03b9 \u03b3\u03b9\u03b1 \u03c4\u03bf\u03bd \u03c7\u03c1\u03cc\u03bd\u03bf \u03ba\u03cd\u03ba\u03bb\u03bf\u03c5 \u03c4\u03bf\u03c5 \u03c3\u03c4\u03b1\u03b8\u03bc\u03bf\u03cd.<\/p>\n\n\n<p>\u0393\u03b9\u03b1 \u03ba\u03ac\u03b8\u03b5 \u03b5\u03c0\u03b9\u03bc\u03ad\u03c1\u03bf\u03c5\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1, \u03ba\u03b1\u03c4\u03b1\u03b3\u03c1\u03ac\u03c8\u03c4\u03b5:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>\u03a4\u03b7\u03bd \u03c0\u03c1\u03bf\u03b7\u03b3\u03bf\u03cd\u03bc\u03b5\u03bd\u03b7 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1: \u03c4\u03b9 \u03c0\u03c1\u03ad\u03c0\u03b5\u03b9 \u03bd\u03b1 \u03ad\u03c7\u03b5\u03b9 \u03b3\u03af\u03bd\u03b5\u03b9 \u03c0\u03c1\u03b9\u03bd \u03be\u03b5\u03ba\u03b9\u03bd\u03ae\u03c3\u03b5\u03b9 \u03b7 \u03c3\u03c5\u03b3\u03ba\u03b5\u03ba\u03c1\u03b9\u03bc\u03ad\u03bd\u03b7 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1;<\/li><li>\u03a4\u03bf\u03bd \u03ba\u03b1\u03c4\u03ac\u03bb\u03bb\u03b7\u03bb\u03bf \u03c3\u03c4\u03b1\u03b8\u03bc\u03cc, \u03c4\u03bf\u03bd \u03b5\u03be\u03bf\u03c0\u03bb\u03b9\u03c3\u03bc\u03cc, \u03c4\u03b7 \u03b4\u03b9\u03ac\u03c4\u03b1\u03be\u03b7 \u03c3\u03c5\u03b3\u03ba\u03c1\u03ac\u03c4\u03b7\u03c3\u03b7\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03b1\u03c0\u03b1\u03b9\u03c4\u03bf\u03cd\u03bc\u03b5\u03bd\u03b7 \u03b4\u03b5\u03be\u03b9\u03cc\u03c4\u03b7\u03c4\u03b1.<\/li><li>\u039a\u03ac\u03b8\u03b5 \u03c0\u03b5\u03c1\u03b9\u03bf\u03c1\u03b9\u03c3\u03bc\u03cc \u03c3\u03c4\u03b7 \u03bc\u03b5\u03c4\u03b1\u03c6\u03bf\u03c1\u03ac \u03c4\u03b7\u03c2, \u03cc\u03c0\u03c9\u03c2 \u03b8\u03ad\u03bc\u03b1\u03c4\u03b1 \u03b1\u03c3\u03c6\u03ac\u03bb\u03b5\u03b9\u03b1\u03c2, \u03b5\u03c1\u03b3\u03bf\u03bd\u03bf\u03bc\u03af\u03b1\u03c2, \u03c0\u03bf\u03b9\u03cc\u03c4\u03b7\u03c4\u03b1\u03c2 \u03ae \u03c0\u03c1\u03cc\u03c3\u03b2\u03b1\u03c3\u03b7\u03c2 \u03c3\u03c4\u03bf \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd.<\/li><li>\u0391\u03bd \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03b4\u03b9\u03b1\u03b9\u03c1\u03b5\u03b8\u03b5\u03af, \u03bd\u03b1 \u03b5\u03c0\u03b9\u03ba\u03b1\u03bb\u03c5\u03c6\u03b8\u03b5\u03af \u03c7\u03c1\u03bf\u03bd\u03b9\u03ba\u03ac \u03bc\u03b5 \u03ac\u03bb\u03bb\u03b7 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1 \u03ae \u03bd\u03b1 \u03b5\u03ba\u03c4\u03b5\u03bb\u03b5\u03c3\u03c4\u03b5\u03af \u03c3\u03b5 \u03c0\u03b1\u03c1\u03ac\u03bb\u03bb\u03b7\u03bb\u03bf \u03c0\u03cc\u03c1\u03bf.<\/li><\/ul>\n\n\n<p>\u0391\u03c0\u03bf\u03c4\u03c5\u03c0\u03ce\u03c3\u03c4\u03b5 \u03c4\u03b9\u03c2 \u03c3\u03c7\u03ad\u03c3\u03b5\u03b9\u03c2 \u03b4\u03b9\u03b1\u03b4\u03bf\u03c7\u03ae\u03c2 \u03c3\u03b5 \u03ad\u03bd\u03b1 \u03b1\u03c0\u03bb\u03cc \u03b4\u03af\u03ba\u03c4\u03c5\u03bf \u03b5\u03c1\u03b3\u03b1\u03c3\u03b9\u03ce\u03bd. \u039a\u03ac\u03b8\u03b5 \u03c0\u03c1\u03bf\u03c4\u03b5\u03b9\u03bd\u03cc\u03bc\u03b5\u03bd\u03b7 \u03b1\u03bd\u03ac\u03b8\u03b5\u03c3\u03b7 \u03c0\u03c1\u03ad\u03c0\u03b5\u03b9 \u03bd\u03b1 \u03c4\u03b7\u03c1\u03b5\u03af \u03b1\u03c5\u03c4\u03ad\u03c2 \u03c4\u03b9\u03c2 \u03c3\u03c7\u03ad\u03c3\u03b5\u03b9\u03c2, \u03ba\u03b1\u03b8\u03ce\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03b7 \u03c3\u03b5\u03b9\u03c1\u03ac \u03c4\u03c9\u03bd \u03b5\u03c0\u03b9\u03bc\u03ad\u03c1\u03bf\u03c5\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03b9\u03ce\u03bd \u03bc\u03ad\u03c3\u03b1 \u03c3\u03c4\u03bf\u03bd \u03af\u03b4\u03b9\u03bf \u03c3\u03c4\u03b1\u03b8\u03bc\u03cc. \u0394\u03cd\u03bf \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2 \u03bc\u03b5 \u03b2\u03bf\u03bb\u03b9\u03ba\u03ad\u03c2 \u03b4\u03b9\u03ac\u03c1\u03ba\u03b5\u03b9\u03b5\u03c2 \u03b4\u03b5\u03bd \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03bd\u03b1 \u03b1\u03bb\u03bb\u03ac\u03be\u03bf\u03c5\u03bd \u03b8\u03ad\u03c3\u03b7 \u03bc\u03b5\u03c4\u03b1\u03be\u03cd \u03c4\u03bf\u03c5\u03c2 \u03b1\u03bd \u03b7 \u03bc\u03af\u03b1 \u03b1\u03c0\u03b1\u03b9\u03c4\u03b5\u03af \u03bd\u03b1 \u03ad\u03c7\u03b5\u03b9 \u03bf\u03bb\u03bf\u03ba\u03bb\u03b7\u03c1\u03c9\u03b8\u03b5\u03af \u03c0\u03c1\u03ce\u03c4\u03b1 \u03b7 \u03ac\u03bb\u03bb\u03b7.<\/p>\n\n\n<h2 class=\"wp-block-heading\">3. \u0391\u03bd\u03b1\u03ba\u03b1\u03c4\u03b1\u03bd\u03b5\u03af\u03bc\u03b5\u03c4\u03b5 \u03c4\u03b7\u03bd \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1 \u03b5\u03bd\u03c4\u03cc\u03c2 \u03c4\u03c9\u03bd \u03c0\u03c1\u03b1\u03b3\u03bc\u03b1\u03c4\u03b9\u03ba\u03ce\u03bd \u03c0\u03b5\u03c1\u03b9\u03bf\u03c1\u03b9\u03c3\u03bc\u03ce\u03bd<\/h2>\n\n\n<p>\u0388\u03bd\u03b1 \u03b4\u03b9\u03ac\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1 \u03b5\u03be\u03b9\u03c3\u03bf\u03c1\u03c1\u03cc\u03c0\u03b7\u03c3\u03b7\u03c2 \u03c7\u03b5\u03b9\u03c1\u03b9\u03c3\u03c4\u03ce\u03bd, \u03b3\u03bd\u03c9\u03c3\u03c4\u03cc \u03c3\u03c5\u03c7\u03bd\u03ac \u03c9\u03c2 \u03b4\u03b9\u03ac\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1 yamazumi, \u03b4\u03b9\u03b5\u03c5\u03ba\u03bf\u03bb\u03cd\u03bd\u03b5\u03b9 \u03c4\u03b7\u03bd \u03b1\u03c1\u03c7\u03b9\u03ba\u03ae \u03c3\u03cd\u03b3\u03ba\u03c1\u03b9\u03c3\u03b7. \u0393\u03b9\u03b1 \u03ba\u03ac\u03b8\u03b5 \u03c7\u03b5\u03b9\u03c1\u03b9\u03c3\u03c4\u03ae, \u03b4\u03b7\u03bc\u03b9\u03bf\u03c5\u03c1\u03b3\u03ae\u03c3\u03c4\u03b5 \u03bc\u03b9\u03b1 \u03c3\u03c4\u03ae\u03bb\u03b7 \u03c3\u03c4\u03bf\u03b9\u03b2\u03ac\u03b6\u03bf\u03bd\u03c4\u03b1\u03c2 \u03c4\u03bf\u03c5\u03c2 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c5\u03c2 \u03c4\u03c9\u03bd \u03b5\u03c0\u03b9\u03bc\u03ad\u03c1\u03bf\u03c5\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03b9\u03ce\u03bd \u03ba\u03b1\u03b9 \u03c3\u03c5\u03b3\u03ba\u03c1\u03af\u03bd\u03b5\u03c4\u03b5 \u03c4\u03b9\u03c2 \u03c3\u03c4\u03ae\u03bb\u03b5\u03c2 \u03bc\u03b5 \u03c4\u03bf\u03bd \u03c7\u03c1\u03cc\u03bd\u03bf takt \u03ae \u03c4\u03bf\u03bd \u03c7\u03c1\u03cc\u03bd\u03bf \u03ba\u03cd\u03ba\u03bb\u03bf\u03c5 \u03c3\u03c7\u03b5\u03b4\u03b9\u03b1\u03c3\u03bc\u03bf\u03cd \u03c0\u03bf\u03c5 \u03ad\u03c7\u03b5\u03c4\u03b5 \u03b5\u03c0\u03b9\u03bb\u03ad\u03be\u03b5\u03b9. \u03a4\u03bf \u03bf\u03c5\u03c3\u03b9\u03b1\u03c3\u03c4\u03b9\u03ba\u03cc \u03b5\u03c1\u03ce\u03c4\u03b7\u03bc\u03b1 \u03b5\u03af\u03bd\u03b1\u03b9 \u03c0\u03bf\u03b9\u03b5\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2 \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03bd\u03b1 \u03bc\u03b5\u03c4\u03b1\u03c6\u03b5\u03c1\u03b8\u03bf\u03cd\u03bd, \u03cc\u03c7\u03b9 \u03b1\u03c0\u03bb\u03ce\u03c2 \u03c0\u03bf\u03b9\u03b1 \u03c3\u03c4\u03ae\u03bb\u03b7 \u03c0\u03c1\u03ad\u03c0\u03b5\u03b9 \u03bd\u03b1 \u03bc\u03b9\u03ba\u03c1\u03cd\u03bd\u03b5\u03b9.<\/p>\n\n\n<p>\u0391\u03c2 \u03b4\u03bf\u03cd\u03bc\u03b5 \u03ad\u03bd\u03b1 \u03c5\u03c0\u03bf\u03b8\u03b5\u03c4\u03b9\u03ba\u03cc \u03c0\u03b1\u03c1\u03ac\u03b4\u03b5\u03b9\u03b3\u03bc\u03b1 \u03c3\u03c5\u03bd\u03b1\u03c1\u03bc\u03bf\u03bb\u03cc\u03b3\u03b7\u03c3\u03b7\u03c2. \u03a5\u03c0\u03ac\u03c1\u03c7\u03b5\u03b9 \u03ad\u03bd\u03b1\u03c2 \u03c7\u03b5\u03b9\u03c1\u03b9\u03c3\u03c4\u03ae\u03c2 \u03c3\u03b5 \u03ba\u03b1\u03b8\u03ad\u03bd\u03b1\u03bd \u03b1\u03c0\u03cc \u03c4\u03bf\u03c5\u03c2 \u03c4\u03c1\u03b5\u03b9\u03c2 \u03c3\u03c4\u03b1\u03b8\u03bc\u03bf\u03cd\u03c2 \u03ba\u03b1\u03b9 \u03bf\u03b9 \u03b5\u03c0\u03b9\u03bc\u03ad\u03c1\u03bf\u03c5\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2 \u03b5\u03ba\u03c4\u03b5\u03bb\u03bf\u03cd\u03bd\u03c4\u03b1\u03b9 \u03b4\u03b9\u03b1\u03b4\u03bf\u03c7\u03b9\u03ba\u03ac, \u03c7\u03c9\u03c1\u03af\u03c2 \u03c7\u03c1\u03bf\u03bd\u03b9\u03ba\u03ae \u03b5\u03c0\u03b9\u03ba\u03ac\u03bb\u03c5\u03c8\u03b7. \u039f\u03b9 \u03c7\u03c1\u03cc\u03bd\u03bf\u03b9 \u03c0\u03b5\u03c1\u03b9\u03bb\u03b1\u03bc\u03b2\u03ac\u03bd\u03bf\u03c5\u03bd \u03c4\u03bf\u03c5\u03c2 \u03b1\u03c0\u03b1\u03c1\u03b1\u03af\u03c4\u03b7\u03c4\u03bf\u03c5\u03c2 \u03c7\u03b5\u03b9\u03c1\u03b9\u03c3\u03bc\u03bf\u03cd\u03c2 \u03bc\u03ad\u03c3\u03b1 \u03c3\u03b5 \u03ba\u03ac\u03b8\u03b5 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1. \u03a3\u03c4\u03bf\u03bd \u03b1\u03c0\u03bb\u03bf\u03c0\u03bf\u03b9\u03b7\u03bc\u03ad\u03bd\u03bf \u03b1\u03c5\u03c4\u03cc\u03bd \u03c5\u03c0\u03bf\u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03cc \u03b4\u03b5\u03bd \u03c5\u03c0\u03ac\u03c1\u03c7\u03bf\u03c5\u03bd \u03c0\u03c1\u03cc\u03c3\u03b8\u03b5\u03c4\u03b5\u03c2 \u03bc\u03b5\u03c4\u03b1\u03c6\u03bf\u03c1\u03ad\u03c2 \u03ae \u03b1\u03bb\u03bb\u03b1\u03b3\u03ad\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\u0395\u03c0\u03b9\u03bc\u03ad\u03c1\u03bf\u03c5\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1<\/th><th>\u03a0\u03b5\u03c1\u03b9\u03b3\u03c1\u03b1\u03c6\u03ae<\/th><th>\u03a7\u03c1\u03cc\u03bd\u03bf\u03c2 \u03b1\u03bd\u03ac \u03bc\u03bf\u03bd\u03ac\u03b4\u03b1<\/th><th>\u03a0\u03c1\u03ad\u03c0\u03b5\u03b9 \u03bd\u03b1 \u03c0\u03c1\u03bf\u03b7\u03b3\u03b7\u03b8\u03b5\u03af<\/th><\/tr><\/thead><tbody><tr><td>A<\/td><td>\u03a0\u03c1\u03bf\u03b5\u03c4\u03bf\u03b9\u03bc\u03b1\u03c3\u03af\u03b1 \u03c0\u03b5\u03c1\u03b9\u03b2\u03bb\u03ae\u03bc\u03b1\u03c4\u03bf\u03c2<\/td><td>15 \u03b4\u03b5\u03c5\u03c4\u03b5\u03c1\u03cc\u03bb\u03b5\u03c0\u03c4\u03b1<\/td><td>\u2014<\/td><\/tr><tr><td>B<\/td><td>\u03a4\u03bf\u03c0\u03bf\u03b8\u03ad\u03c4\u03b7\u03c3\u03b7 \u03b2\u03ac\u03c3\u03b7\u03c2<\/td><td>20 \u03b4\u03b5\u03c5\u03c4\u03b5\u03c1\u03cc\u03bb\u03b5\u03c0\u03c4\u03b1<\/td><td>A<\/td><\/tr><tr><td>C<\/td><td>\u03a4\u03bf\u03c0\u03bf\u03b8\u03ad\u03c4\u03b7\u03c3\u03b7 \u03c5\u03c0\u03bf\u03bc\u03bf\u03bd\u03ac\u03b4\u03b1\u03c2<\/td><td>20 \u03b4\u03b5\u03c5\u03c4\u03b5\u03c1\u03cc\u03bb\u03b5\u03c0\u03c4\u03b1<\/td><td>B<\/td><\/tr><tr><td>D<\/td><td>\u03a3\u03cd\u03bd\u03b4\u03b5\u03c3\u03b7 \u03ba\u03b1\u03bb\u03c9\u03b4\u03af\u03c9\u03c3\u03b7\u03c2<\/td><td>25 \u03b4\u03b5\u03c5\u03c4\u03b5\u03c1\u03cc\u03bb\u03b5\u03c0\u03c4\u03b1<\/td><td>C<\/td><\/tr><tr><td>E<\/td><td>\u039a\u03bb\u03b5\u03af\u03c3\u03b9\u03bc\u03bf \u03ba\u03b1\u03b9 \u03c3\u03c4\u03b5\u03c1\u03ad\u03c9\u03c3\u03b7 \u03c0\u03b5\u03c1\u03b9\u03b2\u03bb\u03ae\u03bc\u03b1\u03c4\u03bf\u03c2<\/td><td>25 \u03b4\u03b5\u03c5\u03c4\u03b5\u03c1\u03cc\u03bb\u03b5\u03c0\u03c4\u03b1<\/td><td>D<\/td><\/tr><tr><td>F<\/td><td>\u0394\u03bf\u03ba\u03b9\u03bc\u03ae \u03c3\u03c5\u03bd\u03b1\u03c1\u03bc\u03bf\u03bb\u03bf\u03b3\u03b7\u03bc\u03ad\u03bd\u03bf\u03c5 \u03c3\u03c5\u03bd\u03cc\u03bb\u03bf\u03c5<\/td><td>25 \u03b4\u03b5\u03c5\u03c4\u03b5\u03c1\u03cc\u03bb\u03b5\u03c0\u03c4\u03b1<\/td><td>E<\/td><\/tr><tr><td>G<\/td><td>\u0395\u03c0\u03b9\u03c3\u03ae\u03bc\u03b1\u03bd\u03c3\u03b7 \u03ba\u03b1\u03b9 \u03c3\u03c5\u03c3\u03ba\u03b5\u03c5\u03b1\u03c3\u03af\u03b1<\/td><td>15 \u03b4\u03b5\u03c5\u03c4\u03b5\u03c1\u03cc\u03bb\u03b5\u03c0\u03c4\u03b1<\/td><td>F<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\u039f \u03c3\u03c5\u03bd\u03bf\u03bb\u03b9\u03ba\u03cc\u03c2 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2 \u03b5\u03af\u03bd\u03b1\u03b9 <strong>145 \u03b4\u03b5\u03c5\u03c4\u03b5\u03c1\u03cc\u03bb\u03b5\u03c0\u03c4\u03b1 \u03b1\u03bd\u03ac \u03bc\u03bf\u03bd\u03ac\u03b4\u03b1<\/strong>. \u0391\u03ba\u03bf\u03bb\u03bf\u03c5\u03b8\u03bf\u03cd\u03bd \u03b7 \u03b1\u03c1\u03c7\u03b9\u03ba\u03ae \u03b1\u03bd\u03ac\u03b8\u03b5\u03c3\u03b7 \u03ba\u03b1\u03b9 \u03bc\u03b9\u03b1 \u03c0\u03b9\u03b8\u03b1\u03bd\u03ae \u03b2\u03b5\u03bb\u03c4\u03af\u03c9\u03c3\u03ae \u03c4\u03b7\u03c2:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\u03a3\u03c4\u03b1\u03b8\u03bc\u03cc\u03c2<\/th><th>\u0391\u03c1\u03c7\u03b9\u03ba\u03ae \u03b1\u03bd\u03ac\u03b8\u03b5\u03c3\u03b7<\/th><th>\u0391\u03c1\u03c7\u03b9\u03ba\u03cc\u03c2 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c2<\/th><th>\u0391\u03bd\u03b1\u03b8\u03b5\u03c9\u03c1\u03b7\u03bc\u03ad\u03bd\u03b7 \u03b1\u03bd\u03ac\u03b8\u03b5\u03c3\u03b7<\/th><th>\u0391\u03bd\u03b1\u03b8\u03b5\u03c9\u03c1\u03b7\u03bc\u03ad\u03bd\u03bf\u03c2 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c2<\/th><\/tr><\/thead><tbody><tr><td>1<\/td><td>A + B<\/td><td>35 \u03b4\u03b5\u03c5\u03c4\u03b5\u03c1\u03cc\u03bb\u03b5\u03c0\u03c4\u03b1<\/td><td>A + B + C<\/td><td>55 \u03b4\u03b5\u03c5\u03c4\u03b5\u03c1\u03cc\u03bb\u03b5\u03c0\u03c4\u03b1<\/td><\/tr><tr><td>2<\/td><td>C + D + E<\/td><td>70 \u03b4\u03b5\u03c5\u03c4\u03b5\u03c1\u03cc\u03bb\u03b5\u03c0\u03c4\u03b1<\/td><td>D + E<\/td><td>50 \u03b4\u03b5\u03c5\u03c4\u03b5\u03c1\u03cc\u03bb\u03b5\u03c0\u03c4\u03b1<\/td><\/tr><tr><td>3<\/td><td>F + G<\/td><td>40 \u03b4\u03b5\u03c5\u03c4\u03b5\u03c1\u03cc\u03bb\u03b5\u03c0\u03c4\u03b1<\/td><td>F + G<\/td><td>40 \u03b4\u03b5\u03c5\u03c4\u03b5\u03c1\u03cc\u03bb\u03b5\u03c0\u03c4\u03b1<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\u039c\u03b5 \u03c4\u03b7\u03bd \u03b1\u03c1\u03c7\u03b9\u03ba\u03ae \u03ba\u03b1\u03c4\u03b1\u03bd\u03bf\u03bc\u03ae, \u03bf \u03c3\u03c4\u03b1\u03b8\u03bc\u03cc\u03c2 2 \u03b4\u03b5\u03bd \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03b5\u03c0\u03b1\u03bd\u03b1\u03bb\u03b1\u03bc\u03b2\u03ac\u03bd\u03b5\u03b9 \u03c4\u03b7\u03bd \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1 \u03c4\u03bf\u03c5 \u03ba\u03ac\u03b8\u03b5 60 \u03b4\u03b5\u03c5\u03c4\u03b5\u03c1\u03cc\u03bb\u03b5\u03c0\u03c4\u03b1. \u039f \u03bc\u03ad\u03c3\u03bf\u03c2 \u03c6\u03cc\u03c1\u03c4\u03bf\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2 \u03b1\u03bd\u03ac \u03c3\u03c4\u03b1\u03b8\u03bc\u03cc \u03c3\u03c4\u03b7 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ae \u03b5\u03af\u03bd\u03b1\u03b9 \u03ba\u03ac\u03c4\u03c9 \u03b1\u03c0\u03cc \u03c4\u03bf takt, \u03b1\u03bb\u03bb\u03ac \u03b1\u03c5\u03c4\u03cc\u03c2 \u03bf \u03bc\u03ad\u03c3\u03bf\u03c2 \u03cc\u03c1\u03bf\u03c2 \u03b4\u03b5\u03bd \u03b1\u03bd\u03b1\u03b9\u03c1\u03b5\u03af \u03c4\u03b7\u03bd \u03c5\u03c0\u03b5\u03c1\u03c6\u03cc\u03c1\u03c4\u03c9\u03c3\u03b7 \u03c4\u03bf\u03c5 \u03c3\u03c5\u03b3\u03ba\u03b5\u03ba\u03c1\u03b9\u03bc\u03ad\u03bd\u03bf\u03c5 \u03c3\u03c4\u03b1\u03b8\u03bc\u03bf\u03cd.<\/p>\n\n\n<p>\u039c\u03b5 \u03c4\u03b7 \u03bc\u03b5\u03c4\u03b1\u03c6\u03bf\u03c1\u03ac \u03c4\u03bf\u03c5 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03bf\u03c5 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2 C \u03c3\u03c4\u03bf\u03bd \u03c3\u03c4\u03b1\u03b8\u03bc\u03cc 1, \u03bf \u03c7\u03c1\u03cc\u03bd\u03bf\u03c2 \u03ba\u03ac\u03b8\u03b5 \u03c3\u03c4\u03b1\u03b8\u03bc\u03bf\u03cd \u03c0\u03ad\u03c6\u03c4\u03b5\u03b9 \u03ba\u03ac\u03c4\u03c9 \u03b1\u03c0\u03cc \u03c4\u03bf \u03cc\u03c1\u03b9\u03bf \u03c4\u03c9\u03bd 60 \u03b4\u03b5\u03c5\u03c4\u03b5\u03c1\u03bf\u03bb\u03ad\u03c0\u03c4\u03c9\u03bd \u03ba\u03b1\u03b9 \u03b4\u03b9\u03b1\u03c4\u03b7\u03c1\u03b5\u03af\u03c4\u03b1\u03b9 \u03b7 \u03c3\u03b5\u03b9\u03c1\u03ac \u03b1\u03c0\u03cc \u03c4\u03bf A \u03ad\u03c9\u03c2 \u03c4\u03bf G. \u039a\u03b1\u03bc\u03af\u03b1 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1 \u03b4\u03b5\u03bd \u03ad\u03c7\u03b5\u03b9 \u03b5\u03be\u03b1\u03bb\u03b5\u03b9\u03c6\u03b8\u03b5\u03af \u03ba\u03b1\u03b9 \u03bf \u03c3\u03c4\u03b1\u03b8\u03bc\u03cc\u03c2 3 \u03b5\u03be\u03b1\u03ba\u03bf\u03bb\u03bf\u03c5\u03b8\u03b5\u03af \u03bd\u03b1 \u03ad\u03c7\u03b5\u03b9 \u03bc\u03b9\u03ba\u03c1\u03cc\u03c4\u03b5\u03c1\u03bf \u03c6\u03cc\u03c1\u03c4\u03bf. \u0394\u03b5\u03bd \u03b8\u03b1 \u03b5\u03af\u03c7\u03b5 \u03ba\u03b1\u03bc\u03af\u03b1 \u03b1\u03be\u03af\u03b1 \u03bd\u03b1 \u03b3\u03af\u03bd\u03bf\u03c5\u03bd \u03ba\u03b1\u03b9 \u03bf\u03b9 \u03c4\u03c1\u03b5\u03b9\u03c2 \u03c1\u03ac\u03b2\u03b4\u03bf\u03b9 \u03af\u03c3\u03b5\u03c2, \u03b1\u03bd \u03b1\u03c5\u03c4\u03cc \u03b1\u03c0\u03b1\u03b9\u03c4\u03bf\u03cd\u03c3\u03b5 \u03bc\u03b9\u03b1 \u03bc\u03b5\u03c4\u03b1\u03c6\u03bf\u03c1\u03ac \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2 \u03c0\u03bf\u03c5 \u03b8\u03b1 \u03b4\u03c5\u03c3\u03ba\u03cc\u03bb\u03b5\u03c5\u03b5 \u03c4\u03b7\u03bd \u03b5\u03ba\u03c4\u03ad\u03bb\u03b5\u03c3\u03b7 \u03ae \u03b8\u03b1 \u03b4\u03b7\u03bc\u03b9\u03bf\u03c5\u03c1\u03b3\u03bf\u03cd\u03c3\u03b5 \u03ba\u03af\u03bd\u03b4\u03c5\u03bd\u03bf.<\/p>\n\n\n<p>\u0397 \u03bc\u03b5\u03c4\u03b1\u03c6\u03bf\u03c1\u03ac \u03b5\u03af\u03bd\u03b1\u03b9 \u03b5\u03c6\u03b9\u03ba\u03c4\u03ae \u03bc\u03cc\u03bd\u03bf \u03b1\u03bd \u03b7 \u03bc\u03bf\u03bd\u03ac\u03b4\u03b1 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03c4\u03bf\u03c0\u03bf\u03b8\u03b5\u03c4\u03b7\u03b8\u03b5\u03af \u03c3\u03c9\u03c3\u03c4\u03ac \u03c3\u03c4\u03bf\u03bd \u03c3\u03c4\u03b1\u03b8\u03bc\u03cc 1: \u03c0\u03c1\u03ad\u03c0\u03b5\u03b9 \u03bd\u03b1 \u03c5\u03c0\u03ac\u03c1\u03c7\u03bf\u03c5\u03bd \u03b5\u03ba\u03b5\u03af \u03c4\u03b1 \u03b5\u03be\u03b1\u03c1\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1, \u03c4\u03b1 \u03b5\u03c1\u03b3\u03b1\u03bb\u03b5\u03af\u03b1 \u03ba\u03b1\u03b9 \u03bf \u03c7\u03ce\u03c1\u03bf\u03c2, \u03ba\u03b1\u03b8\u03ce\u03c2 \u03ba\u03b1\u03b9 \u03ba\u03b1\u03c4\u03ac\u03bb\u03bb\u03b7\u03bb\u03b1 \u03b5\u03ba\u03c0\u03b1\u03b9\u03b4\u03b5\u03c5\u03bc\u03ad\u03bd\u03bf\u03c2 \u03c7\u03b5\u03b9\u03c1\u03b9\u03c3\u03c4\u03ae\u03c2. \u0395\u03bb\u03ad\u03b3\u03be\u03c4\u03b5 \u03c4\u03b1 \u03cc\u03bb\u03b1 \u03b1\u03c5\u03c4\u03ac \u03c0\u03c1\u03b9\u03bd \u03b5\u03b3\u03ba\u03c1\u03af\u03bd\u03b5\u03c4\u03b5 \u03c4\u03b7 \u03bd\u03ad\u03b1 \u03b5\u03be\u03b9\u03c3\u03bf\u03c1\u03c1\u03cc\u03c0\u03b7\u03c3\u03b7. \u0391\u03bd \u03b7 \u03c4\u03bf\u03c0\u03bf\u03b8\u03ad\u03c4\u03b7\u03c3\u03b7 \u03c4\u03b7\u03c2 \u03bc\u03bf\u03bd\u03ac\u03b4\u03b1\u03c2 \u03b1\u03c0\u03b1\u03b9\u03c4\u03b5\u03af \u03c3\u03c4\u03b1\u03b8\u03b5\u03c1\u03ae \u03b4\u03b9\u03ac\u03c4\u03b1\u03be\u03b7 \u03c3\u03c5\u03b3\u03ba\u03c1\u03ac\u03c4\u03b7\u03c3\u03b7\u03c2 \u03c3\u03c4\u03bf\u03bd \u03c3\u03c4\u03b1\u03b8\u03bc\u03cc 2, \u03b5\u03c0\u03b9\u03bb\u03ad\u03be\u03c4\u03b5 \u03bc\u03b9\u03b1 \u03b4\u03b9\u03b1\u03c6\u03bf\u03c1\u03b5\u03c4\u03b9\u03ba\u03ae \u03b1\u03bb\u03bb\u03b1\u03b3\u03ae, \u03b1\u03bd\u03c4\u03af \u03bd\u03b1 \u03bc\u03b5\u03c4\u03b1\u03ba\u03b9\u03bd\u03ae\u03c3\u03b5\u03c4\u03b5 \u03b1\u03c0\u03bb\u03ce\u03c2 \u03ad\u03bd\u03b1 \u03bf\u03c1\u03b8\u03bf\u03b3\u03ce\u03bd\u03b9\u03bf \u03c3\u03c4\u03bf \u03b4\u03b9\u03ac\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1 \u03ba\u03b1\u03b9 \u03bd\u03b1 \u03b8\u03b5\u03c9\u03c1\u03ae\u03c3\u03b5\u03c4\u03b5 \u03cc\u03c4\u03b9 \u03c4\u03bf \u03c0\u03c1\u03cc\u03b2\u03bb\u03b7\u03bc\u03b1 \u03bb\u03cd\u03b8\u03b7\u03ba\u03b5.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\u03a5\u03c0\u03bf\u03bb\u03bf\u03b3\u03af\u03c3\u03c4\u03b5 \u03c4\u03bf\u03bd \u03b5\u03bb\u03ac\u03c7\u03b9\u03c3\u03c4\u03bf \u03b1\u03c1\u03b9\u03b8\u03bc\u03cc \u03c3\u03c4\u03b1\u03b8\u03bc\u03ce\u03bd \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03b5\u03be\u03b9\u03c3\u03bf\u03c1\u03c1\u03cc\u03c0\u03b7\u03c3\u03b7\u03c2<\/h3>\n\n\n<p>\u0393\u03b9\u03b1 \u03b1\u03c5\u03c4\u03cc \u03c4\u03bf \u03b1\u03c0\u03bb\u03cc \u03bc\u03bf\u03bd\u03c4\u03ad\u03bb\u03bf \u03b4\u03b9\u03b1\u03b4\u03bf\u03c7\u03b9\u03ba\u03ce\u03bd \u03b5\u03c1\u03b3\u03b1\u03c3\u03b9\u03ce\u03bd, \u03c4\u03bf \u03b8\u03b5\u03c9\u03c1\u03b7\u03c4\u03b9\u03ba\u03cc \u03ba\u03b1\u03c4\u03ce\u03c4\u03b1\u03c4\u03bf \u03cc\u03c1\u03b9\u03bf \u03c5\u03c0\u03bf\u03bb\u03bf\u03b3\u03af\u03b6\u03b5\u03c4\u03b1\u03b9 \u03c9\u03c2 \u03b5\u03be\u03ae\u03c2:<\/p>\n\n\n<p><strong>\u0395\u03bb\u03ac\u03c7\u03b9\u03c3\u03c4\u03bf\u03c2 \u03b1\u03c1\u03b9\u03b8\u03bc\u03cc\u03c2 \u03c3\u03c4\u03b1\u03b8\u03bc\u03ce\u03bd = \u03c3\u03c5\u03bd\u03bf\u03bb\u03b9\u03ba\u03cc\u03c2 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2 \u00f7 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c2 \u03ba\u03cd\u03ba\u03bb\u03bf\u03c5 \u03c3\u03c7\u03b5\u03b4\u03b9\u03b1\u03c3\u03bc\u03bf\u03cd, \u03bc\u03b5 \u03c3\u03c4\u03c1\u03bf\u03b3\u03b3\u03c5\u03bb\u03bf\u03c0\u03bf\u03af\u03b7\u03c3\u03b7 \u03c0\u03c1\u03bf\u03c2 \u03c4\u03b1 \u03c0\u03ac\u03bd\u03c9.<\/strong><\/p>\n\n\n<p>\u039c\u03b5 \u03c7\u03c1\u03cc\u03bd\u03bf \u03ba\u03cd\u03ba\u03bb\u03bf\u03c5 \u03c3\u03c7\u03b5\u03b4\u03b9\u03b1\u03c3\u03bc\u03bf\u03cd 60 \u03b4\u03b5\u03c5\u03c4\u03b5\u03c1\u03bf\u03bb\u03ad\u03c0\u03c4\u03c9\u03bd, \u03c4\u03bf 145 \u00f7 60 \u03b4\u03af\u03bd\u03b5\u03b9 \u03c0\u03b5\u03c1\u03af\u03c0\u03bf\u03c5 2,42, \u03b5\u03c0\u03bf\u03bc\u03ad\u03bd\u03c9\u03c2 \u03c7\u03c1\u03b5\u03b9\u03ac\u03b6\u03bf\u03bd\u03c4\u03b1\u03b9 \u03c4\u03bf\u03c5\u03bb\u03ac\u03c7\u03b9\u03c3\u03c4\u03bf\u03bd <strong>3 \u03c3\u03c4\u03b1\u03b8\u03bc\u03bf\u03af<\/strong>. \u0391\u03c5\u03c4\u03cc \u03b5\u03af\u03bd\u03b1\u03b9 \u03ad\u03bd\u03b1 \u03ba\u03b1\u03c4\u03ce\u03c4\u03b1\u03c4\u03bf \u03cc\u03c1\u03b9\u03bf, \u03cc\u03c7\u03b9 \u03b1\u03c0\u03cc\u03b4\u03b5\u03b9\u03be\u03b7 \u03cc\u03c4\u03b9 \u03bf\u03c0\u03bf\u03b9\u03b1\u03b4\u03ae\u03c0\u03bf\u03c4\u03b5 \u03c3\u03c5\u03b3\u03ba\u03b5\u03ba\u03c1\u03b9\u03bc\u03ad\u03bd\u03b7 \u03ba\u03b1\u03c4\u03b1\u03bd\u03bf\u03bc\u03ae \u03c3\u03b5 \u03c4\u03c1\u03b5\u03b9\u03c2 \u03c3\u03c4\u03b1\u03b8\u03bc\u03bf\u03cd\u03c2 \u03b5\u03af\u03bd\u03b1\u03b9 \u03b5\u03c6\u03b9\u03ba\u03c4\u03ae. \u0397 \u03c5\u03c0\u03bf\u03c7\u03c1\u03b5\u03c9\u03c4\u03b9\u03ba\u03ae \u03c3\u03b5\u03b9\u03c1\u03ac \u03b5\u03ba\u03c4\u03ad\u03bb\u03b5\u03c3\u03b7\u03c2, \u03c4\u03b1 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03b1 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2 \u03c0\u03bf\u03c5 \u03b4\u03b5\u03bd \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03bd\u03b1 \u03b4\u03b9\u03b1\u03b9\u03c1\u03b5\u03b8\u03bf\u03cd\u03bd \u03ba\u03b1\u03b9 \u03bf\u03b9 \u03c0\u03b5\u03c1\u03b9\u03bf\u03c1\u03b9\u03c3\u03bc\u03bf\u03af \u03c4\u03bf\u03c5 \u03b5\u03be\u03bf\u03c0\u03bb\u03b9\u03c3\u03bc\u03bf\u03cd \u03b5\u03bd\u03b4\u03ad\u03c7\u03b5\u03c4\u03b1\u03b9 \u03bd\u03b1 \u03b5\u03c0\u03b9\u03b2\u03ac\u03bb\u03bb\u03bf\u03c5\u03bd \u03b4\u03b9\u03b1\u03c6\u03bf\u03c1\u03b5\u03c4\u03b9\u03ba\u03ae \u03bb\u03cd\u03c3\u03b7.