{"id":104675,"date":"2026-10-20T21:23:51","date_gmt":"2026-10-20T21:23:51","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=104675"},"modified":"2026-10-20T21:26:05","modified_gmt":"2026-10-20T21:26:05","slug":"aggregate-planning","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/aggregate-planning\/","title":{"rendered":"\u03a3\u03c5\u03b3\u03ba\u03b5\u03bd\u03c4\u03c1\u03c9\u03c4\u03b9\u03ba\u03cc\u03c2 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u03c3\u03c4\u03b1\u03b8\u03b5\u03c1\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae, \u03c0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03bf\u03b3\u03ae \u03c3\u03c4\u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7 \u03ae \u03bc\u03b9\u03ba\u03c4\u03ae \u03c3\u03c4\u03c1\u03b1\u03c4\u03b7\u03b3\u03b9\u03ba\u03ae;"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">\u03a3\u03c5\u03b3\u03ba\u03b5\u03bd\u03c4\u03c1\u03c9\u03c4\u03b9\u03ba\u03cc\u03c2 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u03c3\u03c4\u03b1\u03b8\u03b5\u03c1\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae, \u03c0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03bf\u03b3\u03ae \u03c3\u03c4\u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7 \u03ae \u03bc\u03b9\u03ba\u03c4\u03ae \u03c3\u03c4\u03c1\u03b1\u03c4\u03b7\u03b3\u03b9\u03ba\u03ae;<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/el\/\">\u0391\u03c1\u03c7\u03b9\u03ba\u03ae<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/\">\u03a0\u03cc\u03c1\u03bf\u03b9<\/a> &raquo; \u03a3\u03c5\u03b3\u03ba\u03b5\u03bd\u03c4\u03c1\u03c9\u03c4\u03b9\u03ba\u03cc\u03c2 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u03c3\u03c4\u03b1\u03b8\u03b5\u03c1\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae, \u03c0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03bf\u03b3\u03ae \u03c3\u03c4\u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7 \u03ae \u03bc\u03b9\u03ba\u03c4\u03ae \u03c3\u03c4\u03c1\u03b1\u03c4\u03b7\u03b3\u03b9\u03ba\u03ae;<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">\u0395\u03ba\u03c4\u03b9\u03bc\u03ce\u03bc\u03b5\u03bd\u03bf\u03c2 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c2 \u03b1\u03bd\u03ac\u03b3\u03bd\u03c9\u03c3\u03b7\u03c2: <\/span><span class=\"yoast-reading-time__reading-time\">11<\/span><span class=\"yoast-reading-time__time-unit\"> \u03bb\u03b5\u03c0\u03c4\u03ac<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>\u039f \u03c3\u03c5\u03b3\u03ba\u03b5\u03bd\u03c4\u03c1\u03c9\u03c4\u03b9\u03ba\u03cc\u03c2 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03ba\u03b1\u03b8\u03bf\u03c1\u03af\u03b6\u03b5\u03b9 \u03c4\u03b9\u03c2 \u03c0\u03bf\u03c3\u03cc\u03c4\u03b7\u03c4\u03b5\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2, \u03c4\u03b7 \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03bf\u03c5 \u03b4\u03b5\u03c3\u03bc\u03b5\u03cd\u03b5\u03c4\u03b1\u03b9 \u03ba\u03b1\u03b9 \u03c4\u03b1 \u03b1\u03bd\u03b1\u03bc\u03b5\u03bd\u03cc\u03bc\u03b5\u03bd\u03b1 \u03b1\u03c0\u03bf\u03b8\u03ad\u03bc\u03b1\u03c4\u03b1 \u03ae \u03c4\u03b9\u03c2 \u03b1\u03bd\u03b5\u03ba\u03c4\u03ad\u03bb\u03b5\u03c3\u03c4\u03b5\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b5\u03c2 \u03b1\u03bd\u03ac \u03bf\u03b9\u03ba\u03bf\u03b3\u03ad\u03bd\u03b5\u03b9\u03b1 \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03c9\u03bd, \u03c3\u03b5 \u03bc\u03b5\u03c3\u03bf\u03c0\u03c1\u03cc\u03b8\u03b5\u03c3\u03bc\u03bf \u03bf\u03c1\u03af\u03b6\u03bf\u03bd\u03c4\u03b1, \u03c3\u03c5\u03bd\u03ae\u03b8\u03c9\u03c2 \u03c0\u03b5\u03c1\u03af\u03c0\u03bf\u03c5 3\u201318 \u03bc\u03b7\u03bd\u03ce\u03bd. \u0391\u03c0\u03b1\u03bd\u03c4\u03ac \u03c3\u03b5 \u03ad\u03bd\u03b1 \u03c0\u03c1\u03b1\u03ba\u03c4\u03b9\u03ba\u03cc \u03b5\u03c1\u03ce\u03c4\u03b7\u03bc\u03b1: \u03cc\u03c4\u03b1\u03bd \u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7 \u03b1\u03c5\u03be\u03bf\u03bc\u03b5\u03b9\u03ce\u03bd\u03b5\u03c4\u03b1\u03b9, \u03b5\u03af\u03bd\u03b1\u03b9 \u03c0\u03c1\u03bf\u03c4\u03b9\u03bc\u03cc\u03c4\u03b5\u03c1\u03bf \u03bd\u03b1 \u03b4\u03b9\u03b1\u03c4\u03b7\u03c1\u03b5\u03af\u03c4\u03b5 \u03c3\u03c4\u03b1\u03b8\u03b5\u03c1\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae, \u03bd\u03b1 \u03c0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03cc\u03b6\u03b5\u03c4\u03b5 \u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03cc\u03bc\u03b5\u03bd\u03b7 \u03c0\u03bf\u03c3\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c3\u03c4\u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7 \u03ae \u03bd\u03b1 \u03c3\u03c5\u03bd\u03b4\u03c5\u03ac\u03b6\u03b5\u03c4\u03b5 \u03c4\u03b9\u03c2 \u03b4\u03cd\u03bf \u03c0\u03c1\u03bf\u03c3\u03b5\u03b3\u03b3\u03af\u03c3\u03b5\u03b9\u03c2;<\/p>\n\n\n<p>\u039a\u03ac\u03c0\u03bf\u03b9\u03bf\u03c2 \u03bc\u03b7\u03c7\u03b1\u03bd\u03b9\u03c3\u03bc\u03cc\u03c2 \u03c0\u03c1\u03ad\u03c0\u03b5\u03b9 \u03bd\u03b1 \u03b1\u03c0\u03bf\u03c1\u03c1\u03bf\u03c6\u03ae\u03c3\u03b5\u03b9 \u03c4\u03b9\u03c2 \u03b4\u03b9\u03b1\u03ba\u03c5\u03bc\u03ac\u03bd\u03c3\u03b5\u03b9\u03c2. \u0388\u03bd\u03b1\u03c2 \u03c3\u03c4\u03b1\u03b8\u03b5\u03c1\u03cc\u03c2 \u03c1\u03c5\u03b8\u03bc\u03cc\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03b4\u03b7\u03bc\u03b9\u03bf\u03c5\u03c1\u03b3\u03ae\u03c3\u03b5\u03b9 \u03b1\u03c0\u03cc\u03b8\u03b5\u03bc\u03b1 \u03c0\u03c1\u03b9\u03bd \u03b1\u03c0\u03cc \u03c4\u03b7\u03bd \u03b1\u03b9\u03c7\u03bc\u03ae. \u0397 \u03c0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03bf\u03b3\u03ae \u03c4\u03b7\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03c4\u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7 \u03b1\u03c0\u03bf\u03c6\u03b5\u03cd\u03b3\u03b5\u03b9 \u03b1\u03c5\u03c4\u03ae \u03c4\u03b7 \u03c3\u03c5\u03c3\u03c3\u03ce\u03c1\u03b5\u03c5\u03c3\u03b7, \u03b1\u03bb\u03bb\u03ac \u03b1\u03c0\u03b1\u03b9\u03c4\u03b5\u03af \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03bf\u03c5 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af\u03c4\u03b5 \u03c0\u03c1\u03ac\u03b3\u03bc\u03b1\u03c4\u03b9 \u03bd\u03b1 \u03b1\u03c5\u03be\u03ac\u03bd\u03b5\u03c4\u03b5 \u03ba\u03b1\u03b9 \u03bd\u03b1 \u03bc\u03b5\u03b9\u03ce\u03bd\u03b5\u03c4\u03b5. \u039c\u03b9\u03b1 \u03bc\u03b9\u03ba\u03c4\u03ae \u03c3\u03c4\u03c1\u03b1\u03c4\u03b7\u03b3\u03b9\u03ba\u03ae \u03bc\u03bf\u03b9\u03c1\u03ac\u03b6\u03b5\u03b9 \u03c4\u03bf \u03b2\u03ac\u03c1\u03bf\u03c2 \u03bc\u03b5\u03c4\u03b1\u03be\u03cd \u03b1\u03c0\u03bf\u03b8\u03ad\u03bc\u03b1\u03c4\u03bf\u03c2 \u03ba\u03b1\u03b9 \u03b5\u03c5\u03ad\u03bb\u03b9\u03ba\u03c4\u03b7\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2.<\/p>\n\n\n<p>\u0397 \u03c3\u03c9\u03c3\u03c4\u03ae \u03b5\u03c0\u03b9\u03bb\u03bf\u03b3\u03ae \u03b4\u03b9\u03b1\u03c3\u03c6\u03b1\u03bb\u03af\u03b6\u03b5\u03b9 \u03c4\u03b9\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b4\u03cc\u03c3\u03b5\u03b9\u03c2, \u03c7\u03c9\u03c1\u03af\u03c2 \u03bd\u03b1 \u03c0\u03bb\u03b7\u03c1\u03ce\u03bd\u03b5\u03c4\u03b5 \u03b3\u03b9\u03b1 \u03b1\u03c0\u03cc\u03b8\u03b5\u03bc\u03b1 \u03c0\u03bf\u03c5 \u03b4\u03b5\u03bd \u03bc\u03c0\u03bf\u03c1\u03b5\u03af\u03c4\u03b5 \u03bd\u03b1 \u03b1\u03be\u03b9\u03bf\u03c0\u03bf\u03b9\u03ae\u03c3\u03b5\u03c4\u03b5 \u03ae \u03b3\u03b9\u03b1 \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03bf\u03c5 \u03b4\u03b5\u03bd \u03bc\u03c0\u03bf\u03c1\u03b5\u03af\u03c4\u03b5 \u03bd\u03b1 \u03b4\u03b9\u03b1\u03b8\u03ad\u03c3\u03b5\u03c4\u03b5. \u03a4\u03bf SkyPlanner \u03b2\u03bf\u03b7\u03b8\u03ac \u03bd\u03b1 \u03b5\u03c6\u03b1\u03c1\u03bc\u03cc\u03c3\u03b5\u03c4\u03b5 \u03b1\u03c5\u03c4\u03ae \u03c4\u03b7\u03bd \u03b5\u03c0\u03b9\u03bb\u03bf\u03b3\u03ae \u03c3\u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae: \u03b7 \u03c4\u03b5\u03c7\u03bd\u03b7\u03c4\u03ae \u03bd\u03bf\u03b7\u03bc\u03bf\u03c3\u03cd\u03bd\u03b7 \u03c7\u03c1\u03bf\u03bd\u03bf\u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03bf\u03cd Arcturus \u03c3\u03c5\u03bd\u03c4\u03bf\u03bd\u03af\u03b6\u03b5\u03b9 \u03c4\u03b9\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b5\u03c2 \u03c3\u03c4\u03b9\u03c2 \u03bf\u03c0\u03bf\u03af\u03b5\u03c2 \u03b2\u03b1\u03c3\u03af\u03b6\u03b5\u03c4\u03b1\u03b9 \u03c4\u03bf \u03c0\u03bb\u03ac\u03bd\u03bf \u03bc\u03b5 \u03c4\u03bf\u03c5\u03c2 \u03c3\u03c4\u03b1\u03b8\u03bc\u03bf\u03cd\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2, \u03c4\u03b9\u03c2 \u03b2\u03ac\u03c1\u03b4\u03b9\u03b5\u03c2, \u03c4\u03bf\u03c5\u03c2 \u03c7\u03b5\u03b9\u03c1\u03b9\u03c3\u03c4\u03ad\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03b9\u03c2 \u03c0\u03c1\u03bf\u03c4\u03b5\u03c1\u03b1\u03b9\u03cc\u03c4\u03b7\u03c4\u03ad\u03c2 \u03c3\u03b1\u03c2. \u0388\u03c4\u03c3\u03b9 \u03b1\u03c6\u03b9\u03b5\u03c1\u03ce\u03bd\u03b5\u03c4\u03b5 \u03bb\u03b9\u03b3\u03cc\u03c4\u03b5\u03c1\u03bf \u03c7\u03c1\u03cc\u03bd\u03bf \u03b3\u03b9\u03b1 \u03bd\u03b1 \u03c3\u03c5\u03bc\u03b2\u03b9\u03b2\u03ac\u03c3\u03b5\u03c4\u03b5 \u03c4\u03bf\u03bd \u03bc\u03b7\u03bd\u03b9\u03b1\u03af\u03bf \u03c3\u03c4\u03cc\u03c7\u03bf \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03bc\u03b5 \u03c4\u03b9\u03c2 \u03be\u03b5\u03c7\u03c9\u03c1\u03b9\u03c3\u03c4\u03ad\u03c2 \u03bf\u03c5\u03c1\u03ad\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03b9\u03ce\u03bd \u03ba\u03ac\u03b8\u03b5 \u03bc\u03b7\u03c7\u03b1\u03bd\u03ae\u03c2.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u03a4\u03b9 \u03ba\u03b1\u03b8\u03bf\u03c1\u03af\u03b6\u03b5\u03b9 \u03ad\u03bd\u03b1 \u03c3\u03c5\u03b3\u03ba\u03b5\u03bd\u03c4\u03c1\u03c9\u03c4\u03b9\u03ba\u03cc \u03c0\u03bb\u03ac\u03bd\u03bf \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2<\/h2>\n\n\n<p>\u03a4\u03bf \u03c3\u03c5\u03b3\u03ba\u03b5\u03bd\u03c4\u03c1\u03c9\u03c4\u03b9\u03ba\u03cc \u03c0\u03bb\u03ac\u03bd\u03bf \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03b4\u03b5\u03bd \u03b1\u03c6\u03bf\u03c1\u03ac \u03c4\u03b7 \u03bc\u03b5\u03bc\u03bf\u03bd\u03c9\u03bc\u03ad\u03bd\u03b7 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1. \u0391\u03bd\u03c4\u03af \u03bd\u03b1 \u03b1\u03bd\u03b1\u03b8\u03ad\u03c4\u03b5\u03b9 \u03c4\u03b9\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2 \u03c4\u03b7\u03c2 \u03a4\u03c1\u03af\u03c4\u03b7\u03c2 \u03c3\u03b5 \u03bc\u03b7\u03c7\u03b1\u03bd\u03ad\u03c2, \u03ba\u03b1\u03b8\u03bf\u03c1\u03af\u03b6\u03b5\u03b9 \u03c4\u03b7\u03bd \u03c0\u03bf\u03bb\u03b9\u03c4\u03b9\u03ba\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03ba\u03b1\u03b9 \u03c7\u03c1\u03ae\u03c3\u03b7\u03c2 \u03c0\u03cc\u03c1\u03c9\u03bd \u03b3\u03b9\u03b1 \u03bc\u03b9\u03b1 \u03bf\u03b9\u03ba\u03bf\u03b3\u03ad\u03bd\u03b5\u03b9\u03b1 \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03c9\u03bd: \u03c0\u03cc\u03c3\u03bf \u03b8\u03b1 \u03c0\u03b1\u03c1\u03b1\u03c7\u03b8\u03b5\u03af \u03c3\u03b5 \u03ba\u03ac\u03b8\u03b5 \u03c0\u03b5\u03c1\u03af\u03bf\u03b4\u03bf, \u03c4\u03b9 \u03b1\u03c0\u03cc\u03b8\u03b5\u03bc\u03b1 \u03b8\u03b1 \u03b4\u03b9\u03b1\u03c4\u03b7\u03c1\u03b5\u03af\u03c4\u03b1\u03b9 \u03ba\u03b1\u03b9 \u03c0\u03cc\u03c4\u03b5 \u03b8\u03b1 \u03c7\u03c1\u03b5\u03b9\u03b1\u03c3\u03c4\u03b5\u03af \u03c0\u03c1\u03cc\u03c3\u03b8\u03b5\u03c4\u03b7 \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1.<\/p>\n\n\n<p>\u039f\u03bc\u03b1\u03b4\u03bf\u03c0\u03bf\u03b9\u03ae\u03c3\u03c4\u03b5 \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03b1 \u03c4\u03c9\u03bd \u03bf\u03c0\u03bf\u03af\u03c9\u03bd \u03bf\u03b9 \u03b1\u03c0\u03b1\u03b9\u03c4\u03ae\u03c3\u03b5\u03b9\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03b5\u03c0\u03b9\u03c4\u03c1\u03ad\u03c0\u03bf\u03c5\u03bd \u03bc\u03b9\u03b1 \u03bf\u03c5\u03c3\u03b9\u03b1\u03c3\u03c4\u03b9\u03ba\u03ae \u03c3\u03cd\u03b3\u03ba\u03c1\u03b9\u03c3\u03b7. \u0393\u03b9\u03b1 \u03bc\u03b9\u03b1 \u03bf\u03b9\u03ba\u03bf\u03b3\u03ad\u03bd\u03b5\u03b9\u03b1 \u03c0\u03b1\u03c1\u03cc\u03bc\u03bf\u03b9\u03c9\u03bd \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03c9\u03bd, \u03b7 \u03bc\u03ad\u03c4\u03c1\u03b7\u03c3\u03b7 \u03c3\u03b5 \u03c4\u03b5\u03bc\u03ac\u03c7\u03b9\u03b1 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03b5\u03af\u03bd\u03b1\u03b9 \u03ba\u03b1\u03c4\u03ac\u03bb\u03bb\u03b7\u03bb\u03b7. \u038c\u03c4\u03b1\u03bd \u03c4\u03b1 \u03bc\u03b5\u03b3\u03ad\u03b8\u03b7 \u03ae \u03c4\u03b1 \u03c6\u03b1\u03c3\u03b5\u03bf\u03bb\u03cc\u03b3\u03b9\u03b1 \u03b4\u03b9\u03b1\u03c6\u03ad\u03c1\u03bf\u03c5\u03bd \u03c3\u03b7\u03bc\u03b1\u03bd\u03c4\u03b9\u03ba\u03ac, \u03c7\u03c1\u03b7\u03c3\u03b9\u03bc\u03bf\u03c0\u03bf\u03b9\u03ae\u03c3\u03c4\u03b5 \u03ad\u03bd\u03b1 \u03bf\u03c5\u03c3\u03b9\u03b1\u03c3\u03c4\u03b9\u03ba\u03cc \u03ba\u03bf\u03b9\u03bd\u03cc \u03bc\u03ad\u03c4\u03c1\u03bf, \u03cc\u03c0\u03c9\u03c2 \u03bf\u03b9 \u03c0\u03c1\u03cc\u03c4\u03c5\u03c0\u03b5\u03c2 \u03ce\u03c1\u03b5\u03c2 \u03c3\u03c4\u03bf\u03bd \u03b1\u03bd\u03c4\u03af\u03c3\u03c4\u03bf\u03b9\u03c7\u03bf \u03c0\u03cc\u03c1\u03bf. \u0391\u03bd \u03bc\u03b5\u03c4\u03c1\u03ae\u03c3\u03b5\u03c4\u03b5 \u03ad\u03bd\u03b1 \u03bc\u03b9\u03ba\u03c1\u03cc \u03b5\u03be\u03ac\u03c1\u03c4\u03b7\u03bc\u03b1 \u03ba\u03b1\u03b9 \u03ad\u03bd\u03b1 \u03c3\u03cd\u03bd\u03b8\u03b5\u03c4\u03bf \u03c3\u03c5\u03bd\u03b1\u03c1\u03bc\u03bf\u03bb\u03cc\u03b3\u03b7\u03bc\u03b1 \u03c9\u03c2 \u03b4\u03cd\u03bf \u03b9\u03c3\u03bf\u03b4\u03cd\u03bd\u03b1\u03bc\u03b1 \u03c4\u03b5\u03bc\u03ac\u03c7\u03b9\u03b1, \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03ba\u03c1\u03cd\u03c8\u03b5\u03c4\u03b5 \u03c4\u03bf \u03c0\u03c1\u03cc\u03b2\u03bb\u03b7\u03bc\u03b1 \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1\u03c2.<\/p>\n\n\n<p>\u039f\u03b9 \u03bc\u03b7\u03bd\u03b9\u03b1\u03af\u03b5\u03c2 \u03c0\u03b5\u03c1\u03af\u03bf\u03b4\u03bf\u03b9 \u03b2\u03bf\u03b7\u03b8\u03bf\u03cd\u03bd \u03bd\u03b1 \u03b4\u03b9\u03b1\u03ba\u03c1\u03af\u03bd\u03b5\u03c4\u03b5 \u03c4\u03b9\u03c2 \u03b5\u03c0\u03bf\u03c7\u03b9\u03ba\u03ad\u03c2 \u03bc\u03b5\u03c4\u03b1\u03b2\u03bf\u03bb\u03ad\u03c2, \u03b1\u03bb\u03bb\u03ac \u03bf \u03bf\u03c1\u03af\u03b6\u03bf\u03bd\u03c4\u03b1\u03c2 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03bf\u03cd \u03c0\u03c1\u03ad\u03c0\u03b5\u03b9 \u03bd\u03b1 \u03ba\u03b1\u03bb\u03cd\u03c0\u03c4\u03b5\u03b9 \u03c4\u03b9\u03c2 \u03b1\u03c0\u03bf\u03c6\u03ac\u03c3\u03b5\u03b9\u03c2 \u03c0\u03bf\u03c5 \u03c7\u03c1\u03b5\u03b9\u03ac\u03b6\u03b5\u03c4\u03b1\u03b9 \u03bd\u03b1 \u03c0\u03ac\u03c1\u03b5\u03c4\u03b5. \u0397 \u03b5\u03ba\u03c0\u03b1\u03af\u03b4\u03b5\u03c5\u03c3\u03b7 \u03c0\u03c1\u03bf\u03c3\u03c9\u03c0\u03b9\u03ba\u03bf\u03cd, \u03b7 \u03b5\u03be\u03b1\u03c3\u03c6\u03ac\u03bb\u03b9\u03c3\u03b7 \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1\u03c2 \u03b1\u03c0\u03cc \u03c0\u03c1\u03bf\u03bc\u03b7\u03b8\u03b5\u03c5\u03c4\u03ad\u03c2 \u03ba\u03b1\u03b9 \u03b7 \u03c0\u03c1\u03bf\u03b5\u03c4\u03bf\u03b9\u03bc\u03b1\u03c3\u03af\u03b1 \u03c5\u03bb\u03b9\u03ba\u03ce\u03bd \u03b3\u03b9\u03b1 \u03bc\u03b9\u03b1 \u03b1\u03b9\u03c7\u03bc\u03ae \u03b1\u03c0\u03b1\u03b9\u03c4\u03bf\u03cd\u03bd \u03c0\u03b5\u03c1\u03b9\u03c3\u03c3\u03cc\u03c4\u03b5\u03c1\u03bf \u03c7\u03c1\u03cc\u03bd\u03bf \u03c0\u03c1\u03bf\u03b5\u03c4\u03bf\u03b9\u03bc\u03b1\u03c3\u03af\u03b1\u03c2 \u03b1\u03c0\u03cc \u03c4\u03b7\u03bd \u03b1\u03bb\u03bb\u03b1\u03b3\u03ae \u03c4\u03b7\u03c2 \u03b1\u03c5\u03c1\u03b9\u03b1\u03bd\u03ae\u03c2 \u03c3\u03b5\u03b9\u03c1\u03ac\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03b9\u03ce\u03bd.