{"id":77382,"date":"2025-05-13T09:37:46","date_gmt":"2025-05-13T09:37:46","guid":{"rendered":"https:\/\/skyplanner.ai\/docs\/%cf%80%ce%b1%cf%81%ce%b1%ce%b3%ce%b3%ce%b5%ce%bb%ce%af%ce%b1-%ce%b1%ce%bd%cf%84%ce%b9%ce%ba%ce%b5%ce%b9%ce%bc%ce%ad%ce%bd%cf%89%ce%bd\/"},"modified":"2025-10-08T07:30:04","modified_gmt":"2025-10-08T07:30:04","password":"","slug":"%cf%80%ce%b1%cf%81%ce%b1%ce%b3%ce%b3%ce%b5%ce%bb%ce%af%ce%b1-%ce%b1%ce%bd%cf%84%ce%b9%ce%ba%ce%b5%ce%b9%ce%bc%ce%ad%ce%bd%cf%89%ce%bd","status":"publish","type":"docs","link":"https:\/\/skyplanner.ai\/el\/docs\/%cf%80%ce%b1%cf%81%ce%b1%ce%b3%ce%b3%ce%b5%ce%bb%ce%af%ce%b1-%ce%b1%ce%bd%cf%84%ce%b9%ce%ba%ce%b5%ce%b9%ce%bc%ce%ad%ce%bd%cf%89%ce%bd\/","title":{"rendered":"\u03a0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1 \u03b1\u03bd\u03c4\u03b9\u03ba\u03b5\u03b9\u03bc\u03ad\u03bd\u03c9\u03bd"},"content":{"rendered":"\n<p>\u0395\u03b4\u03ce \u03b8\u03b1 \u03b1\u03bd\u03b1\u03c6\u03b5\u03c1\u03b8\u03bf\u03cd\u03bc\u03b5 \u03bb\u03b5\u03c0\u03c4\u03bf\u03bc\u03b5\u03c1\u03ce\u03c2 \u03c3\u03c4\u03b7\u03bd \u03b1\u03bd\u03ac\u03ba\u03c4\u03b7\u03c3\u03b7, \u03b4\u03b7\u03bc\u03b9\u03bf\u03c5\u03c1\u03b3\u03af\u03b1, \u03b5\u03bd\u03b7\u03bc\u03ad\u03c1\u03c9\u03c3\u03b7 \u03ba\u03b1\u03b9 \u03b4\u03b9\u03b1\u03b3\u03c1\u03b1\u03c6\u03ae \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03c9\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2.<\/p>\n\n<p>\u0397 \u03c0\u03c1\u03cc\u03c3\u03b2\u03b1\u03c3\u03b7 \u03c3\u03c4\u03b1 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03b9\u03ce\u03bd \u03b3\u03af\u03bd\u03b5\u03c4\u03b1\u03b9 \u03b1\u03c0\u03cc \u03c4\u03bf \u03c4\u03b5\u03bb\u03b9\u03ba\u03cc \u03c3\u03b7\u03bc\u03b5\u03af\u03bf <mark style=\"background-color:var(--contrast-3)\" class=\"has-inline-color\">\/phaser-order-rows<\/mark>.<\/p>\n\n<h4 class=\"wp-block-heading\" id=\"h-fetching-order-items\">\u039b\u03ae\u03c8\u03b7 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03c9\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2<\/h4>\n\n<p>\u039b\u03b1\u03bc\u03b2\u03ac\u03bd\u03b5\u03c4\u03b5 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 \u03c3\u03c4\u03ad\u03bb\u03bd\u03bf\u03bd\u03c4\u03b1\u03c2 \u03ad\u03bd\u03b1 \u03b1\u03af\u03c4\u03b7\u03bc\u03b1 GET \u03c3\u03c4\u03bf \u03c4\u03b5\u03bb\u03b9\u03ba\u03cc \u03c3\u03b7\u03bc\u03b5\u03af\u03bf <mark style=\"background-color:var(--contrast-3)\" class=\"has-inline-color\">\/phaser-order-rows<\/mark>:<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"825\" height=\"995\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-5.png\" alt=\"\" class=\"wp-image-69594\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-5.png 825w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-5-249x300.png 249w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-5-768x926.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-5-360x434.png 360w\" sizes=\"(max-width: 825px) 100vw, 825px\" \/><figcaption class=\"wp-element-caption\"><strong>\u03a3\u03c7\u03ae\u03bc\u03b1 1.<\/strong>  \u039b\u03ae\u03c8\u03b7 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03c9\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2<\/figcaption><\/figure>\n\n<p>\u039c\u03c0\u03bf\u03c1\u03b5\u03af\u03c4\u03b5 \u03bd\u03b1 \u03b1\u03bd\u03b1\u03b6\u03b7\u03c4\u03ae\u03c3\u03b5\u03c4\u03b5 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 \u03bc\u03b5 \u03b2\u03ac\u03c3\u03b7 \u03b4\u03b9\u03ac\u03c6\u03bf\u03c1\u03b5\u03c2 \u03c0\u03b1\u03c1\u03b1\u03bc\u03ad\u03c4\u03c1\u03bf\u03c5\u03c2:<\/p>\n\n<ul class=\"wp-block-list\">\n<li><strong>phaser_order_id  <\/strong>\n<ul class=\"wp-block-list\">\n<li>\u03b5\u03c3\u03c9\u03c4\u03b5\u03c1\u03b9\u03ba\u03cc \u03b1\u03bd\u03b1\u03b3\u03bd\u03c9\u03c1\u03b9\u03c3\u03c4\u03b9\u03ba\u03cc <strong>\u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 <\/strong>\u03c4\u03bf\u03c5 Skyplanner, \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03b2\u03c1\u03b5\u03b8\u03b5\u03af \u03b1\u03c0\u03cc \u03c4\u03bf <mark style=\"background-color:var(--contrast-3)\" class=\"has-inline-color\">\/phaser-orders-endpoint<\/mark><\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>external_id<\/strong>\n<ul class=\"wp-block-list\">\n<li>\u0395\u03be\u03c9\u03c4\u03b5\u03c1\u03b9\u03ba\u03cc \u03b1\u03bd\u03b1\u03b3\u03bd\u03c9\u03c1\u03b9\u03c3\u03c4\u03b9\u03ba\u03cc \u03c4\u03bf\u03c5 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03bf\u03c5 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2<\/li>\n\n\n\n<li>\u0393\u03b9\u03b1 \u03c0\u03b1\u03c1\u03ac\u03b4\u03b5\u03b9\u03b3\u03bc\u03b1, \u03c4\u03bf \u03bc\u03bf\u03bd\u03b1\u03b4\u03b9\u03ba\u03cc \u03b1\u03bd\u03b1\u03b3\u03bd\u03c9\u03c1\u03b9\u03c3\u03c4\u03b9\u03ba\u03cc \u03b1\u03c0\u03cc \u03c4\u03bf \u03b5\u03be\u03c9\u03c4\u03b5\u03c1\u03b9\u03ba\u03cc \u03c3\u03b1\u03c2 \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1 (ERP \u03ba.\u03bb\u03c0.)<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>production_planning_product_id<\/strong>\n<ul class=\"wp-block-list\">\n<li>\u0395\u03c3\u03c9\u03c4\u03b5\u03c1\u03b9\u03ba\u03cc \u03b1\u03bd\u03b1\u03b3\u03bd\u03c9\u03c1\u03b9\u03c3\u03c4\u03b9\u03ba\u03cc \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03bf\u03c2 Skyplanner<\/li>\n\n\n\n<li>\u039c\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03b2\u03c1\u03b5\u03b8\u03b5\u03af \u03b1\u03c0\u03cc \u03c4\u03bf <mark style=\"background-color:var(--contrast-3)\" class=\"has-inline-color\">\/products-endpoint<\/mark><\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>parent_id<\/strong>\n<ul class=\"wp-block-list\">\n<li>\u0395\u03ac\u03bd \u03ad\u03bd\u03b1 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03bf \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 \u03ad\u03c7\u03b5\u03b9 \u03c5\u03c0\u03bf\u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03b1 (\u03c0.\u03c7. \u03c5\u03c0\u03bf\u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03b1), \u03c4\u03b1 \u03c5\u03c0\u03bf\u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03b1 \u03ad\u03c7\u03bf\u03c5\u03bd \u03c4\u03bf \u03b1\u03bd\u03b1\u03b3\u03bd\u03c9\u03c1\u03b9\u03c3\u03c4\u03b9\u03ba\u03cc \u03c4\u03bf\u03c5 \u03b3\u03bf\u03bd\u03b9\u03ba\u03bf\u03cd \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03bf\u03c5 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 \u03c3\u03c4\u03bf \u03c0\u03b5\u03b4\u03af\u03bf parent_id.<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>row_index<\/strong>\n<ul class=\"wp-block-list\">\n<li>\u0391\u03c1\u03b9\u03b8\u03bc\u03cc\u03c2 \u03b4\u03b5\u03af\u03ba\u03c4\u03b7 \u03c4\u03bf\u03c5 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03bf\u03c5 \u03c4\u03b7\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"278\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-6-1024x278.png\" alt=\"\" class=\"wp-image-69624\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-6-1024x278.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-6-300x81.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-6-768x208.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-6-360x98.png 360w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-6.png 1238w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"><strong>\u03a3\u03c7\u03ae\u03bc\u03b1 2.