<\/p>\n\n\n<p>\u03a3\u03c4\u03b7 \u03bd\u03ad\u03b1 \u03ba\u03b1\u03c4\u03b1\u03bd\u03bf\u03bc\u03ae, \u03bf \u03bc\u03b5\u03b3\u03b1\u03bb\u03cd\u03c4\u03b5\u03c1\u03bf\u03c2 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c2 \u03c3\u03c4\u03b1\u03b8\u03bc\u03bf\u03cd \u03b5\u03af\u03bd\u03b1\u03b9 55 \u03b4\u03b5\u03c5\u03c4\u03b5\u03c1\u03cc\u03bb\u03b5\u03c0\u03c4\u03b1. \u039c\u03b5 \u03c4\u03b9\u03c2 \u03b9\u03b4\u03b1\u03bd\u03b9\u03ba\u03ad\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b4\u03bf\u03c7\u03ad\u03c2 \u03c3\u03c4\u03b1\u03b8\u03b5\u03c1\u03ae\u03c2 \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03af\u03b1\u03c2 \u03b1\u03c5\u03c4\u03bf\u03cd \u03c4\u03bf\u03c5 \u03c0\u03b1\u03c1\u03b1\u03b4\u03b5\u03af\u03b3\u03bc\u03b1\u03c4\u03bf\u03c2, \u03bf \u03c7\u03c1\u03cc\u03bd\u03bf\u03c2 \u03b1\u03c5\u03c4\u03cc\u03c2 \u03ba\u03b1\u03b8\u03bf\u03c1\u03af\u03b6\u03b5\u03b9 \u03c4\u03bf\u03bd \u03c3\u03c5\u03bd\u03c4\u03bf\u03bc\u03cc\u03c4\u03b5\u03c1\u03bf \u03b5\u03c0\u03b1\u03bd\u03b1\u03bb\u03b1\u03bc\u03b2\u03b1\u03bd\u03cc\u03bc\u03b5\u03bd\u03bf \u03ba\u03cd\u03ba\u03bb\u03bf \u03c4\u03b7\u03c2 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ae\u03c2. \u0388\u03bd\u03b1\u03c2 \u03c3\u03c5\u03bd\u03ae\u03b8\u03b7\u03c2 \u03c4\u03c1\u03cc\u03c0\u03bf\u03c2 \u03c5\u03c0\u03bf\u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03bf\u03cd \u03c4\u03b7\u03c2 \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1\u03c2 \u03b5\u03be\u03b9\u03c3\u03bf\u03c1\u03c1\u03cc\u03c0\u03b7\u03c3\u03b7\u03c2 \u03b5\u03af\u03bd\u03b1\u03b9 \u03bf \u03b5\u03be\u03ae\u03c2:<\/p>\n\n\n<p><strong>\u0391\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03b5\u03be\u03b9\u03c3\u03bf\u03c1\u03c1\u03cc\u03c0\u03b7\u03c3\u03b7\u03c2 = \u03c3\u03c5\u03bd\u03bf\u03bb\u03b9\u03ba\u03cc\u03c2 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2 \u00f7 (\u03b1\u03c1\u03b9\u03b8\u03bc\u03cc\u03c2 \u03c3\u03c4\u03b1\u03b8\u03bc\u03ce\u03bd \u00d7 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c2 \u03ba\u03cd\u03ba\u03bb\u03bf\u03c5 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ae\u03c2) \u00d7 100.<\/strong><\/p>\n\n\n<p>\u039c\u03b5 \u03b1\u03c5\u03c4\u03cc\u03bd \u03c4\u03bf\u03bd \u03ba\u03cd\u03ba\u03bb\u03bf \u03c4\u03c9\u03bd 55 \u03b4\u03b5\u03c5\u03c4\u03b5\u03c1\u03bf\u03bb\u03ad\u03c0\u03c4\u03c9\u03bd, \u03c0\u03c1\u03bf\u03ba\u03cd\u03c0\u03c4\u03b5\u03b9 145 \u00f7 (3 \u00d7 55) \u00d7 100 = <strong>87,9%<\/strong>. \u0397 \u03b1\u03bd\u03c4\u03af\u03c3\u03c4\u03bf\u03b9\u03c7\u03b7 \u03b1\u03c0\u03ce\u03bb\u03b5\u03b9\u03b1 \u03bb\u03cc\u03b3\u03c9 \u03b1\u03bd\u03b9\u03c3\u03bf\u03ba\u03b1\u03c4\u03b1\u03bd\u03bf\u03bc\u03ae\u03c2 \u03b5\u03af\u03bd\u03b1\u03b9 12,1%: \u03c4\u03bf \u03c0\u03bf\u03c3\u03bf\u03c3\u03c4\u03cc \u03c4\u03bf\u03c5 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c5 \u03c4\u03c9\u03bd \u03c3\u03c4\u03b1\u03b8\u03bc\u03ce\u03bd \u03c3\u03c4\u03bf \u03bf\u03c0\u03bf\u03af\u03bf \u03b4\u03b5\u03bd \u03ad\u03c7\u03b5\u03b9 \u03b1\u03bd\u03b1\u03c4\u03b5\u03b8\u03b5\u03af \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1 \u03bc\u03ad\u03c3\u03b1 \u03c3\u03b5 \u03b1\u03c5\u03c4\u03cc\u03bd \u03c4\u03bf\u03bd \u03ba\u03cd\u03ba\u03bb\u03bf.<\/p>\n\n\n<p>\u0391\u03bd, \u03b1\u03bd\u03c4\u03af \u03b3\u03b9\u2019 \u03b1\u03c5\u03c4\u03cc, \u03b1\u03be\u03b9\u03bf\u03bb\u03bf\u03b3\u03ae\u03c3\u03b5\u03c4\u03b5 \u03c4\u03b7\u03bd \u03ba\u03b1\u03c4\u03b1\u03bd\u03bf\u03bc\u03ae \u03bc\u03b5 \u03b2\u03ac\u03c3\u03b7 \u03c4\u03bf\u03bd \u03c1\u03c5\u03b8\u03bc\u03cc \u03c0\u03bf\u03c5 \u03b1\u03c0\u03b1\u03b9\u03c4\u03b5\u03af \u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7, \u03b4\u03b7\u03bb\u03b1\u03b4\u03ae \u03c4\u03b1 60 \u03b4\u03b5\u03c5\u03c4\u03b5\u03c1\u03cc\u03bb\u03b5\u03c0\u03c4\u03b1, \u03c0\u03c1\u03bf\u03ba\u03cd\u03c0\u03c4\u03b5\u03b9 145 \u00f7 (3 \u00d7 60) \u00d7 100 = <strong>80,6%<\/strong>. \u038c\u03c4\u03b1\u03bd \u03c3\u03c5\u03b3\u03ba\u03c1\u03af\u03bd\u03b5\u03c4\u03b5 \u03b5\u03bd\u03b1\u03bb\u03bb\u03b1\u03ba\u03c4\u03b9\u03ba\u03bf\u03cd\u03c2 \u03c3\u03c7\u03b5\u03b4\u03b9\u03b1\u03c3\u03bc\u03bf\u03cd\u03c2, \u03b4\u03b7\u03bb\u03ce\u03bd\u03b5\u03c4\u03b5 \u03c0\u03bf\u03b9\u03bf\u03bd \u03c0\u03b1\u03c1\u03bf\u03bd\u03bf\u03bc\u03b1\u03c3\u03c4\u03ae \u03c7\u03c1\u03b7\u03c3\u03b9\u03bc\u03bf\u03c0\u03bf\u03b9\u03b5\u03af\u03c4\u03b5. \u0397 \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03b5\u03be\u03b9\u03c3\u03bf\u03c1\u03c1\u03cc\u03c0\u03b7\u03c3\u03b7\u03c2 \u03bc\u03b5 \u03b2\u03ac\u03c3\u03b7 \u03c4\u03bf\u03bd \u03ba\u03cd\u03ba\u03bb\u03bf \u03ba\u03b1\u03b9 \u03b7 \u03c6\u03cc\u03c1\u03c4\u03b9\u03c3\u03b7 \u03c3\u03b5 \u03c3\u03c7\u03ad\u03c3\u03b7 \u03bc\u03b5 \u03c4\u03bf takt \u03b1\u03c0\u03b1\u03bd\u03c4\u03bf\u03cd\u03bd \u03c3\u03b5 \u03b4\u03b9\u03b1\u03c6\u03bf\u03c1\u03b5\u03c4\u03b9\u03ba\u03ac \u03b5\u03c1\u03c9\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1.<\/p>\n\n\n<p>\u039a\u03b1\u03bd\u03ad\u03bd\u03b1 \u03b1\u03c0\u03cc \u03c4\u03b1 \u03b4\u03cd\u03bf \u03c0\u03bf\u03c3\u03bf\u03c3\u03c4\u03ac \u03b4\u03b5\u03bd \u03b5\u03af\u03bd\u03b1\u03b9 \u03b4\u03b5\u03af\u03ba\u03c4\u03b7\u03c2 OEE, \u03bc\u03ad\u03c4\u03c1\u03bf \u03c0\u03bf\u03b9\u03cc\u03c4\u03b7\u03c4\u03b1\u03c2 \u03ae \u03b5\u03b3\u03b3\u03c5\u03b7\u03bc\u03ad\u03bd\u03bf\u03c2 \u03c1\u03c5\u03b8\u03bc\u03cc\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2. \u0397 \u03bf\u03c5\u03c3\u03b9\u03b1\u03c3\u03c4\u03b9\u03ba\u03ae \u03b4\u03bf\u03ba\u03b9\u03bc\u03ae \u03b5\u03af\u03bd\u03b1\u03b9 \u03b1\u03bd \u03b7 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ae \u03c0\u03b1\u03c1\u03b1\u03b4\u03af\u03b4\u03b5\u03b9 \u03c3\u03c4\u03b1\u03b8\u03b5\u03c1\u03ac \u03c4\u03b5\u03bc\u03ac\u03c7\u03b9\u03b1 \u03b5\u03bd\u03c4\u03cc\u03c2 \u03c0\u03c1\u03bf\u03b4\u03b9\u03b1\u03b3\u03c1\u03b1\u03c6\u03ce\u03bd \u03c3\u03c4\u03bf\u03bd \u03b1\u03c0\u03b1\u03b9\u03c4\u03bf\u03cd\u03bc\u03b5\u03bd\u03bf \u03c1\u03c5\u03b8\u03bc\u03cc, \u03c7\u03c9\u03c1\u03af\u03c2 \u03b5\u03c0\u03b9\u03ba\u03af\u03bd\u03b4\u03c5\u03bd\u03b5\u03c2 \u03c0\u03c1\u03b1\u03ba\u03c4\u03b9\u03ba\u03ad\u03c2, \u03c0\u03b1\u03c1\u03b1\u03bb\u03b5\u03af\u03c8\u03b5\u03b9\u03c2 \u03b5\u03bb\u03ad\u03b3\u03c7\u03c9\u03bd \u03ae \u03b1\u03c5\u03be\u03b1\u03bd\u03cc\u03bc\u03b5\u03bd\u03b5\u03c2 \u03bf\u03c5\u03c1\u03ad\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03b9\u03ce\u03bd. \u0394\u03b5\u03bd \u03c5\u03c0\u03ac\u03c1\u03c7\u03b5\u03b9 \u03cc\u03c6\u03b5\u03bb\u03bf\u03c2 \u03c3\u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae \u03bc\u03b5 \u03c1\u03c5\u03b8\u03bc\u03cc \u03c4\u03b1\u03c7\u03cd\u03c4\u03b5\u03c1\u03bf \u03b1\u03c0\u03cc \u03b1\u03c5\u03c4\u03cc\u03bd \u03c4\u03b7\u03c2 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7\u03c2 \u03bc\u03cc\u03bd\u03bf \u03ba\u03b1\u03b9 \u03bc\u03cc\u03bd\u03bf \u03b3\u03b9\u03b1 \u03bd\u03b1 \u03b2\u03b5\u03bb\u03c4\u03b9\u03c9\u03b8\u03b5\u03af \u03b7 \u03b1\u03be\u03b9\u03bf\u03c0\u03bf\u03af\u03b7\u03c3\u03b7.<\/p>\n\n\n<h2 class=\"wp-block-heading\">4. \u0391\u03bd\u03c4\u03b9\u03bc\u03b5\u03c4\u03c9\u03c0\u03af\u03c3\u03c4\u03b5 \u03c4\u03bf\u03bd \u03c0\u03b5\u03c1\u03b9\u03bf\u03c1\u03b9\u03c3\u03bc\u03cc \u03c0\u03bf\u03c5 \u03b4\u03b5\u03bd \u03bb\u03cd\u03bd\u03b5\u03c4\u03b1\u03b9 \u03bc\u03b5 \u03bc\u03b9\u03b1 \u03bc\u03b5\u03c4\u03b1\u03c6\u03bf\u03c1\u03ac \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2<\/h2>\n\n\n<p>\u039c\u03b5\u03c1\u03b9\u03ba\u03ad\u03c2 \u03c6\u03bf\u03c1\u03ad\u03c2, \u03ba\u03b1\u03bc\u03af\u03b1 \u03b1\u03bd\u03b1\u03ba\u03b1\u03c4\u03b1\u03bd\u03bf\u03bc\u03ae \u03b4\u03b5\u03bd \u03b1\u03c1\u03ba\u03b5\u03af \u03b3\u03b9\u03b1 \u03bd\u03b1 \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03ae\u03c3\u03b5\u03b9 \u03b7 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ae \u03b5\u03bd\u03c4\u03cc\u03c2 \u03c4\u03bf\u03c5 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c5 \u03ba\u03cd\u03ba\u03bb\u03bf\u03c5 \u03c3\u03c7\u03b5\u03b4\u03b9\u03b1\u03c3\u03bc\u03bf\u03cd. \u039e\u03b5\u03ba\u03b9\u03bd\u03ae\u03c3\u03c4\u03b5 \u03b1\u03c0\u03cc \u03c4\u03b7\u03bd \u03b1\u03b9\u03c4\u03af\u03b1, \u03cc\u03c7\u03b9 \u03b1\u03c0\u03cc \u03bc\u03b9\u03b1 \u03b3\u03b5\u03bd\u03b9\u03ba\u03ae \u03b5\u03bd\u03c4\u03bf\u03bb\u03ae \u03b3\u03b9\u03b1 \u03c0\u03b9\u03bf \u03b3\u03c1\u03ae\u03b3\u03bf\u03c1\u03b7 \u03b4\u03bf\u03c5\u03bb\u03b5\u03b9\u03ac.<\/p>\n\n\n<p><strong>\u0388\u03bd\u03b1 \u03b1\u03b4\u03b9\u03b1\u03af\u03c1\u03b5\u03c4\u03bf \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03bf \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2 \u03b4\u03b9\u03b1\u03c1\u03ba\u03b5\u03af \u03c0\u03b5\u03c1\u03b9\u03c3\u03c3\u03cc\u03c4\u03b5\u03c1\u03bf \u03b1\u03c0\u03cc \u03c4\u03bf\u03bd \u03ba\u03cd\u03ba\u03bb\u03bf.<\/strong> \u0392\u03b5\u03bb\u03c4\u03b9\u03ce\u03c3\u03c4\u03b5 \u03c4\u03b7 \u03bc\u03ad\u03b8\u03bf\u03b4\u03bf, \u03bc\u03b5\u03b9\u03ce\u03c3\u03c4\u03b5 \u03c4\u03b7 \u03b4\u03b9\u03ac\u03c1\u03ba\u03b5\u03b9\u03ac \u03c4\u03bf\u03c5 \u03ae \u03b5\u03be\u03b5\u03c4\u03ac\u03c3\u03c4\u03b5 \u03c4\u03b7\u03bd \u03c0\u03c1\u03bf\u03c3\u03b8\u03ae\u03ba\u03b7 \u03b5\u03bd\u03cc\u03c2 \u03c0\u03cc\u03c1\u03bf\u03c5 \u03c0\u03bf\u03c5 \u03b8\u03b1 \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03b5\u03af \u03c0\u03b1\u03c1\u03ac\u03bb\u03bb\u03b7\u03bb\u03b1. \u0397 \u03b1\u03bd\u03ac\u03b8\u03b5\u03c3\u03ae \u03c4\u03bf\u03c5 \u03c3\u03b5 \u03ac\u03bb\u03bb\u03bf\u03bd \u03c7\u03b5\u03b9\u03c1\u03b9\u03c3\u03c4\u03ae \u03b4\u03b5\u03bd \u03b1\u03bb\u03bb\u03ac\u03b6\u03b5\u03b9 \u03c4\u03bf\u03bd \u03c7\u03c1\u03cc\u03bd\u03bf \u03c0\u03bf\u03c5 \u03b1\u03c0\u03b1\u03b9\u03c4\u03b5\u03af. \u0391\u03bd \u03b7 \u03c0\u03b1\u03c1\u03ac\u03bb\u03bb\u03b7\u03bb\u03b7 \u03b5\u03ba\u03c4\u03ad\u03bb\u03b5\u03c3\u03b7 \u03b5\u03af\u03bd\u03b1\u03b9 \u03c0\u03c1\u03b1\u03ba\u03c4\u03b9\u03ba\u03ac \u03b4\u03c5\u03bd\u03b1\u03c4\u03ae, \u03b5\u03be\u03b5\u03c4\u03ac\u03c3\u03c4\u03b5 \u03ba\u03b1\u03c4\u03ac \u03c4\u03bf\u03bd \u03c3\u03c7\u03b5\u03b4\u03b9\u03b1\u03c3\u03bc\u03cc \u03c4\u03bf\u03bd \u03c0\u03c1\u03cc\u03c3\u03b8\u03b5\u03c4\u03bf \u03b5\u03be\u03bf\u03c0\u03bb\u03b9\u03c3\u03bc\u03cc, \u03c4\u03b7 \u03c3\u03c4\u03b5\u03bb\u03ad\u03c7\u03c9\u03c3\u03b7 \u03ba\u03b1\u03b9 \u03c4\u03b9\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b4\u03cc\u03c3\u03b5\u03b9\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2 \u03bc\u03b5\u03c4\u03b1\u03be\u03cd \u03c3\u03c4\u03b1\u03b4\u03af\u03c9\u03bd.<\/p>\n\n\n<p><strong>\u039f \u03bc\u03ad\u03c3\u03bf\u03c2 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c2 \u03b5\u03af\u03bd\u03b1\u03b9 \u03b5\u03bd\u03c4\u03cc\u03c2 \u03bf\u03c1\u03af\u03bf\u03c5, \u03b1\u03bb\u03bb\u03ac \u03b7 \u03c3\u03c5\u03bd\u03ae\u03b8\u03b7\u03c2 \u03b4\u03b9\u03b1\u03ba\u03cd\u03bc\u03b1\u03bd\u03c3\u03b7 \u03bf\u03b4\u03b7\u03b3\u03b5\u03af \u03c3\u03b5 \u03c5\u03c0\u03b5\u03c1\u03b2\u03ac\u03c3\u03b5\u03b9\u03c2.<\/strong> \u039c\u03b5\u03bb\u03b5\u03c4\u03ae\u03c3\u03c4\u03b5 \u03c4\u03b9\u03c2 \u03b1\u03b9\u03c4\u03af\u03b5\u03c2: \u03c4\u03bf\u03bd \u03c4\u03c1\u03cc\u03c0\u03bf \u03bc\u03b5 \u03c4\u03bf\u03bd \u03bf\u03c0\u03bf\u03af\u03bf \u03b4\u03b9\u03b1\u03c4\u03af\u03b8\u03b5\u03bd\u03c4\u03b1\u03b9 \u03c4\u03b1 \u03b5\u03be\u03b1\u03c1\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1 \u03c3\u03c4\u03b7 \u03b8\u03ad\u03c3\u03b7 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2, \u03c4\u03b9\u03c2 \u03c1\u03c5\u03b8\u03bc\u03af\u03c3\u03b5\u03b9\u03c2, \u03c4\u03b7\u03bd \u03b5\u03c0\u03b1\u03bd\u03b5\u03c0\u03b5\u03be\u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1, \u03c4\u03b7\u03bd \u03b1\u03bd\u03b1\u03c4\u03c1\u03bf\u03c6\u03bf\u03b4\u03cc\u03c4\u03b7\u03c3\u03b7 \u03c5\u03bb\u03b9\u03ba\u03ce\u03bd \u03ae \u03c4\u03b9\u03c2 \u03bc\u03b7 \u03bf\u03bc\u03bf\u03b9\u03cc\u03bc\u03bf\u03c1\u03c6\u03b5\u03c2 \u03bc\u03b5\u03b8\u03cc\u03b4\u03bf\u03c5\u03c2. \u039c\u03b9\u03b1 \u03b5\u03be\u03b9\u03c3\u03bf\u03c1\u03c1\u03cc\u03c0\u03b7\u03c3\u03b7 \u03c0\u03bf\u03c5 \u03b2\u03b1\u03c3\u03af\u03b6\u03b5\u03c4\u03b1\u03b9 \u03c3\u03b5 \u03b9\u03b4\u03b1\u03bd\u03b9\u03ba\u03bf\u03cd\u03c2 \u03ba\u03cd\u03ba\u03bb\u03bf\u03c5\u03c2 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03b1\u03c0\u03bb\u03ce\u03c2 \u03bd\u03b1 \u03bc\u03b5\u03c4\u03b1\u03c4\u03c1\u03ad\u03c0\u03b5\u03b9 \u03bc\u03b9\u03ba\u03c1\u03ad\u03c2 \u03b4\u03b9\u03b1\u03ba\u03c5\u03bc\u03ac\u03bd\u03c3\u03b5\u03b9\u03c2 \u03c3\u03b5 \u03b5\u03c0\u03b1\u03bd\u03b1\u03bb\u03b1\u03bc\u03b2\u03b1\u03bd\u03cc\u03bc\u03b5\u03bd\u03b5\u03c2 \u03c3\u03c4\u03ac\u03c3\u03b5\u03b9\u03c2. \u0391\u03c6\u03ae\u03c3\u03c4\u03b5 \u03b5\u03c0\u03b1\u03c1\u03ba\u03ad\u03c2 \u03c0\u03b5\u03c1\u03b9\u03b8\u03ce\u03c1\u03b9\u03bf \u03b1\u03bd\u03ac\u03ba\u03b1\u03bc\u03c8\u03b7\u03c2 \u03ba\u03b1\u03b9 \u03b5\u03c0\u03b1\u03bb\u03b7\u03b8\u03b5\u03cd\u03c3\u03c4\u03b5 \u03c4\u03bf \u03c3\u03c4\u03b7\u03bd \u03c0\u03b9\u03bb\u03bf\u03c4\u03b9\u03ba\u03ae \u03b5\u03c6\u03b1\u03c1\u03bc\u03bf\u03b3\u03ae.