<\/p>\n\n\n<p>\u039f \u03c3\u03c5\u03b3\u03ba\u03b5\u03bd\u03c4\u03c1\u03c9\u03c4\u03b9\u03ba\u03cc\u03c2 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03c5\u03bd\u03b4\u03ad\u03b5\u03b9 \u03b5\u03c0\u03af\u03c3\u03b7\u03c2 \u03b4\u03b9\u03b1\u03c6\u03bf\u03c1\u03b5\u03c4\u03b9\u03ba\u03ad\u03c2 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b5\u03c2 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03bf\u03cd:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>\u03a4\u03bf <a href=\"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/%ce%be%ce%b5%ce%ba%ce%bb%ce%b5%ce%b9%ce%b4%cf%8e%ce%bd%ce%bf%ce%bd%cf%84%ce%b1%cf%82-%cf%84%ce%b7-%ce%b4%cf%8d%ce%bd%ce%b1%ce%bc%ce%b7-%cf%84%ce%bf%cf%85-sop-%cf%83%cf%84%ce%b7-%ce%bc%ce%b5%cf%84\/\">S&#038;OP<\/a><\/strong> \u03c3\u03c5\u03bd\u03b4\u03c5\u03ac\u03b6\u03b5\u03b9 \u03c4\u03b9\u03c2 \u03b1\u03c0\u03bf\u03c6\u03ac\u03c3\u03b5\u03b9\u03c2 \u03b3\u03b9\u03b1 \u03c4\u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7, \u03c4\u03bf\u03bd \u03b5\u03c6\u03bf\u03b4\u03b9\u03b1\u03c3\u03bc\u03cc \u03ba\u03b1\u03b9 \u03c4\u03b1 \u03bf\u03b9\u03ba\u03bf\u03bd\u03bf\u03bc\u03b9\u03ba\u03ac \u03c3\u03b5 \u03ad\u03bd\u03b1 \u03ba\u03bf\u03b9\u03bd\u03ac \u03b1\u03c0\u03bf\u03b4\u03b5\u03ba\u03c4\u03cc \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03b7\u03c3\u03b9\u03b1\u03ba\u03cc \u03c0\u03bb\u03ac\u03bd\u03bf. \u039c\u03ad\u03c3\u03b1 \u03b1\u03c0\u03cc \u03b1\u03c5\u03c4\u03ae \u03c4\u03b7 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b1 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03b4\u03b9\u03b1\u03bc\u03bf\u03c1\u03c6\u03c9\u03b8\u03b5\u03af \u03ba\u03b1\u03b9 \u03bd\u03b1 \u03b5\u03b3\u03ba\u03c1\u03b9\u03b8\u03b5\u03af \u03b7 \u03c3\u03c5\u03b3\u03ba\u03b5\u03bd\u03c4\u03c1\u03c9\u03c4\u03b9\u03ba\u03ae \u03c0\u03bf\u03bb\u03b9\u03c4\u03b9\u03ba\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2.<\/li><li><strong>\u03a4\u03bf <a href=\"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/master-production-schedule\/\">\u03ba\u03cd\u03c1\u03b9\u03bf \u03c0\u03c1\u03cc\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 (MPS)<\/a><\/strong> \u03bc\u03b5\u03c4\u03b1\u03c4\u03c1\u03ad\u03c0\u03b5\u03b9 \u03c4\u03b7 \u03b3\u03b5\u03bd\u03b9\u03ba\u03ae \u03ba\u03b1\u03c4\u03b5\u03cd\u03b8\u03c5\u03bd\u03c3\u03b7 \u03c3\u03b5 \u03c0\u03bf\u03c3\u03cc\u03c4\u03b7\u03c4\u03b5\u03c2 \u03ba\u03b1\u03b9 \u03b7\u03bc\u03b5\u03c1\u03bf\u03bc\u03b7\u03bd\u03af\u03b5\u03c2 \u03b4\u03b9\u03b1\u03b8\u03b5\u03c3\u03b9\u03bc\u03cc\u03c4\u03b7\u03c4\u03b1\u03c2 \u03b3\u03b9\u03b1 \u03b5\u03c0\u03b9\u03bb\u03b5\u03b3\u03bc\u03ad\u03bd\u03b1 \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03b1.<\/li><li><strong>\u039f <a href=\"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/rough-cut-capacity-planning\/\">\u03c0\u03c1\u03bf\u03c3\u03b5\u03b3\u03b3\u03b9\u03c3\u03c4\u03b9\u03ba\u03cc\u03c2 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc\u03c2 \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1\u03c2 (RCCP)<\/a><\/strong> \u03b5\u03bb\u03ad\u03b3\u03c7\u03b5\u03b9 \u03b1\u03bd \u03bf\u03b9 \u03ba\u03c1\u03af\u03c3\u03b9\u03bc\u03bf\u03b9 \u03c0\u03cc\u03c1\u03bf\u03b9 \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03bd\u03b1 \u03c5\u03c0\u03bf\u03c3\u03c4\u03b7\u03c1\u03af\u03be\u03bf\u03c5\u03bd \u03c4\u03bf \u03c0\u03c1\u03bf\u03c4\u03b5\u03b9\u03bd\u03cc\u03bc\u03b5\u03bd\u03bf \u03ba\u03cd\u03c1\u03b9\u03bf \u03c0\u03c1\u03cc\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2.<\/li><li><strong>\u039f <a href=\"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/production-scheduling\/\">\u03bb\u03b5\u03c0\u03c4\u03bf\u03bc\u03b5\u03c1\u03ae\u03c2 \u03c7\u03c1\u03bf\u03bd\u03bf\u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc\u03c2<\/a><\/strong> \u03ba\u03b1\u03c4\u03b1\u03bd\u03ad\u03bc\u03b5\u03b9 \u03c4\u03b9\u03c2 \u03b5\u03c0\u03b9\u03bc\u03ad\u03c1\u03bf\u03c5\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2 \u03c0\u03bf\u03c5 \u03c0\u03c1\u03bf\u03ba\u03cd\u03c0\u03c4\u03bf\u03c5\u03bd \u03c3\u03c4\u03bf\u03bd \u03b4\u03b9\u03b1\u03b8\u03ad\u03c3\u03b9\u03bc\u03bf \u03c7\u03c1\u03cc\u03bd\u03bf \u03c4\u03c9\u03bd \u03c0\u03cc\u03c1\u03c9\u03bd.<\/li><\/ul>\n\n\n<p>\u03a4\u03b1 \u03b5\u03c0\u03af\u03c0\u03b5\u03b4\u03b1 \u03b1\u03c5\u03c4\u03ac \u03b1\u03bb\u03bb\u03b7\u03bb\u03bf\u03c4\u03c1\u03bf\u03c6\u03bf\u03b4\u03bf\u03c4\u03bf\u03cd\u03bd\u03c4\u03b1\u03b9. \u0391\u03bd \u03bf \u03c7\u03c1\u03bf\u03bd\u03bf\u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc\u03c2 \u03c4\u03c9\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03b9\u03ce\u03bd \u03b1\u03c0\u03b1\u03b9\u03c4\u03b5\u03af \u03b5\u03c0\u03b1\u03bd\u03b5\u03b9\u03bb\u03b7\u03bc\u03bc\u03ad\u03bd\u03b1 \u03c0\u03b5\u03c1\u03b9\u03c3\u03c3\u03cc\u03c4\u03b5\u03c1\u03b5\u03c2 \u03c5\u03c0\u03b5\u03c1\u03c9\u03c1\u03af\u03b5\u03c2 \u03b1\u03c0\u03cc \u03cc\u03c3\u03b5\u03c2 \u03c0\u03c1\u03bf\u03b2\u03bb\u03ad\u03c0\u03b5\u03b9 \u03c4\u03bf \u03c3\u03c5\u03b3\u03ba\u03b5\u03bd\u03c4\u03c1\u03c9\u03c4\u03b9\u03ba\u03cc \u03c0\u03bb\u03ac\u03bd\u03bf, \u03b5\u03c0\u03b1\u03bd\u03b5\u03be\u03b5\u03c4\u03ac\u03c3\u03c4\u03b5 \u03c4\u03b7\u03bd \u03c0\u03bf\u03bb\u03b9\u03c4\u03b9\u03ba\u03ae \u03b1\u03bd\u03c4\u03af \u03bd\u03b1 \u03b6\u03b7\u03c4\u03ac\u03c4\u03b5 \u03b1\u03c0\u03cc \u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae \u03bd\u03b1 \u03b1\u03c0\u03bf\u03c1\u03c1\u03bf\u03c6\u03ac \u03c4\u03b7 \u03b4\u03b9\u03b1\u03c6\u03bf\u03c1\u03ac \u03b5\u03c0\u2019 \u03b1\u03cc\u03c1\u03b9\u03c3\u03c4\u03bf\u03bd.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u03a3\u03c4\u03c1\u03b1\u03c4\u03b7\u03b3\u03b9\u03ba\u03ad\u03c2 \u03c3\u03c5\u03b3\u03ba\u03b5\u03bd\u03c4\u03c1\u03c9\u03c4\u03b9\u03ba\u03bf\u03cd \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03bf\u03cd: \u03c3\u03c4\u03b1\u03b8\u03b5\u03c1\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae, \u03c0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03bf\u03b3\u03ae \u03c3\u03c4\u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7 \u03ba\u03b1\u03b9 \u03bc\u03b9\u03ba\u03c4\u03ae \u03c0\u03c1\u03bf\u03c3\u03ad\u03b3\u03b3\u03b9\u03c3\u03b7<\/h2>\n\n\n<p>\u0397 \u03b2\u03b1\u03c3\u03b9\u03ba\u03ae \u03b4\u03b9\u03b1\u03c6\u03bf\u03c1\u03ac \u03b5\u03af\u03bd\u03b1\u03b9 \u03c4\u03b9 \u03b5\u03c0\u03b9\u03c4\u03c1\u03ad\u03c0\u03b5\u03c4\u03b5 \u03bd\u03b1 \u03bc\u03b5\u03c4\u03b1\u03b2\u03ac\u03bb\u03bb\u03b5\u03c4\u03b1\u03b9 \u03cc\u03c4\u03b1\u03bd \u03b1\u03bb\u03bb\u03ac\u03b6\u03b5\u03b9 \u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\u03a3\u03c4\u03c1\u03b1\u03c4\u03b7\u03b3\u03b9\u03ba\u03ae<\/th><th>\u03a4\u03b9 \u03c0\u03b1\u03c1\u03b1\u03bc\u03ad\u03bd\u03b5\u03b9 \u03c3\u03c7\u03b5\u03c4\u03b9\u03ba\u03ac \u03c3\u03c4\u03b1\u03b8\u03b5\u03c1\u03cc<\/th><th>\u03a4\u03b9 \u03b1\u03c0\u03bf\u03c1\u03c1\u03bf\u03c6\u03ac \u03c4\u03b9\u03c2 \u03b4\u03b9\u03b1\u03ba\u03c5\u03bc\u03ac\u03bd\u03c3\u03b5\u03b9\u03c2 \u03c4\u03b7\u03c2 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7\u03c2<\/th><th>\u0392\u03b1\u03c3\u03b9\u03ba\u03cc\u03c2 \u03c3\u03c5\u03bc\u03b2\u03b9\u03b2\u03b1\u03c3\u03bc\u03cc\u03c2<\/th><\/tr><\/thead><tbody><tr><td>\u03a3\u03c4\u03b1\u03b8\u03b5\u03c1\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae<\/td><td>\u03a1\u03c5\u03b8\u03bc\u03cc\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2<\/td><td>\u0391\u03c0\u03cc\u03b8\u03b5\u03bc\u03b1 \u03ae \u03b1\u03bd\u03b5\u03ba\u03c4\u03ad\u03bb\u03b5\u03c3\u03c4\u03b5\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b5\u03c2 \u03c4\u03c9\u03bd \u03bf\u03c0\u03bf\u03af\u03c9\u03bd \u03b7 \u03b5\u03ba\u03ba\u03c1\u03b5\u03bc\u03cc\u03c4\u03b7\u03c4\u03b1 \u03ad\u03c7\u03b5\u03b9 \u03b3\u03af\u03bd\u03b5\u03b9 \u03c1\u03b7\u03c4\u03ac \u03b1\u03c0\u03bf\u03b4\u03b5\u03ba\u03c4\u03ae<\/td><td>\u03a3\u03c4\u03b1\u03b8\u03b5\u03c1\u03ae \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03af\u03b1 \u03ad\u03bd\u03b1\u03bd\u03c4\u03b9 \u03ba\u03cc\u03c3\u03c4\u03bf\u03c5\u03c2 \u03b1\u03c0\u03bf\u03b8\u03ad\u03bc\u03b1\u03c4\u03bf\u03c2 \u03ba\u03b1\u03b9 \u03ba\u03b9\u03bd\u03b4\u03cd\u03bd\u03bf\u03c5 \u03bc\u03b5\u03c4\u03b1\u03b2\u03bf\u03bb\u03ae\u03c2 \u03c4\u03b7\u03c2 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7\u03c2<\/td><\/tr><tr><td>\u03a0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03bf\u03b3\u03ae \u03c3\u03c4\u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7<\/td><td>\u0397 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae \u03b1\u03ba\u03bf\u03bb\u03bf\u03c5\u03b8\u03b5\u03af \u03c3\u03c4\u03b5\u03bd\u03ac \u03c4\u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7 \u03ba\u03ac\u03b8\u03b5 \u03c0\u03b5\u03c1\u03b9\u03cc\u03b4\u03bf\u03c5<\/td><td>\u038f\u03c1\u03b5\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2, \u03c3\u03c4\u03b5\u03bb\u03ad\u03c7\u03c9\u03c3\u03b7 \u03ae \u03ac\u03bb\u03bb\u03b7 \u03b1\u03be\u03b9\u03bf\u03c0\u03bf\u03b9\u03ae\u03c3\u03b9\u03bc\u03b7 \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1<\/td><td>\u039b\u03b9\u03b3\u03cc\u03c4\u03b5\u03c1\u03bf \u03b1\u03c0\u03cc\u03b8\u03b5\u03bc\u03b1 \u03ad\u03bd\u03b1\u03bd\u03c4\u03b9 \u03c4\u03bf\u03c5 \u03ba\u03cc\u03c3\u03c4\u03bf\u03c5\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03b7\u03c2 \u03b4\u03c5\u03c3\u03ba\u03bf\u03bb\u03af\u03b1\u03c2 \u03bc\u03b5\u03c4\u03b1\u03b2\u03bf\u03bb\u03ae\u03c2 \u03c4\u03b7\u03c2 \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1\u03c2<\/td><\/tr><tr><td>\u039c\u03b9\u03ba\u03c4\u03ae<\/td><td>\u0388\u03bd\u03b1\u03c2 \u03b5\u03c0\u03b9\u03bb\u03b5\u03b3\u03bc\u03ad\u03bd\u03bf\u03c2 \u03b2\u03b1\u03c3\u03b9\u03ba\u03cc\u03c2 \u03c1\u03c5\u03b8\u03bc\u03cc\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2, \u03bc\u03b5 \u03b5\u03bb\u03b5\u03b3\u03c7\u03cc\u03bc\u03b5\u03bd\u03b5\u03c2 \u03bc\u03b5\u03c4\u03b1\u03b2\u03bf\u03bb\u03ad\u03c2<\/td><td>\u03a3\u03c5\u03bd\u03b4\u03c5\u03b1\u03c3\u03bc\u03cc\u03c2 \u03b1\u03c0\u03bf\u03b8\u03ad\u03bc\u03b1\u03c4\u03bf\u03c2 \u03ba\u03b1\u03b9 \u03b5\u03c5\u03b5\u03bb\u03b9\u03be\u03af\u03b1\u03c2 \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1\u03c2<\/td><td>\u03a0\u03b9\u03bf \u03c0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03bf\u03c3\u03bc\u03ad\u03bd\u03b7 \u03b1\u03bd\u03c4\u03b9\u03bc\u03b5\u03c4\u03ce\u03c0\u03b9\u03c3\u03b7, \u03bc\u03b5 \u03b1\u03c1\u03ba\u03b5\u03c4\u03bf\u03cd\u03c2 \u03c0\u03b5\u03c1\u03b9\u03bf\u03c1\u03b9\u03c3\u03bc\u03bf\u03cd\u03c2 \u03c0\u03bf\u03c5 \u03c0\u03c1\u03ad\u03c0\u03b5\u03b9 \u03bd\u03b1 \u03bb\u03b7\u03c6\u03b8\u03bf\u03cd\u03bd \u03c5\u03c0\u03cc\u03c8\u03b7 \u03c4\u03b1\u03c5\u03c4\u03cc\u03c7\u03c1\u03bf\u03bd\u03b1<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<h3 class=\"wp-block-heading\">\u03a3\u03c4\u03c1\u03b1\u03c4\u03b7\u03b3\u03b9\u03ba\u03ae \u03c3\u03c4\u03b1\u03b8\u03b5\u03c1\u03ae\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u03c0\u03b1\u03c1\u03ac\u03b3\u03b5\u03c4\u03b5 \u03c0\u03c1\u03b9\u03bd \u03b1\u03c0\u03cc \u03c4\u03b7\u03bd \u03b1\u03b9\u03c7\u03bc\u03ae<\/h3>\n\n\n<p>\u0397 \u03c3\u03c4\u03c1\u03b1\u03c4\u03b7\u03b3\u03b9\u03ba\u03ae \u03c3\u03c4\u03b1\u03b8\u03b5\u03c1\u03ae\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03b4\u03b9\u03b1\u03c4\u03b7\u03c1\u03b5\u03af \u03c3\u03c4\u03b1\u03b8\u03b5\u03c1\u03cc \u03c4\u03bf\u03bd \u03c1\u03c5\u03b8\u03bc\u03cc \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03b5\u03bd\u03ce \u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7 \u03bc\u03b5\u03c4\u03b1\u03b2\u03ac\u03bb\u03bb\u03b5\u03c4\u03b1\u03b9. \u03a3\u03c4\u03b9\u03c2 \u03c0\u03b5\u03c1\u03b9\u03cc\u03b4\u03bf\u03c5\u03c2 \u03c7\u03b1\u03bc\u03b7\u03bb\u03cc\u03c4\u03b5\u03c1\u03b7\u03c2 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7\u03c2, \u03b7 \u03c0\u03bf\u03c3\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03bf\u03c5 \u03c0\u03b1\u03c1\u03ac\u03b3\u03b5\u03c4\u03b1\u03b9 \u03c0\u03ad\u03c1\u03b1 \u03b1\u03c0\u03cc \u03c4\u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7 \u03b3\u03af\u03bd\u03b5\u03c4\u03b1\u03b9 \u03b1\u03c0\u03cc\u03b8\u03b5\u03bc\u03b1. \u03a3\u03c4\u03b7\u03bd \u03b1\u03b9\u03c7\u03bc\u03ae, \u03b1\u03c5\u03c4\u03cc \u03c4\u03bf \u03b1\u03c0\u03cc\u03b8\u03b5\u03bc\u03b1 \u03c3\u03c5\u03bc\u03c0\u03bb\u03b7\u03c1\u03ce\u03bd\u03b5\u03b9 \u03c4\u03b7\u03bd \u03c4\u03c1\u03ad\u03c7\u03bf\u03c5\u03c3\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae.<\/p>\n\n\n<p>\u0397 \u03c0\u03c1\u03bf\u03c3\u03ad\u03b3\u03b3\u03b9\u03c3\u03b7 \u03b1\u03c5\u03c4\u03ae \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03c4\u03b1\u03b9\u03c1\u03b9\u03ac\u03b6\u03b5\u03b9 \u03c3\u03b5 \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03b1 \u03b5\u03c0\u03b1\u03bd\u03b1\u03bb\u03b1\u03bc\u03b2\u03b1\u03bd\u03cc\u03bc\u03b5\u03bd\u03b7\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03bc\u03b5 \u03c0\u03c1\u03bf\u03b2\u03bb\u03ad\u03c8\u03b9\u03bc\u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7, \u03b4\u03b9\u03b1\u03c7\u03b5\u03b9\u03c1\u03af\u03c3\u03b9\u03bc\u03bf \u03ba\u03cc\u03c3\u03c4\u03bf\u03c2 \u03b1\u03c0\u03bf\u03b8\u03ae\u03ba\u03b5\u03c5\u03c3\u03b7\u03c2 \u03ba\u03b1\u03b9 \u03c0\u03c1\u03bf\u03c3\u03c9\u03c0\u03b9\u03ba\u03cc \u03c4\u03bf\u03c5 \u03bf\u03c0\u03bf\u03af\u03bf\u03c5 \u03b1\u03be\u03af\u03b6\u03b5\u03b9 \u03bd\u03b1 \u03b4\u03b9\u03b1\u03c4\u03b7\u03c1\u03b7\u03b8\u03bf\u03cd\u03bd \u03bf\u03b9 \u03b4\u03b5\u03be\u03b9\u03cc\u03c4\u03b7\u03c4\u03b5\u03c2. \u03a0\u03c1\u03bf\u03c3\u03c6\u03ad\u03c1\u03b5\u03b9 \u03c0\u03b9\u03bf \u03c3\u03c4\u03b1\u03b8\u03b5\u03c1\u03cc \u03c6\u03cc\u03c1\u03c4\u03bf \u03c3\u03c4\u03b9\u03c2 \u03c0\u03c1\u03bf\u03bc\u03ae\u03b8\u03b5\u03b9\u03b5\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae \u03ba\u03b1\u03b9 \u03bc\u03b5\u03b9\u03ce\u03bd\u03b5\u03b9 \u03c4\u03b7\u03bd \u03b1\u03bd\u03ac\u03b3\u03ba\u03b7 \u03b3\u03b9\u03b1 \u03b1\u03c0\u03cc\u03c4\u03bf\u03bc\u03b7 \u03b1\u03cd\u03be\u03b7\u03c3\u03b7 \u03c4\u03b7\u03c2 \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1\u03c2 \u03b3\u03b9\u03b1 \u03bc\u03b9\u03b1 \u03c3\u03cd\u03bd\u03c4\u03bf\u03bc\u03b7 \u03b5\u03c0\u03bf\u03c7\u03b9\u03ba\u03ae \u03b1\u03b9\u03c7\u03bc\u03ae.