<\/strong>  \u0394\u03b5\u03af\u03ba\u03c4\u03b5\u03c2 \u03c3\u03b5\u03b9\u03c1\u03ac\u03c2 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03c9\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2<\/figcaption><\/figure>\n\n<ul class=\"wp-block-list\">\n<li><strong>\u03b1\u03c1\u03b9\u03b8\u03bc\u03cc\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2<\/strong>\n<ul class=\"wp-block-list\">\n<li>\u0397 \u03c4\u03b9\u03bc\u03ae \u03c4\u03bf\u03c5 \u03b1\u03c1\u03b9\u03b8\u03bc\u03bf\u03cd \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2 \u03c4\u03bf\u03c5 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03bf\u03c5 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>\u03ba\u03b1\u03c4\u03ac\u03c3\u03c4\u03b1\u03c3\u03b7<\/strong>\n<ul class=\"wp-block-list\">\n<li>\u039a\u03b1\u03c4\u03ac\u03c3\u03c4\u03b1\u03c3\u03b7 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03bf\u03c5 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2<\/li>\n\n\n\n<li>\u0395\u03c0\u03b9\u03c4\u03c1\u03b5\u03c0\u03cc\u03bc\u03b5\u03bd\u03b5\u03c2 \u03c4\u03b9\u03bc\u03ad\u03c2: <strong>new<\/strong>, <strong>started<\/strong> \u03ae <strong>completed<\/strong><\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>\u03b8\u03ad\u03c3\u03b7<\/strong>\n<ul class=\"wp-block-list\">\n<li>\u0397 \u03c4\u03b9\u03bc\u03ae \u03b8\u03ad\u03c3\u03b7\u03c2 \u03c4\u03bf\u03c5 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03bf\u03c5 \u03c4\u03b7\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"252\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-7-1024x252.png\" alt=\"\" class=\"wp-image-69653\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-7-1024x252.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-7-300x74.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-7-768x189.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-7-360x89.png 360w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-7.png 1225w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">\u03a3\u03c7\u03ae\u03bc\u03b1 3. \u03a4\u03b9\u03bc\u03ad\u03c2 \u03b8\u03ad\u03c3\u03b7\u03c2 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03bf\u03c5 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 <\/figcaption><\/figure>\n\n<ul class=\"wp-block-list\">\n<li><strong>delivery_date<\/strong>\n<ul class=\"wp-block-list\">\n<li>\u0397 \u03b7\u03bc\u03b5\u03c1\u03bf\u03bc\u03b7\u03bd\u03af\u03b1 \u03c0\u03b1\u03c1\u03ac\u03b4\u03bf\u03c3\u03b7\u03c2 \u03c4\u03bf\u03c5 \u03b1\u03bd\u03c4\u03b9\u03ba\u03b5\u03b9\u03bc\u03ad\u03bd\u03bf\u03c5 \u03c4\u03b7\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2<\/li>\n\n\n\n<li>\u039c\u03bf\u03c1\u03c6\u03ae: <strong>2025-06-05T22:00:00+00:00<\/strong><\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>delivery_date_condition<\/strong>\n<ul class=\"wp-block-list\">\n<li>\u03a0\u03c1\u03bf\u03b1\u03b9\u03c1\u03b5\u03c4\u03b9\u03ba\u03ae \u03c0\u03c1\u03bf\u03cb\u03c0\u03cc\u03b8\u03b5\u03c3\u03b7 \u03b1\u03bd\u03b1\u03b6\u03ae\u03c4\u03b7\u03c3\u03b7\u03c2 \u03b7\u03bc\u03b5\u03c1\u03bf\u03bc\u03b7\u03bd\u03af\u03b1\u03c2 \u03c0\u03b1\u03c1\u03ac\u03b4\u03bf\u03c3\u03b7\u03c2<\/li>\n\n\n\n<li>\u0395\u03c0\u03b9\u03bb\u03bf\u03b3\u03ad\u03c2: &gt;, =, &lt;=, =, !=<\/li>\n\n\n\n<li>\u0395\u03ac\u03bd \u03b4\u03b5\u03bd \u03b4\u03bf\u03b8\u03b5\u03af \u03ba\u03b1\u03bc\u03af\u03b1 \u03c4\u03b9\u03bc\u03ae, \u03b8\u03b1 \u03c7\u03c1\u03b7\u03c3\u03b9\u03bc\u03bf\u03c0\u03bf\u03b9\u03b7\u03b8\u03b5\u03af \u03b7 \u03c3\u03c5\u03bd\u03b8\u03ae\u03ba\u03b7 <strong>&gt;=.<\/strong> <\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>is_prospect<\/strong>\n<ul class=\"wp-block-list\">\n<li>\u0395\u03c0\u03b9\u03c3\u03c4\u03c1\u03ad\u03c8\u03c4\u03b5 \u03bc\u03cc\u03bd\u03bf \u03c4\u03b1 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 \u03c0\u03bf\u03c5 \u03b5\u03af\u03bd\u03b1\u03b9 \u03c0\u03c1\u03bf\u03bf\u03c0\u03c4\u03b9\u03ba\u03ad\u03c2<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>include_archived<\/strong>\n<ul class=\"wp-block-list\">\n<li>\u03a3\u03c5\u03bc\u03c0\u03b5\u03c1\u03b9\u03bb\u03ac\u03b2\u03b5\u03c4\u03b5 \u03b1\u03c1\u03c7\u03b5\u03b9\u03bf\u03b8\u03b5\u03c4\u03b7\u03bc\u03ad\u03bd\u03b1 (\u03b1\u03c0\u03b1\u03bb\u03ae \u03b4\u03b9\u03b1\u03b3\u03c1\u03b1\u03c6\u03ae) \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 \u03c3\u03c4\u03b7\u03bd \u03b1\u03bd\u03ac\u03ba\u03c4\u03b7\u03c3\u03b7<\/li>\n\n\n\n<li>\u0394\u03b7\u03bb\u03ce\u03bd\u03b5\u03c4\u03b1\u03b9 \u03b1\u03c0\u03cc \u03c4\u03b7\u03bd \u03c4\u03b9\u03bc\u03ae <strong>is_archive<\/strong> <\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>\u03c4\u03c1\u03bf\u03c0\u03bf\u03c0\u03bf\u03b9\u03b7\u03bc\u03ad\u03bd\u03bf<\/strong>\n<ul class=\"wp-block-list\">\n<li>\u0395\u03c0\u03b9\u03c3\u03c4\u03c1\u03bf\u03c6\u03ae \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03c9\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 \u03c0\u03bf\u03c5 \u03ad\u03c7\u03bf\u03c5\u03bd \u03c4\u03c1\u03bf\u03c0\u03bf\u03c0\u03bf\u03b9\u03b7\u03b8\u03b5\u03af \u03bc\u03b5\u03c4\u03ac \u03c4\u03b7 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03b7 \u03b7\u03bc\u03b5\u03c1\u03bf\u03bc\u03b7\u03bd\u03af\u03b1<\/li>\n\n\n\n<li>\u039c\u03bf\u03c1\u03c6\u03ae: <strong>2025-06-05T22:00:00+00:00<\/strong><\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>modifiedCondition<\/strong>\n<ul class=\"wp-block-list\">\n<li>\u03a0\u03c1\u03bf\u03b1\u03b9\u03c1\u03b5\u03c4\u03b9\u03ba\u03ae \u03c3\u03c5\u03bd\u03b8\u03ae\u03ba\u03b7 \u03b1\u03bd\u03b1\u03b6\u03ae\u03c4\u03b7\u03c3\u03b7\u03c2 \u03c4\u03c1\u03bf\u03c0\u03bf\u03c0\u03bf\u03b9\u03b7\u03bc\u03ad\u03bd\u03b7\u03c2 \u03c4\u03b9\u03bc\u03ae\u03c2<\/li>\n\n\n\n<li>\u0395\u03c0\u03b9\u03bb\u03bf\u03b3\u03ad\u03c2: &gt;, =, &lt;=, =, !=<\/li>\n\n\n\n<li>\u0395\u03ac\u03bd \u03b4\u03b5\u03bd \u03b4\u03bf\u03b8\u03b5\u03af \u03ba\u03b1\u03bc\u03af\u03b1 \u03c4\u03b9\u03bc\u03ae, \u03b8\u03b1 \u03c7\u03c1\u03b7\u03c3\u03b9\u03bc\u03bf\u03c0\u03bf\u03b9\u03b7\u03b8\u03b5\u03af \u03b7 \u03c3\u03c5\u03bd\u03b8\u03ae\u03ba\u03b7 <strong>&gt;=.<\/strong> <\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n<p>\u039c\u03c0\u03bf\u03c1\u03b5\u03af\u03c4\u03b5 \u03b5\u03c0\u03af\u03c3\u03b7\u03c2 \u03bd\u03b1 \u03c3\u03c5\u03bd\u03b4\u03c5\u03ac\u03c3\u03b5\u03c4\u03b5 \u03c4\u03b9\u03c2 \u03c0\u03b1\u03c1\u03b1\u03bc\u03ad\u03c4\u03c1\u03bf\u03c5\u03c2 \u03b1\u03bd\u03b1\u03b6\u03ae\u03c4\u03b7\u03c3\u03b7\u03c2 \u03c9\u03c2 \u03b5\u03be\u03ae\u03c2:<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"784\" height=\"777\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-8.png\" alt=\"\" class=\"wp-image-69732\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-8.png 784w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-8-300x297.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-8-150x150.png 150w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-8-768x761.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-8-360x357.png 360w\" sizes=\"(max-width: 784px) 100vw, 784px\" \/><figcaption class=\"wp-element-caption\"><strong>\u03a3\u03c7\u03ae\u03bc\u03b1 4. <\/strong>\u039b\u03ae\u03c8\u03b7 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03c9\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 \u03bc\u03b5 \u03b2\u03ac\u03c3\u03b7 \u03c4\u03bf <strong>phaser_order_id <\/strong>\u03ba\u03b1\u03b9 \u03c4\u03bf <strong>row_index<\/strong><\/figcaption><\/figure>\n\n<p>\u0393\u03b9\u03b1 \u03bd\u03b1 \u03b1\u03bd\u03b1\u03ba\u03c4\u03ae\u03c3\u03b5\u03c4\u03b5 \u03ad\u03bd\u03b1 \u03c3\u03c5\u03b3\u03ba\u03b5\u03ba\u03c1\u03b9\u03bc\u03ad\u03bd\u03bf \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03bf \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 \u03bc\u03b5 \u03c4\u03bf \u03b5\u03c3\u03c9\u03c4\u03b5\u03c1\u03b9\u03ba\u03cc \u03b1\u03bd\u03b1\u03b3\u03bd\u03c9\u03c1\u03b9\u03c3\u03c4\u03b9\u03ba\u03cc \u03c4\u03bf\u03c5 Skyplanner \u03bc\u03c0\u03bf\u03c1\u03b5\u03af\u03c4\u03b5 \u03bd\u03b1 \u03ba\u03ac\u03bd\u03b5\u03c4\u03b5 \u03bc\u03b9\u03b1 \u03b1\u03af\u03c4\u03b7\u03c3\u03b7 \u03c9\u03c2 \u03b5\u03be\u03ae\u03c2:<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"621\" height=\"664\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-32.png\" alt=\"\" class=\"wp-image-70681\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-32.png 621w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-32-281x300.png 281w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-32-360x385.png 360w\" sizes=\"(max-width: 621px) 100vw, 621px\" \/><figcaption class=\"wp-element-caption\"><strong>\u03a3\u03c7\u03ae\u03bc\u03b1 5.