<\/p>\n\n\n<p><strong>\u03a4\u03bf \u03bc\u03b5\u03af\u03b3\u03bc\u03b1 \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03c9\u03bd \u03b1\u03bb\u03bb\u03ac\u03b6\u03b5\u03b9 \u03c4\u03bf\u03bd \u03c6\u03cc\u03c1\u03c4\u03bf \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2.<\/strong> \u0395\u03bb\u03ad\u03b3\u03be\u03c4\u03b5 \u03c4\u03bf\u03c5\u03c2 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c5\u03c2 \u03c4\u03c9\u03bd \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03c9\u03bd \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2 \u03b1\u03bd\u03ac \u03bc\u03bf\u03bd\u03c4\u03ad\u03bb\u03bf. \u0388\u03bd\u03b1\u03c2 \u03c3\u03c4\u03b1\u03b8\u03bc\u03b9\u03c3\u03bc\u03ad\u03bd\u03bf\u03c2 \u03bc\u03ad\u03c3\u03bf\u03c2 \u03cc\u03c1\u03bf\u03c2 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03ba\u03c1\u03cd\u03b2\u03b5\u03b9 \u03c4\u03b7\u03bd \u03c5\u03c0\u03b5\u03c1\u03c6\u03cc\u03c1\u03c4\u03c9\u03c3\u03b7 \u03b5\u03bd\u03cc\u03c2 \u03c3\u03c4\u03b1\u03b8\u03bc\u03bf\u03cd \u03b1\u03c0\u03cc \u03b1\u03c1\u03ba\u03b5\u03c4\u03ac \u03b4\u03b9\u03b1\u03b4\u03bf\u03c7\u03b9\u03ba\u03ac \u03c4\u03b5\u03bc\u03ac\u03c7\u03b9\u03b1 \u03b1\u03c5\u03be\u03b7\u03bc\u03ad\u03bd\u03b7\u03c2 \u03c0\u03bf\u03bb\u03c5\u03c0\u03bb\u03bf\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1\u03c2. \u0394\u03bf\u03ba\u03b9\u03bc\u03ac\u03c3\u03c4\u03b5 \u03c1\u03b5\u03b1\u03bb\u03b9\u03c3\u03c4\u03b9\u03ba\u03ad\u03c2 \u03b1\u03ba\u03bf\u03bb\u03bf\u03c5\u03b8\u03af\u03b5\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2, \u03cc\u03c7\u03b9 \u03bc\u03cc\u03bd\u03bf \u03c4\u03bf \u03bc\u03ad\u03c3\u03bf \u03bc\u03b5\u03af\u03b3\u03bc\u03b1\u00b7 \u03c7\u03c1\u03b7\u03c3\u03b9\u03bc\u03bf\u03c0\u03bf\u03b9\u03ae\u03c3\u03c4\u03b5 \u03c4\u03b7\u03bd \u03b5\u03be\u03bf\u03bc\u03ac\u03bb\u03c5\u03bd\u03c3\u03b7 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03cc\u03c0\u03bf\u03c5 \u03b2\u03bf\u03b7\u03b8\u03ac \u03c3\u03c4\u03b7\u03bd \u03ba\u03b1\u03c4\u03b1\u03bd\u03bf\u03bc\u03ae \u03b1\u03c5\u03c4\u03ce\u03bd \u03c4\u03c9\u03bd \u03b1\u03c0\u03b1\u03b9\u03c4\u03ae\u03c3\u03b5\u03c9\u03bd \u03c3\u03c4\u03bf\u03bd \u03c7\u03c1\u03cc\u03bd\u03bf.<\/p>\n\n\n<p><strong>\u03a0\u03bf\u03bb\u03bb\u03bf\u03af \u03c3\u03c4\u03b1\u03b8\u03bc\u03bf\u03af \u03bc\u03bf\u03b9\u03c1\u03ac\u03b6\u03bf\u03bd\u03c4\u03b1\u03b9 \u03c4\u03bf \u03af\u03b4\u03b9\u03bf \u03ac\u03c4\u03bf\u03bc\u03bf \u03ae \u03bc\u03b7\u03c7\u03ac\u03bd\u03b7\u03bc\u03b1.<\/strong> \u0395\u03bb\u03ad\u03b3\u03be\u03c4\u03b5 \u03c0\u03cc\u03c4\u03b5 \u03c7\u03c1\u03b5\u03b9\u03ac\u03b6\u03b5\u03c4\u03b1\u03b9 \u03bf \u03ba\u03b1\u03b8\u03ad\u03bd\u03b1\u03c2 \u03b1\u03c5\u03c4\u03bf\u03cd\u03c2 \u03c4\u03bf\u03c5\u03c2 \u03c0\u03cc\u03c1\u03bf\u03c5\u03c2. \u0394\u03cd\u03bf \u03c3\u03c4\u03b1\u03b8\u03bc\u03bf\u03af \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03ad\u03c7\u03bf\u03c5\u03bd \u03c7\u03c1\u03cc\u03bd\u03bf\u03c5\u03c2 \u03ba\u03ac\u03c4\u03c9 \u03b1\u03c0\u03cc \u03c4\u03bf takt \u03ba\u03b1\u03b9 \u03c0\u03b1\u03c1\u2019 \u03cc\u03bb\u03b1 \u03b1\u03c5\u03c4\u03ac \u03bd\u03b1 \u03c7\u03c1\u03b5\u03b9\u03ac\u03b6\u03bf\u03bd\u03c4\u03b1\u03b9 \u03c4\u03bf\u03bd \u03af\u03b4\u03b9\u03bf \u03c7\u03b5\u03b9\u03c1\u03b9\u03c3\u03c4\u03ae \u03c4\u03b7\u03bd \u03af\u03b4\u03b9\u03b1 \u03c3\u03c4\u03b9\u03b3\u03bc\u03ae. \u0388\u03bd\u03b1 \u03ba\u03bf\u03b9\u03bd\u03cc\u03c7\u03c1\u03b7\u03c3\u03c4\u03bf \u03bc\u03b7\u03c7\u03ac\u03bd\u03b7\u03bc\u03b1 \u03b4\u03bf\u03ba\u03b9\u03bc\u03ce\u03bd \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03b5\u03c0\u03af\u03c3\u03b7\u03c2 \u03bd\u03b1 \u03b5\u03af\u03bd\u03b1\u03b9 \u03b1\u03c0\u03b1\u03c3\u03c7\u03bf\u03bb\u03b7\u03bc\u03ad\u03bd\u03bf \u03bc\u03b5 \u03ac\u03bb\u03bb\u03b7 \u03bf\u03b9\u03ba\u03bf\u03b3\u03ad\u03bd\u03b5\u03b9\u03b1 \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03c9\u03bd. \u0397 \u03b5\u03be\u03b9\u03c3\u03bf\u03c1\u03c1\u03cc\u03c0\u03b7\u03c3\u03b7 \u03c4\u03c9\u03bd \u03c3\u03c4\u03b1\u03b8\u03bc\u03ce\u03bd \u03c0\u03c1\u03ad\u03c0\u03b5\u03b9 \u03bd\u03b1 \u03c3\u03c4\u03b7\u03c1\u03af\u03b6\u03b5\u03c4\u03b1\u03b9 \u03c3\u03c4\u03b7\u03bd \u03c0\u03c1\u03b1\u03b3\u03bc\u03b1\u03c4\u03b9\u03ba\u03ae \u03b4\u03b9\u03b1\u03b8\u03b5\u03c3\u03b9\u03bc\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c4\u03bf\u03c5 \u03c0\u03cc\u03c1\u03bf\u03c5.<\/p>\n\n\n<p>\u03a3\u03b5 \u03b1\u03c5\u03c4\u03cc \u03c4\u03bf \u03c4\u03b5\u03bb\u03b5\u03c5\u03c4\u03b1\u03af\u03bf \u03c0\u03c1\u03cc\u03b2\u03bb\u03b7\u03bc\u03b1 \u03c3\u03c5\u03bd\u03b1\u03bd\u03c4\u03b9\u03bf\u03cd\u03bd\u03c4\u03b1\u03b9 \u03bf \u03c3\u03c7\u03b5\u03b4\u03b9\u03b1\u03c3\u03bc\u03cc\u03c2 \u03c4\u03b7\u03c2 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b1\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03bf \u03c0\u03c1\u03cc\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1 \u03c4\u03bf\u03c5 \u03b5\u03c1\u03b3\u03bf\u03c3\u03c4\u03b1\u03c3\u03af\u03bf\u03c5. \u0397 \u03ba\u03b1\u03c4\u03b1\u03bd\u03bf\u03bc\u03ae \u03c4\u03c9\u03bd \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03c9\u03bd \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2 \u03bf\u03c1\u03af\u03b6\u03b5\u03b9 \u03c0\u03ce\u03c2 \u03c0\u03c1\u03ad\u03c0\u03b5\u03b9 \u03bd\u03b1 \u03c1\u03ad\u03b5\u03b9 \u03b7 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1. \u03a4\u03bf \u03c0\u03c1\u03cc\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1 \u03c0\u03c1\u03ad\u03c0\u03b5\u03b9 \u03bd\u03b1 \u03c4\u03b7\u03c2 \u03b5\u03be\u03b1\u03c3\u03c6\u03b1\u03bb\u03af\u03b6\u03b5\u03b9 \u03bc\u03b9\u03b1 \u03c1\u03b5\u03b1\u03bb\u03b9\u03c3\u03c4\u03b9\u03ba\u03ae \u03b8\u03ad\u03c3\u03b7 \u03b1\u03bd\u03ac\u03bc\u03b5\u03c3\u03b1 \u03c3\u03b5 \u03cc\u03bb\u03b5\u03c2 \u03c4\u03b9\u03c2 \u03ac\u03bb\u03bb\u03b5\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2 \u03c0\u03bf\u03c5 \u03b4\u03b9\u03b5\u03ba\u03b4\u03b9\u03ba\u03bf\u03cd\u03bd \u03c4\u03bf\u03c5\u03c2 \u03af\u03b4\u03b9\u03bf\u03c5\u03c2 \u03c0\u03cc\u03c1\u03bf\u03c5\u03c2.<\/p>\n\n\n<h2 class=\"wp-block-heading\">5. \u0395\u03bd\u03c4\u03ac\u03be\u03c4\u03b5 \u03c4\u03b7\u03bd \u03b5\u03b3\u03ba\u03b5\u03ba\u03c1\u03b9\u03bc\u03ad\u03bd\u03b7 \u03b5\u03be\u03b9\u03c3\u03bf\u03c1\u03c1\u03cc\u03c0\u03b7\u03c3\u03b7 \u03c3\u03b5 \u03ad\u03bd\u03b1 \u03ba\u03bf\u03b9\u03bd\u03cc \u03c0\u03c1\u03cc\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1 \u03c3\u03c4\u03bf SkyPlanner<\/h2>\n\n\n<p>\u039c\u03cc\u03bb\u03b9\u03c2 \u03b7 \u03bf\u03bc\u03ac\u03b4\u03b1 \u03c3\u03c5\u03bc\u03c6\u03c9\u03bd\u03ae\u03c3\u03b5\u03b9 \u03c3\u03b5 \u03ad\u03bd\u03b1\u03bd \u03b5\u03c6\u03b9\u03ba\u03c4\u03cc \u03ba\u03b1\u03c4\u03b1\u03bc\u03b5\u03c1\u03b9\u03c3\u03bc\u03cc \u03c4\u03b7\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2, \u03c0\u03b5\u03c1\u03ac\u03c3\u03c4\u03b5 \u03c4\u03b9\u03c2 \u03c6\u03ac\u03c3\u03b5\u03b9\u03c2, \u03c4\u03b9\u03c2 \u03b4\u03b9\u03ac\u03c1\u03ba\u03b5\u03b9\u03b5\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03b9\u03c2 \u03b5\u03be\u03b1\u03c1\u03c4\u03ae\u03c3\u03b5\u03b9\u03c2 \u03c4\u03bf\u03c5\u03c2 \u03c3\u03c4\u03bf <a href=\"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/production-routing\/\">\u03c6\u03b1\u03c3\u03b5\u03bf\u03bb\u03cc\u03b3\u03b9\u03bf<\/a>. \u039f\u03c1\u03af\u03c3\u03c4\u03b5 \u03c0\u03bf\u03b9\u03bf\u03b9 \u03c3\u03c4\u03b1\u03b8\u03bc\u03bf\u03af \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2 \u03b5\u03af\u03bd\u03b1\u03b9 \u03ba\u03b1\u03c4\u03ac\u03bb\u03bb\u03b7\u03bb\u03bf\u03b9, \u03c4\u03b9\u03c2 \u03b2\u03ac\u03c1\u03b4\u03b9\u03b5\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03b7 \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03ac \u03c4\u03bf\u03c5\u03c2, \u03ba\u03b1\u03b8\u03ce\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03b7 \u03b4\u03b9\u03b1\u03b8\u03b5\u03c3\u03b9\u03bc\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03c1\u03bf\u03c3\u03c9\u03c0\u03b9\u03ba\u03bf\u03cd \u03c0\u03bf\u03c5 \u03b5\u03c0\u03b7\u03c1\u03b5\u03ac\u03b6\u03b5\u03b9 \u03b1\u03c5\u03c4\u03ae \u03c4\u03b7 \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1.<\/p>\n\n\n<p>\u03a4\u03bf Arcturus, \u03b7 \u03c4\u03b5\u03c7\u03bd\u03b7\u03c4\u03ae \u03bd\u03bf\u03b7\u03bc\u03bf\u03c3\u03cd\u03bd\u03b7 \u03c4\u03bf\u03c5 SkyPlanner \u03b3\u03b9\u03b1 \u03c4\u03bf\u03bd \u03c7\u03c1\u03bf\u03bd\u03bf\u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc, \u03c7\u03c1\u03b7\u03c3\u03b9\u03bc\u03bf\u03c0\u03bf\u03b9\u03b5\u03af \u03b1\u03c5\u03c4\u03ac \u03c4\u03b1 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03b1 \u03ba\u03b1\u03b9 \u03c4\u03b9\u03c2 \u03c0\u03c1\u03bf\u03c4\u03b5\u03c1\u03b1\u03b9\u03cc\u03c4\u03b7\u03c4\u03ad\u03c2 \u03c3\u03b1\u03c2 \u03b3\u03b9\u03b1 \u03bd\u03b1 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03af\u03c3\u03b5\u03b9 \u03c4\u03b9\u03c2 \u03c6\u03ac\u03c3\u03b5\u03b9\u03c2 \u03c4\u03c9\u03bd \u03b5\u03bd\u03c4\u03bf\u03bb\u03ce\u03bd \u03c3\u03c4\u03bf\u03c5\u03c2 \u03b4\u03b9\u03b1\u03b8\u03ad\u03c3\u03b9\u03bc\u03bf\u03c5\u03c2 \u03c0\u03cc\u03c1\u03bf\u03c5\u03c2. \u03a4\u03bf \u03c7\u03c1\u03bf\u03bd\u03bf\u03b4\u03b9\u03ac\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1 Gantt \u03b4\u03b5\u03af\u03c7\u03bd\u03b5\u03b9 \u03c4\u03b7\u03bd \u03b1\u03ba\u03bf\u03bb\u03bf\u03c5\u03b8\u03af\u03b1 \u03c0\u03bf\u03c5 \u03c0\u03c1\u03bf\u03ba\u03cd\u03c0\u03c4\u03b5\u03b9, \u03b5\u03bd\u03ce \u03bf\u03b9 \u03c0\u03c1\u03bf\u03b2\u03bf\u03bb\u03ad\u03c2 \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1\u03c2 \u03c3\u03b1\u03c2 \u03b2\u03bf\u03b7\u03b8\u03bf\u03cd\u03bd \u03bd\u03b1 \u03b5\u03bd\u03c4\u03bf\u03c0\u03af\u03c3\u03b5\u03c4\u03b5 \u03c0\u03bf\u03cd \u03bf \u03c6\u03cc\u03c1\u03c4\u03bf\u03c2 \u03c0\u03bb\u03b7\u03c3\u03b9\u03ac\u03b6\u03b5\u03b9 \u03c4\u03b1 \u03cc\u03c1\u03b9\u03b1. \u038c\u03c4\u03b1\u03bd \u03b5\u03af\u03bd\u03b1\u03b9 \u03b5\u03bd\u03b5\u03c1\u03b3\u03bf\u03c0\u03bf\u03b9\u03b7\u03bc\u03ad\u03bd\u03bf\u03c2 \u03bf \u03c7\u03c1\u03bf\u03bd\u03bf\u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc\u03c2 \u03c0\u03bf\u03c5 \u03bb\u03b1\u03bc\u03b2\u03ac\u03bd\u03b5\u03b9 \u03c5\u03c0\u03cc\u03c8\u03b7 \u03c4\u03b1 \u03c5\u03bb\u03b9\u03ba\u03ac, \u03b7 \u03b4\u03b9\u03b1\u03b8\u03b5\u03c3\u03b9\u03bc\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c4\u03c9\u03bd \u03b5\u03be\u03b1\u03c1\u03c4\u03b7\u03bc\u03ac\u03c4\u03c9\u03bd \u03b5\u03c0\u03b7\u03c1\u03b5\u03ac\u03b6\u03b5\u03b9 \u03b5\u03c0\u03af\u03c3\u03b7\u03c2 \u03c4\u03bf \u03c0\u03cc\u03c4\u03b5 \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03bd\u03b1 \u03b5\u03ba\u03c4\u03b5\u03bb\u03b5\u03c3\u03c4\u03bf\u03cd\u03bd \u03bf\u03b9 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2.