<\/p>\n\n\n<p>\u03a4\u03bf \u03c4\u03af\u03bc\u03b7\u03bc\u03b1 \u03b5\u03af\u03bd\u03b1\u03b9 \u03cc\u03c4\u03b9 \u03bf\u03b9 \u03b4\u03b1\u03c0\u03ac\u03bd\u03b5\u03c2 \u03b3\u03af\u03bd\u03bf\u03bd\u03c4\u03b1\u03b9 \u03bd\u03c9\u03c1\u03af\u03c4\u03b5\u03c1\u03b1 \u03ba\u03b1\u03b9 \u03b1\u03bd\u03b1\u03bb\u03b1\u03bc\u03b2\u03ac\u03bd\u03b5\u03c4\u03b5 \u03c4\u03bf\u03bd \u03ba\u03af\u03bd\u03b4\u03c5\u03bd\u03bf \u03c4\u03bf\u03c5 \u03b1\u03c0\u03bf\u03b8\u03ad\u03bc\u03b1\u03c4\u03bf\u03c2. \u03a5\u03bb\u03b9\u03ba\u03ac, \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1 \u03ba\u03b1\u03b9 \u03b1\u03c0\u03bf\u03b8\u03b7\u03ba\u03b5\u03c5\u03c4\u03b9\u03ba\u03cc\u03c2 \u03c7\u03ce\u03c1\u03bf\u03c2 \u03b4\u03b5\u03c3\u03bc\u03b5\u03cd\u03bf\u03bd\u03c4\u03b1\u03b9 \u03c0\u03c1\u03b9\u03bd \u03b1\u03c0\u03cc \u03c4\u03b7\u03bd \u03c0\u03ce\u03bb\u03b7\u03c3\u03b7. \u0391\u03bd \u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7 \u03bc\u03b5\u03b9\u03c9\u03b8\u03b5\u03af \u03ae \u03b1\u03bb\u03bb\u03ac\u03be\u03b5\u03b9 \u03ba\u03ac\u03c0\u03bf\u03b9\u03b1 \u03c0\u03c1\u03bf\u03b4\u03b9\u03b1\u03b3\u03c1\u03b1\u03c6\u03ae, \u03c4\u03bf \u03b1\u03c0\u03cc\u03b8\u03b5\u03bc\u03b1 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03bc\u03b7\u03bd \u03b5\u03af\u03bd\u03b1\u03b9 \u03c0\u03bb\u03ad\u03bf\u03bd \u03b1\u03be\u03b9\u03bf\u03c0\u03bf\u03b9\u03ae\u03c3\u03b9\u03bc\u03bf. \u03a4\u03b1 \u03b5\u03c5\u03c0\u03b1\u03b8\u03ae \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03b1 \u03ba\u03b1\u03b9 \u03bf\u03b9 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b5\u03c2 \u03bc\u03b5 \u03c5\u03c8\u03b7\u03bb\u03cc \u03b2\u03b1\u03b8\u03bc\u03cc \u03b5\u03be\u03b1\u03c4\u03bf\u03bc\u03af\u03ba\u03b5\u03c5\u03c3\u03b7\u03c2 \u03b1\u03c6\u03ae\u03bd\u03bf\u03c5\u03bd \u03c0\u03bf\u03bb\u03cd \u03bc\u03b9\u03ba\u03c1\u03cc\u03c4\u03b5\u03c1\u03b1 \u03c0\u03b5\u03c1\u03b9\u03b8\u03ce\u03c1\u03b9\u03b1 \u03b3\u03b9\u03b1 \u03b1\u03c5\u03c4\u03ae \u03c4\u03b7\u03bd \u03c0\u03c1\u03bf\u03c3\u03ad\u03b3\u03b3\u03b9\u03c3\u03b7.<\/p>\n\n\n<p>\u038c\u03c4\u03b1\u03bd \u03b4\u03b5\u03bd \u03b5\u03af\u03bd\u03b1\u03b9 \u03b4\u03c5\u03bd\u03b1\u03c4\u03ae \u03b7 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae \u03b5\u03ba \u03c4\u03c9\u03bd \u03c0\u03c1\u03bf\u03c4\u03ad\u03c1\u03c9\u03bd, \u03ad\u03bd\u03b1\u03c2 \u03c3\u03c4\u03b1\u03b8\u03b5\u03c1\u03cc\u03c2 \u03c1\u03c5\u03b8\u03bc\u03cc\u03c2 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03b1\u03bd\u03c4\u03af \u03b3\u03b9\u2019 \u03b1\u03c5\u03c4\u03cc \u03bd\u03b1 \u03b4\u03b7\u03bc\u03b9\u03bf\u03c5\u03c1\u03b3\u03ae\u03c3\u03b5\u03b9 \u03b1\u03bd\u03b5\u03ba\u03c4\u03ad\u03bb\u03b5\u03c3\u03c4\u03b5\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b5\u03c2 \u03c3\u03c4\u03b9\u03c2 \u03b1\u03b9\u03c7\u03bc\u03ad\u03c2. \u03a0\u03c1\u03cc\u03ba\u03b5\u03b9\u03c4\u03b1\u03b9 \u03b3\u03b9\u03b1 \u03b1\u03c0\u03cc\u03c6\u03b1\u03c3\u03b7 \u03b5\u03be\u03c5\u03c0\u03b7\u03c1\u03ad\u03c4\u03b7\u03c3\u03b7\u03c2 \u03c0\u03bf\u03c5 \u03c0\u03c1\u03bf\u03cb\u03c0\u03bf\u03b8\u03ad\u03c4\u03b5\u03b9 \u03b1\u03c0\u03bf\u03b4\u03b5\u03ba\u03c4\u03ac lead time, \u03cc\u03c7\u03b9 \u03b3\u03b9\u03b1 \u03c5\u03c0\u03bf\u03ba\u03b1\u03c4\u03ac\u03c3\u03c4\u03b1\u03c4\u03bf \u03c4\u03bf\u03c5 \u03b1\u03c0\u03bf\u03b8\u03ad\u03bc\u03b1\u03c4\u03bf\u03c2 \u03c7\u03c9\u03c1\u03af\u03c2 \u03ba\u03cc\u03c3\u03c4\u03bf\u03c2. \u039e\u03b5\u03c7\u03c9\u03c1\u03af\u03c3\u03c4\u03b5 \u03b5\u03c0\u03af\u03c3\u03b7\u03c2 \u03c4\u03b7 \u03c3\u03c4\u03b1\u03b8\u03b5\u03c1\u03ae \u03c3\u03c4\u03b5\u03bb\u03ad\u03c7\u03c9\u03c3\u03b7 \u03b1\u03c0\u03cc \u03c4\u03bf\u03bd \u03c3\u03c4\u03b1\u03b8\u03b5\u03c1\u03cc \u03c1\u03c5\u03b8\u03bc\u03cc \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u03b7 \u03bc\u03b5\u03c4\u03b1\u03b2\u03bf\u03bb\u03ae \u03c4\u03c9\u03bd \u03c5\u03c0\u03b5\u03c1\u03c9\u03c1\u03b9\u03ce\u03bd \u03b1\u03bb\u03bb\u03ac\u03b6\u03b5\u03b9 \u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03cc\u03bc\u03b5\u03bd\u03b7 \u03c0\u03bf\u03c3\u03cc\u03c4\u03b7\u03c4\u03b1, \u03b1\u03ba\u03cc\u03bc\u03b7 \u03ba\u03b9 \u03b1\u03bd \u03bf \u03b1\u03c1\u03b9\u03b8\u03bc\u03cc\u03c2 \u03c4\u03c9\u03bd \u03b5\u03c1\u03b3\u03b1\u03b6\u03bf\u03bc\u03ad\u03bd\u03c9\u03bd \u03c0\u03b1\u03c1\u03b1\u03bc\u03ad\u03bd\u03b5\u03b9 \u03af\u03b4\u03b9\u03bf\u03c2.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\u03a3\u03c4\u03c1\u03b1\u03c4\u03b7\u03b3\u03b9\u03ba\u03ae \u03c0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03bf\u03b3\u03ae\u03c2 \u03c3\u03c4\u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7: \u03b1\u03c5\u03be\u03bf\u03bc\u03b5\u03b9\u03ce\u03c3\u03c4\u03b5 \u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae \u03b1\u03bd\u03ac\u03bb\u03bf\u03b3\u03b1 \u03bc\u03b5 \u03c4\u03b9\u03c2 \u03b1\u03bd\u03ac\u03b3\u03ba\u03b5\u03c2<\/h3>\n\n\n<p>\u0397 \u03c3\u03c4\u03c1\u03b1\u03c4\u03b7\u03b3\u03b9\u03ba\u03ae \u03c0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03bf\u03b3\u03ae\u03c2 \u03c3\u03c4\u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7 \u03b1\u03c5\u03be\u03ac\u03bd\u03b5\u03b9 \u03ba\u03b1\u03b9 \u03bc\u03b5\u03b9\u03ce\u03bd\u03b5\u03b9 \u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae \u03ce\u03c3\u03c4\u03b5 \u03bd\u03b1 \u03ba\u03b1\u03bb\u03cd\u03c0\u03c4\u03b5\u03b9 \u03c4\u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7 \u03ba\u03ac\u03b8\u03b5 \u03c0\u03b5\u03c1\u03b9\u03cc\u03b4\u03bf\u03c5. \u039f\u03b9 \u03c0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03bf\u03b3\u03ad\u03c2 \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1\u03c2 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03c0\u03b5\u03c1\u03b9\u03bb\u03b1\u03bc\u03b2\u03ac\u03bd\u03bf\u03c5\u03bd \u03c5\u03c0\u03b5\u03c1\u03c9\u03c1\u03af\u03b5\u03c2, \u03c0\u03c1\u03cc\u03c3\u03b8\u03b5\u03c4\u03b5\u03c2 \u03b2\u03ac\u03c1\u03b4\u03b9\u03b5\u03c2, \u03ad\u03ba\u03c4\u03b1\u03ba\u03c4\u03bf \u03c0\u03c1\u03bf\u03c3\u03c9\u03c0\u03b9\u03ba\u03cc \u03ae \u03c5\u03c0\u03b5\u03c1\u03b3\u03bf\u03bb\u03b1\u03b2\u03af\u03b1. \u039f\u03b9 \u03c0\u03c1\u03bf\u03c3\u03bb\u03ae\u03c8\u03b5\u03b9\u03c2 \u03ba\u03b1\u03b9 \u03bf\u03b9 \u03b1\u03c0\u03bf\u03bb\u03cd\u03c3\u03b5\u03b9\u03c2 \u03b5\u03af\u03bd\u03b1\u03b9 \u03c0\u03b9\u03b8\u03b1\u03bd\u03bf\u03af \u03bc\u03bf\u03c7\u03bb\u03bf\u03af \u03c0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03bf\u03b3\u03ae\u03c2, \u03b1\u03bb\u03bb\u03ac \u03b4\u03b5\u03bd \u03b5\u03af\u03bd\u03b1\u03b9 \u03bf \u03bc\u03cc\u03bd\u03bf\u03c2 \u03c4\u03c1\u03cc\u03c0\u03bf\u03c2 \u03bd\u03b1 \u03b1\u03ba\u03bf\u03bb\u03bf\u03c5\u03b8\u03ae\u03c3\u03b5\u03b9 \u03b7 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae \u03c4\u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7.<\/p>\n\n\n<p>\u03a4\u03bf \u03c0\u03bb\u03b5\u03bf\u03bd\u03ad\u03ba\u03c4\u03b7\u03bc\u03b1 \u03b5\u03af\u03bd\u03b1\u03b9 \u03bf \u03bc\u03b9\u03ba\u03c1\u03cc\u03c4\u03b5\u03c1\u03bf\u03c2 \u03ba\u03af\u03bd\u03b4\u03c5\u03bd\u03bf\u03c2 \u03c0\u03bf\u03c5 \u03c3\u03c5\u03bd\u03b4\u03ad\u03b5\u03c4\u03b1\u03b9 \u03bc\u03b5 \u03c4\u03bf \u03b1\u03c0\u03cc\u03b8\u03b5\u03bc\u03b1. \u0391\u03c0\u03bf\u03c6\u03b5\u03cd\u03b3\u03b5\u03c4\u03b5 \u03bd\u03b1 \u03c0\u03b1\u03c1\u03ac\u03b3\u03b5\u03c4\u03b5 \u03bc\u03b5\u03b3\u03ac\u03bb\u03b5\u03c2 \u03c0\u03bf\u03c3\u03cc\u03c4\u03b7\u03c4\u03b5\u03c2 \u03bc\u03cc\u03bd\u03bf \u03ba\u03b1\u03b9 \u03bc\u03cc\u03bd\u03bf \u03b5\u03c0\u03b5\u03b9\u03b4\u03ae \u03bc\u03b9\u03b1 \u03c0\u03c1\u03cc\u03b2\u03bb\u03b5\u03c8\u03b7 \u03b4\u03b5\u03af\u03c7\u03bd\u03b5\u03b9 \u03cc\u03c4\u03b9 \u03b8\u03b1 \u03c0\u03bf\u03c5\u03bb\u03b7\u03b8\u03bf\u03cd\u03bd \u03b1\u03c1\u03b3\u03cc\u03c4\u03b5\u03c1\u03b1. \u0391\u03c5\u03c4\u03cc \u03ad\u03c7\u03b5\u03b9 \u03c3\u03b7\u03bc\u03b1\u03c3\u03af\u03b1 \u03cc\u03c4\u03b1\u03bd \u03b7 \u03b1\u03c0\u03bf\u03b8\u03ae\u03ba\u03b5\u03c5\u03c3\u03b7 \u03c4\u03c9\u03bd \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03c9\u03bd \u03b4\u03b5\u03bd \u03b5\u03af\u03bd\u03b1\u03b9 \u03bf\u03b9\u03ba\u03bf\u03bd\u03bf\u03bc\u03b9\u03ba\u03ac \u03c3\u03c5\u03bc\u03c6\u03ad\u03c1\u03bf\u03c5\u03c3\u03b1 \u03ae \u03bf\u03b9 \u03c0\u03c1\u03bf\u03b4\u03b9\u03b1\u03b3\u03c1\u03b1\u03c6\u03ad\u03c2 \u03c4\u03bf\u03c5 \u03c0\u03b5\u03bb\u03ac\u03c4\u03b7 \u03b4\u03b5\u03bd \u03b5\u03af\u03bd\u03b1\u03b9 \u03b3\u03bd\u03c9\u03c3\u03c4\u03ad\u03c2 \u03b1\u03c1\u03ba\u03b5\u03c4\u03ac \u03bd\u03c9\u03c1\u03af\u03c2.<\/p>\n\n\n<p>\u0397 \u03b4\u03c5\u03c3\u03ba\u03bf\u03bb\u03af\u03b1 \u03b5\u03af\u03bd\u03b1\u03b9 \u03bd\u03b1 \u03b5\u03be\u03b1\u03c3\u03c6\u03b1\u03bb\u03af\u03c3\u03b5\u03c4\u03b5 \u03c4\u03b7\u03bd \u03c0\u03c1\u03cc\u03c3\u03b8\u03b5\u03c4\u03b7 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae \u03c4\u03b7 \u03c3\u03c4\u03b9\u03b3\u03bc\u03ae \u03c0\u03bf\u03c5 \u03c7\u03c1\u03b5\u03b9\u03ac\u03b6\u03b5\u03c4\u03b1\u03b9. \u0397 \u03c0\u03c1\u03cc\u03c3\u03bb\u03b7\u03c8\u03b7 \u03ae \u03b7 \u03b5\u03ba\u03c0\u03b1\u03af\u03b4\u03b5\u03c5\u03c3\u03b7 \u03b5\u03be\u03b5\u03b9\u03b4\u03b9\u03ba\u03b5\u03c5\u03bc\u03ad\u03bd\u03c9\u03bd \u03c7\u03b5\u03b9\u03c1\u03b9\u03c3\u03c4\u03ce\u03bd \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03b1\u03c0\u03b1\u03b9\u03c4\u03ae\u03c3\u03b5\u03b9 \u03bc\u03ae\u03bd\u03b5\u03c2. \u039c\u03b9\u03b1 \u03c0\u03c1\u03cc\u03c3\u03b8\u03b5\u03c4\u03b7 \u03b2\u03ac\u03c1\u03b4\u03b9\u03b1 \u03c7\u03c1\u03b5\u03b9\u03ac\u03b6\u03b5\u03c4\u03b1\u03b9 \u03b1\u03bd\u03b8\u03c1\u03ce\u03c0\u03bf\u03c5\u03c2, \u03bc\u03b7\u03c7\u03b1\u03bd\u03ad\u03c2, \u03c5\u03bb\u03b9\u03ba\u03ac \u03ba\u03b1\u03b9 \u03c5\u03c0\u03bf\u03c3\u03c4\u03b7\u03c1\u03b9\u03ba\u03c4\u03b9\u03ba\u03ad\u03c2 \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03af\u03b5\u03c2, \u03cc\u03c7\u03b9 \u03b1\u03c0\u03bb\u03ce\u03c2 \u03ad\u03bd\u03b1\u03bd \u03bc\u03b5\u03b3\u03b1\u03bb\u03cd\u03c4\u03b5\u03c1\u03bf \u03b1\u03c1\u03b9\u03b8\u03bc\u03cc \u03c3\u03c4\u03bf \u03c0\u03bb\u03ac\u03bd\u03bf \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1\u03c2. \u039f\u03b9 \u03c0\u03c1\u03bf\u03bc\u03b7\u03b8\u03b5\u03c5\u03c4\u03ad\u03c2 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03b1\u03bd\u03c4\u03b9\u03bc\u03b5\u03c4\u03c9\u03c0\u03af\u03b6\u03bf\u03c5\u03bd \u03c4\u03b7\u03bd \u03af\u03b4\u03b9\u03b1 \u03b5\u03c0\u03bf\u03c7\u03b9\u03ba\u03ae \u03b1\u03b9\u03c7\u03bc\u03ae \u03bc\u03b5 \u03b5\u03c3\u03ac\u03c2.<\/p>\n\n\n<p>\u0391\u03bd\u03c4\u03b9\u03bc\u03b5\u03c4\u03c9\u03c0\u03af\u03c3\u03c4\u03b5 \u03c4\u03b7\u03bd \u03b5\u03c5\u03b5\u03bb\u03b9\u03be\u03af\u03b1 \u03c9\u03c2 \u03c0\u03cc\u03c1\u03bf \u03bc\u03b5 \u03cc\u03c1\u03b9\u03bf \u03ba\u03b1\u03b9 lead time. \u0388\u03bd\u03b1 \u03c0\u03bb\u03ac\u03bd\u03bf \u03c0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03bf\u03b3\u03ae\u03c2 \u03c3\u03c4\u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7 \u03c0\u03bf\u03c5 \u03b1\u03c0\u03b1\u03b9\u03c4\u03b5\u03af \u03c5\u03c0\u03b5\u03c1\u03c9\u03c1\u03af\u03b5\u03c2 \u03bf\u03b9 \u03bf\u03c0\u03bf\u03af\u03b5\u03c2 \u03b4\u03b5\u03bd \u03b5\u03af\u03bd\u03b1\u03b9 \u03b4\u03b9\u03b1\u03b8\u03ad\u03c3\u03b9\u03bc\u03b5\u03c2 \u03b4\u03b5\u03bd \u03b1\u03c0\u03bf\u03c4\u03b5\u03bb\u03b5\u03af \u03bb\u03cd\u03c3\u03b7 \u03c7\u03b1\u03bc\u03b7\u03bb\u03bf\u03cd \u03b1\u03c0\u03bf\u03b8\u03ad\u03bc\u03b1\u03c4\u03bf\u03c2\u00b7 \u03b5\u03af\u03bd\u03b1\u03b9 \u03ad\u03bd\u03b1 \u03c0\u03bb\u03ac\u03bd\u03bf \u03c0\u03bf\u03c5 \u03b1\u03c6\u03ae\u03bd\u03b5\u03b9 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7 \u03b1\u03ba\u03ac\u03bb\u03c5\u03c0\u03c4\u03b7.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\u039c\u03b9\u03ba\u03c4\u03ae \u03c3\u03c4\u03c1\u03b1\u03c4\u03b7\u03b3\u03b9\u03ba\u03ae: \u03b1\u03c0\u03bf\u03c6\u03b1\u03c3\u03af\u03c3\u03c4\u03b5 \u03c0\u03cc\u03c3\u03bf \u03b8\u03b1 \u03c3\u03c5\u03bd\u03b5\u03b9\u03c3\u03c6\u03ad\u03c1\u03b5\u03b9 \u03ba\u03ac\u03b8\u03b5 \u03bc\u03b7\u03c7\u03b1\u03bd\u03b9\u03c3\u03bc\u03cc\u03c2 \u03ba\u03ac\u03bb\u03c5\u03c8\u03b7\u03c2<\/h3>\n\n\n<p>\u0397 \u03bc\u03b9\u03ba\u03c4\u03ae \u03c3\u03c4\u03c1\u03b1\u03c4\u03b7\u03b3\u03b9\u03ba\u03ae \u03c3\u03c5\u03bd\u03b4\u03c5\u03ac\u03b6\u03b5\u03b9 \u03bc\u03b9\u03b1 \u03c3\u03c4\u03b1\u03b8\u03b5\u03c1\u03ae \u03b2\u03ac\u03c3\u03b7 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03bc\u03b5 \u03b5\u03c0\u03b9\u03bb\u03b5\u03b3\u03bc\u03ad\u03bd\u03b5\u03c2 \u03bc\u03b5\u03c4\u03b1\u03b2\u03bf\u03bb\u03ad\u03c2 \u03c3\u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03cc\u03bc\u03b5\u03bd\u03b7 \u03c0\u03bf\u03c3\u03cc\u03c4\u03b7\u03c4\u03b1. \u039c\u03c0\u03bf\u03c1\u03b5\u03af\u03c4\u03b5, \u03b3\u03b9\u03b1 \u03c0\u03b1\u03c1\u03ac\u03b4\u03b5\u03b9\u03b3\u03bc\u03b1, \u03bd\u03b1 \u03b4\u03b7\u03bc\u03b9\u03bf\u03c5\u03c1\u03b3\u03ae\u03c3\u03b5\u03c4\u03b5 \u03ba\u03ac\u03c0\u03bf\u03b9\u03bf \u03b1\u03c0\u03cc\u03b8\u03b5\u03bc\u03b1 \u03c0\u03c1\u03b9\u03bd \u03b1\u03c0\u03cc \u03c4\u03b7\u03bd \u03b1\u03b9\u03c7\u03bc\u03ae \u03ba\u03b1\u03b9 \u03c3\u03c4\u03b7 \u03c3\u03c5\u03bd\u03ad\u03c7\u03b5\u03b9\u03b1 \u03bd\u03b1 \u03ba\u03b1\u03bb\u03cd\u03c8\u03b5\u03c4\u03b5 \u03c4\u03b7\u03bd \u03c5\u03c0\u03cc\u03bb\u03bf\u03b9\u03c0\u03b7 \u03b1\u03cd\u03be\u03b7\u03c3\u03b7 \u03bc\u03b5 \u03b5\u03b3\u03ba\u03b5\u03ba\u03c1\u03b9\u03bc\u03ad\u03bd\u03b5\u03c2 \u03c5\u03c0\u03b5\u03c1\u03c9\u03c1\u03af\u03b5\u03c2 \u03ae \u03c5\u03c0\u03b5\u03c1\u03b3\u03bf\u03bb\u03b1\u03b2\u03af\u03b1.