<\/strong>  \u039b\u03ae\u03c8\u03b7 \u03b5\u03bd\u03cc\u03c2 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03bf\u03c5 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 \u03bc\u03b5 \u03c4\u03bf \u03b1\u03bd\u03b1\u03b3\u03bd\u03c9\u03c1\u03b9\u03c3\u03c4\u03b9\u03ba\u03cc Skyplanner 4<\/figcaption><\/figure>\n\n<h4 class=\"wp-block-heading\" id=\"h-creating-order-items\">\u0394\u03b7\u03bc\u03b9\u03bf\u03c5\u03c1\u03b3\u03af\u03b1 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03c9\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2<\/h4>\n\n<p>\u03a3\u03b7\u03bc\u03b5\u03b9\u03ce\u03c3\u03c4\u03b5 \u03cc\u03c4\u03b9 \u03c0\u03c1\u03ad\u03c0\u03b5\u03b9 \u03bd\u03b1 \u03b4\u03b7\u03bc\u03b9\u03bf\u03c5\u03c1\u03b3\u03ae\u03c3\u03b5\u03c4\u03b5 \u03bc\u03b9\u03b1 <strong>\u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1<\/strong> \u03c0\u03c1\u03b9\u03bd \u03b1\u03c0\u03cc \u03c4\u03b7 \u03b4\u03b7\u03bc\u03b9\u03bf\u03c5\u03c1\u03b3\u03af\u03b1 \u03c4\u03bf\u03c5 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03bf\u03c5 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2!<\/p>\n\n<p>\u0393\u03b9\u03b1 \u03bd\u03b1 \u03b4\u03b7\u03bc\u03b9\u03bf\u03c5\u03c1\u03b3\u03ae\u03c3\u03b5\u03c4\u03b5 \u03ad\u03bd\u03b1 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03bf \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2, \u03c3\u03c4\u03b5\u03af\u03bb\u03c4\u03b5 \u03ad\u03bd\u03b1 \u03b1\u03af\u03c4\u03b7\u03bc\u03b1 POST \u03c3\u03c4\u03bf \u03c4\u03b5\u03bb\u03b9\u03ba\u03cc \u03c3\u03b7\u03bc\u03b5\u03af\u03bf <mark style=\"background-color:var(--contrast-3)\" class=\"has-inline-color\">\/phaser-order-rows<\/mark>:<\/p>\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"669\" height=\"1024\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-10-669x1024.png\" alt=\"\" class=\"wp-image-69818\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-10-669x1024.png 669w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-10-196x300.png 196w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-10-768x1175.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-10-335x512.png 335w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-10.png 815w\" sizes=\"(max-width: 669px) 100vw, 669px\" \/><figcaption class=\"wp-element-caption\"><strong>\u03a3\u03c7\u03ae\u03bc\u03b1<\/strong> <strong>6.<\/strong> \u0394\u03b7\u03bc\u03b9\u03bf\u03c5\u03c1\u03b3\u03af\u03b1 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03bf\u03c5 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2<\/figcaption><\/figure>\n\n<figure class=\"wp-block-image size-large is-resized\"><img decoding=\"async\" width=\"1024\" height=\"536\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-13-1024x536.png\" alt=\"\" class=\"wp-image-69909\" style=\"width:1024px;height:auto\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-13-1024x536.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-13-300x157.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-13-768x402.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-13-1536x803.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-13-360x188.png 360w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-13.png 1807w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"><strong>\u0395\u03b9\u03ba. 7.<\/strong>  \u0394\u03b7\u03bc\u03b9\u03bf\u03c5\u03c1\u03b3\u03ae\u03b8\u03b7\u03ba\u03b5 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03bf \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2<\/figcaption><\/figure>\n\n<p>\u0391\u03ba\u03bf\u03bb\u03bf\u03c5\u03b8\u03b5\u03af \u03bc\u03b9\u03b1 \u03b5\u03c0\u03b9\u03c3\u03ba\u03cc\u03c0\u03b7\u03c3\u03b7 \u03c4\u03c9\u03bd \u03c0\u03b5\u03b4\u03af\u03c9\u03bd \u03c0\u03bf\u03c5 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af\u03c4\u03b5 \u03bd\u03b1 \u03c7\u03c1\u03b7\u03c3\u03b9\u03bc\u03bf\u03c0\u03bf\u03b9\u03ae\u03c3\u03b5\u03c4\u03b5 \u03ba\u03b1\u03c4\u03ac \u03c4\u03b7 \u03b4\u03b7\u03bc\u03b9\u03bf\u03c5\u03c1\u03b3\u03af\u03b1 \u03b5\u03bd\u03cc\u03c2 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03bf\u03c5 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2:<\/p>\n\n<ul class=\"wp-block-list\">\n<li><strong>phaser_order_id<\/strong>\n<ul class=\"wp-block-list\">\n<li>\u0395\u03c3\u03c9\u03c4\u03b5\u03c1\u03b9\u03ba\u03cc \u03b1\u03bd\u03b1\u03b3\u03bd\u03c9\u03c1\u03b9\u03c3\u03c4\u03b9\u03ba\u03cc \u03c4\u03bf\u03c5 Skyplanner \u03b3\u03b9\u03b1 \u03c4\u03b7\u03bd <strong>\u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1<\/strong> \u03c3\u03c4\u03b7\u03bd \u03bf\u03c0\u03bf\u03af\u03b1 \u03b5\u03c0\u03b9\u03c3\u03c5\u03bd\u03ac\u03c0\u03c4\u03b5\u03c4\u03b1\u03b9 \u03c4\u03bf \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03bf \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2<\/li>\n\n\n\n<li><strong>\u03a5\u03c0\u03bf\u03c7\u03c1\u03b5\u03c9\u03c4\u03b9\u03ba\u03cc \u03c0\u03b5\u03b4\u03af\u03bf<\/strong><\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>production_planning_order_row_id<\/strong>\n<ul class=\"wp-block-list\">\n<li>\u039c\u03b5\u03c4\u03ac \u03c4\u03b7\u03bd \u03b5\u03be\u03b1\u03b3\u03c9\u03b3\u03ae \u03c4\u03b7\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 \u03c3\u03c4\u03b7\u03bd \u03b5\u03bd\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03bf\u03cd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c4\u03bf\u03c5 Skyplanner \u03b4\u03b7\u03bc\u03b9\u03bf\u03c5\u03c1\u03b3\u03b5\u03af\u03c4\u03b1\u03b9 \u03bc\u03b9\u03b1 \u03be\u03b5\u03c7\u03c9\u03c1\u03b9\u03c3\u03c4\u03ae \u03bf\u03bd\u03c4\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03bf\u03c5 \u03bf\u03bd\u03bf\u03bc\u03ac\u03b6\u03b5\u03c4\u03b1\u03b9 <strong>\u03c3\u03b5\u03b9\u03c1\u03ac \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03bf\u03cd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2<\/strong> \u03ba\u03b1\u03b9 \u03c4\u03bf id \u03c4\u03b7\u03c2 \u03bf\u03c1\u03af\u03b6\u03b5\u03c4\u03b1\u03b9 \u03c3\u03b5 \u03b1\u03c5\u03c4\u03cc \u03c4\u03bf \u03c0\u03b5\u03b4\u03af\u03bf<\/li>\n\n\n\n<li><strong>\u0394\u03b5\u03bd \u03c3\u03c5\u03bd\u03b9\u03c3\u03c4\u03ac\u03c4\u03b1\u03b9 \u03b7 \u03c7\u03c1\u03ae\u03c3\u03b7 \u03c4\u03bf\u03c5 <\/strong>(\u03b1\u03c6\u03ae\u03c3\u03c4\u03b5 \u03c4\u03bf \u03bc\u03b7\u03b4\u03b5\u03bd\u03b9\u03ba\u03cc \u03ae \u03bc\u03b7\u03bd \u03c3\u03c4\u03b5\u03af\u03bb\u03b5\u03c4\u03b5 \u03ba\u03b1\u03b8\u03cc\u03bb\u03bf\u03c5 \u03b1\u03c5\u03c4\u03cc \u03c4\u03bf \u03c0\u03b5\u03b4\u03af\u03bf \u03c3\u03c4\u03bf \u03c0\u03b5\u03b4\u03af\u03bf \u03b1\u03af\u03c4\u03b7\u03c3\u03b7\u03c2)<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>production_planning_product_id<\/strong>\n<ul class=\"wp-block-list\">\n<li>Skyplanner product id \u03b3\u03b9\u03b1 \u03c4\u03bf \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd \u03c0\u03bf\u03c5 \u03c0\u03b1\u03c1\u03ac\u03b3\u03b5\u03b9 \u03c4\u03bf \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03bf \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2<\/li>\n\n\n\n<li>\u0391\u03c0\u03b1\u03b9\u03c4\u03b5\u03af\u03c4\u03b1\u03b9 \u03b5\u03ac\u03bd \u03b8\u03ad\u03bb\u03b5\u03c4\u03b5 \u03bd\u03b1 \u03c6\u03ad\u03c1\u03b5\u03c4\u03b5 \u03c0\u03c1\u03bf\u03b5\u03c0\u03b9\u03bb\u03b5\u03b3\u03bc\u03ad\u03bd\u03b1 \u03b2\u03ae\u03bc\u03b1\u03c4\u03b1 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b1\u03c2 \u03b1\u03c0\u03cc \u03ad\u03bd\u03b1 \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>external_id<\/strong>\n<ul class=\"wp-block-list\">\n<li>\u039c\u03bf\u03bd\u03b1\u03b4\u03b9\u03ba\u03cc \u03b1\u03bd\u03b1\u03b3\u03bd\u03c9\u03c1\u03b9\u03c3\u03c4\u03b9\u03ba\u03cc \u03c4\u03bf\u03c5 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03bf\u03c5 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2<\/li>\n\n\n\n<li>\u03a7\u03c1\u03b7\u03c3\u03b9\u03bc\u03bf\u03c0\u03bf\u03b9\u03ae\u03c3\u03c4\u03b5 \u03c4\u03bf \u03b3\u03b9\u03b1 \u03bd\u03b1 \u03c3\u03c5\u03bd\u03b4\u03ad\u03c3\u03b5\u03c4\u03b5 \u03c4\u03bf \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03bf \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 \u03c4\u03bf\u03c5 Skyplanner \u03bc\u03b5 \u03c4\u03bf \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03bf \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 \u03c3\u03b1\u03c2 \u03b1\u03c0\u03cc \u03ad\u03bd\u03b1 \u03b5\u03be\u03c9\u03c4\u03b5\u03c1\u03b9\u03ba\u03cc \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1 (ERP \u03ba.\u03bb\u03c0.)<\/li>\n\n\n\n<li><strong>\u03a0\u03c1\u03ad\u03c0\u03b5\u03b9 \u03bd\u03b1 \u03b5\u03af\u03bd\u03b1\u03b9 \u03bc\u03bf\u03bd\u03b1\u03b4\u03b9\u03ba\u03cc<\/strong><\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>parent_id<\/strong>\n<ul class=\"wp-block-list\">\n<li>\u0395\u03ac\u03bd \u03c4\u03bf \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03bf \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 \u03b5\u03af\u03bd\u03b1\u03b9 \u03c5\u03c0\u03bf\u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03bf \u03ac\u03bb\u03bb\u03bf\u03c5 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03bf\u03c5 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2, \u03b4\u03ce\u03c3\u03c4\u03b5 \u03b5\u03b4\u03ce \u03c4\u03b7\u03bd \u03c4\u03b9\u03bc\u03ae id \u03c4\u03bf\u03c5 \u03b3\u03bf\u03bd\u03ad\u03b1.<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>row_index<\/strong>\n<ul class=\"wp-block-list\">\n<li>\u03a3\u03b5 \u03c0\u03bf\u03b9\u03bf \u03c3\u03b7\u03bc\u03b5\u03af\u03bf \u03c4\u03bf\u03c5 \u03ba\u03b1\u03c4\u03b1\u03bb\u03cc\u03b3\u03bf\u03c5 \u03c4\u03c9\u03bd \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03c9\u03bd \u03c4\u03b7\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 \u03b2\u03c1\u03af\u03c3\u03ba\u03b5\u03c4\u03b1\u03b9 \u03b1\u03c5\u03c4\u03cc \u03c4\u03bf \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03bf.<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>\u03b1\u03c1\u03b9\u03b8\u03bc\u03cc\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2<\/strong>\n<ul class=\"wp-block-list\">\n<li>\u03a7\u03c1\u03b7\u03c3\u03b9\u03bc\u03bf\u03c0\u03bf\u03b9\u03b5\u03af\u03c4\u03b1\u03b9 \u03bc\u03cc\u03bd\u03bf \u03c9\u03c2 \u03c0\u03bb\u03b7\u03c1\u03bf\u03c6\u03bf\u03c1\u03b9\u03b1\u03ba\u03ae \u03c4\u03b9\u03bc\u03ae \u03b1\u03c1\u03b9\u03b8\u03bc\u03bf\u03cd \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2 \u03b3\u03b9\u03b1 \u03c4\u03bf \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03bf \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2.<\/li>\n\n\n\n<li>\u0394\u03b5\u03bd \u03b5\u03af\u03bd\u03b1\u03b9 \u03bf\u03c1\u03b1\u03c4\u03cc \u03c3\u03c4\u03bf Skyplanner UI<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>\u03ba\u03b1\u03c4\u03ac\u03c3\u03c4\u03b1\u03c3\u03b7<\/strong>\n<ul class=\"wp-block-list\">\n<li>\u039a\u03b1\u03c4\u03ac\u03c3\u03c4\u03b1\u03c3\u03b7 \u03c4\u03bf\u03c5 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03bf\u03c5 \u03c4\u03b7\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2<\/li>\n\n\n\n<li>\u0395\u03c0\u03b9\u03c4\u03c1\u03b5\u03c0\u03cc\u03bc\u03b5\u03bd\u03b5\u03c2 \u03c4\u03b9\u03bc\u03ad\u03c2: <strong>new, started, ready, phased<\/strong><\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>is_archive<\/strong>\n<ul class=\"wp-block-list\">\n<li>\u0395\u03af\u03bd\u03b1\u03b9 \u03c4\u03bf \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03bf \u03c4\u03b7\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 \u03b1\u03c1\u03c7\u03b5\u03b9\u03bf\u03b8\u03b5\u03c4\u03b7\u03bc\u03ad\u03bd\u03bf (\u03b1\u03c0\u03b1\u03bb\u03ae \u03b4\u03b9\u03b1\u03b3\u03c1\u03b1\u03c6\u03ae)<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>\u03b8\u03ad\u03c3\u03b7<\/strong>\n<ul class=\"wp-block-list\">\n<li>\u03a4\u03b9\u03bc\u03ae \u03b1\u03bd\u03b1\u03b3\u03bd\u03c9\u03c1\u03b9\u03c3\u03c4\u03b9\u03ba\u03bf\u03cd \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03bf\u03c5 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 (\u03b2\u03bb. \u03a3\u03c7\u03ae\u03bc\u03b1 3.)<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>\u03c0\u03bf\u03c3\u03cc<\/strong>\n<ul class=\"wp-block-list\">\n<li>\u03a3\u03c5\u03bd\u03bf\u03bb\u03b9\u03ba\u03ae \u03ba\u03b1\u03c4\u03b1\u03c3\u03ba\u03b5\u03c5\u03b1\u03c3\u03b8\u03b5\u03af\u03c3\u03b1 \u03c0\u03bf\u03c3\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03bf\u03c2<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>ordered_amount<\/strong>\n<ul class=\"wp-block-list\">\n<li>\u03a0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03b8\u03b5\u03af\u03c3\u03b1 \u03c0\u03bf\u03c3\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03bf\u03c2<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>\u03c4\u03b9\u03bc\u03ae<\/strong>\n<ul class=\"wp-block-list\">\n<li>\u039c\u03bf\u03bd\u03b1\u03b4\u03b9\u03b1\u03af\u03b1 \u03c4\u03b9\u03bc\u03ae \u03c4\u03bf\u03c5 \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03bf\u03c2<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>use_custom_materials<\/strong>\n<ul class=\"wp-block-list\">\n<li>\u0395\u03ac\u03bd \u03b4\u03b5\u03bd \u03b8\u03ad\u03bb\u03b5\u03c4\u03b5 \u03bd\u03b1 \u03c7\u03c1\u03b7\u03c3\u03b9\u03bc\u03bf\u03c0\u03bf\u03b9\u03ae\u03c3\u03b5\u03c4\u03b5 \u03c4\u03b7\u03bd \u03c0\u03c1\u03bf\u03b5\u03c0\u03b9\u03bb\u03b5\u03b3\u03bc\u03ad\u03bd\u03b7 \u03c1\u03cd\u03b8\u03bc\u03b9\u03c3\u03b7 \u03c5\u03bb\u03b9\u03ba\u03bf\u03cd \u03b1\u03c0\u03cc \u03c4\u03b1 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03b1 \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03bf\u03c2, \u03bf\u03c1\u03af\u03c3\u03c4\u03b5 \u03b1\u03c5\u03c4\u03ae \u03c4\u03b7\u03bd \u03c4\u03b9\u03bc\u03ae \u03c3\u03b5 true.<\/li>\n\n\n\n<li>\u03a0\u03c1\u03bf\u03b5\u03c0\u03b9\u03bb\u03bf\u03b3\u03ae: <strong>false<\/strong><\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>use_custom_materials_calculated<\/strong>\n<ul class=\"wp-block-list\">\n<li>\u039f\u03b9 \u03c0\u03bf\u03c3\u03cc\u03c4\u03b7\u03c4\u03b5\u03c2 \u03c0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03bf\u03c3\u03bc\u03ad\u03bd\u03c9\u03bd \u03c5\u03bb\u03b9\u03ba\u03ce\u03bd \u03c5\u03c0\u03bf\u03bb\u03bf\u03b3\u03af\u03b6\u03bf\u03bd\u03c4\u03b1\u03b9 \u03bc\u03b5 \u03b2\u03ac\u03c3\u03b7 \u03c4\u03b7\u03bd \u03ba\u03b1\u03c4\u03b1\u03c3\u03ba\u03b5\u03c5\u03b1\u03c3\u03bc\u03ad\u03bd\u03b7 \u03c0\u03bf\u03c3\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c4\u03c9\u03bd \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03c9\u03bd.