<\/p>\n\n\n<p>\u0391\u03c2 \u03b5\u03c0\u03b9\u03c3\u03c4\u03c1\u03ad\u03c8\u03bf\u03c5\u03bc\u03b5 \u03c3\u03c4\u03bf \u03ba\u03bf\u03b9\u03bd\u03cc\u03c7\u03c1\u03b7\u03c3\u03c4\u03bf \u03bc\u03b7\u03c7\u03ac\u03bd\u03b7\u03bc\u03b1 \u03b4\u03bf\u03ba\u03b9\u03bc\u03ce\u03bd. \u0397 \u03bc\u03b5\u03bb\u03ad\u03c4\u03b7 \u03b5\u03be\u03b9\u03c3\u03bf\u03c1\u03c1\u03cc\u03c0\u03b7\u03c3\u03b7\u03c2 \u03ad\u03c7\u03b5\u03b9 \u03b4\u03b5\u03af\u03be\u03b5\u03b9 \u03cc\u03c4\u03b9 \u03bf\u03b9 \u03b4\u03bf\u03ba\u03b9\u03bc\u03ad\u03c2 \u03ba\u03b1\u03b9 \u03b7 \u03c3\u03c5\u03c3\u03ba\u03b5\u03c5\u03b1\u03c3\u03af\u03b1 \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03bd\u03b1 \u03c5\u03c0\u03bf\u03c3\u03c4\u03b7\u03c1\u03af\u03be\u03bf\u03c5\u03bd \u03c4\u03bf\u03bd \u03b1\u03c0\u03b1\u03b9\u03c4\u03bf\u03cd\u03bc\u03b5\u03bd\u03bf \u03c1\u03c5\u03b8\u03bc\u03cc. \u03a4\u03bf \u03bc\u03b7\u03c7\u03ac\u03bd\u03b7\u03bc\u03b1 \u03b4\u03bf\u03ba\u03b9\u03bc\u03ce\u03bd, \u03cc\u03bc\u03c9\u03c2, \u03c7\u03c1\u03b5\u03b9\u03ac\u03b6\u03b5\u03c4\u03b1\u03b9 \u03ba\u03b1\u03b9 \u03b3\u03b9\u03b1 \u03bc\u03b9\u03b1 \u03ac\u03bb\u03bb\u03b7 \u03b5\u03bd\u03c4\u03bf\u03bb\u03ae \u03bc\u03ad\u03c3\u03b1 \u03c3\u03c4\u03bf \u03c0\u03c1\u03bf\u03b2\u03bb\u03b5\u03c0\u03cc\u03bc\u03b5\u03bd\u03bf \u03c7\u03c1\u03bf\u03bd\u03b9\u03ba\u03cc \u03b4\u03b9\u03ac\u03c3\u03c4\u03b7\u03bc\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2. \u0397 \u03ad\u03bd\u03c4\u03b1\u03be\u03b7 \u03ba\u03b1\u03b9 \u03c4\u03c9\u03bd \u03b4\u03cd\u03bf \u03b5\u03bd\u03c4\u03bf\u03bb\u03ce\u03bd \u03c3\u03c4\u03bf \u03af\u03b4\u03b9\u03bf \u03c0\u03c1\u03cc\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1 \u03c0\u03b5\u03c0\u03b5\u03c1\u03b1\u03c3\u03bc\u03ad\u03bd\u03b7\u03c2 \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1\u03c2 \u03b1\u03bd\u03b1\u03b4\u03b5\u03b9\u03ba\u03bd\u03cd\u03b5\u03b9 \u03b1\u03c5\u03c4\u03ae \u03c4\u03b7 \u03b4\u03b9\u03b5\u03ba\u03b4\u03af\u03ba\u03b7\u03c3\u03b7 \u03c4\u03bf\u03c5 \u03af\u03b4\u03b9\u03bf\u03c5 \u03c0\u03cc\u03c1\u03bf\u03c5, \u03b1\u03bd\u03c4\u03af \u03bd\u03b1 \u03b5\u03c0\u03b9\u03c4\u03c1\u03ad\u03c0\u03b5\u03b9 \u03c3\u03b5 \u03b4\u03cd\u03bf \u03be\u03b5\u03c7\u03c9\u03c1\u03b9\u03c3\u03c4\u03ad\u03c2 \u03bb\u03af\u03c3\u03c4\u03b5\u03c2 \u03bd\u03b1 \u03b4\u03b5\u03c3\u03bc\u03b5\u03cd\u03bf\u03c5\u03bd \u03c4\u03bf\u03bd \u03af\u03b4\u03b9\u03bf \u03c7\u03c1\u03cc\u03bd\u03bf.<\/p>\n\n\n<p>\u039c\u03c0\u03bf\u03c1\u03b5\u03af\u03c4\u03b5 \u03c4\u03cc\u03c4\u03b5 \u03bd\u03b1 \u03c0\u03ac\u03c1\u03b5\u03c4\u03b5 \u03c4\u03b7\u03bd \u03bf\u03c5\u03c3\u03b9\u03b1\u03c3\u03c4\u03b9\u03ba\u03ae \u03b1\u03c0\u03cc\u03c6\u03b1\u03c3\u03b7: \u03bd\u03b1 \u03b1\u03bb\u03bb\u03ac\u03be\u03b5\u03c4\u03b5 \u03c4\u03b7\u03bd \u03c0\u03c1\u03bf\u03c4\u03b5\u03c1\u03b1\u03b9\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c4\u03b7\u03c2 \u03b5\u03bd\u03c4\u03bf\u03bb\u03ae\u03c2, \u03bd\u03b1 \u03c7\u03c1\u03b7\u03c3\u03b9\u03bc\u03bf\u03c0\u03bf\u03b9\u03ae\u03c3\u03b5\u03c4\u03b5 \u03ac\u03bb\u03bb\u03bf\u03bd \u03ba\u03b1\u03c4\u03ac\u03bb\u03bb\u03b7\u03bb\u03bf \u03c0\u03cc\u03c1\u03bf, \u03bd\u03b1 \u03c0\u03c1\u03bf\u03c3\u03b8\u03ad\u03c3\u03b5\u03c4\u03b5 \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03ae \u03bd\u03b1 \u03b1\u03bb\u03bb\u03ac\u03be\u03b5\u03c4\u03b5 \u03c4\u03bf\u03bd \u03c7\u03c1\u03cc\u03bd\u03bf \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2. \u03a4\u03bf Arcturus \u03b1\u03bd\u03b1\u03bb\u03b1\u03bc\u03b2\u03ac\u03bd\u03b5\u03b9 \u03c4\u03bf\u03c5\u03c2 \u03c5\u03c0\u03bf\u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03bf\u03cd\u03c2 \u03c4\u03bf\u03c5 \u03c7\u03c1\u03bf\u03bd\u03bf\u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03bf\u03cd \u03bc\u03b5 \u03b2\u03ac\u03c3\u03b7 \u03c4\u03bf\u03c5\u03c2 \u03ba\u03b1\u03bd\u03cc\u03bd\u03b5\u03c2 \u03c0\u03bf\u03c5 \u03bf\u03c1\u03af\u03b6\u03b5\u03c4\u03b5, \u03bc\u03b5\u03b9\u03ce\u03bd\u03bf\u03bd\u03c4\u03b1\u03c2 \u03c4\u03b7 \u03c7\u03b5\u03b9\u03c1\u03bf\u03ba\u03af\u03bd\u03b7\u03c4\u03b7 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1 \u03c0\u03bf\u03c5 \u03b1\u03c0\u03b1\u03b9\u03c4\u03b5\u03af\u03c4\u03b1\u03b9 \u03b3\u03b9\u03b1 \u03bd\u03b1 \u03c0\u03b1\u03c1\u03b1\u03bc\u03ad\u03bd\u03bf\u03c5\u03bd \u03c3\u03c5\u03bd\u03c4\u03bf\u03bd\u03b9\u03c3\u03bc\u03ad\u03bd\u03b5\u03c2 \u03bf\u03b9 \u03bf\u03c5\u03c1\u03ad\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03b9\u03ce\u03bd \u03c4\u03c9\u03bd \u03c3\u03c4\u03b1\u03b8\u03bc\u03ce\u03bd \u03ba\u03b1\u03b9 \u03c4\u03c9\u03bd \u03c4\u03bc\u03b7\u03bc\u03ac\u03c4\u03c9\u03bd.<\/p>\n\n\n<p>\u038c\u03c4\u03b1\u03bd \u03bc\u03b9\u03b1 \u03c6\u03ac\u03c3\u03b7 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03c0\u03c1\u03ac\u03b3\u03bc\u03b1\u03c4\u03b9 \u03bd\u03b1 \u03b5\u03ba\u03c4\u03b5\u03bb\u03b5\u03c3\u03c4\u03b5\u03af \u03c3\u03b5 \u03c0\u03b5\u03c1\u03b9\u03c3\u03c3\u03cc\u03c4\u03b5\u03c1\u03bf\u03c5\u03c2 \u03ba\u03b1\u03c4\u03ac\u03bb\u03bb\u03b7\u03bb\u03bf\u03c5\u03c2 \u03c3\u03c4\u03b1\u03b8\u03bc\u03bf\u03cd\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2, \u03c4\u03bf SkyPlanner \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03b5\u03c0\u03af\u03c3\u03b7\u03c2 \u03bd\u03b1 \u03b5\u03c0\u03b9\u03bc\u03b5\u03c1\u03af\u03c3\u03b5\u03b9 \u03c4\u03b7\u03bd \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1 \u03bc\u03b5\u03c4\u03b1\u03be\u03cd \u03c4\u03bf\u03c5\u03c2, \u03b5\u03c6\u03cc\u03c3\u03bf\u03bd \u03ad\u03c7\u03b5\u03b9 \u03b5\u03bd\u03b5\u03c1\u03b3\u03bf\u03c0\u03bf\u03b9\u03b7\u03b8\u03b5\u03af \u03b7 \u03c3\u03c7\u03b5\u03c4\u03b9\u03ba\u03ae \u03c1\u03cd\u03b8\u03bc\u03b9\u03c3\u03b7. \u0391\u03c5\u03c4\u03cc \u03b5\u03af\u03bd\u03b1\u03b9 \u03c7\u03c1\u03ae\u03c3\u03b9\u03bc\u03bf \u03b3\u03b9\u03b1 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2 \u03c0\u03bf\u03c5 \u03c0\u03c1\u03bf\u03c3\u03c6\u03ad\u03c1\u03bf\u03bd\u03c4\u03b1\u03b9 \u03b3\u03b9\u03b1 \u03c0\u03b1\u03c1\u03ac\u03bb\u03bb\u03b7\u03bb\u03b7 \u03b5\u03ba\u03c4\u03ad\u03bb\u03b5\u03c3\u03b7. <strong>\u039f \u03b5\u03c0\u03b9\u03bc\u03b5\u03c1\u03b9\u03c3\u03bc\u03cc\u03c2 \u03bc\u03b9\u03b1\u03c2 \u03c6\u03ac\u03c3\u03b7\u03c2 \u03b5\u03bd\u03c4\u03bf\u03bb\u03ae\u03c2 \u03c3\u03b5 \u03ba\u03b1\u03c4\u03ac\u03bb\u03bb\u03b7\u03bb\u03bf\u03c5\u03c2 \u03c0\u03cc\u03c1\u03bf\u03c5\u03c2 \u03b5\u03af\u03bd\u03b1\u03b9 \u03b4\u03b9\u03b1\u03c6\u03bf\u03c1\u03b5\u03c4\u03b9\u03ba\u03ae \u03b1\u03c0\u03cc\u03c6\u03b1\u03c3\u03b7 \u03b1\u03c0\u03cc \u03c4\u03bf\u03bd \u03ba\u03b1\u03b8\u03bf\u03c1\u03b9\u03c3\u03bc\u03cc \u03c4\u03c9\u03bd \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03c9\u03bd \u03c3\u03c5\u03bd\u03b1\u03c1\u03bc\u03bf\u03bb\u03cc\u03b3\u03b7\u03c3\u03b7\u03c2 \u03c0\u03bf\u03c5 \u03b1\u03bd\u03ae\u03ba\u03bf\u03c5\u03bd \u03c3\u03b5 \u03ba\u03ac\u03b8\u03b5 \u03c3\u03c4\u03b1\u03b8\u03bc\u03cc.<\/strong> \u0394\u03b9\u03b1\u03c4\u03c5\u03c0\u03ce\u03c3\u03c4\u03b5 \u03bc\u03b5 \u03c3\u03b1\u03c6\u03ae\u03bd\u03b5\u03b9\u03b1 \u03c4\u03b7\u03bd \u03b5\u03b3\u03ba\u03b5\u03ba\u03c1\u03b9\u03bc\u03ad\u03bd\u03b7 \u03bc\u03ad\u03b8\u03bf\u03b4\u03bf \u03ba\u03b1\u03b9 \u03c4\u03bf\u03c5\u03c2 \u03ba\u03b1\u03bd\u03cc\u03bd\u03b5\u03c2 \u03ba\u03b1\u03c4\u03b1\u03bb\u03bb\u03b7\u03bb\u03cc\u03c4\u03b7\u03c4\u03b1\u03c2, \u03ce\u03c3\u03c4\u03b5 \u03c4\u03bf \u03c0\u03c1\u03cc\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1 \u03bd\u03b1 \u03b1\u03c0\u03bf\u03c4\u03c5\u03c0\u03ce\u03bd\u03b5\u03b9 \u03c4\u03b7 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c0\u03bf\u03c5 \u03c3\u03ba\u03bf\u03c0\u03b5\u03cd\u03b5\u03c4\u03b5 \u03bd\u03b1 \u03b5\u03c6\u03b1\u03c1\u03bc\u03cc\u03c3\u03b5\u03c4\u03b5.<\/p>\n\n\n<p>\u03a4\u03bf SkyPlanner \u03b4\u03b9\u03b1\u03c3\u03c5\u03bd\u03b4\u03ad\u03b5\u03c4\u03b1\u03b9 \u03bc\u03b5 \u03bf\u03c0\u03bf\u03b9\u03bf\u03b4\u03ae\u03c0\u03bf\u03c4\u03b5 ERP \u03ae MES \u03bc\u03ad\u03c3\u03c9 \u03c4\u03bf\u03c5 \u03b1\u03bd\u03bf\u03b9\u03c7\u03c4\u03bf\u03cd REST API \u03c4\u03bf\u03c5. \u039c\u03c0\u03bf\u03c1\u03b5\u03af\u03c4\u03b5 \u03bd\u03b1 \u03b4\u03b9\u03b1\u03c4\u03b7\u03c1\u03ae\u03c3\u03b5\u03c4\u03b5 \u03c4\u03bf \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1 \u03c0\u03bf\u03c5 \u03b4\u03b9\u03b1\u03c7\u03b5\u03b9\u03c1\u03af\u03b6\u03b5\u03c4\u03b1\u03b9 \u03c4\u03b9\u03c2 \u03b5\u03bd\u03c4\u03bf\u03bb\u03ad\u03c2 \u03c3\u03b1\u03c2 \u03ba\u03b1\u03b9 \u03bd\u03b1 \u03c4\u03bf \u03c3\u03c5\u03bd\u03b4\u03ad\u03c3\u03b5\u03c4\u03b5 \u03bc\u03b5 \u03ad\u03bd\u03b1 \u03c3\u03c5\u03bd\u03c4\u03bf\u03bd\u03b9\u03c3\u03bc\u03ad\u03bd\u03bf \u03c0\u03c1\u03cc\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2, \u03b1\u03bd\u03c4\u03af \u03bd\u03b1 \u03b1\u03bd\u03b1\u03b4\u03b7\u03bc\u03b9\u03bf\u03c5\u03c1\u03b3\u03b5\u03af\u03c4\u03b5 \u03c4\u03b9\u03c2 \u03c0\u03c1\u03bf\u03c4\u03b5\u03c1\u03b1\u03b9\u03cc\u03c4\u03b7\u03c4\u03b5\u03c2 \u03c4\u03b7\u03c2 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ae\u03c2 \u03c3\u03b5 \u03be\u03b5\u03c7\u03c9\u03c1\u03b9\u03c3\u03c4\u03cc \u03c5\u03c0\u03bf\u03bb\u03bf\u03b3\u03b9\u03c3\u03c4\u03b9\u03ba\u03cc \u03c6\u03cd\u03bb\u03bb\u03bf.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\u03a4\u03b9 \u03ac\u03bb\u03bb\u03b1\u03be\u03b5 \u03b3\u03b9\u03b1 \u03c4\u03b7\u03bd UTU \u03bc\u03b5 \u03ad\u03bd\u03b1 \u03ba\u03bf\u03b9\u03bd\u03cc \u03c0\u03c1\u03cc\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1<\/h3>\n\n\n<p>\u03a3\u03c4\u03bf <a href=\"\/el\/%ce%b9%cf%83%cf%84%ce%bf%cf%81%ce%af%ce%b5%cf%82-%cf%80%ce%b5%ce%bb%ce%b1%cf%84%cf%8e%ce%bd\/utu\/\">\u03b5\u03c1\u03b3\u03bf\u03c3\u03c4\u03ac\u03c3\u03b9\u03bf \u03c4\u03b7\u03c2 UTU \u03c3\u03c4\u03b7\u03bd Ulvila<\/a>, \u03c0\u03bf\u03c5 \u03ba\u03b1\u03c4\u03b1\u03c3\u03ba\u03b5\u03c5\u03ac\u03b6\u03b5\u03b9 \u03b7\u03bb\u03b5\u03ba\u03c4\u03c1\u03b9\u03ba\u03bf\u03cd\u03c2 \u03c0\u03af\u03bd\u03b1\u03ba\u03b5\u03c2 \u03ba\u03b1\u03b9 \u03b5\u03be\u03bf\u03c0\u03bb\u03b9\u03c3\u03bc\u03cc \u03b4\u03b9\u03b1\u03ba\u03bf\u03c0\u03ae\u03c2 \u03ba\u03b1\u03b9 \u03c0\u03c1\u03bf\u03c3\u03c4\u03b1\u03c3\u03af\u03b1\u03c2, \u03bf \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc\u03c2 \u03b2\u03b1\u03c3\u03b9\u03b6\u03cc\u03c4\u03b1\u03bd \u03c0\u03c1\u03bf\u03b7\u03b3\u03bf\u03c5\u03bc\u03ad\u03bd\u03c9\u03c2 \u03c3\u03b5 \u03be\u03b5\u03c7\u03c9\u03c1\u03b9\u03c3\u03c4\u03ac \u03c5\u03c0\u03bf\u03bb\u03bf\u03b3\u03b9\u03c3\u03c4\u03b9\u03ba\u03ac \u03c6\u03cd\u03bb\u03bb\u03b1 Excel \u03b1\u03bd\u03ac \u03c4\u03bc\u03ae\u03bc\u03b1. \u039f\u03b9 \u03b1\u03bb\u03bb\u03b1\u03b3\u03ad\u03c2 \u03c3\u03c4\u03b7 \u03c3\u03b5\u03b9\u03c1\u03ac \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c4\u03bf\u03c5 ERP \u03b4\u03b5\u03bd \u03ad\u03c6\u03c4\u03b1\u03bd\u03b1\u03bd \u03c0\u03ac\u03bd\u03c4\u03b1 \u03c3\u03c4\u03bf\u03bd \u03c7\u03ce\u03c1\u03bf \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03ba\u03b1\u03b9 \u03ae\u03c4\u03b1\u03bd \u03b4\u03cd\u03c3\u03ba\u03bf\u03bb\u03bf \u03bd\u03b1 \u03c5\u03c0\u03ac\u03c1\u03c7\u03b5\u03b9 \u03b5\u03b9\u03ba\u03cc\u03bd\u03b1 \u03c4\u03b7\u03c2 \u03c0\u03c1\u03b1\u03b3\u03bc\u03b1\u03c4\u03b9\u03ba\u03ae\u03c2 \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1\u03c2.