<\/p>\n\n\n<p>\u0395\u03af\u03bd\u03b1\u03b9 \u03c7\u03c1\u03ae\u03c3\u03b9\u03bc\u03b7 \u03cc\u03c4\u03b1\u03bd \u03ba\u03b1\u03bc\u03af\u03b1 \u03b1\u03c0\u03cc \u03c4\u03b9\u03c2 \u03b4\u03cd\u03bf \u03b1\u03ba\u03c1\u03b1\u03af\u03b5\u03c2 \u03b5\u03c0\u03b9\u03bb\u03bf\u03b3\u03ad\u03c2 \u03b4\u03b5\u03bd \u03c4\u03b1\u03b9\u03c1\u03b9\u03ac\u03b6\u03b5\u03b9. \u039f \u03b1\u03c0\u03bf\u03b8\u03b7\u03ba\u03b5\u03c5\u03c4\u03b9\u03ba\u03cc\u03c2 \u03c7\u03ce\u03c1\u03bf\u03c2 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03b5\u03af\u03bd\u03b1\u03b9 \u03c0\u03b5\u03c1\u03b9\u03bf\u03c1\u03b9\u03c3\u03bc\u03ad\u03bd\u03bf\u03c2, \u03b5\u03bd\u03ce \u03c4\u03bf \u03c0\u03c1\u03bf\u03c3\u03c9\u03c0\u03b9\u03ba\u03cc \u03b4\u03b5\u03bd \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03b1\u03c5\u03be\u03b7\u03b8\u03b5\u03af \u03b1\u03c1\u03ba\u03b5\u03c4\u03ac \u03ce\u03c3\u03c4\u03b5 \u03bd\u03b1 \u03ba\u03b1\u03bb\u03cd\u03c8\u03b5\u03b9 \u03bf\u03bb\u03cc\u03ba\u03bb\u03b7\u03c1\u03b7 \u03c4\u03b7\u03bd \u03b1\u03b9\u03c7\u03bc\u03ae. \u03a4\u03bf \u03b5\u03c1\u03ce\u03c4\u03b7\u03bc\u03b1 \u03b3\u03af\u03bd\u03b5\u03c4\u03b1\u03b9 \u03c0\u03b9\u03bf \u03c3\u03c5\u03b3\u03ba\u03b5\u03ba\u03c1\u03b9\u03bc\u03ad\u03bd\u03bf: \u03c0\u03cc\u03c3\u03bf \u03b1\u03c0\u03cc\u03b8\u03b5\u03bc\u03b1 \u03b1\u03be\u03af\u03b6\u03b5\u03b9 \u03bd\u03b1 \u03b4\u03b9\u03b1\u03c4\u03b7\u03c1\u03b5\u03af\u03c4\u03b5 \u03ba\u03b1\u03b9 \u03c0\u03cc\u03c3\u03b7 \u03c0\u03c1\u03cc\u03c3\u03b8\u03b5\u03c4\u03b7 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae \u03bc\u03c0\u03bf\u03c1\u03b5\u03af\u03c4\u03b5 \u03bd\u03b1 \u03b5\u03be\u03b1\u03c3\u03c6\u03b1\u03bb\u03af\u03c3\u03b5\u03c4\u03b5 \u03bc\u03b5 \u03b1\u03be\u03b9\u03bf\u03c0\u03b9\u03c3\u03c4\u03af\u03b1;<\/p>\n\n\n<p>\u0397 \u03bc\u03b9\u03ba\u03c4\u03ae \u03c3\u03c4\u03c1\u03b1\u03c4\u03b7\u03b3\u03b9\u03ba\u03ae \u03b4\u03b5\u03bd \u03b5\u03af\u03bd\u03b1\u03b9 \u03b1\u03c5\u03c4\u03bf\u03bc\u03ac\u03c4\u03c9\u03c2 \u03b7 \u03c6\u03b8\u03b7\u03bd\u03cc\u03c4\u03b5\u03c1\u03b7. \u03a3\u03b1\u03c2 \u03b5\u03c0\u03b9\u03c4\u03c1\u03ad\u03c0\u03b5\u03b9 \u03bd\u03b1 \u03c3\u03c5\u03b3\u03ba\u03c1\u03af\u03bd\u03b5\u03c4\u03b5 \u03ad\u03bd\u03b1\u03bd \u03c0\u03b9\u03bf \u03ba\u03b1\u03c4\u03ac\u03bb\u03bb\u03b7\u03bb\u03bf \u03c3\u03c5\u03bd\u03b4\u03c5\u03b1\u03c3\u03bc\u03cc \u03bc\u03b5 \u03c4\u03b9\u03c2 \u03b5\u03bd\u03b1\u03bb\u03bb\u03b1\u03ba\u03c4\u03b9\u03ba\u03ad\u03c2, \u03b3\u03b9\u03b1 \u03c4\u03b7\u03bd \u03af\u03b4\u03b9\u03b1 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7, \u03c4\u03b9\u03c2 \u03af\u03b4\u03b9\u03b5\u03c2 \u03c0\u03c1\u03bf\u03c3\u03b4\u03bf\u03ba\u03af\u03b5\u03c2 \u03b5\u03be\u03c5\u03c0\u03b7\u03c1\u03ad\u03c4\u03b7\u03c3\u03b7\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03bf\u03bd \u03af\u03b4\u03b9\u03bf \u03c3\u03c4\u03cc\u03c7\u03bf \u03c4\u03b5\u03bb\u03b9\u03ba\u03bf\u03cd \u03b1\u03c0\u03bf\u03b8\u03ad\u03bc\u03b1\u03c4\u03bf\u03c2.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u03a0\u03b1\u03c1\u03ac\u03b4\u03b5\u03b9\u03b3\u03bc\u03b1 \u03c3\u03c5\u03b3\u03ba\u03b5\u03bd\u03c4\u03c1\u03c9\u03c4\u03b9\u03ba\u03bf\u03cd \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03bf\u03cd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u03c0\u03ce\u03c2 \u03ba\u03b1\u03bb\u03cd\u03c0\u03c4\u03b5\u03c4\u03b1\u03b9 \u03b7 \u03b1\u03b9\u03c7\u03bc\u03ae;<\/h2>\n\n\n<p>\u03a6\u03b1\u03bd\u03c4\u03b1\u03c3\u03c4\u03b5\u03af\u03c4\u03b5 \u03ad\u03bd\u03b1\u03bd \u03ba\u03b1\u03c4\u03b1\u03c3\u03ba\u03b5\u03c5\u03b1\u03c3\u03c4\u03ae \u03c0\u03bf\u03c5 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03af\u03b6\u03b5\u03b9 \u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae \u03bc\u03b9\u03b1\u03c2 \u03bf\u03b9\u03ba\u03bf\u03b3\u03ad\u03bd\u03b5\u03b9\u03b1\u03c2 \u03c4\u03c5\u03c0\u03bf\u03c0\u03bf\u03b9\u03b7\u03bc\u03ad\u03bd\u03c9\u03bd \u03c0\u03b5\u03c1\u03b9\u03b2\u03bb\u03b7\u03bc\u03ac\u03c4\u03c9\u03bd. \u0397 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7 \u03b5\u03af\u03bd\u03b1\u03b9 <strong>800 \u03c4\u03b5\u03bc\u03ac\u03c7\u03b9\u03b1 \u03c3\u03c4\u03b7\u03bd \u03a0\u03b5\u03c1\u03af\u03bf\u03b4\u03bf 1, 1.200 \u03c3\u03c4\u03b7\u03bd \u03a0\u03b5\u03c1\u03af\u03bf\u03b4\u03bf 2 \u03ba\u03b1\u03b9 1.600 \u03c3\u03c4\u03b7\u03bd \u03a0\u03b5\u03c1\u03af\u03bf\u03b4\u03bf 3<\/strong>. \u039f\u03b9 \u03c0\u03b5\u03c1\u03af\u03bf\u03b4\u03bf\u03b9 \u03ad\u03c7\u03bf\u03c5\u03bd \u03af\u03c3\u03bf \u03c7\u03c1\u03cc\u03bd\u03bf \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2 \u03ba\u03b1\u03b9 \u03b7 \u03ba\u03b1\u03bd\u03bf\u03bd\u03b9\u03ba\u03ae \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03b5\u03af\u03bd\u03b1\u03b9 1.200 \u03c4\u03b5\u03bc\u03ac\u03c7\u03b9\u03b1 \u03b1\u03bd\u03ac \u03c0\u03b5\u03c1\u03af\u03bf\u03b4\u03bf.<\/p>\n\n\n<p>\u0391\u03c2 \u03c5\u03c0\u03bf\u03b8\u03ad\u03c3\u03bf\u03c5\u03bc\u03b5 \u03cc\u03c4\u03b9 \u03c4\u03bf \u03b1\u03c1\u03c7\u03b9\u03ba\u03cc \u03b1\u03c0\u03cc\u03b8\u03b5\u03bc\u03b1 \u03b5\u03af\u03bd\u03b1\u03b9 \u03bc\u03b7\u03b4\u03b5\u03bd\u03b9\u03ba\u03cc, \u03b4\u03b5\u03bd \u03c5\u03c0\u03ac\u03c1\u03c7\u03bf\u03c5\u03bd \u03b1\u03c0\u03bf\u03c1\u03c1\u03af\u03c8\u03b5\u03b9\u03c2 \u03ae \u03b1\u03bd\u03b5\u03ba\u03c4\u03ad\u03bb\u03b5\u03c3\u03c4\u03b5\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b5\u03c2 \u03ba\u03b1\u03b9 \u03bf \u03c3\u03c4\u03cc\u03c7\u03bf\u03c2 \u03b5\u03af\u03bd\u03b1\u03b9 \u03bc\u03b7\u03b4\u03b5\u03bd\u03b9\u03ba\u03cc \u03c4\u03b5\u03bb\u03b9\u03ba\u03cc \u03b1\u03c0\u03cc\u03b8\u03b5\u03bc\u03b1 \u03bc\u03b5\u03c4\u03ac \u03c4\u03b7\u03bd \u03a0\u03b5\u03c1\u03af\u03bf\u03b4\u03bf 3. \u03a4\u03b1 \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03b1 \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03bd\u03b1 \u03b1\u03c0\u03bf\u03b8\u03b7\u03ba\u03b5\u03c5\u03c4\u03bf\u03cd\u03bd. \u0398\u03b5\u03c9\u03c1\u03bf\u03cd\u03bc\u03b5 \u03cc\u03c4\u03b9 \u03b7 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae \u03ba\u03ac\u03b8\u03b5 \u03c0\u03b5\u03c1\u03b9\u03cc\u03b4\u03bf\u03c5 \u03b5\u03af\u03bd\u03b1\u03b9 \u03b4\u03b9\u03b1\u03b8\u03ad\u03c3\u03b9\u03bc\u03b7 \u03b5\u03b3\u03ba\u03b1\u03af\u03c1\u03c9\u03c2 \u03b3\u03b9\u03b1 \u03c4\u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7 \u03c0\u03bf\u03c5 \u03ba\u03b1\u03bb\u03cd\u03c0\u03c4\u03b5\u03b9\u00b7 \u03b1\u03c5\u03c4\u03ae \u03b7 \u03b1\u03c0\u03bb\u03bf\u03c5\u03c3\u03c4\u03b5\u03c5\u03bc\u03ad\u03bd\u03b7 \u03c3\u03cd\u03b3\u03ba\u03c1\u03b9\u03c3\u03b7 \u03b4\u03b5\u03bd \u03c0\u03c1\u03bf\u03c3\u03b4\u03b9\u03bf\u03c1\u03af\u03b6\u03b5\u03b9 \u03c4\u03b9\u03c2 \u03c3\u03c5\u03b3\u03ba\u03b5\u03ba\u03c1\u03b9\u03bc\u03ad\u03bd\u03b5\u03c2 \u03b7\u03bc\u03ad\u03c1\u03b5\u03c2 \u03c0\u03b1\u03c1\u03ac\u03b4\u03bf\u03c3\u03b7\u03c2.<\/p>\n\n\n<p>\u039a\u03b1\u03b9 \u03bf\u03b9 \u03c4\u03c1\u03b5\u03b9\u03c2 \u03c0\u03bf\u03bb\u03b9\u03c4\u03b9\u03ba\u03ad\u03c2 \u03c0\u03b1\u03c1\u03ac\u03b3\u03bf\u03c5\u03bd \u03c4\u03b7\u03bd \u03af\u03b4\u03b9\u03b1 \u03c3\u03c5\u03bd\u03bf\u03bb\u03b9\u03ba\u03ae \u03c0\u03bf\u03c3\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c4\u03c9\u03bd <strong>3.600 \u03c4\u03b5\u03bc\u03b1\u03c7\u03af\u03c9\u03bd<\/strong>:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\u03a0\u03bf\u03bb\u03b9\u03c4\u03b9\u03ba\u03ae<\/th><th>\u03a0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae \u03c3\u03c4\u03b9\u03c2 \u03a0\u03b5\u03c1\u03b9\u03cc\u03b4\u03bf\u03c5\u03c2 1 \/ 2 \/ 3<\/th><th>\u0391\u03c0\u03cc\u03b8\u03b5\u03bc\u03b1 \u03c3\u03c4\u03bf \u03c4\u03ad\u03bb\u03bf\u03c2 \u03c4\u03c9\u03bd \u03a0\u03b5\u03c1\u03b9\u03cc\u03b4\u03c9\u03bd 1 \/ 2 \/ 3<\/th><th>\u03a4\u03b9 \u03c0\u03c1\u03ad\u03c0\u03b5\u03b9 \u03bd\u03b1 \u03b5\u03be\u03b1\u03c3\u03c6\u03b1\u03bb\u03b9\u03c3\u03c4\u03b5\u03af<\/th><\/tr><\/thead><tbody><tr><td>\u03a3\u03c4\u03b1\u03b8\u03b5\u03c1\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae<\/td><td>1.200 \/ 1.200 \/ 1.200<\/td><td>400 \/ 400 \/ 0<\/td><td>\u0391\u03c0\u03bf\u03b8\u03b7\u03ba\u03b5\u03c5\u03c4\u03b9\u03ba\u03cc\u03c2 \u03c7\u03ce\u03c1\u03bf\u03c2 \u03ba\u03b1\u03b9 \u03c7\u03c1\u03b7\u03bc\u03b1\u03c4\u03bf\u03b4\u03cc\u03c4\u03b7\u03c3\u03b7 \u03b3\u03b9\u03b1 \u03c4\u03bf \u03b1\u03c0\u03cc\u03b8\u03b5\u03bc\u03b1 \u03c0\u03bf\u03c5 \u03c0\u03b1\u03c1\u03ac\u03b3\u03b5\u03c4\u03b1\u03b9 \u03b5\u03ba \u03c4\u03c9\u03bd \u03c0\u03c1\u03bf\u03c4\u03ad\u03c1\u03c9\u03bd<\/td><\/tr><tr><td>\u03a0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03bf\u03b3\u03ae \u03c3\u03c4\u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7<\/td><td>800 \/ 1.200 \/ 1.600<\/td><td>0 \/ 0 \/ 0<\/td><td>\u0394\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03b3\u03b9\u03b1 400 \u03c4\u03b5\u03bc\u03ac\u03c7\u03b9\u03b1 \u03c0\u03ac\u03bd\u03c9 \u03b1\u03c0\u03cc \u03c4\u03b7\u03bd \u03ba\u03b1\u03bd\u03bf\u03bd\u03b9\u03ba\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae \u03c3\u03c4\u03b7\u03bd \u03a0\u03b5\u03c1\u03af\u03bf\u03b4\u03bf 3<\/td><\/tr><tr><td>\u039c\u03b9\u03ba\u03c4\u03ae<\/td><td>1.000 \/ 1.200 \/ 1.400<\/td><td>200 \/ 200 \/ 0<\/td><td>\u039a\u03ac\u03c0\u03bf\u03b9\u03bf \u03b1\u03c0\u03cc\u03b8\u03b5\u03bc\u03b1 \u03ba\u03b1\u03b9 \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03b3\u03b9\u03b1 200 \u03b5\u03c0\u03b9\u03c0\u03bb\u03ad\u03bf\u03bd \u03c4\u03b5\u03bc\u03ac\u03c7\u03b9\u03b1 \u03c3\u03c4\u03b7\u03bd \u03a0\u03b5\u03c1\u03af\u03bf\u03b4\u03bf 3<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\u03a4\u03bf \u03b1\u03c0\u03cc\u03b8\u03b5\u03bc\u03b1 \u03c5\u03c0\u03bf\u03bb\u03bf\u03b3\u03af\u03b6\u03b5\u03c4\u03b1\u03b9 \u03c9\u03c2 \u03b5\u03be\u03ae\u03c2:<\/p>\n\n\n<p><strong>\u03a4\u03b5\u03bb\u03b9\u03ba\u03cc \u03b1\u03c0\u03cc\u03b8\u03b5\u03bc\u03b1 = \u03b1\u03c1\u03c7\u03b9\u03ba\u03cc \u03b1\u03c0\u03cc\u03b8\u03b5\u03bc\u03b1 + \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae \u2212 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7.<\/strong><\/p>\n\n\n<p>\u039c\u03b5 \u03c4\u03b7\u03bd \u03c0\u03bf\u03bb\u03b9\u03c4\u03b9\u03ba\u03ae \u03c3\u03c4\u03b1\u03b8\u03b5\u03c1\u03bf\u03cd \u03c1\u03c5\u03b8\u03bc\u03bf\u03cd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2, \u03b7 \u03a0\u03b5\u03c1\u03af\u03bf\u03b4\u03bf\u03c2 1 \u03ba\u03bb\u03b5\u03af\u03bd\u03b5\u03b9 \u03bc\u03b5 0 + 1.200 \u2212 800 = 400 \u03bc\u03bf\u03bd\u03ac\u03b4\u03b5\u03c2. \u03a3\u03c4\u03b7\u03bd \u03a0\u03b5\u03c1\u03af\u03bf\u03b4\u03bf 2, \u03c4\u03bf \u03c5\u03c0\u03cc\u03bb\u03bf\u03b9\u03c0\u03bf \u03b1\u03c5\u03c4\u03cc \u03c0\u03b1\u03c1\u03b1\u03bc\u03ad\u03bd\u03b5\u03b9 \u03b1\u03bc\u03b5\u03c4\u03ac\u03b2\u03bb\u03b7\u03c4\u03bf. \u03a3\u03c4\u03b7\u03bd \u03a0\u03b5\u03c1\u03af\u03bf\u03b4\u03bf 3, \u03bf\u03b9 400 \u03b1\u03c0\u03bf\u03b8\u03b7\u03ba\u03b5\u03c5\u03bc\u03ad\u03bd\u03b5\u03c2 \u03bc\u03bf\u03bd\u03ac\u03b4\u03b5\u03c2 \u03c3\u03c5\u03bc\u03c0\u03bb\u03b7\u03c1\u03ce\u03bd\u03bf\u03c5\u03bd \u03c4\u03b9\u03c2 1.200 \u03bc\u03bf\u03bd\u03ac\u03b4\u03b5\u03c2 \u03bd\u03ad\u03b1\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2, \u03ba\u03b1\u03bb\u03cd\u03c0\u03c4\u03bf\u03bd\u03c4\u03b1\u03c2 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7 1.600 \u03bc\u03bf\u03bd\u03ac\u03b4\u03c9\u03bd.<\/p>\n\n\n<p>\u0397 \u03bc\u03b9\u03ba\u03c4\u03ae \u03c0\u03bf\u03bb\u03b9\u03c4\u03b9\u03ba\u03ae \u03b4\u03b7\u03bc\u03b9\u03bf\u03c5\u03c1\u03b3\u03b5\u03af, \u03b1\u03bd\u03c4\u03af\u03c3\u03c4\u03bf\u03b9\u03c7\u03b1, \u03ad\u03bd\u03b1 \u03b1\u03c0\u03cc\u03b8\u03b5\u03bc\u03b1 200 \u03bc\u03bf\u03bd\u03ac\u03b4\u03c9\u03bd. \u03a3\u03c4\u03b7\u03bd \u03a0\u03b5\u03c1\u03af\u03bf\u03b4\u03bf 3, \u03c4\u03bf \u03b1\u03c0\u03cc\u03b8\u03b5\u03bc\u03b1 \u03b1\u03c5\u03c4\u03cc, \u03bc\u03b1\u03b6\u03af \u03bc\u03b5 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae 1.400 \u03bc\u03bf\u03bd\u03ac\u03b4\u03c9\u03bd, \u03ba\u03b1\u03bb\u03cd\u03c0\u03c4\u03b5\u03b9 \u03c4\u03b7\u03bd \u03af\u03b4\u03b9\u03b1 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7. \u0388\u03c4\u03c3\u03b9, \u03bc\u03b5\u03b9\u03ce\u03bd\u03b5\u03b9 \u03c3\u03c4\u03bf \u03bc\u03b9\u03c3\u03cc \u03c4\u03cc\u03c3\u03bf \u03c4\u03bf \u03bc\u03ad\u03b3\u03b9\u03c3\u03c4\u03bf \u03b1\u03c0\u03cc\u03b8\u03b5\u03bc\u03b1 \u03c3\u03c4\u03bf \u03c4\u03ad\u03bb\u03bf\u03c2 \u03c0\u03b5\u03c1\u03b9\u03cc\u03b4\u03bf\u03c5 \u03cc\u03c3\u03bf \u03ba\u03b1\u03b9 \u03c4\u03b7 \u03bc\u03ad\u03b3\u03b9\u03c3\u03c4\u03b7 \u03b1\u03c0\u03b1\u03af\u03c4\u03b7\u03c3\u03b7 \u03b3\u03b9\u03b1 \u03c0\u03c1\u03cc\u03c3\u03b8\u03b5\u03c4\u03b7 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae, \u03c3\u03b5 \u03c3\u03cd\u03b3\u03ba\u03c1\u03b9\u03c3\u03b7 \u03bc\u03b5 \u03c4\u03b7\u03bd \u03b1\u03bd\u03c4\u03af\u03c3\u03c4\u03bf\u03b9\u03c7\u03b7 \u03b1\u03bc\u03b9\u03b3\u03ae \u03c3\u03c4\u03c1\u03b1\u03c4\u03b7\u03b3\u03b9\u03ba\u03ae.<\/p>\n\n\n<p>\u0391\u03c2 \u03c5\u03c0\u03bf\u03b8\u03ad\u03c3\u03bf\u03c5\u03bc\u03b5 \u03c4\u03ce\u03c1\u03b1 \u03cc\u03c4\u03b9 \u03b7 \u03b4\u03b9\u03bf\u03af\u03ba\u03b7\u03c3\u03b7 \u03b5\u03c0\u03b9\u03c4\u03c1\u03ad\u03c0\u03b5\u03b9 \u03b1\u03c0\u03cc\u03b8\u03b5\u03bc\u03b1 \u03ad\u03c9\u03c2 200 \u03bc\u03bf\u03bd\u03ac\u03b4\u03b5\u03c2 \u03c3\u03c4\u03bf \u03c4\u03ad\u03bb\u03bf\u03c2 \u03ba\u03ac\u03b8\u03b5 \u03c0\u03b5\u03c1\u03b9\u03cc\u03b4\u03bf\u03c5 \u03ba\u03b1\u03b9 \u03cc\u03c4\u03b9 \u03b7 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03b4\u03ce\u03c3\u03b5\u03b9 \u03bc\u03cc\u03bd\u03bf 200 \u03b5\u03c0\u03b9\u03c0\u03bb\u03ad\u03bf\u03bd \u03bc\u03bf\u03bd\u03ac\u03b4\u03b5\u03c2 \u03c3\u03c4\u03b7\u03bd \u03a0\u03b5\u03c1\u03af\u03bf\u03b4\u03bf 3. \u0397 \u03b5\u03c0\u03b9\u03bb\u03bf\u03b3\u03ae \u03c3\u03c4\u03b1\u03b8\u03b5\u03c1\u03bf\u03cd \u03c1\u03c5\u03b8\u03bc\u03bf\u03cd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c5\u03c0\u03b5\u03c1\u03b2\u03b1\u03af\u03bd\u03b5\u03b9 \u03c4\u03bf \u03cc\u03c1\u03b9\u03bf \u03b1\u03c0\u03bf\u03b8\u03ad\u03bc\u03b1\u03c4\u03bf\u03c2, \u03b5\u03bd\u03ce \u03b7 \u03b5\u03c0\u03b9\u03bb\u03bf\u03b3\u03ae \u03c0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03bf\u03b3\u03ae\u03c2 \u03c4\u03b7\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03c4\u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7 \u03c5\u03c0\u03b5\u03c1\u03b2\u03b1\u03af\u03bd\u03b5\u03b9 \u03c4\u03bf \u03cc\u03c1\u03b9\u03bf \u03c0\u03c1\u03cc\u03c3\u03b8\u03b5\u03c4\u03b7\u03c2 \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1\u03c2. \u03a3\u03c4\u03bf \u03c3\u03c5\u03b3\u03ba\u03b5\u03ba\u03c1\u03b9\u03bc\u03ad\u03bd\u03bf \u03bc\u03bf\u03bd\u03c4\u03ad\u03bb\u03bf, \u03b7 \u03bc\u03b9\u03ba\u03c4\u03ae \u03b5\u03c0\u03b9\u03bb\u03bf\u03b3\u03ae \u03c4\u03b7\u03c1\u03b5\u03af \u03ba\u03b1\u03b9 \u03c4\u03b1 \u03b4\u03cd\u03bf \u03cc\u03c1\u03b9\u03b1.