<\/li>\n\n\n\n<li>\u0391\u03bd \u03bf\u03c1\u03b9\u03c3\u03c4\u03b5\u03af \u03c3\u03b5 false, \u03bf\u03b9 \u03c0\u03bf\u03c3\u03cc\u03c4\u03b7\u03c4\u03b5\u03c2 \u03c5\u03bb\u03b9\u03ba\u03ce\u03bd \u03b5\u03af\u03bd\u03b1\u03b9 \u03c3\u03c4\u03b1\u03b8\u03b5\u03c1\u03ad\u03c2<\/li>\n\n\n\n<li>\u03a0\u03c1\u03bf\u03b5\u03c0\u03b9\u03bb\u03bf\u03b3\u03ae: <strong>false<\/strong><\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>get_default_steps<\/strong>\n<ul class=\"wp-block-list\">\n<li>\u0394\u03b7\u03bc\u03b9\u03bf\u03c5\u03c1\u03b3\u03af\u03b1 \u03b2\u03b7\u03bc\u03ac\u03c4\u03c9\u03bd \u03b4\u03b9\u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2 \u03b3\u03b9\u03b1 \u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1 \u03b1\u03bd\u03c4\u03b9\u03ba\u03b5\u03b9\u03bc\u03ad\u03bd\u03bf\u03c5 \u03bc\u03b5 \u03b2\u03ac\u03c3\u03b7 \u03c4\u03b1 \u03c0\u03c1\u03bf\u03b5\u03c0\u03b9\u03bb\u03b5\u03b3\u03bc\u03ad\u03bd\u03b1 \u03b2\u03ae\u03bc\u03b1\u03c4\u03b1 \u03b4\u03b9\u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2 \u03c4\u03bf\u03c5 \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03bf\u03c2<\/li>\n\n\n\n<li>\u03a0\u03c1\u03bf\u03b5\u03c0\u03b9\u03bb\u03bf\u03b3\u03ae: <strong>false<\/strong><\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>use_calculated_job_durations<\/strong>\n<ul class=\"wp-block-list\">\n<li>\u03a5\u03c0\u03bf\u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03cc\u03c2 \u03b4\u03b9\u03ac\u03c1\u03ba\u03b5\u03b9\u03b1\u03c2 \u03b2\u03b7\u03bc\u03ac\u03c4\u03c9\u03bd \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b1\u03c2 \u03bc\u03b5 \u03b2\u03ac\u03c3\u03b7 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03b1 \u03c7\u03c1\u03bf\u03bd\u03bf\u03bb\u03bf\u03b3\u03af\u03bf\u03c5 \u03c4\u03bf\u03c5 \u03c0\u03b1\u03c1\u03b5\u03bb\u03b8\u03cc\u03bd\u03c4\u03bf\u03c2<\/li>\n\n\n\n<li>\u0395\u03ac\u03bd \u03b4\u03b5\u03bd \u03c5\u03c0\u03ac\u03c1\u03c7\u03bf\u03c5\u03bd \u03b1\u03c1\u03ba\u03b5\u03c4\u03ac \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03b1 \u03b3\u03b9\u03b1 \u03c4\u03bf\u03bd \u03c5\u03c0\u03bf\u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03cc, \u03c7\u03c1\u03b7\u03c3\u03b9\u03bc\u03bf\u03c0\u03bf\u03b9\u03bf\u03cd\u03bd\u03c4\u03b1\u03b9 \u03c0\u03c1\u03bf\u03b5\u03c0\u03b9\u03bb\u03b5\u03b3\u03bc\u03ad\u03bd\u03b5\u03c2 \u03b4\u03b9\u03ac\u03c1\u03ba\u03b5\u03b9\u03b5\u03c2.<\/li>\n\n\n\n<li>\u03a0\u03c1\u03bf\u03b5\u03c0\u03b9\u03bb\u03bf\u03b3\u03ae: <strong>false<\/strong><\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>sub_items<\/strong>\n<ul class=\"wp-block-list\">\n<li>\u0394\u03b7\u03bc\u03b9\u03bf\u03c5\u03c1\u03b3\u03ae\u03c3\u03c4\u03b5 \u03b5\u03c0\u03af\u03c3\u03b7\u03c2 \u03c4\u03b1 \u03c5\u03c0\u03bf-\u03b1\u03bd\u03c4\u03b9\u03ba\u03b5\u03af\u03bc\u03b5\u03bd\u03b1 \u03c4\u03bf\u03c5 \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03bf\u03c2 \u03b5\u03ac\u03bd \u03b5\u03af\u03bd\u03b1\u03b9 \u03b4\u03b9\u03b1\u03b8\u03ad\u03c3\u03b9\u03bc\u03b1<\/li>\n\n\n\n<li>\u03a0\u03c1\u03bf\u03b5\u03c0\u03b9\u03bb\u03bf\u03b3\u03ae: <strong>false<\/strong><\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>delivery_date<\/strong>\n<ul class=\"wp-block-list\">\n<li>\u039c\u03bf\u03c1\u03c6\u03ae: 2022-01-01 10:30:11<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>start_eligibility_date<\/strong>\n<ul class=\"wp-block-list\">\n<li>\u039c\u03bf\u03c1\u03c6\u03ae: 2022-01-01 10:30:11<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>drawing_identifier<\/strong>\n<ul class=\"wp-block-list\">\n<li>\u0391\u03bd\u03b1\u03b3\u03bd\u03c9\u03c1\u03b9\u03c3\u03c4\u03b9\u03ba\u03cc \u03c3\u03c7\u03b5\u03b4\u03af\u03bf\u03c5\/\u03bc\u03c0\u03bb\u03b5 \u03c3\u03c7\u03b5\u03b4\u03af\u03bf\u03c5\/\u03bf\u03b4\u03b7\u03b3\u03b9\u03ce\u03bd<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>\u03c0\u03b5\u03c1\u03b9\u03b3\u03c1\u03b1\u03c6\u03ae<\/strong>\n<ul class=\"wp-block-list\">\n<li>\u03a0\u03b5\u03c1\u03b9\u03b3\u03c1\u03b1\u03c6\u03ae \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03bf\u03c5 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>additional_description<\/strong>\n<ul class=\"wp-block-list\">\n<li>\u03a0\u03c1\u03cc\u03c3\u03b8\u03b5\u03c4\u03b7 \u03c0\u03b5\u03c1\u03b9\u03b3\u03c1\u03b1\u03c6\u03ae \u03b3\u03b9\u03b1 \u03c4\u03bf \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03bf \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>is_prospect<\/strong>\n<ul class=\"wp-block-list\">\n<li>\u0395\u03af\u03bd\u03b1\u03b9 \u03c4\u03bf \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03bf \u03c4\u03b7\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 \u03bc\u03b9\u03b1 \u03c0\u03c1\u03bf\u03bf\u03c0\u03c4\u03b9\u03ba\u03ae<\/li>\n\n\n\n<li>\u03a0\u03c1\u03bf\u03b5\u03c0\u03b9\u03bb\u03bf\u03b3\u03ae: <strong>false<\/strong><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n<h4 class=\"wp-block-heading\" id=\"h-updating-order-items\">\u0395\u03bd\u03b7\u03bc\u03ad\u03c1\u03c9\u03c3\u03b7 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03c9\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2<\/h4>\n\n<p>\u0393\u03b9\u03b1 \u03bd\u03b1 \u03b5\u03bd\u03b7\u03bc\u03b5\u03c1\u03ce\u03c3\u03b5\u03c4\u03b5 \u03c4\u03b1 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03b1 \u03c4\u03c9\u03bd \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03c9\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af\u03c4\u03b5 \u03bd\u03b1 \u03c3\u03c4\u03b5\u03af\u03bb\u03b5\u03c4\u03b5 \u03ad\u03bd\u03b1 \u03b1\u03af\u03c4\u03b7\u03bc\u03b1 PUT \u03c3\u03c4\u03bf \u03c4\u03b5\u03bb\u03b9\u03ba\u03cc \u03c3\u03b7\u03bc\u03b5\u03af\u03bf <mark style=\"background-color:var(--contrast-3)\" class=\"has-inline-color\">\/phaser-order-rows<\/mark>:<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"802\" height=\"1000\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-17.png\" alt=\"\" class=\"wp-image-70065\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-17.png 802w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-17-241x300.png 241w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-17-768x958.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-17-360x449.png 360w\" sizes=\"(max-width: 802px) 100vw, 802px\" \/><figcaption class=\"wp-element-caption\"><strong>\u0395\u03b9\u03ba. 8.  <\/strong>\u0395\u03bd\u03b7\u03bc\u03ad\u03c1\u03c9\u03c3\u03b7 \u03b5\u03bd\u03cc\u03c2 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03bf\u03c5 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2<\/figcaption><\/figure>\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"536\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-15-1024x536.png\" alt=\"\" class=\"wp-image-70003\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-15-1024x536.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-15-300x157.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-15-768x402.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-15-1536x804.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-15-360x188.png 360w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-15.png 1816w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"><strong>\u0395\u03b9\u03ba. 9.  <\/strong>\u0395\u03bd\u03b7\u03bc\u03b5\u03c1\u03c9\u03bc\u03ad\u03bd\u03bf \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03bf \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2<\/figcaption><\/figure>\n\n<h4 class=\"wp-block-heading\" id=\"h-deleting-order-items\">\u0394\u03b9\u03b1\u03b3\u03c1\u03b1\u03c6\u03ae \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03c9\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2<\/h4>\n\n<p>\u0397 \u03b4\u03b9\u03b1\u03b3\u03c1\u03b1\u03c6\u03ae \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03c9\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 \u03b3\u03af\u03bd\u03b5\u03c4\u03b1\u03b9 \u03bc\u03b5 \u03c4\u03b7 \u03bc\u03ad\u03b8\u03bf\u03b4\u03bf &#8220;\u03b1\u03c0\u03b1\u03bb\u03ae\u03c2 \u03b4\u03b9\u03b1\u03b3\u03c1\u03b1\u03c6\u03ae\u03c2&#8221;. \u03a3\u03c4\u03b7\u03bd \u03c0\u03c1\u03b1\u03b3\u03bc\u03b1\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1, \u03b7 \u03b4\u03b9\u03b1\u03b3\u03c1\u03b1\u03c6\u03ae \u03b5\u03bd\u03cc\u03c2 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03bf\u03c5 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 \u03b1\u03bb\u03bb\u03ac\u03b6\u03b5\u03b9 \u03c4\u03b7\u03bd \u03c4\u03b9\u03bc\u03ae <g id=\"gid_0\">is_archive<\/g> \u03c3\u03b5 true. \u0391\u03c5\u03c4\u03cc \u03c3\u03b7\u03bc\u03b1\u03af\u03bd\u03b5\u03b9 \u03cc\u03c4\u03b9 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af\u03c4\u03b5 \u03bd\u03b1 \u03b5\u03c0\u03b1\u03bd\u03b1\u03c6\u03ad\u03c1\u03b5\u03c4\u03b5 \u03c4\u03b1 \u03b4\u03b9\u03b1\u03b3\u03c1\u03b1\u03bc\u03bc\u03ad\u03bd\u03b1 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 \u03b5\u03bd\u03b7\u03bc\u03b5\u03c1\u03ce\u03bd\u03bf\u03bd\u03c4\u03b1\u03c2 \u03c4\u03b7\u03bd \u03c4\u03b9\u03bc\u03ae is_archive \u03c3\u03b5 false.  <\/p>\n\n<p>\u039a\u03b1\u03c4\u03ac \u03c4\u03b7 \u03b4\u03b9\u03b1\u03b3\u03c1\u03b1\u03c6\u03ae \u03b5\u03bd\u03cc\u03c2 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03bf\u03c5 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2, \u03c4\u03bf \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1 \u03b8\u03b1 \u03b4\u03b9\u03b1\u03b3\u03c1\u03ac\u03c8\u03b5\u03b9 \u03b5\u03c0\u03af\u03c3\u03b7\u03c2 \u03c4\u03b1 \u03c3\u03c7\u03b5\u03c4\u03b9\u03ba\u03ac \u03b2\u03ae\u03bc\u03b1\u03c4\u03b1 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b1\u03c2.<\/p>\n\n<p>\u0394\u03b9\u03b1\u03b3\u03c1\u03ac\u03c6\u03b5\u03c4\u03b5 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03b9\u03ce\u03bd \u03c3\u03c4\u03ad\u03bb\u03bd\u03bf\u03bd\u03c4\u03b1\u03c2 \u03ad\u03bd\u03b1 \u03b1\u03af\u03c4\u03b7\u03bc\u03b1 DELETE \u03c3\u03c4\u03bf \u03c4\u03b5\u03bb\u03b9\u03ba\u03cc \u03c3\u03b7\u03bc\u03b5\u03af\u03bf <mark style=\"background-color:var(--contrast-3)\" class=\"has-inline-color\">\/phaser-order-rows<\/mark>:<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"675\" height=\"633\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-19.png\" alt=\"\" class=\"wp-image-70149\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-19.png 675w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-19-300x281.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-19-360x338.png 360w\" sizes=\"(max-width: 675px) 100vw, 675px\" \/><figcaption class=\"wp-element-caption\"><strong>\u0395\u03b9\u03ba. 10.  <\/strong>\u0394\u03b9\u03b1\u03b3\u03c1\u03b1\u03c6\u03ae \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03c9\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2<\/figcaption><\/figure>\n\n<p>\u039c\u03c0\u03bf\u03c1\u03b5\u03af\u03c4\u03b5 \u03bd\u03b1 \u03b4\u03b9\u03b1\u03b3\u03c1\u03ac\u03c8\u03b5\u03c4\u03b5 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 \u03b4\u03af\u03bd\u03bf\u03bd\u03c4\u03b1\u03c2 \u03c4\u03b1 \u03b5\u03c3\u03c9\u03c4\u03b5\u03c1\u03b9\u03ba\u03ac \u03b1\u03bd\u03b1\u03b3\u03bd\u03c9\u03c1\u03b9\u03c3\u03c4\u03b9\u03ba\u03ac \u03c4\u03bf\u03c5 Skyplanner \u03c3\u03c4\u03bf\u03bd \u03c0\u03af\u03bd\u03b1\u03ba\u03b1 <strong>&#8220;ids<\/strong> &#8221; \u03ae \u03c4\u03b1 \u03b5\u03be\u03c9\u03c4\u03b5\u03c1\u03b9\u03ba\u03ac \u03b1\u03bd\u03b1\u03b3\u03bd\u03c9\u03c1\u03b9\u03c3\u03c4\u03b9\u03ba\u03ac \u03c3\u03c4\u03bf\u03bd \u03c0\u03af\u03bd\u03b1\u03ba\u03b1 <strong>&#8220;external_ids<\/strong> &#8220;.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u0395\u03b4\u03ce \u03b8\u03b1 \u03b1\u03bd\u03b1\u03c6\u03b5\u03c1\u03b8\u03bf\u03cd\u03bc\u03b5 \u03bb\u03b5\u03c0\u03c4\u03bf\u03bc\u03b5\u03c1\u03ce\u03c2 \u03c3\u03c4\u03b7\u03bd \u03b1\u03bd\u03ac\u03ba\u03c4\u03b7\u03c3\u03b7, \u03b4\u03b7\u03bc\u03b9\u03bf\u03c5\u03c1\u03b3\u03af\u03b1, \u03b5\u03bd\u03b7\u03bc\u03ad\u03c1\u03c9\u03c3\u03b7 \u03ba\u03b1\u03b9 \u03b4\u03b9\u03b1\u03b3\u03c1\u03b1\u03c6\u03ae \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03c9\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2. \u0397 \u03c0\u03c1\u03cc\u03c3\u03b2\u03b1\u03c3\u03b7 \u03c3\u03c4\u03b1 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03b9\u03ce\u03bd \u03b3\u03af\u03bd\u03b5\u03c4\u03b1\u03b9 \u03b1\u03c0\u03cc \u03c4\u03bf \u03c4\u03b5\u03bb\u03b9\u03ba\u03cc \u03c3\u03b7\u03bc\u03b5\u03af\u03bf \/phaser-order-rows. \u039b\u03ae\u03c8\u03b7 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03c9\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 \u039b\u03b1\u03bc\u03b2\u03ac\u03bd\u03b5\u03c4\u03b5 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 \u03c3\u03c4\u03ad\u03bb\u03bd\u03bf\u03bd\u03c4\u03b1\u03c2 \u03ad\u03bd\u03b1 \u03b1\u03af\u03c4\u03b7\u03bc\u03b1 GET \u03c3\u03c4\u03bf \u03c4\u03b5\u03bb\u03b9\u03ba\u03cc \u03c3\u03b7\u03bc\u03b5\u03af\u03bf \/phaser-order-rows: \u039c\u03c0\u03bf\u03c1\u03b5\u03af\u03c4\u03b5 \u03bd\u03b1 \u03b1\u03bd\u03b1\u03b6\u03b7\u03c4\u03ae\u03c3\u03b5\u03c4\u03b5 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 \u03bc\u03b5 \u03b2\u03ac\u03c3\u03b7 \u03b4\u03b9\u03ac\u03c6\u03bf\u03c1\u03b5\u03c2 \u03c0\u03b1\u03c1\u03b1\u03bc\u03ad\u03c4\u03c1\u03bf\u03c5\u03c2: \u039c\u03c0\u03bf\u03c1\u03b5\u03af\u03c4\u03b5 \u03b5\u03c0\u03af\u03c3\u03b7\u03c2 \u03bd\u03b1 \u03c3\u03c5\u03bd\u03b4\u03c5\u03ac\u03c3\u03b5\u03c4\u03b5 \u03c4\u03b9\u03c2 \u03c0\u03b1\u03c1\u03b1\u03bc\u03ad\u03c4\u03c1\u03bf\u03c5\u03c2 \u03b1\u03bd\u03b1\u03b6\u03ae\u03c4\u03b7\u03c3\u03b7\u03c2 \u03c9\u03c2 \u03b5\u03be\u03ae\u03c2: &#8230; <a title=\"\u03a0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1 \u03b1\u03bd\u03c4\u03b9\u03ba\u03b5\u03b9\u03bc\u03ad\u03bd\u03c9\u03bd\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/el\/docs\/%cf%80%ce%b1%cf%81%ce%b1%ce%b3%ce%b3%ce%b5%ce%bb%ce%af%ce%b1-%ce%b1%ce%bd%cf%84%ce%b9%ce%ba%ce%b5%ce%b9%ce%bc%ce%ad%ce%bd%cf%89%ce%bd\/\" aria-label=\"Read more about \u03a0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1 \u03b1\u03bd\u03c4\u03b9\u03ba\u03b5\u03b9\u03bc\u03ad\u03bd\u03c9\u03bd\">Read more<\/a><\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"doc_category":[635],"doc_tag":[636,1524],"class_list":["post-77382","docs","type-docs","status-publish","hentry","doc_category-635","doc_tag-api-el","doc_tag-1524"],"acf":[],"year_month":"2026-11","word_count":150,"total_views":"243","reactions":{"happy":"0","normal":"0","sad":"0"},"author_info":{"name":"Sami","author_nicename":"sami","author_url":"https:\/\/skyplanner.ai\/el\/author\/sami\/"},"doc_category_info":[{"term_name":"\u0395\u03bd\u03c3\u03c9\u03bc\u03b1\u03c4\u03ce\u03c3\u03b5\u03b9\u03c2","term_url":"https:\/\/skyplanner.ai\/el\/docs-category\/%ce%b5%ce%bd%cf%83%cf%89%ce%bc%ce%b1%cf%84%cf%8e%cf%83%ce%b5%ce%b9%cf%82\/"}],"doc_tag_info":[{"term_name":"API","term_url":"https:\/\/skyplanner.ai\/el\/docs-tag\/api-el\/"},{"term_name":"\u0395\u03bd\u03c3\u03c9\u03bc\u03ac\u03c4\u03c9\u03c3\u03b7","term_url":"https:\/\/skyplanner.ai\/el\/docs-tag\/%ce%b5%ce%bd%cf%83%cf%89%ce%bc%ce%ac%cf%84%cf%89%cf%83%ce%b7\/"}],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\u03a0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1 \u03b1\u03bd\u03c4\u03b9\u03ba\u03b5\u03b9\u03bc\u03ad\u03bd\u03c9\u03bd &#8211; SkyPlanner<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/el\/docs\/%cf%80%ce%b1%cf%81%ce%b1%ce%b3%ce%b3%ce%b5%ce%bb%ce%af%ce%b1-%ce%b1%ce%bd%cf%84%ce%b9%ce%ba%ce%b5%ce%b9%ce%bc%ce%ad%ce%bd%cf%89%ce%bd\/\" \/>\n<meta property=\"og:locale\" content=\"el_GR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u03a0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1 \u03b1\u03bd\u03c4\u03b9\u03ba\u03b5\u03b9\u03bc\u03ad\u03bd\u03c9\u03bd\" \/>\n<meta property=\"og:description\" content=\"\u0395\u03b4\u03ce \u03b8\u03b1 \u03b1\u03bd\u03b1\u03c6\u03b5\u03c1\u03b8\u03bf\u03cd\u03bc\u03b5 \u03bb\u03b5\u03c0\u03c4\u03bf\u03bc\u03b5\u03c1\u03ce\u03c2 \u03c3\u03c4\u03b7\u03bd \u03b1\u03bd\u03ac\u03ba\u03c4\u03b7\u03c3\u03b7, \u03b4\u03b7\u03bc\u03b9\u03bf\u03c5\u03c1\u03b3\u03af\u03b1, \u03b5\u03bd\u03b7\u03bc\u03ad\u03c1\u03c9\u03c3\u03b7 \u03ba\u03b1\u03b9 \u03b4\u03b9\u03b1\u03b3\u03c1\u03b1\u03c6\u03ae \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03c9\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2. \u0397 \u03c0\u03c1\u03cc\u03c3\u03b2\u03b1\u03c3\u03b7 \u03c3\u03c4\u03b1 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03b9\u03ce\u03bd \u03b3\u03af\u03bd\u03b5\u03c4\u03b1\u03b9 \u03b1\u03c0\u03cc \u03c4\u03bf \u03c4\u03b5\u03bb\u03b9\u03ba\u03cc \u03c3\u03b7\u03bc\u03b5\u03af\u03bf \/phaser-order-rows. \u039b\u03ae\u03c8\u03b7 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03c9\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 \u039b\u03b1\u03bc\u03b2\u03ac\u03bd\u03b5\u03c4\u03b5 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 \u03c3\u03c4\u03ad\u03bb\u03bd\u03bf\u03bd\u03c4\u03b1\u03c2 \u03ad\u03bd\u03b1 \u03b1\u03af\u03c4\u03b7\u03bc\u03b1 GET \u03c3\u03c4\u03bf \u03c4\u03b5\u03bb\u03b9\u03ba\u03cc \u03c3\u03b7\u03bc\u03b5\u03af\u03bf \/phaser-order-rows: \u039c\u03c0\u03bf\u03c1\u03b5\u03af\u03c4\u03b5 \u03bd\u03b1 \u03b1\u03bd\u03b1\u03b6\u03b7\u03c4\u03ae\u03c3\u03b5\u03c4\u03b5 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 \u03bc\u03b5 \u03b2\u03ac\u03c3\u03b7 \u03b4\u03b9\u03ac\u03c6\u03bf\u03c1\u03b5\u03c2 \u03c0\u03b1\u03c1\u03b1\u03bc\u03ad\u03c4\u03c1\u03bf\u03c5\u03c2: \u039c\u03c0\u03bf\u03c1\u03b5\u03af\u03c4\u03b5 \u03b5\u03c0\u03af\u03c3\u03b7\u03c2 \u03bd\u03b1 \u03c3\u03c5\u03bd\u03b4\u03c5\u03ac\u03c3\u03b5\u03c4\u03b5 \u03c4\u03b9\u03c2 \u03c0\u03b1\u03c1\u03b1\u03bc\u03ad\u03c4\u03c1\u03bf\u03c5\u03c2 \u03b1\u03bd\u03b1\u03b6\u03ae\u03c4\u03b7\u03c3\u03b7\u03c2 \u03c9\u03c2 \u03b5\u03be\u03ae\u03c2: ... Read more\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/el\/docs\/%cf%80%ce%b1%cf%81%ce%b1%ce%b3%ce%b3%ce%b5%ce%bb%ce%af%ce%b1-%ce%b1%ce%bd%cf%84%ce%b9%ce%ba%ce%b5%ce%b9%ce%bc%ce%ad%ce%bd%cf%89%ce%bd\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:modified_time\" content=\"2025-10-08T07:30:04+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-5.png\" \/>\n\t<meta property=\"og:image:width\" content=\"825\" \/>\n\t<meta property=\"og:image:height\" content=\"995\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u0395\u03ba\u03c4\u03b9\u03bc\u03ce\u03bc\u03b5\u03bd\u03bf\u03c2 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c2 \u03b1\u03bd\u03ac\u03b3\u03bd\u03c9\u03c3\u03b7\u03c2\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 \u03bb\u03b5\u03c0\u03c4\u03cc\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/docs\\\/%cf%80%ce%b1%cf%81%ce%b1%ce%b3%ce%b3%ce%b5%ce%bb%ce%af%ce%b1-%ce%b1%ce%bd%cf%84%ce%b9%ce%ba%ce%b5%ce%b9%ce%bc%ce%ad%ce%bd%cf%89%ce%bd\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/docs\\\/%cf%80%ce%b1%cf%81%ce%b1%ce%b3%ce%b3%ce%b5%ce%bb%ce%af%ce%b1-%ce%b1%ce%bd%cf%84%ce%b9%ce%ba%ce%b5%ce%b9%ce%bc%ce%ad%ce%bd%cf%89%ce%bd\\\/\",\"name\":\"\u03a0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1 \u03b1\u03bd\u03c4\u03b9\u03ba\u03b5\u03b9\u03bc\u03ad\u03bd\u03c9\u03bd &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/docs\\\/%cf%80%ce%b1%cf%81%ce%b1%ce%b3%ce%b3%ce%b5%ce%bb%ce%af%ce%b1-%ce%b1%ce%bd%cf%84%ce%b9%ce%ba%ce%b5%ce%b9%ce%bc%ce%ad%ce%bd%cf%89%ce%bd\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/docs\\\/%cf%80%ce%b1%cf%81%ce%b1%ce%b3%ce%b3%ce%b5%ce%bb%ce%af%ce%b1-%ce%b1%ce%bd%cf%84%ce%b9%ce%ba%ce%b5%ce%b9%ce%bc%ce%ad%ce%bd%cf%89%ce%bd\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2025\\\/05\\\/image-5.png\",\"datePublished\":\"2025-05-13T09:37:46+00:00\",\"dateModified\":\"2025-10-08T07:30:04+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/docs\\\/%cf%80%ce%b1%cf%81%ce%b1%ce%b3%ce%b3%ce%b5%ce%bb%ce%af%ce%b1-%ce%b1%ce%bd%cf%84%ce%b9%ce%ba%ce%b5%ce%b9%ce%bc%ce%ad%ce%bd%cf%89%ce%bd\\\/#breadcrumb\"},\"inLanguage\":\"el\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/el\\\/docs\\\/%cf%80%ce%b1%cf%81%ce%b1%ce%b3%ce%b3%ce%b5%ce%bb%ce%af%ce%b1-%ce%b1%ce%bd%cf%84%ce%b9%ce%ba%ce%b5%ce%b9%ce%bc%ce%ad%ce%bd%cf%89%ce%bd\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"el\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/docs\\\/%cf%80%ce%b1%cf%81%ce%b1%ce%b3%ce%b3%ce%b5%ce%bb%ce%af%ce%b1-%ce%b1%ce%bd%cf%84%ce%b9%ce%ba%ce%b5%ce%b9%ce%bc%ce%ad%ce%bd%cf%89%ce%bd\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2025\\\/05\\\/image-5.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2025\\\/05\\\/image-5.png\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/docs\\\/%cf%80%ce%b1%cf%81%ce%b1%ce%b3%ce%b3%ce%b5%ce%bb%ce%af%ce%b1-%ce%b1%ce%bd%cf%84%ce%b9%ce%ba%ce%b5%ce%b9%ce%bc%ce%ad%ce%bd%cf%89%ce%bd\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Docs\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/docs\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"\u03a0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1 \u03b1\u03bd\u03c4\u03b9\u03ba\u03b5\u03b9\u03bc\u03ad\u03bd\u03c9\u03bd\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"el\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"el\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\u03a0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1 \u03b1\u03bd\u03c4\u03b9\u03ba\u03b5\u03b9\u03bc\u03ad\u03bd\u03c9\u03bd &#8211; SkyPlanner","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/el\/docs\/%cf%80%ce%b1%cf%81%ce%b1%ce%b3%ce%b3%ce%b5%ce%bb%ce%af%ce%b1-%ce%b1%ce%bd%cf%84%ce%b9%ce%ba%ce%b5%ce%b9%ce%bc%ce%ad%ce%bd%cf%89%ce%bd\/","og_locale":"el_GR","og_type":"article","og_title":"\u03a0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1 \u03b1\u03bd\u03c4\u03b9\u03ba\u03b5\u03b9\u03bc\u03ad\u03bd\u03c9\u03bd","og_description":"\u0395\u03b4\u03ce \u03b8\u03b1 \u03b1\u03bd\u03b1\u03c6\u03b5\u03c1\u03b8\u03bf\u03cd\u03bc\u03b5 \u03bb\u03b5\u03c0\u03c4\u03bf\u03bc\u03b5\u03c1\u03ce\u03c2 \u03c3\u03c4\u03b7\u03bd \u03b1\u03bd\u03ac\u03ba\u03c4\u03b7\u03c3\u03b7, \u03b4\u03b7\u03bc\u03b9\u03bf\u03c5\u03c1\u03b3\u03af\u03b1, \u03b5\u03bd\u03b7\u03bc\u03ad\u03c1\u03c9\u03c3\u03b7 \u03ba\u03b1\u03b9 \u03b4\u03b9\u03b1\u03b3\u03c1\u03b1\u03c6\u03ae \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03c9\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2. \u0397 \u03c0\u03c1\u03cc\u03c3\u03b2\u03b1\u03c3\u03b7 \u03c3\u03c4\u03b1 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03b9\u03ce\u03bd \u03b3\u03af\u03bd\u03b5\u03c4\u03b1\u03b9 \u03b1\u03c0\u03cc \u03c4\u03bf \u03c4\u03b5\u03bb\u03b9\u03ba\u03cc \u03c3\u03b7\u03bc\u03b5\u03af\u03bf \/phaser-order-rows. \u039b\u03ae\u03c8\u03b7 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03c9\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 \u039b\u03b1\u03bc\u03b2\u03ac\u03bd\u03b5\u03c4\u03b5 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 \u03c3\u03c4\u03ad\u03bb\u03bd\u03bf\u03bd\u03c4\u03b1\u03c2 \u03ad\u03bd\u03b1 \u03b1\u03af\u03c4\u03b7\u03bc\u03b1 GET \u03c3\u03c4\u03bf \u03c4\u03b5\u03bb\u03b9\u03ba\u03cc \u03c3\u03b7\u03bc\u03b5\u03af\u03bf \/phaser-order-rows: \u039c\u03c0\u03bf\u03c1\u03b5\u03af\u03c4\u03b5 \u03bd\u03b1 \u03b1\u03bd\u03b1\u03b6\u03b7\u03c4\u03ae\u03c3\u03b5\u03c4\u03b5 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 \u03bc\u03b5 \u03b2\u03ac\u03c3\u03b7 \u03b4\u03b9\u03ac\u03c6\u03bf\u03c1\u03b5\u03c2 \u03c0\u03b1\u03c1\u03b1\u03bc\u03ad\u03c4\u03c1\u03bf\u03c5\u03c2: \u039c\u03c0\u03bf\u03c1\u03b5\u03af\u03c4\u03b5 \u03b5\u03c0\u03af\u03c3\u03b7\u03c2 \u03bd\u03b1 \u03c3\u03c5\u03bd\u03b4\u03c5\u03ac\u03c3\u03b5\u03c4\u03b5 \u03c4\u03b9\u03c2 \u03c0\u03b1\u03c1\u03b1\u03bc\u03ad\u03c4\u03c1\u03bf\u03c5\u03c2 \u03b1\u03bd\u03b1\u03b6\u03ae\u03c4\u03b7\u03c3\u03b7\u03c2 \u03c9\u03c2 \u03b5\u03be\u03ae\u03c2: ... Read more","og_url":"https:\/\/skyplanner.ai\/el\/docs\/%cf%80%ce%b1%cf%81%ce%b1%ce%b3%ce%b3%ce%b5%ce%bb%ce%af%ce%b1-%ce%b1%ce%bd%cf%84%ce%b9%ce%ba%ce%b5%ce%b9%ce%bc%ce%ad%ce%bd%cf%89%ce%bd\/","og_site_name":"SkyPlanner","article_modified_time":"2025-10-08T07:30:04+00:00","og_image":[{"width":825,"height":995,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-5.png","type":"image\/png"}],"twitter_card":"summary_large_image","twitter_misc":{"\u0395\u03ba\u03c4\u03b9\u03bc\u03ce\u03bc\u03b5\u03bd\u03bf\u03c2 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c2 \u03b1\u03bd\u03ac\u03b3\u03bd\u03c9\u03c3\u03b7\u03c2":"1 \u03bb\u03b5\u03c0\u03c4\u03cc"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/el\/docs\/%cf%80%ce%b1%cf%81%ce%b1%ce%b3%ce%b3%ce%b5%ce%bb%ce%af%ce%b1-%ce%b1%ce%bd%cf%84%ce%b9%ce%ba%ce%b5%ce%b9%ce%bc%ce%ad%ce%bd%cf%89%ce%bd\/","url":"https:\/\/skyplanner.ai\/el\/docs\/%cf%80%ce%b1%cf%81%ce%b1%ce%b3%ce%b3%ce%b5%ce%bb%ce%af%ce%b1-%ce%b1%ce%bd%cf%84%ce%b9%ce%ba%ce%b5%ce%b9%ce%bc%ce%ad%ce%bd%cf%89%ce%bd\/","name":"\u03a0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1 \u03b1\u03bd\u03c4\u03b9\u03ba\u03b5\u03b9\u03bc\u03ad\u03bd\u03c9\u03bd &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/el\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/el\/docs\/%cf%80%ce%b1%cf%81%ce%b1%ce%b3%ce%b3%ce%b5%ce%bb%ce%af%ce%b1-%ce%b1%ce%bd%cf%84%ce%b9%ce%ba%ce%b5%ce%b9%ce%bc%ce%ad%ce%bd%cf%89%ce%bd\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/el\/docs\/%cf%80%ce%b1%cf%81%ce%b1%ce%b3%ce%b3%ce%b5%ce%bb%ce%af%ce%b1-%ce%b1%ce%bd%cf%84%ce%b9%ce%ba%ce%b5%ce%b9%ce%bc%ce%ad%ce%bd%cf%89%ce%bd\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-5.png","datePublished":"2025-05-13T09:37:46+00:00","dateModified":"2025-10-08T07:30:04+00:00","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/el\/docs\/%cf%80%ce%b1%cf%81%ce%b1%ce%b3%ce%b3%ce%b5%ce%bb%ce%af%ce%b1-%ce%b1%ce%bd%cf%84%ce%b9%ce%ba%ce%b5%ce%b9%ce%bc%ce%ad%ce%bd%cf%89%ce%bd\/#breadcrumb"},"inLanguage":"el","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/el\/docs\/%cf%80%ce%b1%cf%81%ce%b1%ce%b3%ce%b3%ce%b5%ce%bb%ce%af%ce%b1-%ce%b1%ce%bd%cf%84%ce%b9%ce%ba%ce%b5%ce%b9%ce%bc%ce%ad%ce%bd%cf%89%ce%bd\/"]}]},{"@type":"ImageObject","inLanguage":"el","@id":"https:\/\/skyplanner.ai\/el\/docs\/%cf%80%ce%b1%cf%81%ce%b1%ce%b3%ce%b3%ce%b5%ce%bb%ce%af%ce%b1-%ce%b1%ce%bd%cf%84%ce%b9%ce%ba%ce%b5%ce%b9%ce%bc%ce%ad%ce%bd%cf%89%ce%bd\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-5.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-5.png"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/el\/docs\/%cf%80%ce%b1%cf%81%ce%b1%ce%b3%ce%b3%ce%b5%ce%bb%ce%af%ce%b1-%ce%b1%ce%bd%cf%84%ce%b9%ce%ba%ce%b5%ce%b9%ce%bc%ce%ad%ce%bd%cf%89%ce%bd\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/el\/"},{"@type":"ListItem","position":2,"name":"Docs","item":"https:\/\/skyplanner.ai\/el\/docs\/"},{"@type":"ListItem","position":3,"name":"\u03a0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1 \u03b1\u03bd\u03c4\u03b9\u03ba\u03b5\u03b9\u03bc\u03ad\u03bd\u03c9\u03bd"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/el\/#website","url":"https:\/\/skyplanner.ai\/el\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/el\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/el\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"el"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/el\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/el\/","logo":{"@type":"ImageObject","inLanguage":"el","@id":"https:\/\/skyplanner.ai\/el\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/el\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Sami","author_link":"https:\/\/skyplanner.ai\/el\/author\/sami\/"},"uagb_comment_info":0,"uagb_excerpt":"\u0395\u03b4\u03ce \u03b8\u03b1 \u03b1\u03bd\u03b1\u03c6\u03b5\u03c1\u03b8\u03bf\u03cd\u03bc\u03b5 \u03bb\u03b5\u03c0\u03c4\u03bf\u03bc\u03b5\u03c1\u03ce\u03c2 \u03c3\u03c4\u03b7\u03bd \u03b1\u03bd\u03ac\u03ba\u03c4\u03b7\u03c3\u03b7, \u03b4\u03b7\u03bc\u03b9\u03bf\u03c5\u03c1\u03b3\u03af\u03b1, \u03b5\u03bd\u03b7\u03bc\u03ad\u03c1\u03c9\u03c3\u03b7 \u03ba\u03b1\u03b9 \u03b4\u03b9\u03b1\u03b3\u03c1\u03b1\u03c6\u03ae \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03c9\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2. \u0397 \u03c0\u03c1\u03cc\u03c3\u03b2\u03b1\u03c3\u03b7 \u03c3\u03c4\u03b1 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03b9\u03ce\u03bd \u03b3\u03af\u03bd\u03b5\u03c4\u03b1\u03b9 \u03b1\u03c0\u03cc \u03c4\u03bf \u03c4\u03b5\u03bb\u03b9\u03ba\u03cc \u03c3\u03b7\u03bc\u03b5\u03af\u03bf \/phaser-order-rows. \u039b\u03ae\u03c8\u03b7 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03c9\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 \u039b\u03b1\u03bc\u03b2\u03ac\u03bd\u03b5\u03c4\u03b5 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 \u03c3\u03c4\u03ad\u03bb\u03bd\u03bf\u03bd\u03c4\u03b1\u03c2 \u03ad\u03bd\u03b1 \u03b1\u03af\u03c4\u03b7\u03bc\u03b1 GET \u03c3\u03c4\u03bf \u03c4\u03b5\u03bb\u03b9\u03ba\u03cc \u03c3\u03b7\u03bc\u03b5\u03af\u03bf \/phaser-order-rows: \u039c\u03c0\u03bf\u03c1\u03b5\u03af\u03c4\u03b5 \u03bd\u03b1 \u03b1\u03bd\u03b1\u03b6\u03b7\u03c4\u03ae\u03c3\u03b5\u03c4\u03b5 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 \u03bc\u03b5 \u03b2\u03ac\u03c3\u03b7 \u03b4\u03b9\u03ac\u03c6\u03bf\u03c1\u03b5\u03c2 \u03c0\u03b1\u03c1\u03b1\u03bc\u03ad\u03c4\u03c1\u03bf\u03c5\u03c2: \u039c\u03c0\u03bf\u03c1\u03b5\u03af\u03c4\u03b5 \u03b5\u03c0\u03af\u03c3\u03b7\u03c2 \u03bd\u03b1 \u03c3\u03c5\u03bd\u03b4\u03c5\u03ac\u03c3\u03b5\u03c4\u03b5 \u03c4\u03b9\u03c2 \u03c0\u03b1\u03c1\u03b1\u03bc\u03ad\u03c4\u03c1\u03bf\u03c5\u03c2 \u03b1\u03bd\u03b1\u03b6\u03ae\u03c4\u03b7\u03c3\u03b7\u03c2 \u03c9\u03c2 \u03b5\u03be\u03ae\u03c2:&hellip;","knowledge_base_info":[],"knowledge_base_slug":[],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/docs\/77382","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/docs"}],"about":[{"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/types\/docs"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/comments?post=77382"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/docs\/77382\/revisions"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/media?parent=77382"}],"wp:term":[{"taxonomy":"doc_category","embeddable":true,"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/doc_category?post=77382"},{"taxonomy":"doc_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/doc_tag?post=77382"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}