<\/p>\n\n\n<p>\u0397 UTU \u03c0\u03ad\u03c1\u03b1\u03c3\u03b5 \u03c3\u03c4\u03bf SkyPlanner \u03c0\u03b1\u03c1\u03ac\u03bb\u03bb\u03b7\u03bb\u03b1 \u03bc\u03b5 \u03c4\u03bf Oracle NetSuite \u03ba\u03b1\u03b9 \u03b5\u03bd\u03ad\u03c4\u03b1\u03be\u03b5 \u03c4\u03b9\u03c2 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ad\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03b1 \u03c4\u03bc\u03ae\u03bc\u03b1\u03c4\u03b1 \u03c4\u03bf\u03c5 \u03b5\u03c1\u03b3\u03bf\u03c3\u03c4\u03b1\u03c3\u03af\u03bf\u03c5 \u03c3\u03b5 \u03ad\u03bd\u03b1 \u03b5\u03bd\u03b9\u03b1\u03af\u03bf \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03bf\u03cd. \u0397 \u03bf\u03bc\u03ac\u03b4\u03b1 \u03c4\u03b7\u03c2 \u03be\u03b5\u03c7\u03c9\u03c1\u03af\u03b6\u03b5\u03b9 \u03c4\u03bf\u03bd \u03c3\u03c5\u03bd\u03b4\u03c5\u03b1\u03c3\u03bc\u03cc \u03c7\u03c1\u03bf\u03bd\u03bf\u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03bf\u03cd \u03bc\u03b5 \u03c4\u03b5\u03c7\u03bd\u03b7\u03c4\u03ae \u03bd\u03bf\u03b7\u03bc\u03bf\u03c3\u03cd\u03bd\u03b7, \u03c7\u03c1\u03bf\u03bd\u03bf\u03b4\u03b9\u03b1\u03b3\u03c1\u03ac\u03bc\u03bc\u03b1\u03c4\u03bf\u03c2 Gantt \u03ba\u03b1\u03b9 \u03bf\u03c1\u03b1\u03c4\u03cc\u03c4\u03b7\u03c4\u03b1\u03c2 \u03c4\u03b7\u03c2 \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1\u03c2. \u03a3\u03cd\u03bc\u03c6\u03c9\u03bd\u03b1 \u03bc\u03b5 \u03c4\u03bf\u03bd \u03c0\u03b5\u03bb\u03ac\u03c4\u03b7, \u03bf\u03b9 \u03b5\u03bd\u03b7\u03bc\u03b5\u03c1\u03c9\u03bc\u03ad\u03bd\u03b5\u03c2 \u03bf\u03c5\u03c1\u03ad\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03b9\u03ce\u03bd \u03c6\u03c4\u03ac\u03bd\u03bf\u03c5\u03bd \u03c0\u03bb\u03ad\u03bf\u03bd \u03c3\u03c4\u03bf\u03c5\u03c2 \u03b5\u03b3\u03ba\u03b1\u03c4\u03b1\u03c3\u03c4\u03ac\u03c4\u03b5\u03c2 \u03c4\u03b7\u03c2 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ae\u03c2 \u03bc\u03ad\u03c3\u03b1 \u03c3\u03b5 \u03b4\u03b5\u03c5\u03c4\u03b5\u03c1\u03cc\u03bb\u03b5\u03c0\u03c4\u03b1.<\/p>\n\n\n<p>\u0391\u03c5\u03c4\u03ae \u03b7 \u03b5\u03bc\u03c0\u03b5\u03b9\u03c1\u03af\u03b1 \u03b1\u03bd\u03b1\u03b4\u03b5\u03b9\u03ba\u03bd\u03cd\u03b5\u03b9 \u03c4\u03bf \u03c0\u03c1\u03cc\u03b2\u03bb\u03b7\u03bc\u03b1 \u03c7\u03c1\u03bf\u03bd\u03bf\u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03bf\u03cd \u03c0\u03bf\u03c5 \u03b5\u03be\u03b1\u03ba\u03bf\u03bb\u03bf\u03c5\u03b8\u03b5\u03af \u03bd\u03b1 \u03c5\u03c0\u03ac\u03c1\u03c7\u03b5\u03b9 \u03b1\u03ba\u03cc\u03bc\u03b7 \u03ba\u03b1\u03b9 \u03bc\u03b5 \u03bc\u03b9\u03b1 \u03ba\u03b1\u03bb\u03ae \u03b5\u03be\u03b9\u03c3\u03bf\u03c1\u03c1\u03cc\u03c0\u03b7\u03c3\u03b7: \u03bf\u03b9 \u03ac\u03bd\u03b8\u03c1\u03c9\u03c0\u03bf\u03b9 \u03c0\u03bf\u03c5 \u03b5\u03ba\u03c4\u03b5\u03bb\u03bf\u03cd\u03bd \u03c4\u03b7\u03bd \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1 \u03c7\u03c1\u03b5\u03b9\u03ac\u03b6\u03bf\u03bd\u03c4\u03b1\u03b9 \u03c4\u03b7\u03bd \u03c4\u03c1\u03ad\u03c7\u03bf\u03c5\u03c3\u03b1 \u03c3\u03b5\u03b9\u03c1\u03ac \u03b5\u03ba\u03c4\u03ad\u03bb\u03b5\u03c3\u03b7\u03c2, \u03cc\u03c7\u03b9 \u03bc\u03b9\u03b1 \u03c0\u03c1\u03bf\u03c3\u03b5\u03ba\u03c4\u03b9\u03ba\u03ac \u03bc\u03b5\u03bb\u03b5\u03c4\u03b7\u03bc\u03ad\u03bd\u03b7 \u03ba\u03b1\u03c4\u03b1\u03bd\u03bf\u03bc\u03ae \u03c0\u03bf\u03c5 \u03c3\u03c5\u03bd\u03bf\u03b4\u03b5\u03cd\u03b5\u03c4\u03b1\u03b9 \u03b1\u03c0\u03cc \u03c0\u03b1\u03c1\u03c9\u03c7\u03b7\u03bc\u03ad\u03bd\u03b7 \u03bf\u03c5\u03c1\u03ac \u03b5\u03c1\u03b3\u03b1\u03c3\u03b9\u03ce\u03bd.<\/p>\n\n\n<h2 class=\"wp-block-heading\">6. \u0395\u03c0\u03b1\u03bb\u03b7\u03b8\u03b5\u03cd\u03c3\u03c4\u03b5 \u03c4\u03b7\u03bd \u03b5\u03be\u03b9\u03c3\u03bf\u03c1\u03c1\u03cc\u03c0\u03b7\u03c3\u03b7 \u03c3\u03c4\u03b7 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ae \u03ba\u03b1\u03b9 \u03b4\u03b9\u03b1\u03c4\u03b7\u03c1\u03ae\u03c3\u03c4\u03b5 \u03c4\u03b7\u03bd \u03b5\u03c0\u03af\u03ba\u03b1\u03b9\u03c1\u03b7<\/h2>\n\n\n<p>\u0395\u03c6\u03b1\u03c1\u03bc\u03cc\u03c3\u03c4\u03b5 \u03c0\u03b9\u03bb\u03bf\u03c4\u03b9\u03ba\u03ac \u03c4\u03b7 \u03bd\u03ad\u03b1 \u03ba\u03b1\u03c4\u03b1\u03bd\u03bf\u03bc\u03ae \u03bc\u03b5 \u03b1\u03bd\u03c4\u03b9\u03c0\u03c1\u03bf\u03c3\u03c9\u03c0\u03b5\u03c5\u03c4\u03b9\u03ba\u03ac \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03b1, \u03c7\u03b5\u03b9\u03c1\u03b9\u03c3\u03c4\u03ad\u03c2 \u03ba\u03b1\u03b9 \u03c3\u03c5\u03bd\u03b8\u03ae\u03ba\u03b5\u03c2 \u03c4\u03c1\u03bf\u03c6\u03bf\u03b4\u03bf\u03c3\u03af\u03b1\u03c2 \u03c5\u03bb\u03b9\u03ba\u03ce\u03bd. \u03a0\u03b1\u03c1\u03b1\u03c4\u03b7\u03c1\u03ae\u03c3\u03c4\u03b5 \u03bf\u03bb\u03cc\u03ba\u03bb\u03b7\u03c1\u03bf \u03c4\u03bf\u03bd \u03ba\u03cd\u03ba\u03bb\u03bf, \u03bc\u03b1\u03b6\u03af \u03bc\u03b5 \u03c4\u03b9\u03c2 \u03bc\u03b5\u03c4\u03b1\u03c6\u03bf\u03c1\u03ad\u03c2, \u03c4\u03b7\u03bd \u03b5\u03ba\u03ba\u03af\u03bd\u03b7\u03c3\u03b7 \u03ba\u03b1\u03b9 \u03c4\u03b7 \u03c7\u03c1\u03ae\u03c3\u03b7 \u03c4\u03c9\u03bd \u03ba\u03bf\u03b9\u03bd\u03cc\u03c7\u03c1\u03b7\u03c3\u03c4\u03c9\u03bd \u03c0\u03cc\u03c1\u03c9\u03bd, \u03b1\u03bd\u03c4\u03af \u03bd\u03b1 \u03c7\u03c1\u03bf\u03bd\u03bf\u03bc\u03b5\u03c4\u03c1\u03ae\u03c3\u03b5\u03c4\u03b5 \u03bc\u03cc\u03bd\u03bf \u03c4\u03bf \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03bf \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2 \u03c0\u03bf\u03c5 \u03bc\u03b5\u03c4\u03b1\u03c6\u03ad\u03c1\u03b8\u03b7\u03ba\u03b5.<\/p>\n\n\n<p>\u0395\u03bb\u03ad\u03b3\u03be\u03c4\u03b5 \u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae \u03c4\u03b5\u03bc\u03b1\u03c7\u03af\u03c9\u03bd \u03b5\u03bd\u03c4\u03cc\u03c2 \u03c0\u03c1\u03bf\u03b4\u03b9\u03b1\u03b3\u03c1\u03b1\u03c6\u03ce\u03bd \u03c3\u03b5 \u03c3\u03c7\u03ad\u03c3\u03b7 \u03bc\u03b5 \u03c4\u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7, \u03c4\u03b7 \u03b4\u03b9\u03b1\u03ba\u03cd\u03bc\u03b1\u03bd\u03c3\u03b7 \u03c4\u03c9\u03bd \u03c7\u03c1\u03cc\u03bd\u03c9\u03bd \u03ba\u03cd\u03ba\u03bb\u03bf\u03c5 \u03c4\u03c9\u03bd \u03c3\u03c4\u03b1\u03b8\u03bc\u03ce\u03bd, \u03c4\u03b9\u03c2 \u03b1\u03bd\u03b1\u03bc\u03bf\u03bd\u03ad\u03c2, \u03c4\u03b1 \u03b1\u03c0\u03bf\u03b8\u03ad\u03bc\u03b1\u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03b5 \u03b5\u03be\u03ad\u03bb\u03b9\u03be\u03b7, \u03c4\u03b7\u03bd \u03c0\u03bf\u03b9\u03cc\u03c4\u03b7\u03c4\u03b1 \u03ba\u03b1\u03b9 \u03c4\u03b1 \u03c3\u03c7\u03cc\u03bb\u03b9\u03b1 \u03c4\u03c9\u03bd \u03c7\u03b5\u03b9\u03c1\u03b9\u03c3\u03c4\u03ce\u03bd. \u0391\u03bd \u03b7 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ae \u03b4\u03b5\u03bd \u03c0\u03b5\u03c4\u03c5\u03c7\u03b1\u03af\u03bd\u03b5\u03b9 \u03c4\u03bf\u03bd \u03c3\u03c4\u03cc\u03c7\u03bf \u03c4\u03b7\u03c2, \u03b4\u03b9\u03b1\u03c0\u03b9\u03c3\u03c4\u03ce\u03c3\u03c4\u03b5 \u03b1\u03bd \u03b7 \u03b1\u03b9\u03c4\u03af\u03b1 \u03b5\u03af\u03bd\u03b1\u03b9 \u03b7 \u03ba\u03b1\u03c4\u03b1\u03bd\u03bf\u03bc\u03ae \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2, \u03bc\u03b9\u03b1 \u03b1\u03c3\u03c4\u03b1\u03b8\u03ae\u03c2 \u03bc\u03ad\u03b8\u03bf\u03b4\u03bf\u03c2, \u03bc\u03b9\u03b1 \u03ad\u03bb\u03bb\u03b5\u03b9\u03c8\u03b7 \u03ae \u03bc\u03b9\u03b1 \u03c3\u03cd\u03b3\u03ba\u03c1\u03bf\u03c5\u03c3\u03b7 \u03c3\u03c4\u03bf \u03c0\u03c1\u03cc\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1. \u039a\u03ac\u03b8\u03b5 \u03c0\u03b5\u03c1\u03af\u03c0\u03c4\u03c9\u03c3\u03b7 \u03b1\u03c0\u03b1\u03b9\u03c4\u03b5\u03af \u03b4\u03b9\u03b1\u03c6\u03bf\u03c1\u03b5\u03c4\u03b9\u03ba\u03ae \u03b1\u03bd\u03c4\u03b9\u03bc\u03b5\u03c4\u03ce\u03c0\u03b9\u03c3\u03b7.<\/p>\n\n\n<p>\u0395\u03bd\u03b7\u03bc\u03b5\u03c1\u03ce\u03c3\u03c4\u03b5 \u03c4\u03b9\u03c2 \u03c4\u03c5\u03c0\u03bf\u03c0\u03bf\u03b9\u03b7\u03bc\u03ad\u03bd\u03b5\u03c2 \u03bf\u03b4\u03b7\u03b3\u03af\u03b5\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2 \u03ba\u03b1\u03b9 \u03b5\u03ba\u03c0\u03b1\u03b9\u03b4\u03b5\u03cd\u03c3\u03c4\u03b5 \u03c4\u03bf\u03c5\u03c2 \u03c7\u03b5\u03b9\u03c1\u03b9\u03c3\u03c4\u03ad\u03c2 \u03c0\u03bf\u03c5 \u03b5\u03c0\u03b7\u03c1\u03b5\u03ac\u03b6\u03bf\u03bd\u03c4\u03b1\u03b9 \u03c0\u03c1\u03b9\u03bd \u03b5\u03c0\u03b5\u03ba\u03c4\u03b5\u03af\u03bd\u03b5\u03c4\u03b5 \u03c4\u03b7\u03bd \u03b1\u03bb\u03bb\u03b1\u03b3\u03ae. \u0395\u03c0\u03b1\u03bd\u03b5\u03be\u03b5\u03c4\u03ac\u03c3\u03c4\u03b5 \u03c4\u03b7\u03bd \u03b5\u03be\u03b9\u03c3\u03bf\u03c1\u03c1\u03cc\u03c0\u03b7\u03c3\u03b7 \u03cc\u03c4\u03b1\u03bd \u03b1\u03bb\u03bb\u03ac\u03b6\u03bf\u03c5\u03bd \u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7, \u03bf \u03c3\u03c7\u03b5\u03b4\u03b9\u03b1\u03c3\u03bc\u03cc\u03c2 \u03c4\u03c9\u03bd \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03c9\u03bd, \u03c4\u03bf \u03bc\u03b5\u03af\u03b3\u03bc\u03b1, \u03c4\u03b1 \u03b5\u03c1\u03b3\u03b1\u03bb\u03b5\u03af\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03ae \u03b7 \u03c3\u03c4\u03b5\u03bb\u03ad\u03c7\u03c9\u03c3\u03b7. \u0394\u03b9\u03b1\u03c4\u03b7\u03c1\u03ae\u03c3\u03c4\u03b5 \u03c4\u03b9\u03c2 \u03b4\u03b9\u03ac\u03c1\u03ba\u03b5\u03b9\u03b5\u03c2 \u03c4\u03c9\u03bd \u03c6\u03ac\u03c3\u03b5\u03c9\u03bd \u03ba\u03b1\u03b9 \u03c4\u03b7 \u03b4\u03b9\u03b1\u03b8\u03b5\u03c3\u03b9\u03bc\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c4\u03c9\u03bd \u03c0\u03cc\u03c1\u03c9\u03bd \u03c3\u03c4\u03bf \u03c0\u03c1\u03cc\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03b5 \u03c3\u03c5\u03bc\u03c6\u03c9\u03bd\u03af\u03b1 \u03bc\u03b5 \u03cc\u03c3\u03b1 \u03b5\u03c0\u03b9\u03b2\u03b5\u03b2\u03b1\u03b9\u03ce\u03bd\u03bf\u03bd\u03c4\u03b1\u03b9 \u03c3\u03c4\u03b7\u03bd \u03c0\u03b9\u03bb\u03bf\u03c4\u03b9\u03ba\u03ae \u03b5\u03c6\u03b1\u03c1\u03bc\u03bf\u03b3\u03ae.