<\/p>\n\n\n<p>\u0391\u03c5\u03c4\u03cc \u03c4\u03b7\u03bd \u03ba\u03b1\u03b8\u03b9\u03c3\u03c4\u03ac \u03b5\u03c6\u03b9\u03ba\u03c4\u03ae \u03b5\u03c0\u03b9\u03bb\u03bf\u03b3\u03ae, \u03cc\u03c7\u03b9 \u03b1\u03c0\u03bf\u03b4\u03b5\u03b4\u03b5\u03b9\u03b3\u03bc\u03ad\u03bd\u03b1 \u03c4\u03b7 \u03b2\u03ad\u03bb\u03c4\u03b9\u03c3\u03c4\u03b7 \u03b1\u03c0\u03cc \u03ac\u03c0\u03bf\u03c8\u03b7 \u03ba\u03cc\u03c3\u03c4\u03bf\u03c5\u03c2. \u03a7\u03c1\u03b5\u03b9\u03ac\u03b6\u03b5\u03c4\u03b1\u03b9 \u03b1\u03ba\u03cc\u03bc\u03b7 \u03bd\u03b1 \u03ba\u03bf\u03c3\u03c4\u03bf\u03bb\u03bf\u03b3\u03ae\u03c3\u03b5\u03c4\u03b5 \u03c4\u03b9\u03c2 \u03b5\u03bd\u03b1\u03bb\u03bb\u03b1\u03ba\u03c4\u03b9\u03ba\u03ad\u03c2 \u03ba\u03b1\u03b9 \u03bd\u03b1 \u03b5\u03bb\u03ad\u03b3\u03be\u03b5\u03c4\u03b5 \u03c4\u03bf \u03c0\u03c1\u03b1\u03b3\u03bc\u03b1\u03c4\u03b9\u03ba\u03cc \u03bc\u03b5\u03af\u03b3\u03bc\u03b1 \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03c9\u03bd \u03ba\u03b1\u03b9 \u03c4\u03bf\u03bd \u03c7\u03c1\u03bf\u03bd\u03b9\u03c3\u03bc\u03cc \u03c4\u03b7\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03b7\u03c2 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7\u03c2. \u0391\u03bd \u03b7 \u03b1\u03b9\u03c7\u03bc\u03ae \u03b4\u03b5\u03bd \u03b5\u03bc\u03c6\u03b1\u03bd\u03b9\u03c3\u03c4\u03b5\u03af, \u03b1\u03ba\u03cc\u03bc\u03b7 \u03ba\u03b1\u03b9 \u03b7 \u03bc\u03b9\u03ba\u03c4\u03ae \u03c0\u03bf\u03bb\u03b9\u03c4\u03b9\u03ba\u03ae \u03b5\u03bd\u03ad\u03c7\u03b5\u03b9 \u03ba\u03af\u03bd\u03b4\u03c5\u03bd\u03bf \u03c0\u03bb\u03b5\u03bf\u03bd\u03ac\u03b6\u03bf\u03bd\u03c4\u03bf\u03c2 \u03b1\u03c0\u03bf\u03b8\u03ad\u03bc\u03b1\u03c4\u03bf\u03c2. \u0391\u03bd \u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7 \u03b5\u03ba\u03b4\u03b7\u03bb\u03c9\u03b8\u03b5\u03af \u03bd\u03c9\u03c1\u03af\u03c2 \u03c3\u03c4\u03b7\u03bd \u03a0\u03b5\u03c1\u03af\u03bf\u03b4\u03bf 3, \u03b7 \u03c0\u03c1\u03cc\u03c3\u03b8\u03b5\u03c4\u03b7 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae \u03c0\u03c1\u03ad\u03c0\u03b5\u03b9 \u03bd\u03b1 \u03b5\u03af\u03bd\u03b1\u03b9 \u03ad\u03c4\u03bf\u03b9\u03bc\u03b7 \u03b5\u03b3\u03ba\u03b1\u03af\u03c1\u03c9\u03c2.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u03a0\u03ce\u03c2 \u03bd\u03b1 \u03b5\u03c0\u03b9\u03bb\u03ad\u03be\u03b5\u03c4\u03b5 \u03bc\u03b9\u03b1 \u03b5\u03c6\u03b1\u03c1\u03bc\u03cc\u03c3\u03b9\u03bc\u03b7 \u03c0\u03bf\u03bb\u03b9\u03c4\u03b9\u03ba\u03ae<\/h2>\n\n\n<p>\u039e\u03b5\u03ba\u03b9\u03bd\u03ae\u03c3\u03c4\u03b5 \u03bc\u03b5 \u03b5\u03bd\u03b9\u03b1\u03af\u03b1 \u03ba\u03b1\u03b9 \u03c3\u03c5\u03bd\u03b5\u03c0\u03ae \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03b1 \u03b1\u03bd\u03b1\u03c6\u03bf\u03c1\u03ac\u03c2 \u03b3\u03b9\u03b1 \u03c4\u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7 \u03ba\u03b1\u03b9 \u03c4\u03b1 \u03b1\u03c0\u03bf\u03b8\u03ad\u03bc\u03b1\u03c4\u03b1. \u03a3\u03c5\u03bc\u03c6\u03c9\u03bd\u03ae\u03c3\u03c4\u03b5 \u03c4\u03b9\u03c2 \u03bf\u03c1\u03b9\u03c3\u03c4\u03b9\u03ba\u03ad\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b5\u03c2 \u03bc\u03b5 \u03c4\u03bf \u03c5\u03c0\u03cc\u03bb\u03bf\u03b9\u03c0\u03bf \u03c4\u03b7\u03c2 \u03c0\u03c1\u03cc\u03b2\u03bb\u03b5\u03c8\u03b7\u03c2, \u03ce\u03c3\u03c4\u03b5 \u03b7 \u03af\u03b4\u03b9\u03b1 \u03b1\u03c0\u03b1\u03af\u03c4\u03b7\u03c3\u03b7 \u03bd\u03b1 \u03bc\u03b7 \u03bc\u03b5\u03c4\u03c1\u03b7\u03b8\u03b5\u03af \u03b4\u03cd\u03bf \u03c6\u03bf\u03c1\u03ad\u03c2. \u039a\u03b1\u03c4\u03b1\u03b3\u03c1\u03ac\u03c8\u03c4\u03b5 \u03c4\u03bf \u03b1\u03be\u03b9\u03bf\u03c0\u03bf\u03b9\u03ae\u03c3\u03b9\u03bc\u03bf \u03b1\u03c1\u03c7\u03b9\u03ba\u03cc \u03b1\u03c0\u03cc\u03b8\u03b5\u03bc\u03b1, \u03c4\u03b9\u03c2 \u03c5\u03c6\u03b9\u03c3\u03c4\u03ac\u03bc\u03b5\u03bd\u03b5\u03c2 \u03b4\u03b5\u03c3\u03bc\u03b5\u03cd\u03c3\u03b5\u03b9\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03bf \u03b1\u03c0\u03cc\u03b8\u03b5\u03bc\u03b1 \u03ae \u03c4\u03b9\u03c2 \u03b1\u03bd\u03b5\u03ba\u03c4\u03ad\u03bb\u03b5\u03c3\u03c4\u03b5\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b5\u03c2 \u03c0\u03bf\u03c5 \u03b5\u03af\u03c3\u03c4\u03b5 \u03b4\u03b9\u03b1\u03c4\u03b5\u03b8\u03b5\u03b9\u03bc\u03ad\u03bd\u03bf\u03b9 \u03bd\u03b1 \u03b4\u03b5\u03c7\u03c4\u03b5\u03af\u03c4\u03b5 \u03c3\u03c4\u03bf \u03c4\u03ad\u03bb\u03bf\u03c2 \u03c4\u03b7\u03c2 \u03c0\u03b5\u03c1\u03b9\u03cc\u03b4\u03bf\u03c5.<\/p>\n\n\n<p>\u03a3\u03c4\u03b7 \u03c3\u03c5\u03bd\u03ad\u03c7\u03b5\u03b9\u03b1, \u03c3\u03c5\u03b3\u03ba\u03c1\u03af\u03bd\u03b5\u03c4\u03b5 \u03b5\u03c6\u03b9\u03ba\u03c4\u03ad\u03c2 \u03b5\u03bd\u03b1\u03bb\u03bb\u03b1\u03ba\u03c4\u03b9\u03ba\u03ad\u03c2 \u03bb\u03cd\u03c3\u03b5\u03b9\u03c2 \u03ba\u03b1\u03b9 \u03cc\u03c7\u03b9 \u03b1\u03c0\u03bb\u03ce\u03c2 \u03c4\u03c1\u03af\u03b1 \u03c3\u03cd\u03bd\u03bf\u03bb\u03b1 \u03b1\u03c1\u03b9\u03b8\u03bc\u03ce\u03bd \u03c0\u03bf\u03c5 \u03c6\u03b1\u03af\u03bd\u03bf\u03bd\u03c4\u03b1\u03b9 \u03b5\u03bb\u03ba\u03c5\u03c3\u03c4\u03b9\u03ba\u03ac:<\/p>\n\n\n<p>1. <strong>\u039a\u03b1\u03b8\u03bf\u03c1\u03af\u03c3\u03c4\u03b5 \u03c0\u03c1\u03ce\u03c4\u03b1 \u03c4\u03b1 \u03cc\u03c1\u03b9\u03b1.<\/strong> \u0395\u03bb\u03ad\u03b3\u03be\u03c4\u03b5 \u03c4\u03b7 \u03b4\u03b9\u03ac\u03c1\u03ba\u03b5\u03b9\u03b1 \u03b6\u03c9\u03ae\u03c2 \u03c4\u03c9\u03bd \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03c9\u03bd, \u03c4\u03b9\u03c2 \u03b4\u03c5\u03bd\u03b1\u03c4\u03cc\u03c4\u03b7\u03c4\u03b5\u03c2 \u03b1\u03c0\u03bf\u03b8\u03ae\u03ba\u03b5\u03c5\u03c3\u03b7\u03c2, \u03c4\u03bf \u03ba\u03b5\u03c6\u03ac\u03bb\u03b1\u03b9\u03bf \u03ba\u03af\u03bd\u03b7\u03c3\u03b7\u03c2, \u03c4\u03b9\u03c2 \u03b5\u03b3\u03ba\u03b5\u03ba\u03c1\u03b9\u03bc\u03ad\u03bd\u03b5\u03c2 \u03c5\u03c0\u03b5\u03c1\u03c9\u03c1\u03af\u03b5\u03c2, \u03c4\u03b9\u03c2 \u03b4\u03b9\u03b1\u03b8\u03ad\u03c3\u03b9\u03bc\u03b5\u03c2 \u03b4\u03b5\u03be\u03b9\u03cc\u03c4\u03b7\u03c4\u03b5\u03c2, \u03c4\u03b1 lead time \u03c4\u03c9\u03bd \u03c0\u03c1\u03bf\u03bc\u03b7\u03b8\u03b5\u03c5\u03c4\u03ce\u03bd \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03b1\u03bd\u03bf\u03c7\u03ae \u03c4\u03c9\u03bd \u03c0\u03b5\u03bb\u03b1\u03c4\u03ce\u03bd \u03c3\u03c4\u03b7\u03bd \u03b1\u03bd\u03b1\u03bc\u03bf\u03bd\u03ae. \u0391\u03c0\u03bf\u03ba\u03bb\u03b5\u03af\u03c3\u03c4\u03b5 \u03b5\u03c0\u03b9\u03bb\u03bf\u03b3\u03ad\u03c2 \u03c0\u03bf\u03c5 \u03b2\u03b1\u03c3\u03af\u03b6\u03bf\u03bd\u03c4\u03b1\u03b9 \u03c3\u03b5 \u03c0\u03cc\u03c1\u03bf\u03c5\u03c2 \u03c4\u03bf\u03c5\u03c2 \u03bf\u03c0\u03bf\u03af\u03bf\u03c5\u03c2 \u03b4\u03b5\u03bd \u03bc\u03c0\u03bf\u03c1\u03b5\u03af\u03c4\u03b5 \u03bd\u03b1 \u03b5\u03be\u03b1\u03c3\u03c6\u03b1\u03bb\u03af\u03c3\u03b5\u03c4\u03b5.<\/p>\n\n\n<p>2. <strong>\u03a3\u03c5\u03b3\u03ba\u03c1\u03af\u03bd\u03b5\u03c4\u03b5 \u03c4\u03bf \u03c3\u03cd\u03bd\u03bf\u03bb\u03bf \u03c4\u03bf\u03c5 \u03c3\u03c7\u03b5\u03c4\u03b9\u03ba\u03bf\u03cd \u03ba\u03cc\u03c3\u03c4\u03bf\u03c5\u03c2.<\/strong> \u03a3\u03c5\u03bc\u03c0\u03b5\u03c1\u03b9\u03bb\u03ac\u03b2\u03b5\u03c4\u03b5 \u03c4\u03b7\u03bd \u03ba\u03b1\u03bd\u03bf\u03bd\u03b9\u03ba\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae, \u03c4\u03bf\u03bd \u03b1\u03bc\u03b5\u03b9\u03b2\u03cc\u03bc\u03b5\u03bd\u03bf \u03c7\u03c1\u03cc\u03bd\u03bf \u03b1\u03b4\u03c1\u03ac\u03bd\u03b5\u03b9\u03b1\u03c2, \u03c4\u03b9\u03c2 \u03c5\u03c0\u03b5\u03c1\u03c9\u03c1\u03af\u03b5\u03c2, \u03c4\u03bf \u03ba\u03cc\u03c3\u03c4\u03bf\u03c2 \u03b4\u03b9\u03b1\u03c4\u03ae\u03c1\u03b7\u03c3\u03b7\u03c2 \u03b1\u03c0\u03bf\u03b8\u03ad\u03bc\u03b1\u03c4\u03bf\u03c2, \u03c4\u03b9\u03c2 \u03c0\u03c1\u03bf\u03c3\u03bb\u03ae\u03c8\u03b5\u03b9\u03c2 \u03ae \u03c4\u03b7\u03bd \u03b5\u03ba\u03c0\u03b1\u03af\u03b4\u03b5\u03c5\u03c3\u03b7, \u03c4\u03b7\u03bd \u03c5\u03c0\u03b5\u03c1\u03b3\u03bf\u03bb\u03b1\u03b2\u03af\u03b1 \u03ba\u03b1\u03b9 \u03c4\u03c5\u03c7\u03cc\u03bd \u03b1\u03c0\u03bf\u03b4\u03b5\u03ba\u03c4\u03ad\u03c2 \u03c3\u03c5\u03bd\u03ad\u03c0\u03b5\u03b9\u03b5\u03c2 \u03b1\u03c0\u03cc \u03ba\u03b1\u03b8\u03c5\u03c3\u03c4\u03b5\u03c1\u03b7\u03bc\u03ad\u03bd\u03b5\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b4\u03cc\u03c3\u03b5\u03b9\u03c2. \u03a7\u03c1\u03b7\u03c3\u03b9\u03bc\u03bf\u03c0\u03bf\u03b9\u03ae\u03c3\u03c4\u03b5 \u03c4\u03b7\u03bd \u03af\u03b4\u03b9\u03b1 \u03b2\u03ac\u03c3\u03b7 \u03ba\u03bf\u03c3\u03c4\u03bf\u03bb\u03cc\u03b3\u03b7\u03c3\u03b7\u03c2 \u03b3\u03b9\u03b1 \u03cc\u03bb\u03b5\u03c2 \u03c4\u03b9\u03c2 \u03b5\u03c0\u03b9\u03bb\u03bf\u03b3\u03ad\u03c2\u00b7 \u03bc\u03b7\u03bd \u03c5\u03c0\u03bf\u03bb\u03bf\u03b3\u03af\u03b6\u03b5\u03c4\u03b5 \u03b4\u03cd\u03bf \u03c6\u03bf\u03c1\u03ad\u03c2 \u03c4\u03b9\u03c2 \u03b2\u03b1\u03c3\u03b9\u03ba\u03ad\u03c2 \u03b1\u03c0\u03bf\u03b4\u03bf\u03c7\u03ad\u03c2 \u03cc\u03c4\u03b1\u03bd \u03c0\u03b5\u03c1\u03b9\u03bb\u03b1\u03bc\u03b2\u03ac\u03bd\u03bf\u03bd\u03c4\u03b1\u03b9 \u03ae\u03b4\u03b7 \u03c3\u03c4\u03b7\u03bd \u03b1\u03bc\u03bf\u03b9\u03b2\u03ae \u03c4\u03b7\u03c2 \u03c5\u03c0\u03b5\u03c1\u03c9\u03c1\u03af\u03b1\u03c2.<\/p>\n\n\n<p>3. <strong>\u0394\u03bf\u03ba\u03b9\u03bc\u03ac\u03c3\u03c4\u03b5 \u03ad\u03bd\u03b1 \u03b4\u03b9\u03b1\u03c6\u03bf\u03c1\u03b5\u03c4\u03b9\u03ba\u03cc \u03c3\u03b5\u03bd\u03ac\u03c1\u03b9\u03bf \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7\u03c2.<\/strong> \u0395\u03be\u03b5\u03c4\u03ac\u03c3\u03c4\u03b5 \u03c4\u03b9 \u03b8\u03b1 \u03c3\u03c5\u03bc\u03b2\u03b5\u03af \u03b1\u03bd \u03b7 \u03b1\u03b9\u03c7\u03bc\u03ae \u03b5\u03af\u03bd\u03b1\u03b9 \u03c7\u03b1\u03bc\u03b7\u03bb\u03cc\u03c4\u03b5\u03c1\u03b7, \u03c5\u03c8\u03b7\u03bb\u03cc\u03c4\u03b5\u03c1\u03b7 \u03ae \u03b5\u03bc\u03c6\u03b1\u03bd\u03b9\u03c3\u03c4\u03b5\u03af \u03bd\u03c9\u03c1\u03af\u03c4\u03b5\u03c1\u03b1. \u0388\u03bd\u03b1 \u03c0\u03bb\u03ac\u03bd\u03bf \u03c0\u03bf\u03c5 \u03ba\u03bf\u03c3\u03c4\u03af\u03b6\u03b5\u03b9 \u03bb\u03af\u03b3\u03bf \u03bb\u03b9\u03b3\u03cc\u03c4\u03b5\u03c1\u03bf \u03bc\u03b5 \u03b2\u03ac\u03c3\u03b7 \u03bc\u03af\u03b1 \u03c0\u03c1\u03cc\u03b2\u03bb\u03b5\u03c8\u03b7 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af, \u03b1\u03bd \u03b1\u03bb\u03bb\u03ac\u03be\u03b5\u03b9 \u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7, \u03bd\u03b1 \u03b1\u03c6\u03ae\u03c3\u03b5\u03b9 \u03c0\u03bf\u03bb\u03cd \u03c0\u03b5\u03c1\u03b9\u03c3\u03c3\u03cc\u03c4\u03b5\u03c1\u03bf \u03b1\u03c0\u03bf\u03cd\u03bb\u03b7\u03c4\u03bf \u03b1\u03c0\u03cc\u03b8\u03b5\u03bc\u03b1 \u03ae \u03ad\u03bd\u03b1 \u03bc\u03b7 \u03b4\u03b9\u03b1\u03c7\u03b5\u03b9\u03c1\u03af\u03c3\u03b9\u03bc\u03bf \u03ad\u03bb\u03bb\u03b5\u03b9\u03bc\u03bc\u03b1 \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1\u03c2.<\/p>\n\n\n<p>4. <strong>\u0395\u03b3\u03ba\u03c1\u03af\u03bd\u03b5\u03c4\u03b5 \u03b5\u03bd\u03ad\u03c1\u03b3\u03b5\u03b9\u03b5\u03c2, \u03cc\u03c7\u03b9 \u03bc\u03cc\u03bd\u03bf \u03c0\u03bf\u03c3\u03cc\u03c4\u03b7\u03c4\u03b5\u03c2.<\/strong> \u039f\u03c1\u03af\u03c3\u03c4\u03b5 \u03c0\u03bf\u03b9\u03bf\u03c2 \u03b8\u03b1 \u03b5\u03be\u03b1\u03c3\u03c6\u03b1\u03bb\u03af\u03c3\u03b5\u03b9 \u03c4\u03b7\u03bd \u03c0\u03c1\u03cc\u03c3\u03b8\u03b5\u03c4\u03b7 \u03b2\u03ac\u03c1\u03b4\u03b9\u03b1, \u03b8\u03b1 \u03b1\u03b3\u03bf\u03c1\u03ac\u03c3\u03b5\u03b9 \u03c4\u03b1 \u03c5\u03bb\u03b9\u03ba\u03ac \u03ae \u03b8\u03b1 \u03b4\u03b5\u03c3\u03bc\u03b5\u03cd\u03c3\u03b5\u03b9 \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c3\u03c4\u03bf\u03bd \u03c0\u03c1\u03bf\u03bc\u03b7\u03b8\u03b5\u03c5\u03c4\u03ae, \u03ba\u03b1\u03b8\u03ce\u03c2 \u03ba\u03b1\u03b9 \u03bc\u03ad\u03c7\u03c1\u03b9 \u03c0\u03cc\u03c4\u03b5. \u0395\u03c0\u03b1\u03bd\u03b5\u03be\u03b5\u03c4\u03ac\u03b6\u03b5\u03c4\u03b5 \u03c4\u03bf \u03c0\u03bb\u03ac\u03bd\u03bf \u03bc\u03b5 \u03b2\u03ac\u03c3\u03b7 \u03c4\u03b7\u03bd \u03c0\u03c1\u03b1\u03b3\u03bc\u03b1\u03c4\u03b9\u03ba\u03ae \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7 \u03ba\u03b1\u03b9 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae, \u03ad\u03c7\u03bf\u03bd\u03c4\u03b1\u03c2 \u03c3\u03b1\u03c6\u03ae \u03ba\u03c1\u03b9\u03c4\u03ae\u03c1\u03b9\u03b1 \u03b3\u03b9\u03b1 \u03c4\u03bf \u03c0\u03cc\u03c4\u03b5 \u03c0\u03c1\u03ad\u03c0\u03b5\u03b9 \u03bd\u03b1 \u03b1\u03bb\u03bb\u03ac\u03be\u03b5\u03b9.<\/p>\n\n\n<p>\u03a3\u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae \u03ba\u03b1\u03c4\u03ac \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1, \u03c4\u03bf \u03c7\u03c1\u03ae\u03c3\u03b9\u03bc\u03bf \u03c3\u03c5\u03b3\u03ba\u03b5\u03bd\u03c4\u03c1\u03c9\u03c4\u03b9\u03ba\u03cc \u03bc\u03ad\u03b3\u03b5\u03b8\u03bf\u03c2 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03b5\u03af\u03bd\u03b1\u03b9 \u03bf \u03c6\u03cc\u03c1\u03c4\u03bf\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2 \u03ba\u03b1\u03b9 \u03bf\u03b9 \u03b1\u03bd\u03b5\u03ba\u03c4\u03ad\u03bb\u03b5\u03c3\u03c4\u03b5\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b5\u03c2, \u03b1\u03bd\u03c4\u03af \u03b3\u03b9\u03b1 \u03c4\u03bf \u03b1\u03c0\u03cc\u03b8\u03b5\u03bc\u03b1 \u03ad\u03c4\u03bf\u03b9\u03bc\u03c9\u03bd \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03c9\u03bd. \u039c\u03c0\u03bf\u03c1\u03b5\u03af\u03c4\u03b5 \u03bd\u03b1 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03af\u03c3\u03b5\u03c4\u03b5 \u03c4\u03b7 \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03c1\u03b9\u03bd \u03b3\u03bd\u03c9\u03c1\u03af\u03b6\u03b5\u03c4\u03b5 \u03ba\u03ac\u03b8\u03b5 \u03c4\u03b5\u03bb\u03b9\u03ba\u03cc \u03b5\u03af\u03b4\u03bf\u03c2, \u03b1\u03bb\u03bb\u03ac \u03b4\u03b5\u03bd \u03bc\u03c0\u03bf\u03c1\u03b5\u03af\u03c4\u03b5 \u03bd\u03b1 \u03c0\u03b1\u03c1\u03ac\u03b3\u03b5\u03c4\u03b5 \u03b5\u03ba \u03c4\u03c9\u03bd \u03c0\u03c1\u03bf\u03c4\u03ad\u03c1\u03c9\u03bd \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03b1 \u03b5\u03b9\u03b4\u03b9\u03ba\u03ac \u03b3\u03b9\u03b1 \u03ad\u03bd\u03b1\u03bd \u03c0\u03b5\u03bb\u03ac\u03c4\u03b7 \u03cc\u03c4\u03b1\u03bd \u03bf\u03b9 \u03b1\u03c0\u03b1\u03b9\u03c4\u03ae\u03c3\u03b5\u03b9\u03c2 \u03c4\u03bf\u03c5\u03c2 \u03c0\u03b1\u03c1\u03b1\u03bc\u03ad\u03bd\u03bf\u03c5\u03bd \u03ac\u03b3\u03bd\u03c9\u03c3\u03c4\u03b5\u03c2.<\/p>\n\n\n<p>\u0395\u03c0\u03b9\u03bb\u03ad\u03be\u03c4\u03b5 \u03c4\u03b7\u03bd \u03b5\u03c6\u03b1\u03c1\u03bc\u03cc\u03c3\u03b9\u03bc\u03b7 \u03bb\u03cd\u03c3\u03b7 \u03bc\u03b5 \u03c4\u03bf \u03c7\u03b1\u03bc\u03b7\u03bb\u03cc\u03c4\u03b5\u03c1\u03bf \u03ba\u03cc\u03c3\u03c4\u03bf\u03c2, \u03b7 \u03bf\u03c0\u03bf\u03af\u03b1 \u03b1\u03bd\u03c4\u03b1\u03c0\u03bf\u03ba\u03c1\u03af\u03bd\u03b5\u03c4\u03b1\u03b9 \u03c3\u03c4\u03b9\u03c2 \u03b4\u03b5\u03c3\u03bc\u03b5\u03cd\u03c3\u03b5\u03b9\u03c2 \u03c3\u03b1\u03c2 \u03c0\u03c1\u03bf\u03c2 \u03c4\u03bf\u03c5\u03c2 \u03c0\u03b5\u03bb\u03ac\u03c4\u03b5\u03c2 \u03ba\u03b1\u03b9 \u03c3\u03c4\u03b7\u03bd \u03b1\u03bd\u03bf\u03c7\u03ae \u03c3\u03b1\u03c2 \u03c3\u03c4\u03bf\u03bd \u03ba\u03af\u03bd\u03b4\u03c5\u03bd\u03bf. \u0388\u03c0\u03b5\u03b9\u03c4\u03b1, \u03b5\u03bb\u03ad\u03b3\u03be\u03c4\u03b5 \u03b1\u03bd \u03bf\u03b9 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2 \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03bd\u03b1 \u03b5\u03ba\u03c4\u03b5\u03bb\u03b5\u03c3\u03c4\u03bf\u03cd\u03bd \u03bc\u03b5 \u03c4\u03b7 \u03c3\u03b5\u03b9\u03c1\u03ac \u03c0\u03bf\u03c5 \u03b1\u03c0\u03b1\u03b9\u03c4\u03bf\u03cd\u03bd \u03b1\u03c5\u03c4\u03ad\u03c2 \u03bf\u03b9 \u03b4\u03b5\u03c3\u03bc\u03b5\u03cd\u03c3\u03b5\u03b9\u03c2.