<\/p>\n\n\n<p>\u0393\u03b9\u03b1 \u03bd\u03b1 \u03b4\u03b5\u03af\u03c4\u03b5 \u03c0\u03ce\u03c2 \u03b8\u03b1 \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03bf\u03cd\u03c3\u03b5 \u03bf \u03b5\u03b3\u03ba\u03b5\u03ba\u03c1\u03b9\u03bc\u03ad\u03bd\u03bf\u03c2 \u03c3\u03c7\u03b5\u03b4\u03b9\u03b1\u03c3\u03bc\u03cc\u03c2 \u03c0\u03b1\u03c1\u03ac\u03bb\u03bb\u03b7\u03bb\u03b1 \u03bc\u03b5 \u03c4\u03b9\u03c2 \u03c5\u03c0\u03cc\u03bb\u03bf\u03b9\u03c0\u03b5\u03c2 \u03b5\u03bd\u03c4\u03bf\u03bb\u03ad\u03c2 \u03c4\u03bf\u03c5 \u03b5\u03c1\u03b3\u03bf\u03c3\u03c4\u03b1\u03c3\u03af\u03bf\u03c5 \u03c3\u03b1\u03c2, <a href=\"https:\/\/skyplanner.ai\/el\/%ce%b5%cf%80%ce%b9%ce%ba%ce%bf%ce%b9%ce%bd%cf%89%ce%bd%ce%af%ce%b1-%cf%80%cf%89%ce%bb%ce%ae%cf%83%ce%b5%cf%89%ce%bd\/\">\u03ba\u03bb\u03b5\u03af\u03c3\u03c4\u03b5 \u03bc\u03b9\u03b1 \u03c0\u03b1\u03c1\u03bf\u03c5\u03c3\u03af\u03b1\u03c3\u03b7 \u03c4\u03bf\u03c5 SkyPlanner<\/a>. \u03a6\u03ad\u03c1\u03c4\u03b5 \u03c4\u03bf \u03c6\u03b1\u03c3\u03b5\u03bf\u03bb\u03cc\u03b3\u03b9\u03bf \u03bc\u03b9\u03b1\u03c2 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ae\u03c2, \u03c4\u03bf\u03c5\u03c2 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c5\u03c2 \u03c4\u03c9\u03bd \u03c3\u03c4\u03b1\u03b8\u03bc\u03ce\u03bd \u03c4\u03b7\u03c2 \u03ba\u03b1\u03b9 \u03bc\u03b9\u03b1 \u03c0\u03b5\u03c1\u03af\u03c0\u03c4\u03c9\u03c3\u03b7 \u03c3\u03cd\u03b3\u03ba\u03c1\u03bf\u03c5\u03c3\u03b7\u03c2 \u03c3\u03c4\u03b7 \u03c7\u03c1\u03ae\u03c3\u03b7 \u03ba\u03bf\u03b9\u03bd\u03cc\u03c7\u03c1\u03b7\u03c3\u03c4\u03bf\u03c5 \u03c0\u03cc\u03c1\u03bf\u03c5. \u039c\u03c0\u03bf\u03c1\u03b5\u03af\u03c4\u03b5 \u03bd\u03b1 \u03b5\u03be\u03b5\u03c4\u03ac\u03c3\u03b5\u03c4\u03b5 \u03c0\u03ce\u03c2 \u03b1\u03c5\u03c4\u03ac \u03c4\u03b1 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03b1 \u03bc\u03b5\u03c4\u03b1\u03c4\u03c1\u03ad\u03c0\u03bf\u03bd\u03c4\u03b1\u03b9 \u03c3\u03b5 \u03c3\u03c5\u03bd\u03c4\u03bf\u03bd\u03b9\u03c3\u03bc\u03ad\u03bd\u03bf \u03c0\u03c1\u03cc\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1 \u03ba\u03b1\u03b9 \u03c0\u03ce\u03c2 \u03c0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03cc\u03b6\u03b5\u03c4\u03b1\u03b9 \u03c4\u03bf \u03c0\u03c1\u03cc\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1 \u03cc\u03c4\u03b1\u03bd \u03b1\u03bb\u03bb\u03ac\u03b6\u03bf\u03c5\u03bd \u03bf\u03b9 \u03c0\u03c1\u03bf\u03c4\u03b5\u03c1\u03b1\u03b9\u03cc\u03c4\u03b7\u03c4\u03b5\u03c2 \u03ae \u03b7 \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1. \u0391\u03bd \u03c0\u03c1\u03bf\u03c4\u03b9\u03bc\u03ac\u03c4\u03b5 \u03c0\u03c1\u03ce\u03c4\u03b1 \u03bd\u03b1 \u03c4\u03bf \u03b5\u03be\u03b5\u03c1\u03b5\u03c5\u03bd\u03ae\u03c3\u03b5\u03c4\u03b5 \u03bc\u03cc\u03bd\u03bf\u03b9 \u03c3\u03b1\u03c2, <a href=\"https:\/\/skyplanner.ai\/el\/%ce%b4%ce%bf%ce%ba%ce%b9%ce%bc%ce%ae\/\">\u03b4\u03bf\u03ba\u03b9\u03bc\u03ac\u03c3\u03c4\u03b5 \u03c4\u03bf SkyPlanner \u03bc\u03b5 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03b1 \u03b5\u03c0\u03af\u03b4\u03b5\u03b9\u03be\u03b7\u03c2<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>\u0395\u03be\u03b9\u03c3\u03bf\u03c1\u03c1\u03cc\u03c0\u03b7\u03c3\u03b7 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ae\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u03a0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03cc\u03c3\u03c4\u03b5 \u03c4\u03b7\u03bd \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1 \u03c3\u03c4\u03bf\u03bd \u03c1\u03c5\u03b8\u03bc\u03cc \u0391\u03c1\u03c7\u03b9\u03ba\u03ae &raquo; \u03a0\u03cc\u03c1\u03bf\u03b9 &raquo; \u0395\u03be\u03b9\u03c3\u03bf\u03c1\u03c1\u03cc\u03c0\u03b7\u03c3\u03b7 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ae\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u03a0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03cc\u03c3\u03c4\u03b5 \u03c4\u03b7\u03bd \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1 \u03c3\u03c4\u03bf\u03bd \u03c1\u03c5\u03b8\u03bc\u03cc \u0388\u03bd\u03b1\u03c2 \u03c7\u03b5\u03b9\u03c1\u03b9\u03c3\u03c4\u03ae\u03c2 \u03b1\u03ba\u03cc\u03bc\u03b7 \u03c3\u03c4\u03b5\u03c1\u03b5\u03ce\u03bd\u03b5\u03b9 \u03c4\u03bf \u03c3\u03c5\u03bd\u03b1\u03c1\u03bc\u03bf\u03bb\u03bf\u03b3\u03b7\u03bc\u03ad\u03bd\u03bf \u03c3\u03cd\u03bd\u03bf\u03bb\u03bf, \u03b5\u03bd\u03ce \u03bf \u03b5\u03c0\u03cc\u03bc\u03b5\u03bd\u03bf\u03c2 \u03c0\u03b5\u03c1\u03b9\u03bc\u03ad\u03bd\u03b5\u03b9 \u03bd\u03b1 \u03c4\u03bf \u03c0\u03b1\u03c1\u03b1\u03bb\u03ac\u03b2\u03b5\u03b9. \u03a3\u03c4\u03bf \u03c4\u03ad\u03bb\u03bf\u03c2 \u03c4\u03b7\u03c2 \u03b2\u03ac\u03c1\u03b4\u03b9\u03b1\u03c2, \u03b7 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ae \u03b4\u03b5\u03bd \u03ad\u03c7\u03b5\u03b9 \u03c0\u03b9\u03ac\u03c3\u03b5\u03b9 \u03c4\u03bf\u03bd \u03c3\u03c4\u03cc\u03c7\u03bf \u03c4\u03b7\u03c2, \u03c0\u03b1\u03c1\u03cc\u03c4\u03b9 \u03c4\u03bf \u03c0\u03c1\u03bf\u03c3\u03c9\u03c0\u03b9\u03ba\u03cc \u03ba\u03b1\u03b9 \u03bf \u03b5\u03be\u03bf\u03c0\u03bb\u03b9\u03c3\u03bc\u03cc\u03c2 \u03c6\u03b1\u03af\u03bd\u03bf\u03bd\u03c4\u03b1\u03bd \u03b5\u03c0\u03b1\u03c1\u03ba\u03ae. \u0397 &#8230; <a title=\"\u0395\u03be\u03b9\u03c3\u03bf\u03c1\u03c1\u03cc\u03c0\u03b7\u03c3\u03b7 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ae\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u03a0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03cc\u03c3\u03c4\u03b5 \u03c4\u03b7\u03bd \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1 \u03c3\u03c4\u03bf\u03bd \u03c1\u03c5\u03b8\u03bc\u03cc\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/line-balancing\/\" aria-label=\"Read more about \u0395\u03be\u03b9\u03c3\u03bf\u03c1\u03c1\u03cc\u03c0\u03b7\u03c3\u03b7 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ae\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u03a0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03cc\u03c3\u03c4\u03b5 \u03c4\u03b7\u03bd \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1 \u03c3\u03c4\u03bf\u03bd \u03c1\u03c5\u03b8\u03bc\u03cc\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":105631,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2553,477],"tags":[],"class_list":["post-105626","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-2553","category-477","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\u0395\u03be\u03b9\u03c3\u03bf\u03c1\u03c1\u03cc\u03c0\u03b7\u03c3\u03b7 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ae\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u0397 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1 \u03c3\u03c4\u03bf\u03bd \u03c3\u03c9\u03c3\u03c4\u03cc \u03c1\u03c5\u03b8\u03bc\u03cc<\/title>\n<meta name=\"description\" content=\"\u0388\u03bd\u03b1\u03c2 \u03c3\u03c4\u03b1\u03b8\u03bc\u03cc\u03c2 \u03b1\u03c1\u03b3\u03b5\u03af, \u03ac\u03bb\u03bb\u03bf\u03c2 \u03c0\u03b5\u03c1\u03b9\u03bc\u03ad\u03bd\u03b5\u03b9. \u0391\u03bd\u03b1\u03ba\u03b1\u03c4\u03b1\u03bd\u03b5\u03af\u03bc\u03b5\u03c4\u03b5 \u03bc\u03b5 \u03b1\u03c3\u03c6\u03ac\u03bb\u03b5\u03b9\u03b1 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2, \u03c4\u03b7\u03c1\u03ae\u03c3\u03c4\u03b5 \u03c4\u03bf\u03bd \u03b1\u03bd\u03b1\u03b3\u03ba\u03b1\u03af\u03bf \u03c1\u03c5\u03b8\u03bc\u03cc \u03ba\u03b1\u03b9 \u03ba\u03c1\u03b1\u03c4\u03ae\u03c3\u03c4\u03b5 \u03ba\u03bf\u03b9\u03bd\u03bf\u03cd\u03c2 \u03c0\u03cc\u03c1\u03bf\u03c5\u03c2 \u03c3\u03b5 \u03b5\u03c6\u03b1\u03c1\u03bc\u03cc\u03c3\u03b9\u03bc\u03bf \u03c0\u03c1\u03cc\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/line-balancing\/\" \/>\n<meta property=\"og:locale\" content=\"el_GR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u0395\u03be\u03b9\u03c3\u03bf\u03c1\u03c1\u03cc\u03c0\u03b7\u03c3\u03b7 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ae\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u03a0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03cc\u03c3\u03c4\u03b5 \u03c4\u03b7\u03bd \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1 \u03c3\u03c4\u03bf\u03bd \u03c1\u03c5\u03b8\u03bc\u03cc\" \/>\n<meta property=\"og:description\" content=\"\u0388\u03bd\u03b1\u03c2 \u03c3\u03c4\u03b1\u03b8\u03bc\u03cc\u03c2 \u03b1\u03c1\u03b3\u03b5\u03af, \u03ac\u03bb\u03bb\u03bf\u03c2 \u03c0\u03b5\u03c1\u03b9\u03bc\u03ad\u03bd\u03b5\u03b9. \u0391\u03bd\u03b1\u03ba\u03b1\u03c4\u03b1\u03bd\u03b5\u03af\u03bc\u03b5\u03c4\u03b5 \u03bc\u03b5 \u03b1\u03c3\u03c6\u03ac\u03bb\u03b5\u03b9\u03b1 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2, \u03c4\u03b7\u03c1\u03ae\u03c3\u03c4\u03b5 \u03c4\u03bf\u03bd \u03b1\u03bd\u03b1\u03b3\u03ba\u03b1\u03af\u03bf \u03c1\u03c5\u03b8\u03bc\u03cc \u03ba\u03b1\u03b9 \u03ba\u03c1\u03b1\u03c4\u03ae\u03c3\u03c4\u03b5 \u03ba\u03bf\u03b9\u03bd\u03bf\u03cd\u03c2 \u03c0\u03cc\u03c1\u03bf\u03c5\u03c2 \u03c3\u03b5 \u03b5\u03c6\u03b1\u03c1\u03bc\u03cc\u03c3\u03b9\u03bc\u03bf \u03c0\u03c1\u03cc\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/line-balancing\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-22T03:50:52+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-22T03:53:10+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/line-balancing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1774\" \/>\n\t<meta property=\"og:image:height\" content=\"887\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u03a3\u03c5\u03bd\u03c4\u03ac\u03c7\u03b8\u03b7\u03ba\u03b5 \u03b1\u03c0\u03cc\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/line-balancing\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/line-balancing\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"\u0395\u03be\u03b9\u03c3\u03bf\u03c1\u03c1\u03cc\u03c0\u03b7\u03c3\u03b7 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ae\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u03a0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03cc\u03c3\u03c4\u03b5 \u03c4\u03b7\u03bd \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1 \u03c3\u03c4\u03bf\u03bd \u03c1\u03c5\u03b8\u03bc\u03cc\",\"datePublished\":\"2026-10-22T03:50:52+00:00\",\"dateModified\":\"2026-10-22T03:53:10+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/line-balancing\\\/\"},\"wordCount\":68,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/line-balancing\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/line-balancing-hero.png\",\"articleSection\":[\"\u0391\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2\",\"\u03c0\u03cc\u03c1\u03bf\u03b9\"],\"inLanguage\":\"el\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/line-balancing\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/line-balancing\\\/\",\"name\":\"\u0395\u03be\u03b9\u03c3\u03bf\u03c1\u03c1\u03cc\u03c0\u03b7\u03c3\u03b7 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ae\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u0397 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1 \u03c3\u03c4\u03bf\u03bd \u03c3\u03c9\u03c3\u03c4\u03cc \u03c1\u03c5\u03b8\u03bc\u03cc\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/line-balancing\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/line-balancing\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/line-balancing-hero.png\",\"datePublished\":\"2026-10-22T03:50:52+00:00\",\"dateModified\":\"2026-10-22T03:53:10+00:00\",\"description\":\"\u0388\u03bd\u03b1\u03c2 \u03c3\u03c4\u03b1\u03b8\u03bc\u03cc\u03c2 \u03b1\u03c1\u03b3\u03b5\u03af, \u03ac\u03bb\u03bb\u03bf\u03c2 \u03c0\u03b5\u03c1\u03b9\u03bc\u03ad\u03bd\u03b5\u03b9. \u0391\u03bd\u03b1\u03ba\u03b1\u03c4\u03b1\u03bd\u03b5\u03af\u03bc\u03b5\u03c4\u03b5 \u03bc\u03b5 \u03b1\u03c3\u03c6\u03ac\u03bb\u03b5\u03b9\u03b1 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2, \u03c4\u03b7\u03c1\u03ae\u03c3\u03c4\u03b5 \u03c4\u03bf\u03bd \u03b1\u03bd\u03b1\u03b3\u03ba\u03b1\u03af\u03bf \u03c1\u03c5\u03b8\u03bc\u03cc \u03ba\u03b1\u03b9 \u03ba\u03c1\u03b1\u03c4\u03ae\u03c3\u03c4\u03b5 \u03ba\u03bf\u03b9\u03bd\u03bf\u03cd\u03c2 \u03c0\u03cc\u03c1\u03bf\u03c5\u03c2 \u03c3\u03b5 \u03b5\u03c6\u03b1\u03c1\u03bc\u03cc\u03c3\u03b9\u03bc\u03bf \u03c0\u03c1\u03cc\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/line-balancing\\\/#breadcrumb\"},\"inLanguage\":\"el\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/line-balancing\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"el\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/line-balancing\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/line-balancing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/line-balancing-hero.png\",\"width\":1774,\"height\":887,\"caption\":\"A module-fitting task moves from the middle assembly bench to the first, spreading work across three stations.