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u039c\u03b5\u03c4\u03b1\u03c4\u03c1\u03ad\u03c8\u03c4\u03b5 \u03c4\u03b7\u03bd \u03b5\u03c0\u03b9\u03bb\u03b5\u03b3\u03bc\u03ad\u03bd\u03b7 \u03c0\u03bf\u03bb\u03b9\u03c4\u03b9\u03ba\u03ae \u03c3\u03b5 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03ad\u03bd\u03b5\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2 \u03bc\u03b5 \u03c4\u03bf SkyPlanner<\/h2>\n\n\n<p>\u03a3\u03c4\u03bf \u03c0\u03b1\u03c1\u03ac\u03b4\u03b5\u03b9\u03b3\u03bc\u03b1 \u03c4\u03b7\u03c2 \u03bc\u03b9\u03ba\u03c4\u03ae\u03c2 \u03c0\u03bf\u03bb\u03b9\u03c4\u03b9\u03ba\u03ae\u03c2 \u03b1\u03c0\u03b1\u03b9\u03c4\u03bf\u03cd\u03bd\u03c4\u03b1\u03b9 200 \u03b5\u03c0\u03b9\u03c0\u03bb\u03ad\u03bf\u03bd \u03bc\u03bf\u03bd\u03ac\u03b4\u03b5\u03c2 \u03c3\u03c4\u03b7\u03bd \u03a0\u03b5\u03c1\u03af\u03bf\u03b4\u03bf 3. \u039f \u03b1\u03c1\u03b9\u03b8\u03bc\u03cc\u03c2 \u03b1\u03c5\u03c4\u03cc\u03c2 \u03b1\u03c0\u03bf\u03ba\u03c4\u03ac \u03c0\u03c1\u03b1\u03ba\u03c4\u03b9\u03ba\u03ae \u03b1\u03be\u03af\u03b1 \u03bc\u03cc\u03bd\u03bf \u03cc\u03c4\u03b1\u03bd \u03b7 \u03c0\u03c1\u03cc\u03c3\u03b8\u03b5\u03c4\u03b7 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03c0\u03b5\u03c1\u03ac\u03c3\u03b5\u03b9 \u03b1\u03c0\u03cc \u03c4\u03b1 \u03b1\u03c0\u03b1\u03b9\u03c4\u03bf\u03cd\u03bc\u03b5\u03bd\u03b1 \u03c3\u03c4\u03ac\u03b4\u03b9\u03b1 \u03c3\u03c4\u03bf \u03b5\u03c1\u03b3\u03bf\u03c3\u03c4\u03ac\u03c3\u03b9\u03bf. \u039f\u03b9 \u03c0\u03b5\u03c1\u03b9\u03c3\u03c3\u03cc\u03c4\u03b5\u03c1\u03b5\u03c2 \u03ce\u03c1\u03b5\u03c2 \u03bc\u03b7\u03c7\u03b1\u03bd\u03bf\u03c5\u03c1\u03b3\u03b9\u03ba\u03ae\u03c2 \u03ba\u03b1\u03c4\u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2 \u03b4\u03b5\u03bd \u03b2\u03bf\u03b7\u03b8\u03bf\u03cd\u03bd \u03b1\u03bd \u03c4\u03bf \u03c6\u03b9\u03bd\u03af\u03c1\u03b9\u03c3\u03bc\u03b1 \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03b5\u03af \u03ae\u03b4\u03b7 \u03c3\u03b5 \u03c0\u03bb\u03ae\u03c1\u03b7 \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03ae \u03b1\u03bd \u03c4\u03b1 \u03c5\u03bb\u03b9\u03ba\u03ac \u03c6\u03c4\u03ac\u03c3\u03bf\u03c5\u03bd \u03b1\u03c6\u03bf\u03cd \u03c0\u03b5\u03c1\u03ac\u03c3\u03b5\u03b9 \u03c4\u03bf \u03b1\u03bd\u03b1\u03b3\u03ba\u03b1\u03af\u03bf \u03c7\u03c1\u03bf\u03bd\u03b9\u03ba\u03cc \u03c0\u03b5\u03c1\u03b9\u03b8\u03ce\u03c1\u03b9\u03bf \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2.<\/p>\n\n\n<p>\u03a7\u03c1\u03b7\u03c3\u03b9\u03bc\u03bf\u03c0\u03bf\u03b9\u03ae\u03c3\u03c4\u03b5 \u03c4\u03bf SkyPlanner APS \u03b3\u03b9\u03b1 \u03bd\u03b1 \u03c3\u03c5\u03bd\u03b4\u03ad\u03c3\u03b5\u03c4\u03b5 \u03c4\u03b7\u03bd \u03b5\u03b3\u03ba\u03b5\u03ba\u03c1\u03b9\u03bc\u03ad\u03bd\u03b7 \u03c0\u03bf\u03bb\u03b9\u03c4\u03b9\u03ba\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03bc\u03b5 \u03b1\u03c5\u03c4\u03ad\u03c2 \u03c4\u03b9\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2. \u0394\u03b9\u03b1\u03c4\u03b7\u03c1\u03ae\u03c3\u03c4\u03b5 \u03c4\u03b7\u03bd \u03c0\u03c1\u03cc\u03b2\u03bb\u03b5\u03c8\u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03b9\u03c2 \u03b1\u03c0\u03bf\u03c6\u03ac\u03c3\u03b5\u03b9\u03c2 \u03b3\u03b9\u03b1 \u03b1\u03c0\u03bf\u03b8\u03ad\u03bc\u03b1\u03c4\u03b1 \u03ba\u03b1\u03b9 \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03b1\u03bd\u03ac \u03bf\u03b9\u03ba\u03bf\u03b3\u03ad\u03bd\u03b5\u03b9\u03b1 \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03c9\u03bd \u03c3\u03c4\u03b7 \u03b4\u03b9\u03ba\u03ae \u03c3\u03b1\u03c2 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b1 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03bf\u03cd \u03ba\u03b1\u03b9 \u03b4\u03ce\u03c3\u03c4\u03b5 \u03c3\u03c4\u03bf SkyPlanner \u03c4\u03b9\u03c2 \u03b5\u03bd\u03c4\u03bf\u03bb\u03ad\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c0\u03bf\u03c5 \u03c4\u03b9\u03c2 \u03c5\u03bb\u03bf\u03c0\u03bf\u03b9\u03bf\u03cd\u03bd. \u0388\u03c4\u03c3\u03b9 \u03c0\u03b5\u03c1\u03bd\u03ac\u03c4\u03b5 \u03c3\u03c4\u03bf \u03c3\u03c4\u03ac\u03b4\u03b9\u03bf \u03c4\u03bf\u03c5 \u03c7\u03c1\u03bf\u03bd\u03bf\u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03bf\u03cd\u00b7 \u03b4\u03b5\u03bd \u03bc\u03b5\u03c4\u03b1\u03c4\u03c1\u03ad\u03c0\u03b5\u03c4\u03b1\u03b9 \u03b1\u03c5\u03c4\u03cc\u03bc\u03b1\u03c4\u03b1 \u03b7 \u03c0\u03c1\u03cc\u03b2\u03bb\u03b5\u03c8\u03b7 \u03bc\u03b9\u03b1\u03c2 \u03bf\u03b9\u03ba\u03bf\u03b3\u03ad\u03bd\u03b5\u03b9\u03b1\u03c2 \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03c9\u03bd \u03c3\u03b5 \u03b5\u03bd\u03c4\u03bf\u03bb\u03ad\u03c2.<\/p>\n\n\n<p>\u03a4\u03b1 \u03c3\u03c4\u03ac\u03b4\u03b9\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03ba\u03ac\u03b8\u03b5 \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03bf\u03c2, \u03bf\u03b9 \u03b4\u03b9\u03ac\u03c1\u03ba\u03b5\u03b9\u03b5\u03c2, \u03bf\u03b9 \u03ba\u03b1\u03c4\u03ac\u03bb\u03bb\u03b7\u03bb\u03bf\u03b9 \u03c3\u03c4\u03b1\u03b8\u03bc\u03bf\u03af \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2, \u03c4\u03b1 \u03c5\u03bb\u03b9\u03ba\u03ac \u03ba\u03b1\u03b9 \u03bf\u03b9 \u03c0\u03af\u03bd\u03b1\u03ba\u03b5\u03c2 \u03c5\u03bb\u03b9\u03ba\u03ce\u03bd \u03c1\u03c5\u03b8\u03bc\u03af\u03b6\u03bf\u03bd\u03c4\u03b1\u03b9 \u03bc\u03af\u03b1 \u03c6\u03bf\u03c1\u03ac. \u039a\u03ac\u03b8\u03b5 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 \u03ba\u03bb\u03b7\u03c1\u03bf\u03bd\u03bf\u03bc\u03b5\u03af \u03c4\u03bf \u03c6\u03b1\u03c3\u03b5\u03bf\u03bb\u03cc\u03b3\u03b9\u03bf \u03c4\u03bf\u03c5 \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03bf\u03c2 \u03c4\u03b7\u03c2, \u03b5\u03bd\u03ce \u03b7 \u03c0\u03bf\u03c3\u03cc\u03c4\u03b7\u03c4\u03b1 \u03ba\u03b1\u03b9 \u03b7 \u03b7\u03bc\u03b5\u03c1\u03bf\u03bc\u03b7\u03bd\u03af\u03b1 \u03c0\u03b1\u03c1\u03ac\u03b4\u03bf\u03c3\u03ae\u03c2 \u03c4\u03b7\u03c2 \u03ba\u03b1\u03b8\u03bf\u03c1\u03af\u03b6\u03bf\u03c5\u03bd \u03c4\u03b7 \u03bd\u03ad\u03b1 \u03b1\u03c0\u03b1\u03af\u03c4\u03b7\u03c3\u03b7. \u03a4\u03bf Arcturus \u03c7\u03c1\u03bf\u03bd\u03bf\u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03af\u03b6\u03b5\u03b9 \u03c4\u03b9\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b5\u03c2 \u03b1\u03c0\u03cc \u03ba\u03bf\u03b9\u03bd\u03bf\u03cd, \u03ce\u03c3\u03c4\u03b5 \u03b7 \u03b1\u03b9\u03c7\u03bc\u03ae \u03bc\u03b9\u03b1\u03c2 \u03bf\u03b9\u03ba\u03bf\u03b3\u03ad\u03bd\u03b5\u03b9\u03b1\u03c2 \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03c9\u03bd \u03bd\u03b1 \u03bc\u03b7\u03bd \u03b5\u03be\u03b5\u03c4\u03ac\u03b6\u03b5\u03c4\u03b1\u03b9 \u03b1\u03c0\u03bf\u03bc\u03bf\u03bd\u03c9\u03bc\u03ad\u03bd\u03b1 \u03b1\u03c0\u03cc \u03c4\u03b9\u03c2 \u03c5\u03c0\u03cc\u03bb\u03bf\u03b9\u03c0\u03b5\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2 \u03c0\u03bf\u03c5 \u03b4\u03b9\u03b5\u03ba\u03b4\u03b9\u03ba\u03bf\u03cd\u03bd \u03c4\u03bf\u03c5\u03c2 \u03af\u03b4\u03b9\u03bf\u03c5\u03c2 \u03c0\u03cc\u03c1\u03bf\u03c5\u03c2.<\/p>\n\n\n<p>\u0393\u03b9\u03b1 \u03c4\u03b7 \u03bc\u03b9\u03ba\u03c4\u03ae \u03c0\u03bf\u03bb\u03b9\u03c4\u03b9\u03ba\u03ae, \u03b1\u03c0\u03bf\u03c4\u03c5\u03c0\u03ce\u03c3\u03c4\u03b5 \u03c4\u03bf\u03bd \u03b5\u03b3\u03ba\u03b5\u03ba\u03c1\u03b9\u03bc\u03ad\u03bd\u03bf \u03c0\u03c1\u03cc\u03c3\u03b8\u03b5\u03c4\u03bf \u03c7\u03c1\u03cc\u03bd\u03bf \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2 \u03c3\u03c4\u03b9\u03c2 \u03b1\u03bd\u03c4\u03af\u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03c2 \u03b2\u03ac\u03c1\u03b4\u03b9\u03b5\u03c2 \u03ba\u03b1\u03b9 \u03c3\u03c4\u03b7 \u03b4\u03b9\u03b1\u03b8\u03b5\u03c3\u03b9\u03bc\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c4\u03c9\u03bd \u03c7\u03b5\u03b9\u03c1\u03b9\u03c3\u03c4\u03ce\u03bd, \u03bc\u03b1\u03b6\u03af \u03bc\u03b5 \u03c4\u03b9\u03c2 \u03c5\u03c0\u03ac\u03c1\u03c7\u03bf\u03c5\u03c3\u03b5\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b5\u03c2. \u038c\u03c4\u03b1\u03bd \u03b5\u03af\u03bd\u03b1\u03b9 \u03b5\u03bd\u03b5\u03c1\u03b3\u03bf\u03c0\u03bf\u03b9\u03b7\u03bc\u03ad\u03bd\u03bf\u03c2 \u03bf \u03c7\u03c1\u03bf\u03bd\u03bf\u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc\u03c2 \u03c0\u03bf\u03c5 \u03bb\u03b1\u03bc\u03b2\u03ac\u03bd\u03b5\u03b9 \u03c5\u03c0\u03cc\u03c8\u03b7 \u03c4\u03b1 \u03c5\u03bb\u03b9\u03ba\u03ac, \u03b7 \u03ba\u03b1\u03c4\u03b1\u03b3\u03b5\u03b3\u03c1\u03b1\u03bc\u03bc\u03ad\u03bd\u03b7 \u03b4\u03b9\u03b1\u03b8\u03b5\u03c3\u03b9\u03bc\u03cc\u03c4\u03b7\u03c4\u03ac \u03c4\u03bf\u03c5\u03c2 \u03b5\u03c0\u03b7\u03c1\u03b5\u03ac\u03b6\u03b5\u03b9 \u03b5\u03c0\u03af\u03c3\u03b7\u03c2 \u03c4\u03bf \u03c0\u03cc\u03c4\u03b5 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03be\u03b5\u03ba\u03b9\u03bd\u03ae\u03c3\u03b5\u03b9 \u03bc\u03b9\u03b1 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1. \u0395\u03c0\u03b1\u03bd\u03c5\u03c0\u03bf\u03bb\u03bf\u03b3\u03af\u03c3\u03c4\u03b5 \u03c4\u03bf \u03c0\u03c1\u03cc\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1 \u03ba\u03b1\u03b9 \u03c0\u03b1\u03c1\u03b1\u03ba\u03bf\u03bb\u03bf\u03c5\u03b8\u03ae\u03c3\u03c4\u03b5 \u03c4\u03b9\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2 \u03c0\u03bf\u03c5 \u03c0\u03c1\u03bf\u03ba\u03cd\u03c0\u03c4\u03bf\u03c5\u03bd \u03c3\u03c4\u03bf \u03c7\u03c1\u03bf\u03bd\u03bf\u03b4\u03b9\u03ac\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1 Gantt.<\/p>\n\n\n<p>\u03a3\u03c4\u03b7 \u03c3\u03c5\u03bd\u03ad\u03c7\u03b5\u03b9\u03b1, \u03bc\u03c0\u03bf\u03c1\u03b5\u03af\u03c4\u03b5 \u03bd\u03b1 \u03b5\u03be\u03b5\u03c4\u03ac\u03c3\u03b5\u03c4\u03b5 \u03c4\u03bf \u03b5\u03c1\u03ce\u03c4\u03b7\u03bc\u03b1 \u03c3\u03c4\u03bf \u03bf\u03c0\u03bf\u03af\u03bf \u03b4\u03b5\u03bd \u03b1\u03c0\u03b1\u03bd\u03c4\u03ac \u03bf \u03c3\u03c5\u03b3\u03ba\u03b5\u03bd\u03c4\u03c1\u03c9\u03c4\u03b9\u03ba\u03cc\u03c2 \u03c0\u03af\u03bd\u03b1\u03ba\u03b1\u03c2: \u03bf\u03bb\u03bf\u03ba\u03bb\u03b7\u03c1\u03ce\u03bd\u03bf\u03bd\u03c4\u03b1\u03b9 \u03c4\u03b1 \u03c0\u03b5\u03c1\u03b9\u03b2\u03bb\u03ae\u03bc\u03b1\u03c4\u03b1 \u03cc\u03c4\u03b1\u03bd \u03c7\u03c1\u03b5\u03b9\u03ac\u03b6\u03b5\u03c4\u03b1\u03b9 \u03ba\u03b1\u03b9 \u03c4\u03b9 \u03c3\u03c5\u03bc\u03b2\u03b1\u03af\u03bd\u03b5\u03b9 \u03bc\u03b5 \u03c4\u03b9\u03c2 \u03c5\u03c0\u03cc\u03bb\u03bf\u03b9\u03c0\u03b5\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b5\u03c2; \u0391\u03bd \u03ba\u03ac\u03c0\u03bf\u03b9\u03bf\u03c2 \u03c0\u03b5\u03c1\u03b9\u03bf\u03c1\u03b9\u03c3\u03bc\u03cc\u03c2 \u03b5\u03bc\u03c0\u03bf\u03b4\u03af\u03b6\u03b5\u03b9 \u03c4\u03b7\u03bd \u03b5\u03c0\u03af\u03c4\u03b5\u03c5\u03be\u03b7 \u03c4\u03bf\u03c5 \u03c3\u03c4\u03cc\u03c7\u03bf\u03c5, \u03b1\u03c0\u03bf\u03c6\u03b1\u03c3\u03af\u03c3\u03c4\u03b5 \u03b1\u03bd \u03b8\u03b1 \u03b1\u03bb\u03bb\u03ac\u03be\u03b5\u03c4\u03b5 \u03c0\u03c1\u03bf\u03c4\u03b5\u03c1\u03b1\u03b9\u03cc\u03c4\u03b7\u03c4\u03b5\u03c2, \u03b8\u03b1 \u03b4\u03b9\u03b1\u03b8\u03ad\u03c3\u03b5\u03c4\u03b5 \u03b4\u03b9\u03b1\u03c6\u03bf\u03c1\u03b5\u03c4\u03b9\u03ba\u03ae \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03ae \u03b8\u03b1 \u03b1\u03bd\u03b1\u03b8\u03b5\u03c9\u03c1\u03ae\u03c3\u03b5\u03c4\u03b5 \u03c4\u03b7 \u03b4\u03ad\u03c3\u03bc\u03b5\u03c5\u03c3\u03b7 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2. \u03a4\u03bf Arcturus \u03b1\u03bd\u03b1\u03bb\u03b1\u03bc\u03b2\u03ac\u03bd\u03b5\u03b9 \u03c4\u03bf\u03c5\u03c2 \u03c5\u03c0\u03bf\u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03bf\u03cd\u03c2 \u03c4\u03bf\u03c5 \u03c7\u03c1\u03bf\u03bd\u03bf\u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03bf\u03cd, \u03b5\u03bd\u03ce \u03b5\u03c3\u03b5\u03af\u03c2 \u03b4\u03b9\u03b1\u03c4\u03b7\u03c1\u03b5\u03af\u03c4\u03b5 \u03c4\u03bf\u03bd \u03ad\u03bb\u03b5\u03b3\u03c7\u03bf \u03b1\u03c5\u03c4\u03ce\u03bd \u03c4\u03c9\u03bd \u03b1\u03c0\u03bf\u03c6\u03ac\u03c3\u03b5\u03c9\u03bd.<\/p>\n\n\n<p>\u03a4\u03bf SkyPlanner \u03b4\u03b9\u03b1\u03c3\u03c5\u03bd\u03b4\u03ad\u03b5\u03c4\u03b1\u03b9 \u03bc\u03b5 \u03bf\u03c0\u03bf\u03b9\u03bf\u03b4\u03ae\u03c0\u03bf\u03c4\u03b5 ERP \u03ae MES \u03bc\u03ad\u03c3\u03c9 \u03c4\u03bf\u03c5 \u03b1\u03bd\u03bf\u03b9\u03c7\u03c4\u03bf\u03cd REST API \u03c4\u03bf\u03c5. \u039c\u03c0\u03bf\u03c1\u03b5\u03af\u03c4\u03b5 \u03bd\u03b1 \u03b4\u03b9\u03b1\u03c4\u03b7\u03c1\u03ae\u03c3\u03b5\u03c4\u03b5 \u03c4\u03bf \u03c5\u03c6\u03b9\u03c3\u03c4\u03ac\u03bc\u03b5\u03bd\u03bf \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03b7\u03c3\u03b9\u03b1\u03ba\u03cc \u03c3\u03b1\u03c2 \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1, \u03b5\u03bd\u03ce \u03c4\u03bf SkyPlanner \u03bc\u03b5\u03b9\u03ce\u03bd\u03b5\u03b9 \u03c4\u03b9\u03c2 \u03c7\u03b5\u03b9\u03c1\u03bf\u03ba\u03af\u03bd\u03b7\u03c4\u03b5\u03c2 \u03b5\u03bd\u03ad\u03c1\u03b3\u03b5\u03b9\u03b5\u03c2 \u03c0\u03bf\u03c5 \u03b1\u03c0\u03b1\u03b9\u03c4\u03bf\u03cd\u03bd\u03c4\u03b1\u03b9 \u03b3\u03b9\u03b1 \u03bd\u03b1 \u03b5\u03bd\u03c4\u03b1\u03c7\u03b8\u03bf\u03cd\u03bd \u03bf\u03b9 \u03b5\u03b3\u03ba\u03b5\u03ba\u03c1\u03b9\u03bc\u03ad\u03bd\u03b5\u03c2 \u03c0\u03bf\u03c3\u03cc\u03c4\u03b7\u03c4\u03b5\u03c2 \u03c3\u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae \u03ba\u03b1\u03b9 \u03bd\u03b1 \u03c0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03cc\u03b6\u03b5\u03c4\u03b1\u03b9 \u03c4\u03bf \u03c7\u03c1\u03bf\u03bd\u03bf\u03b4\u03b9\u03ac\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1 \u03cc\u03c4\u03b1\u03bd \u03b1\u03bb\u03bb\u03ac\u03b6\u03bf\u03c5\u03bd \u03bf\u03b9 \u03c3\u03c5\u03bd\u03b8\u03ae\u03ba\u03b5\u03c2.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\u03a4\u03b9 \u03ac\u03bb\u03bb\u03b1\u03be\u03b5 \u03c3\u03c4\u03b7 Fredman Operations \u03c7\u03ac\u03c1\u03b7 \u03c3\u03c4\u03b7 \u03c3\u03b1\u03c6\u03ae \u03b5\u03b9\u03ba\u03cc\u03bd\u03b1 \u03b1\u03bd\u03ac \u03b2\u03ac\u03c1\u03b4\u03b9\u03b1<\/h3>\n\n\n<p>\u0397 <a href=\"\/el\/%ce%b9%cf%83%cf%84%ce%bf%cf%81%ce%af%ce%b5%cf%82-%cf%80%ce%b5%ce%bb%ce%b1%cf%84%cf%8e%ce%bd\/fredman-operations\/\">Fredman Operations, \u03c6\u03b9\u03bd\u03bb\u03b1\u03bd\u03b4\u03b9\u03ba\u03ae \u03b5\u03c4\u03b1\u03b9\u03c1\u03b5\u03af\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2<\/a> \u03b5\u03b9\u03b4\u03ce\u03bd \u03ba\u03bf\u03c5\u03b6\u03af\u03bd\u03b1\u03c2 \u03ba\u03b1\u03b9 \u03c3\u03c5\u03c3\u03ba\u03b5\u03c5\u03b1\u03c3\u03af\u03b1\u03c2, \u03c7\u03c1\u03b5\u03b9\u03b1\u03b6\u03cc\u03c4\u03b1\u03bd \u03c3\u03b1\u03c6\u03ad\u03c3\u03c4\u03b5\u03c1\u03b7 \u03b5\u03b9\u03ba\u03cc\u03bd\u03b1 \u03c4\u03b7\u03c2 \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1\u03c2 \u03b1\u03bd\u03ac \u03b2\u03ac\u03c1\u03b4\u03b9\u03b1, \u03ba\u03b1\u03b8\u03ce\u03c2 \u03b1\u03c5\u03be\u03ac\u03bd\u03bf\u03bd\u03c4\u03b1\u03bd \u03bf\u03b9 \u03cc\u03b3\u03ba\u03bf\u03b9 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03b9\u03ce\u03bd. \u03a0\u03c1\u03bf\u03b7\u03b3\u03bf\u03c5\u03bc\u03ad\u03bd\u03c9\u03c2, \u03bf\u03b9 \u03ba\u03ac\u03c1\u03c4\u03b5\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2 \u03bc\u03b5\u03c4\u03b1\u03c6\u03ad\u03c1\u03bf\u03bd\u03c4\u03b1\u03bd \u03c7\u03b5\u03b9\u03c1\u03bf\u03ba\u03af\u03bd\u03b7\u03c4\u03b1 \u03bc\u03b5\u03c4\u03b1\u03be\u03cd \u03c3\u03c5\u03c3\u03c4\u03b7\u03bc\u03ac\u03c4\u03c9\u03bd \u03ba\u03b1\u03b9 \u03bf \u03c5\u03c0\u03b5\u03cd\u03b8\u03c5\u03bd\u03bf\u03c2 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03bf\u03cd \u03ad\u03b8\u03b5\u03c4\u03b5 \u03c0\u03c1\u03bf\u03c4\u03b5\u03c1\u03b1\u03b9\u03cc\u03c4\u03b7\u03c4\u03b5\u03c2 \u03c3\u03c4\u03b9\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2 \u03c7\u03c9\u03c1\u03af\u03c2 \u03b1\u03ba\u03c1\u03b9\u03b2\u03ae \u03b5\u03b9\u03ba\u03cc\u03bd\u03b1 \u03c4\u03b7\u03c2 \u03b4\u03b9\u03b1\u03b8\u03b5\u03c3\u03b9\u03bc\u03cc\u03c4\u03b7\u03c4\u03b1\u03c2 \u03c4\u03c9\u03bd \u03bc\u03b7\u03c7\u03b1\u03bd\u03ce\u03bd.