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/line-balancing\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u0395\u03be\u03b9\u03c3\u03bf\u03c1\u03c1\u03cc\u03c0\u03b7\u03c3\u03b7 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ae\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u03a0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03cc\u03c3\u03c4\u03b5 \u03c4\u03b7\u03bd \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1 \u03c3\u03c4\u03bf\u03bd \u03c1\u03c5\u03b8\u03bc\u03cc\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"el\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"el\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"el\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\u0395\u03be\u03b9\u03c3\u03bf\u03c1\u03c1\u03cc\u03c0\u03b7\u03c3\u03b7 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ae\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u0397 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1 \u03c3\u03c4\u03bf\u03bd \u03c3\u03c9\u03c3\u03c4\u03cc \u03c1\u03c5\u03b8\u03bc\u03cc","description":"\u0388\u03bd\u03b1\u03c2 \u03c3\u03c4\u03b1\u03b8\u03bc\u03cc\u03c2 \u03b1\u03c1\u03b3\u03b5\u03af, \u03ac\u03bb\u03bb\u03bf\u03c2 \u03c0\u03b5\u03c1\u03b9\u03bc\u03ad\u03bd\u03b5\u03b9. \u0391\u03bd\u03b1\u03ba\u03b1\u03c4\u03b1\u03bd\u03b5\u03af\u03bc\u03b5\u03c4\u03b5 \u03bc\u03b5 \u03b1\u03c3\u03c6\u03ac\u03bb\u03b5\u03b9\u03b1 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2, \u03c4\u03b7\u03c1\u03ae\u03c3\u03c4\u03b5 \u03c4\u03bf\u03bd \u03b1\u03bd\u03b1\u03b3\u03ba\u03b1\u03af\u03bf \u03c1\u03c5\u03b8\u03bc\u03cc \u03ba\u03b1\u03b9 \u03ba\u03c1\u03b1\u03c4\u03ae\u03c3\u03c4\u03b5 \u03ba\u03bf\u03b9\u03bd\u03bf\u03cd\u03c2 \u03c0\u03cc\u03c1\u03bf\u03c5\u03c2 \u03c3\u03b5 \u03b5\u03c6\u03b1\u03c1\u03bc\u03cc\u03c3\u03b9\u03bc\u03bf \u03c0\u03c1\u03cc\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/line-balancing\/","og_locale":"el_GR","og_type":"article","og_title":"\u0395\u03be\u03b9\u03c3\u03bf\u03c1\u03c1\u03cc\u03c0\u03b7\u03c3\u03b7 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ae\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u03a0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03cc\u03c3\u03c4\u03b5 \u03c4\u03b7\u03bd \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1 \u03c3\u03c4\u03bf\u03bd \u03c1\u03c5\u03b8\u03bc\u03cc","og_description":"\u0388\u03bd\u03b1\u03c2 \u03c3\u03c4\u03b1\u03b8\u03bc\u03cc\u03c2 \u03b1\u03c1\u03b3\u03b5\u03af, \u03ac\u03bb\u03bb\u03bf\u03c2 \u03c0\u03b5\u03c1\u03b9\u03bc\u03ad\u03bd\u03b5\u03b9. \u0391\u03bd\u03b1\u03ba\u03b1\u03c4\u03b1\u03bd\u03b5\u03af\u03bc\u03b5\u03c4\u03b5 \u03bc\u03b5 \u03b1\u03c3\u03c6\u03ac\u03bb\u03b5\u03b9\u03b1 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2, \u03c4\u03b7\u03c1\u03ae\u03c3\u03c4\u03b5 \u03c4\u03bf\u03bd \u03b1\u03bd\u03b1\u03b3\u03ba\u03b1\u03af\u03bf \u03c1\u03c5\u03b8\u03bc\u03cc \u03ba\u03b1\u03b9 \u03ba\u03c1\u03b1\u03c4\u03ae\u03c3\u03c4\u03b5 \u03ba\u03bf\u03b9\u03bd\u03bf\u03cd\u03c2 \u03c0\u03cc\u03c1\u03bf\u03c5\u03c2 \u03c3\u03b5 \u03b5\u03c6\u03b1\u03c1\u03bc\u03cc\u03c3\u03b9\u03bc\u03bf \u03c0\u03c1\u03cc\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2.","og_url":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/line-balancing\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-22T03:50:52+00:00","article_modified_time":"2026-10-22T03:53:10+00:00","og_image":[{"width":1774,"height":887,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/line-balancing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"\u03a3\u03c5\u03bd\u03c4\u03ac\u03c7\u03b8\u03b7\u03ba\u03b5 \u03b1\u03c0\u03cc":"Jussi M\u00e4ntyl\u00e4"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/line-balancing\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/line-balancing\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/el\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"\u0395\u03be\u03b9\u03c3\u03bf\u03c1\u03c1\u03cc\u03c0\u03b7\u03c3\u03b7 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ae\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u03a0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03cc\u03c3\u03c4\u03b5 \u03c4\u03b7\u03bd \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1 \u03c3\u03c4\u03bf\u03bd \u03c1\u03c5\u03b8\u03bc\u03cc","datePublished":"2026-10-22T03:50:52+00:00","dateModified":"2026-10-22T03:53:10+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/line-balancing\/"},"wordCount":68,"publisher":{"@id":"https:\/\/skyplanner.ai\/el\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/line-balancing\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/line-balancing-hero.png","articleSection":["\u0391\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2","\u03c0\u03cc\u03c1\u03bf\u03b9"],"inLanguage":"el"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/line-balancing\/","url":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/line-balancing\/","name":"\u0395\u03be\u03b9\u03c3\u03bf\u03c1\u03c1\u03cc\u03c0\u03b7\u03c3\u03b7 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ae\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u0397 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1 \u03c3\u03c4\u03bf\u03bd \u03c3\u03c9\u03c3\u03c4\u03cc \u03c1\u03c5\u03b8\u03bc\u03cc","isPartOf":{"@id":"https:\/\/skyplanner.ai\/el\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/line-balancing\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/line-balancing\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/line-balancing-hero.png","datePublished":"2026-10-22T03:50:52+00:00","dateModified":"2026-10-22T03:53:10+00:00","description":"\u0388\u03bd\u03b1\u03c2 \u03c3\u03c4\u03b1\u03b8\u03bc\u03cc\u03c2 \u03b1\u03c1\u03b3\u03b5\u03af, \u03ac\u03bb\u03bb\u03bf\u03c2 \u03c0\u03b5\u03c1\u03b9\u03bc\u03ad\u03bd\u03b5\u03b9. \u0391\u03bd\u03b1\u03ba\u03b1\u03c4\u03b1\u03bd\u03b5\u03af\u03bc\u03b5\u03c4\u03b5 \u03bc\u03b5 \u03b1\u03c3\u03c6\u03ac\u03bb\u03b5\u03b9\u03b1 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2, \u03c4\u03b7\u03c1\u03ae\u03c3\u03c4\u03b5 \u03c4\u03bf\u03bd \u03b1\u03bd\u03b1\u03b3\u03ba\u03b1\u03af\u03bf \u03c1\u03c5\u03b8\u03bc\u03cc \u03ba\u03b1\u03b9 \u03ba\u03c1\u03b1\u03c4\u03ae\u03c3\u03c4\u03b5 \u03ba\u03bf\u03b9\u03bd\u03bf\u03cd\u03c2 \u03c0\u03cc\u03c1\u03bf\u03c5\u03c2 \u03c3\u03b5 \u03b5\u03c6\u03b1\u03c1\u03bc\u03cc\u03c3\u03b9\u03bc\u03bf \u03c0\u03c1\u03cc\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/line-balancing\/#breadcrumb"},"inLanguage":"el","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/line-balancing\/"]}]},{"@type":"ImageObject","inLanguage":"el","@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/line-balancing\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/line-balancing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/line-balancing-hero.png","width":1774,"height":887,"caption":"A module-fitting task moves from the middle assembly bench to the first, spreading work across three stations."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/line-balancing\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/el\/"},{"@type":"ListItem","position":2,"name":"\u0395\u03be\u03b9\u03c3\u03bf\u03c1\u03c1\u03cc\u03c0\u03b7\u03c3\u03b7 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ae\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u03a0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03cc\u03c3\u03c4\u03b5 \u03c4\u03b7\u03bd \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1 \u03c3\u03c4\u03bf\u03bd \u03c1\u03c5\u03b8\u03bc\u03cc"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/el\/#website","url":"https:\/\/skyplanner.ai\/el\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/el\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/el\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"el"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/el\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/el\/","logo":{"@type":"ImageObject","inLanguage":"el","@id":"https:\/\/skyplanner.ai\/el\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/el\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/el\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"el","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/line-balancing-hero.png",1774,887,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/line-balancing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/line-balancing-hero-300x150.png",300,150,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/line-balancing-hero-768x384.png",768,384,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/line-balancing-hero-1024x512.png",1024,512,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/line-balancing-hero-1536x768.png",1536,768,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/line-balancing-hero.png",1774,887,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/line-balancing-hero-360x180.png",360,180,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/el\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"\u0395\u03be\u03b9\u03c3\u03bf\u03c1\u03c1\u03cc\u03c0\u03b7\u03c3\u03b7 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ae\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u03a0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03cc\u03c3\u03c4\u03b5 \u03c4\u03b7\u03bd \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1 \u03c3\u03c4\u03bf\u03bd \u03c1\u03c5\u03b8\u03bc\u03cc \u0391\u03c1\u03c7\u03b9\u03ba\u03ae &raquo; \u03a0\u03cc\u03c1\u03bf\u03b9 &raquo; \u0395\u03be\u03b9\u03c3\u03bf\u03c1\u03c1\u03cc\u03c0\u03b7\u03c3\u03b7 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ae\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u03a0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03cc\u03c3\u03c4\u03b5 \u03c4\u03b7\u03bd \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1 \u03c3\u03c4\u03bf\u03bd \u03c1\u03c5\u03b8\u03bc\u03cc \u0388\u03bd\u03b1\u03c2 \u03c7\u03b5\u03b9\u03c1\u03b9\u03c3\u03c4\u03ae\u03c2 \u03b1\u03ba\u03cc\u03bc\u03b7 \u03c3\u03c4\u03b5\u03c1\u03b5\u03ce\u03bd\u03b5\u03b9 \u03c4\u03bf \u03c3\u03c5\u03bd\u03b1\u03c1\u03bc\u03bf\u03bb\u03bf\u03b3\u03b7\u03bc\u03ad\u03bd\u03bf \u03c3\u03cd\u03bd\u03bf\u03bb\u03bf, \u03b5\u03bd\u03ce \u03bf \u03b5\u03c0\u03cc\u03bc\u03b5\u03bd\u03bf\u03c2 \u03c0\u03b5\u03c1\u03b9\u03bc\u03ad\u03bd\u03b5\u03b9 \u03bd\u03b1 \u03c4\u03bf \u03c0\u03b1\u03c1\u03b1\u03bb\u03ac\u03b2\u03b5\u03b9. \u03a3\u03c4\u03bf \u03c4\u03ad\u03bb\u03bf\u03c2 \u03c4\u03b7\u03c2 \u03b2\u03ac\u03c1\u03b4\u03b9\u03b1\u03c2, \u03b7 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ae \u03b4\u03b5\u03bd \u03ad\u03c7\u03b5\u03b9 \u03c0\u03b9\u03ac\u03c3\u03b5\u03b9 \u03c4\u03bf\u03bd \u03c3\u03c4\u03cc\u03c7\u03bf \u03c4\u03b7\u03c2, \u03c0\u03b1\u03c1\u03cc\u03c4\u03b9 \u03c4\u03bf \u03c0\u03c1\u03bf\u03c3\u03c9\u03c0\u03b9\u03ba\u03cc \u03ba\u03b1\u03b9 \u03bf \u03b5\u03be\u03bf\u03c0\u03bb\u03b9\u03c3\u03bc\u03cc\u03c2 \u03c6\u03b1\u03af\u03bd\u03bf\u03bd\u03c4\u03b1\u03bd \u03b5\u03c0\u03b1\u03c1\u03ba\u03ae. \u0397&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/posts\/105626","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/comments?post=105626"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/posts\/105626\/revisions"}],"predecessor-version":[{"id":105690,"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/posts\/105626\/revisions\/105690"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/media\/105631"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/media?parent=105626"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/categories?post=105626"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/tags?post=105626"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}