<\/p>\n\n\n<p>\u039c\u03b5 \u03c4\u03b7\u03bd \u03c5\u03bb\u03bf\u03c0\u03bf\u03af\u03b7\u03c3\u03b7 \u03c4\u03bf\u03c5 SkyPlanner \u03c3\u03c5\u03bd\u03b4\u03ad\u03b8\u03b7\u03ba\u03b1\u03bd \u03c4\u03b1 L7 \u03ba\u03b1\u03b9 LTR \u03ba\u03b1\u03b9 \u03c3\u03c5\u03b3\u03ba\u03b5\u03bd\u03c4\u03c1\u03ce\u03b8\u03b7\u03ba\u03b1\u03bd \u03c3\u03b5 \u03ba\u03bf\u03b9\u03bd\u03ae \u03c0\u03c1\u03bf\u03b2\u03bf\u03bb\u03ae Gantt \u03bf\u03b9 \u03bc\u03b7\u03c7\u03b1\u03bd\u03ad\u03c2, \u03b7 \u03b5\u03bb\u03b5\u03cd\u03b8\u03b5\u03c1\u03b7 \u03ba\u03b1\u03b9 \u03b4\u03b5\u03c3\u03bc\u03b5\u03c5\u03bc\u03ad\u03bd\u03b7 \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03ba\u03b1\u03b9 \u03b7 \u03c0\u03c1\u03cc\u03bf\u03b4\u03bf\u03c2 \u03c4\u03c9\u03bd \u03b5\u03c1\u03b3\u03b1\u03c3\u03b9\u03ce\u03bd. \u0397 Fredman \u03b1\u03bd\u03b1\u03c6\u03ad\u03c1\u03b5\u03b9 \u03bc\u03b9\u03ba\u03c1\u03cc\u03c4\u03b5\u03c1\u03b7 \u03b1\u03bd\u03ac\u03b3\u03ba\u03b7 \u03b3\u03b9\u03b1 \u03c5\u03c0\u03b5\u03c1\u03c9\u03c1\u03af\u03b5\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03b1\u03c7\u03cd\u03c4\u03b5\u03c1\u03b7 \u03b1\u03bd\u03c4\u03b1\u03c0\u03cc\u03ba\u03c1\u03b9\u03c3\u03b7 \u03c3\u03c4\u03b9\u03c2 \u03b1\u03bb\u03bb\u03b1\u03b3\u03ad\u03c2 \u03c4\u03bf\u03c5 \u03c7\u03c1\u03bf\u03bd\u03bf\u03b4\u03b9\u03b1\u03b3\u03c1\u03ac\u03bc\u03bc\u03b1\u03c4\u03bf\u03c2.<\/p>\n\n\n<p>\u0391\u03c5\u03c4\u03ae \u03b7 \u03c3\u03b1\u03c6\u03ae\u03c2 \u03b5\u03b9\u03ba\u03cc\u03bd\u03b1 \u03b4\u03af\u03bd\u03b5\u03b9 \u03c3\u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae \u03c0\u03b9\u03bf \u03c3\u03c4\u03ad\u03c1\u03b5\u03b7 \u03b2\u03ac\u03c3\u03b7 \u03b3\u03b9\u03b1 \u03c4\u03b7\u03bd \u03b1\u03bd\u03c4\u03b9\u03bc\u03b5\u03c4\u03ce\u03c0\u03b9\u03c3\u03b7 \u03bc\u03b9\u03b1\u03c2 \u03b1\u03b9\u03c7\u03bc\u03ae\u03c2 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7\u03c2: \u03b5\u03be\u03b5\u03c4\u03ac\u03c3\u03c4\u03b5 \u03bc\u03b1\u03b6\u03af \u03c4\u03bf\u03bd \u03c6\u03cc\u03c1\u03c4\u03bf \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03b7 \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1, \u03c0\u03c1\u03b9\u03bd \u03b8\u03b5\u03c9\u03c1\u03ae\u03c3\u03b5\u03c4\u03b5 \u03cc\u03c4\u03b9 \u03bf\u03b9 \u03c0\u03b5\u03c1\u03b9\u03c3\u03c3\u03cc\u03c4\u03b5\u03c1\u03b5\u03c2 \u03c5\u03c0\u03b5\u03c1\u03c9\u03c1\u03af\u03b5\u03c2 \u03b5\u03af\u03bd\u03b1\u03b9 \u03b7 \u03bc\u03cc\u03bd\u03b7 \u03bb\u03cd\u03c3\u03b7.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u0395\u03bd\u03c4\u03ac\u03be\u03c4\u03b5 \u03c4\u03b7\u03bd \u03b5\u03c0\u03cc\u03bc\u03b5\u03bd\u03b7 \u03b1\u03b9\u03c7\u03bc\u03ae \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7\u03c2 \u03c3\u03c4\u03bf \u03c0\u03bb\u03ac\u03bd\u03bf \u03c3\u03b1\u03c2<\/h2>\n\n\n<p>\u03a0\u03c1\u03b9\u03bd \u03b5\u03b3\u03ba\u03c1\u03af\u03bd\u03b5\u03c4\u03b5 \u03c4\u03bf\u03bd \u03b5\u03c0\u03cc\u03bc\u03b5\u03bd\u03bf \u03b5\u03c0\u03bf\u03c7\u03b9\u03ba\u03cc \u03c3\u03c4\u03cc\u03c7\u03bf, \u03b1\u03bd\u03b1\u03c1\u03c9\u03c4\u03b7\u03b8\u03b5\u03af\u03c4\u03b5 \u03c0\u03ce\u03c2 \u03b8\u03b1 \u03b1\u03c0\u03bf\u03c1\u03c1\u03bf\u03c6\u03b7\u03b8\u03b5\u03af \u03b7 \u03b4\u03b9\u03b1\u03ba\u03cd\u03bc\u03b1\u03bd\u03c3\u03b7. \u0391\u03bd \u03b7 \u03b1\u03c0\u03ac\u03bd\u03c4\u03b7\u03c3\u03b7 \u03b5\u03af\u03bd\u03b1\u03b9 \u03bc\u03b5 \u03b1\u03c0\u03cc\u03b8\u03b5\u03bc\u03b1, \u03b5\u03bb\u03ad\u03b3\u03be\u03c4\u03b5 \u03b1\u03bd \u03b1\u03be\u03af\u03b6\u03b5\u03b9 \u03bd\u03b1 \u03c0\u03b1\u03c1\u03b1\u03c7\u03b8\u03bf\u03cd\u03bd \u03c4\u03b1 \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03b1 \u03bd\u03c9\u03c1\u03af\u03c4\u03b5\u03c1\u03b1. \u0391\u03bd \u03b5\u03af\u03bd\u03b1\u03b9 \u03bc\u03b5 \u03c0\u03c1\u03cc\u03c3\u03b8\u03b5\u03c4\u03b7 \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1, \u03b5\u03be\u03b1\u03c3\u03c6\u03b1\u03bb\u03af\u03c3\u03c4\u03b5 \u03c4\u03bf \u03c0\u03c1\u03bf\u03c3\u03c9\u03c0\u03b9\u03ba\u03cc \u03ba\u03b1\u03b9 \u03c4\u03bf\u03c5\u03c2 \u03c0\u03cc\u03c1\u03bf\u03c5\u03c2. \u0391\u03bd \u03b5\u03af\u03bd\u03b1\u03b9 \u03ba\u03b1\u03b9 \u03bc\u03b5 \u03c4\u03b1 \u03b4\u03cd\u03bf, \u03bf\u03c1\u03af\u03c3\u03c4\u03b5 \u03bc\u03b5 \u03c3\u03b1\u03c6\u03ae\u03bd\u03b5\u03b9\u03b1 \u03c4\u03b1 \u03cc\u03c1\u03b9\u03b1.<\/p>\n\n\n<p>\u03a3\u03c4\u03b7 \u03c3\u03c5\u03bd\u03ad\u03c7\u03b5\u03b9\u03b1, \u03c7\u03c1\u03b7\u03c3\u03b9\u03bc\u03bf\u03c0\u03bf\u03b9\u03ae\u03c3\u03c4\u03b5 \u03c4\u03bf SkyPlanner \u03b3\u03b9\u03b1 \u03bd\u03b1 \u03c3\u03c5\u03bd\u03b4\u03ad\u03c3\u03b5\u03c4\u03b5 \u03b1\u03c5\u03c4\u03ad\u03c2 \u03c4\u03b9\u03c2 \u03b1\u03c0\u03bf\u03c6\u03ac\u03c3\u03b5\u03b9\u03c2 \u03bc\u03b5 \u03c4\u03b9\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b5\u03c2 \u03c0\u03bf\u03c5 \u03c0\u03c1\u03ad\u03c0\u03b5\u03b9 \u03bd\u03b1 \u03bf\u03bb\u03bf\u03ba\u03bb\u03b7\u03c1\u03ce\u03c3\u03b5\u03b9 \u03b7 \u03bf\u03bc\u03ac\u03b4\u03b1 \u03c3\u03b1\u03c2. <a href=\"https:\/\/skyplanner.ai\/el\/%ce%b5%cf%80%ce%b9%ce%ba%ce%bf%ce%b9%ce%bd%cf%89%ce%bd%ce%af%ce%b1-%cf%80%cf%89%ce%bb%ce%ae%cf%83%ce%b5%cf%89%ce%bd\/\">\u039a\u03bb\u03b5\u03af\u03c3\u03c4\u03b5 \u03bc\u03b9\u03b1 \u03c0\u03b1\u03c1\u03bf\u03c5\u03c3\u03af\u03b1\u03c3\u03b7<\/a>, \u03ad\u03c7\u03bf\u03bd\u03c4\u03b1\u03c2 \u03bc\u03b1\u03b6\u03af \u03c3\u03b1\u03c2 \u03c4\u03bf \u03c0\u03c1\u03bf\u03c6\u03af\u03bb \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7\u03c2 \u03bc\u03b9\u03b1\u03c2 \u03bf\u03b9\u03ba\u03bf\u03b3\u03ad\u03bd\u03b5\u03b9\u03b1\u03c2 \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03c9\u03bd, \u03c4\u03b9\u03c2 \u03b5\u03b3\u03ba\u03b5\u03ba\u03c1\u03b9\u03bc\u03ad\u03bd\u03b5\u03c2 \u03c0\u03bf\u03c3\u03cc\u03c4\u03b7\u03c4\u03b5\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03b9\u03c2 \u03b2\u03ac\u03c1\u03b4\u03b9\u03b5\u03c2 \u03c0\u03bf\u03c5 \u03c0\u03c1\u03bf\u03b2\u03bb\u03ad\u03c0\u03bf\u03bd\u03c4\u03b1\u03b9 \u03b3\u03b9\u03b1 \u03c4\u03b7\u03bd \u03c5\u03bb\u03bf\u03c0\u03bf\u03af\u03b7\u03c3\u03ae \u03c4\u03bf\u03c5\u03c2. \u0388\u03c4\u03c3\u03b9 \u03b8\u03b1 \u03ad\u03c7\u03b5\u03c4\u03b5 \u03bc\u03b9\u03b1 \u03c3\u03c5\u03b3\u03ba\u03b5\u03ba\u03c1\u03b9\u03bc\u03ad\u03bd\u03b7 \u03b2\u03ac\u03c3\u03b7 \u03b3\u03b9\u03b1 \u03bd\u03b1 \u03b4\u03b5\u03af\u03c4\u03b5 \u03c0\u03ce\u03c2 \u03c4\u03bf Arcturus \u03ba\u03b1\u03b9 \u03c4\u03bf \u03c7\u03c1\u03bf\u03bd\u03bf\u03b4\u03b9\u03ac\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1 Gantt \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03bd\u03b1 \u03bc\u03b5\u03b9\u03ce\u03c3\u03bf\u03c5\u03bd \u03c4\u03b7\u03bd \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1 \u03c0\u03bf\u03c5 \u03b1\u03c0\u03b1\u03b9\u03c4\u03b5\u03af\u03c4\u03b1\u03b9 \u03b1\u03c0\u03cc \u03c4\u03bf \u03bc\u03b7\u03bd\u03b9\u03b1\u03af\u03bf \u03c0\u03bb\u03ac\u03bd\u03bf \u03bc\u03ad\u03c7\u03c1\u03b9 \u03c4\u03b7\u03bd \u03b5\u03ba\u03c4\u03ad\u03bb\u03b5\u03c3\u03b7 \u03c3\u03c4\u03bf \u03b5\u03c1\u03b3\u03bf\u03c3\u03c4\u03ac\u03c3\u03b9\u03bf. \u0391\u03bd \u03b8\u03ad\u03bb\u03b5\u03c4\u03b5 \u03c0\u03c1\u03ce\u03c4\u03b1 \u03bd\u03b1 \u03b5\u03be\u03b5\u03c1\u03b5\u03c5\u03bd\u03ae\u03c3\u03b5\u03c4\u03b5 \u03c4\u03b7 \u03c1\u03bf\u03ae \u03c7\u03c1\u03bf\u03bd\u03bf\u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03bf\u03cd, <a href=\"https:\/\/skyplanner.ai\/el\/%ce%b4%ce%bf%ce%ba%ce%b9%ce%bc%ce%ae\/\">\u03be\u03b5\u03ba\u03b9\u03bd\u03ae\u03c3\u03c4\u03b5 \u03bc\u03b9\u03b1 \u03b4\u03bf\u03ba\u03b9\u03bc\u03ae \u03bc\u03b5 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03b1 \u03b5\u03c0\u03af\u03b4\u03b5\u03b9\u03be\u03b7\u03c2<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>\u03a3\u03c5\u03b3\u03ba\u03b5\u03bd\u03c4\u03c1\u03c9\u03c4\u03b9\u03ba\u03cc\u03c2 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u03c3\u03c4\u03b1\u03b8\u03b5\u03c1\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae, \u03c0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03bf\u03b3\u03ae \u03c3\u03c4\u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7 \u03ae \u03bc\u03b9\u03ba\u03c4\u03ae \u03c3\u03c4\u03c1\u03b1\u03c4\u03b7\u03b3\u03b9\u03ba\u03ae; \u0391\u03c1\u03c7\u03b9\u03ba\u03ae &raquo; \u03a0\u03cc\u03c1\u03bf\u03b9 &raquo; \u03a3\u03c5\u03b3\u03ba\u03b5\u03bd\u03c4\u03c1\u03c9\u03c4\u03b9\u03ba\u03cc\u03c2 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u03c3\u03c4\u03b1\u03b8\u03b5\u03c1\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae, \u03c0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03bf\u03b3\u03ae \u03c3\u03c4\u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7 \u03ae \u03bc\u03b9\u03ba\u03c4\u03ae \u03c3\u03c4\u03c1\u03b1\u03c4\u03b7\u03b3\u03b9\u03ba\u03ae; \u039f \u03c3\u03c5\u03b3\u03ba\u03b5\u03bd\u03c4\u03c1\u03c9\u03c4\u03b9\u03ba\u03cc\u03c2 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03ba\u03b1\u03b8\u03bf\u03c1\u03af\u03b6\u03b5\u03b9 \u03c4\u03b9\u03c2 \u03c0\u03bf\u03c3\u03cc\u03c4\u03b7\u03c4\u03b5\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2, \u03c4\u03b7 \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03bf\u03c5 \u03b4\u03b5\u03c3\u03bc\u03b5\u03cd\u03b5\u03c4\u03b1\u03b9 \u03ba\u03b1\u03b9 \u03c4\u03b1 \u03b1\u03bd\u03b1\u03bc\u03b5\u03bd\u03cc\u03bc\u03b5\u03bd\u03b1 \u03b1\u03c0\u03bf\u03b8\u03ad\u03bc\u03b1\u03c4\u03b1 \u03ae \u03c4\u03b9\u03c2 \u03b1\u03bd\u03b5\u03ba\u03c4\u03ad\u03bb\u03b5\u03c3\u03c4\u03b5\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b5\u03c2 \u03b1\u03bd\u03ac \u03bf\u03b9\u03ba\u03bf\u03b3\u03ad\u03bd\u03b5\u03b9\u03b1 \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03c9\u03bd, \u03c3\u03b5 \u03bc\u03b5\u03c3\u03bf\u03c0\u03c1\u03cc\u03b8\u03b5\u03c3\u03bc\u03bf \u03bf\u03c1\u03af\u03b6\u03bf\u03bd\u03c4\u03b1, \u03c3\u03c5\u03bd\u03ae\u03b8\u03c9\u03c2 \u03c0\u03b5\u03c1\u03af\u03c0\u03bf\u03c5 3\u201318 &#8230; <a title=\"\u03a3\u03c5\u03b3\u03ba\u03b5\u03bd\u03c4\u03c1\u03c9\u03c4\u03b9\u03ba\u03cc\u03c2 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u03c3\u03c4\u03b1\u03b8\u03b5\u03c1\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae, \u03c0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03bf\u03b3\u03ae \u03c3\u03c4\u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7 \u03ae \u03bc\u03b9\u03ba\u03c4\u03ae \u03c3\u03c4\u03c1\u03b1\u03c4\u03b7\u03b3\u03b9\u03ba\u03ae;\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/aggregate-planning\/\" aria-label=\"Read more about \u03a3\u03c5\u03b3\u03ba\u03b5\u03bd\u03c4\u03c1\u03c9\u03c4\u03b9\u03ba\u03cc\u03c2 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u03c3\u03c4\u03b1\u03b8\u03b5\u03c1\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae, \u03c0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03bf\u03b3\u03ae \u03c3\u03c4\u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7 \u03ae \u03bc\u03b9\u03ba\u03c4\u03ae \u03c3\u03c4\u03c1\u03b1\u03c4\u03b7\u03b3\u03b9\u03ba\u03ae;\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":104680,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2525,477],"tags":[],"class_list":["post-104675","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps--","category-477","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\u03a3\u03c5\u03b3\u03ba\u03b5\u03bd\u03c4\u03c1\u03c9\u03c4\u03b9\u03ba\u03cc\u03c2 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u03c0\u03bf\u03b9\u03b1 \u03c3\u03c4\u03c1\u03b1\u03c4\u03b7\u03b3\u03b9\u03ba\u03ae;<\/title>\n<meta name=\"description\" content=\"\u0391\u03c0\u03cc\u03b8\u03b5\u03bc\u03b1 \u03ae \u03b5\u03c0\u03b9\u03c0\u03bb\u03ad\u03bf\u03bd \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03b3\u03b9\u03b1 \u03c4\u03b7\u03bd \u03b1\u03b9\u03c7\u03bc\u03ae \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7\u03c2; \u03a3\u03c5\u03b3\u03ba\u03c1\u03af\u03bd\u03b5\u03c4\u03b5 \u03c3\u03c4\u03c1\u03b1\u03c4\u03b7\u03b3\u03b9\u03ba\u03ad\u03c2 \u03bc\u03b5 \u03ad\u03bd\u03b1 \u03c0\u03b1\u03c1\u03ac\u03b4\u03b5\u03b9\u03b3\u03bc\u03b1 \u03ba\u03b1\u03b9 \u03bc\u03b5\u03c4\u03b1\u03c4\u03c1\u03ad\u03c8\u03c4\u03b5 \u03c4\u03bf \u03c0\u03bb\u03ac\u03bd\u03bf \u03c3\u03b5 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03ad\u03bd\u03b5\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/aggregate-planning\/\" \/>\n<meta property=\"og:locale\" content=\"el_GR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u03a3\u03c5\u03b3\u03ba\u03b5\u03bd\u03c4\u03c1\u03c9\u03c4\u03b9\u03ba\u03cc\u03c2 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u03c3\u03c4\u03b1\u03b8\u03b5\u03c1\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae, \u03c0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03bf\u03b3\u03ae \u03c3\u03c4\u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7 \u03ae \u03bc\u03b9\u03ba\u03c4\u03ae \u03c3\u03c4\u03c1\u03b1\u03c4\u03b7\u03b3\u03b9\u03ba\u03ae;\" \/>\n<meta property=\"og:description\" content=\"\u0391\u03c0\u03cc\u03b8\u03b5\u03bc\u03b1 \u03ae \u03b5\u03c0\u03b9\u03c0\u03bb\u03ad\u03bf\u03bd \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03b3\u03b9\u03b1 \u03c4\u03b7\u03bd \u03b1\u03b9\u03c7\u03bc\u03ae \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7\u03c2; \u03a3\u03c5\u03b3\u03ba\u03c1\u03af\u03bd\u03b5\u03c4\u03b5 \u03c3\u03c4\u03c1\u03b1\u03c4\u03b7\u03b3\u03b9\u03ba\u03ad\u03c2 \u03bc\u03b5 \u03ad\u03bd\u03b1 \u03c0\u03b1\u03c1\u03ac\u03b4\u03b5\u03b9\u03b3\u03bc\u03b1 \u03ba\u03b1\u03b9 \u03bc\u03b5\u03c4\u03b1\u03c4\u03c1\u03ad\u03c8\u03c4\u03b5 \u03c4\u03bf \u03c0\u03bb\u03ac\u03bd\u03bf \u03c3\u03b5 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03ad\u03bd\u03b5\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/aggregate-planning\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-20T21:23:51+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-20T21:26:05+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/aggregate-planning-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u03a3\u03c5\u03bd\u03c4\u03ac\u03c7\u03b8\u03b7\u03ba\u03b5 \u03b1\u03c0\u03cc\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/aggregate-planning\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/aggregate-planning\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"\u03a3\u03c5\u03b3\u03ba\u03b5\u03bd\u03c4\u03c1\u03c9\u03c4\u03b9\u03ba\u03cc\u03c2 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u03c3\u03c4\u03b1\u03b8\u03b5\u03c1\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae, \u03c0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03bf\u03b3\u03ae \u03c3\u03c4\u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7 \u03ae \u03bc\u03b9\u03ba\u03c4\u03ae \u03c3\u03c4\u03c1\u03b1\u03c4\u03b7\u03b3\u03b9\u03ba\u03ae;\",\"datePublished\":\"2026-10-20T21:23:51+00:00\",\"dateModified\":\"2026-10-20T21:26:05+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/aggregate-planning\\\/\"},\"wordCount\":39,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/aggregate-planning\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/aggregate-planning-hero.png\",\"articleSection\":[\"APS \u03ba\u03b1\u03b9 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc\u03c2\",\"\u03c0\u03cc\u03c1\u03bf\u03b9\"],\"inLanguage\":\"el\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/aggregate-planning\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/aggregate-planning\\\/\",\"name\":\"\u03a3\u03c5\u03b3\u03ba\u03b5\u03bd\u03c4\u03c1\u03c9\u03c4\u03b9\u03ba\u03cc\u03c2 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u03c0\u03bf\u03b9\u03b1 \u03c3\u03c4\u03c1\u03b1\u03c4\u03b7\u03b3\u03b9\u03ba\u03ae;\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/aggregate-planning\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/aggregate-planning\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/aggregate-planning-hero.png\",\"datePublished\":\"2026-10-20T21:23:51+00:00\",\"dateModified\":\"2026-10-20T21:26:05+00:00\",\"description\":\"\u0391\u03c0\u03cc\u03b8\u03b5\u03bc\u03b1 \u03ae \u03b5\u03c0\u03b9\u03c0\u03bb\u03ad\u03bf\u03bd \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03b3\u03b9\u03b1 \u03c4\u03b7\u03bd \u03b1\u03b9\u03c7\u03bc\u03ae \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7\u03c2; \u03a3\u03c5\u03b3\u03ba\u03c1\u03af\u03bd\u03b5\u03c4\u03b5 \u03c3\u03c4\u03c1\u03b1\u03c4\u03b7\u03b3\u03b9\u03ba\u03ad\u03c2 \u03bc\u03b5 \u03ad\u03bd\u03b1 \u03c0\u03b1\u03c1\u03ac\u03b4\u03b5\u03b9\u03b3\u03bc\u03b1 \u03ba\u03b1\u03b9 \u03bc\u03b5\u03c4\u03b1\u03c4\u03c1\u03ad\u03c8\u03c4\u03b5 \u03c4\u03bf \u03c0\u03bb\u03ac\u03bd\u03bf \u03c3\u03b5 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03ad\u03bd\u03b5\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/aggregate-planning\\\/#breadcrumb\"},\"inLanguage\":\"el\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/aggregate-planning\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"el\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/aggregate-planning\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/aggregate-planning-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/aggregate-planning-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Stored blue housings and additional production equipment illustrate two ways to prepare for a demand peak.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/aggregate-planning\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u03a3\u03c5\u03b3\u03ba\u03b5\u03bd\u03c4\u03c1\u03c9\u03c4\u03b9\u03ba\u03cc\u03c2 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u03c3\u03c4\u03b1\u03b8\u03b5\u03c1\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae, \u03c0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03bf\u03b3\u03ae \u03c3\u03c4\u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7 \u03ae \u03bc\u03b9\u03ba\u03c4\u03ae \u03c3\u03c4\u03c1\u03b1\u03c4\u03b7\u03b3\u03b9\u03ba\u03ae;\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"el\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"el\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"el\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\u03a3\u03c5\u03b3\u03ba\u03b5\u03bd\u03c4\u03c1\u03c9\u03c4\u03b9\u03ba\u03cc\u03c2 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u03c0\u03bf\u03b9\u03b1 \u03c3\u03c4\u03c1\u03b1\u03c4\u03b7\u03b3\u03b9\u03ba\u03ae;","description":"\u0391\u03c0\u03cc\u03b8\u03b5\u03bc\u03b1 \u03ae \u03b5\u03c0\u03b9\u03c0\u03bb\u03ad\u03bf\u03bd \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03b3\u03b9\u03b1 \u03c4\u03b7\u03bd \u03b1\u03b9\u03c7\u03bc\u03ae \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7\u03c2; \u03a3\u03c5\u03b3\u03ba\u03c1\u03af\u03bd\u03b5\u03c4\u03b5 \u03c3\u03c4\u03c1\u03b1\u03c4\u03b7\u03b3\u03b9\u03ba\u03ad\u03c2 \u03bc\u03b5 \u03ad\u03bd\u03b1 \u03c0\u03b1\u03c1\u03ac\u03b4\u03b5\u03b9\u03b3\u03bc\u03b1 \u03ba\u03b1\u03b9 \u03bc\u03b5\u03c4\u03b1\u03c4\u03c1\u03ad\u03c8\u03c4\u03b5 \u03c4\u03bf \u03c0\u03bb\u03ac\u03bd\u03bf \u03c3\u03b5 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03ad\u03bd\u03b5\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/aggregate-planning\/","og_locale":"el_GR","og_type":"article","og_title":"\u03a3\u03c5\u03b3\u03ba\u03b5\u03bd\u03c4\u03c1\u03c9\u03c4\u03b9\u03ba\u03cc\u03c2 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u03c3\u03c4\u03b1\u03b8\u03b5\u03c1\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae, \u03c0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03bf\u03b3\u03ae \u03c3\u03c4\u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7 \u03ae \u03bc\u03b9\u03ba\u03c4\u03ae \u03c3\u03c4\u03c1\u03b1\u03c4\u03b7\u03b3\u03b9\u03ba\u03ae;","og_description":"\u0391\u03c0\u03cc\u03b8\u03b5\u03bc\u03b1 \u03ae \u03b5\u03c0\u03b9\u03c0\u03bb\u03ad\u03bf\u03bd \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03b3\u03b9\u03b1 \u03c4\u03b7\u03bd \u03b1\u03b9\u03c7\u03bc\u03ae \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7\u03c2; \u03a3\u03c5\u03b3\u03ba\u03c1\u03af\u03bd\u03b5\u03c4\u03b5 \u03c3\u03c4\u03c1\u03b1\u03c4\u03b7\u03b3\u03b9\u03ba\u03ad\u03c2 \u03bc\u03b5 \u03ad\u03bd\u03b1 \u03c0\u03b1\u03c1\u03ac\u03b4\u03b5\u03b9\u03b3\u03bc\u03b1 \u03ba\u03b1\u03b9 \u03bc\u03b5\u03c4\u03b1\u03c4\u03c1\u03ad\u03c8\u03c4\u03b5 \u03c4\u03bf \u03c0\u03bb\u03ac\u03bd\u03bf \u03c3\u03b5 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03ad\u03bd\u03b5\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2.","og_url":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/aggregate-planning\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-20T21:23:51+00:00","article_modified_time":"2026-10-20T21:26:05+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/aggregate-planning-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"\u03a3\u03c5\u03bd\u03c4\u03ac\u03c7\u03b8\u03b7\u03ba\u03b5 \u03b1\u03c0\u03cc":"Jussi M\u00e4ntyl\u00e4"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/aggregate-planning\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/aggregate-planning\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/el\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"\u03a3\u03c5\u03b3\u03ba\u03b5\u03bd\u03c4\u03c1\u03c9\u03c4\u03b9\u03ba\u03cc\u03c2 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u03c3\u03c4\u03b1\u03b8\u03b5\u03c1\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae, \u03c0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03bf\u03b3\u03ae \u03c3\u03c4\u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7 \u03ae \u03bc\u03b9\u03ba\u03c4\u03ae \u03c3\u03c4\u03c1\u03b1\u03c4\u03b7\u03b3\u03b9\u03ba\u03ae;","datePublished":"2026-10-20T21:23:51+00:00","dateModified":"2026-10-20T21:26:05+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/aggregate-planning\/"},"wordCount":39,"publisher":{"@id":"https:\/\/skyplanner.ai\/el\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/aggregate-planning\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/aggregate-planning-hero.png","articleSection":["APS \u03ba\u03b1\u03b9 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc\u03c2","\u03c0\u03cc\u03c1\u03bf\u03b9"],"inLanguage":"el"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/aggregate-planning\/","url":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/aggregate-planning\/","name":"\u03a3\u03c5\u03b3\u03ba\u03b5\u03bd\u03c4\u03c1\u03c9\u03c4\u03b9\u03ba\u03cc\u03c2 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u03c0\u03bf\u03b9\u03b1 \u03c3\u03c4\u03c1\u03b1\u03c4\u03b7\u03b3\u03b9\u03ba\u03ae;","isPartOf":{"@id":"https:\/\/skyplanner.ai\/el\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/aggregate-planning\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/aggregate-planning\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/aggregate-planning-hero.png","datePublished":"2026-10-20T21:23:51+00:00","dateModified":"2026-10-20T21:26:05+00:00","description":"\u0391\u03c0\u03cc\u03b8\u03b5\u03bc\u03b1 \u03ae \u03b5\u03c0\u03b9\u03c0\u03bb\u03ad\u03bf\u03bd \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03b3\u03b9\u03b1 \u03c4\u03b7\u03bd \u03b1\u03b9\u03c7\u03bc\u03ae \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7\u03c2; \u03a3\u03c5\u03b3\u03ba\u03c1\u03af\u03bd\u03b5\u03c4\u03b5 \u03c3\u03c4\u03c1\u03b1\u03c4\u03b7\u03b3\u03b9\u03ba\u03ad\u03c2 \u03bc\u03b5 \u03ad\u03bd\u03b1 \u03c0\u03b1\u03c1\u03ac\u03b4\u03b5\u03b9\u03b3\u03bc\u03b1 \u03ba\u03b1\u03b9 \u03bc\u03b5\u03c4\u03b1\u03c4\u03c1\u03ad\u03c8\u03c4\u03b5 \u03c4\u03bf \u03c0\u03bb\u03ac\u03bd\u03bf \u03c3\u03b5 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03ad\u03bd\u03b5\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/aggregate-planning\/#breadcrumb"},"inLanguage":"el","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/aggregate-planning\/"]}]},{"@type":"ImageObject","inLanguage":"el","@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/aggregate-planning\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/aggregate-planning-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/aggregate-planning-hero.png","width":1672,"height":941,"caption":"Stored blue housings and additional production equipment illustrate two ways to prepare for a demand peak."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/aggregate-planning\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/el\/"},{"@type":"ListItem","position":2,"name":"\u03a3\u03c5\u03b3\u03ba\u03b5\u03bd\u03c4\u03c1\u03c9\u03c4\u03b9\u03ba\u03cc\u03c2 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u03c3\u03c4\u03b1\u03b8\u03b5\u03c1\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae, \u03c0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03bf\u03b3\u03ae \u03c3\u03c4\u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7 \u03ae \u03bc\u03b9\u03ba\u03c4\u03ae \u03c3\u03c4\u03c1\u03b1\u03c4\u03b7\u03b3\u03b9\u03ba\u03ae;"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/el\/#website","url":"https:\/\/skyplanner.ai\/el\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/el\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/el\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"el"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/el\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/el\/","logo":{"@type":"ImageObject","inLanguage":"el","@id":"https:\/\/skyplanner.ai\/el\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/el\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/el\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"el","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/aggregate-planning-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/aggregate-planning-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/aggregate-planning-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/aggregate-planning-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/aggregate-planning-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/aggregate-planning-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/aggregate-planning-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/aggregate-planning-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/el\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"\u03a3\u03c5\u03b3\u03ba\u03b5\u03bd\u03c4\u03c1\u03c9\u03c4\u03b9\u03ba\u03cc\u03c2 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u03c3\u03c4\u03b1\u03b8\u03b5\u03c1\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae, \u03c0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03bf\u03b3\u03ae \u03c3\u03c4\u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7 \u03ae \u03bc\u03b9\u03ba\u03c4\u03ae \u03c3\u03c4\u03c1\u03b1\u03c4\u03b7\u03b3\u03b9\u03ba\u03ae; \u0391\u03c1\u03c7\u03b9\u03ba\u03ae &raquo; \u03a0\u03cc\u03c1\u03bf\u03b9 &raquo; \u03a3\u03c5\u03b3\u03ba\u03b5\u03bd\u03c4\u03c1\u03c9\u03c4\u03b9\u03ba\u03cc\u03c2 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u03c3\u03c4\u03b1\u03b8\u03b5\u03c1\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae, \u03c0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03bf\u03b3\u03ae \u03c3\u03c4\u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7 \u03ae \u03bc\u03b9\u03ba\u03c4\u03ae \u03c3\u03c4\u03c1\u03b1\u03c4\u03b7\u03b3\u03b9\u03ba\u03ae; \u039f \u03c3\u03c5\u03b3\u03ba\u03b5\u03bd\u03c4\u03c1\u03c9\u03c4\u03b9\u03ba\u03cc\u03c2 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03ba\u03b1\u03b8\u03bf\u03c1\u03af\u03b6\u03b5\u03b9 \u03c4\u03b9\u03c2 \u03c0\u03bf\u03c3\u03cc\u03c4\u03b7\u03c4\u03b5\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2, \u03c4\u03b7 \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03bf\u03c5 \u03b4\u03b5\u03c3\u03bc\u03b5\u03cd\u03b5\u03c4\u03b1\u03b9 \u03ba\u03b1\u03b9 \u03c4\u03b1 \u03b1\u03bd\u03b1\u03bc\u03b5\u03bd\u03cc\u03bc\u03b5\u03bd\u03b1 \u03b1\u03c0\u03bf\u03b8\u03ad\u03bc\u03b1\u03c4\u03b1 \u03ae \u03c4\u03b9\u03c2 \u03b1\u03bd\u03b5\u03ba\u03c4\u03ad\u03bb\u03b5\u03c3\u03c4\u03b5\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b5\u03c2 \u03b1\u03bd\u03ac \u03bf\u03b9\u03ba\u03bf\u03b3\u03ad\u03bd\u03b5\u03b9\u03b1 \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03c9\u03bd, \u03c3\u03b5 \u03bc\u03b5\u03c3\u03bf\u03c0\u03c1\u03cc\u03b8\u03b5\u03c3\u03bc\u03bf \u03bf\u03c1\u03af\u03b6\u03bf\u03bd\u03c4\u03b1, \u03c3\u03c5\u03bd\u03ae\u03b8\u03c9\u03c2 \u03c0\u03b5\u03c1\u03af\u03c0\u03bf\u03c5 3\u201318&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/posts\/104675","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/comments?post=104675"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/posts\/104675\/revisions"}],"predecessor-version":[{"id":104739,"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/posts\/104675\/revisions\/104739"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/media\/104680"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/media?parent=104675"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/categories?post=104675"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/tags?post=104675"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}