{"id":61329,"date":"2025-02-27T10:19:54","date_gmt":"2025-02-27T10:19:54","guid":{"rendered":"https:\/\/skyplanner.ai\/docs\/%ce%b4%ce%b7%ce%bc%ce%b9%ce%bf%cf%85%cf%81%ce%b3%ce%af%ce%b1-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%ce%b3%ce%b5%ce%bb%ce%af%ce%b1%cf%82\/"},"modified":"2025-10-07T10:48:02","modified_gmt":"2025-10-07T10:48:02","password":"","slug":"%ce%b4%ce%b7%ce%bc%ce%b9%ce%bf%cf%85%cf%81%ce%b3%ce%af%ce%b1-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%ce%b3%ce%b5%ce%bb%ce%af%ce%b1%cf%82","status":"publish","type":"docs","link":"https:\/\/skyplanner.ai\/el\/docs\/%ce%b4%ce%b7%ce%bc%ce%b9%ce%bf%cf%85%cf%81%ce%b3%ce%af%ce%b1-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%ce%b3%ce%b5%ce%bb%ce%af%ce%b1%cf%82\/","title":{"rendered":"\u0394\u03b7\u03bc\u03b9\u03bf\u03c5\u03c1\u03b3\u03af\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2"},"content":{"rendered":"\n<p>\u0395\u03b4\u03ce \u03bc\u03c0\u03bf\u03c1\u03b5\u03af\u03c4\u03b5 \u03bd\u03b1 \u03b2\u03c1\u03b5\u03af\u03c4\u03b5 \u03ad\u03bd\u03b1\u03bd \u03b1\u03bd\u03b1\u03bb\u03c5\u03c4\u03b9\u03ba\u03cc \u03bf\u03b4\u03b7\u03b3\u03cc \u03b3\u03b9\u03b1 \u03c4\u03bf \u03c0\u03ce\u03c2 \u03bd\u03b1 \u03b4\u03b7\u03bc\u03b9\u03bf\u03c5\u03c1\u03b3\u03ae\u03c3\u03b5\u03c4\u03b5 \u03bc\u03b9\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1 \u03c3\u03c4\u03bf Skyplanner \u03bc\u03b5 \u03cc\u03bb\u03b1 \u03c4\u03b1 \u03c3\u03c7\u03b5\u03c4\u03b9\u03ba\u03ac \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03b1. \u039a\u03ac\u03c0\u03bf\u03b9\u03b1 \u03b1\u03c0\u03cc \u03b1\u03c5\u03c4\u03ac \u03ad\u03c7\u03bf\u03c5\u03bd \u03ba\u03b1\u03bb\u03c5\u03c6\u03b8\u03b5\u03af \u03c3\u03c4\u03bf <a href=\"https:\/\/skyplanner.ai\/cs\/docs\/vyukovy-kurz-integrace\/\">\u03c3\u03b5\u03bc\u03b9\u03bd\u03ac\u03c1\u03b9\u03bf<\/a> \u03b5\u03bd\u03c3\u03c9\u03bc\u03ac\u03c4\u03c9\u03c3\u03b7\u03c2, \u03b1\u03bb\u03bb\u03ac \u03b5\u03b4\u03ce \u03b8\u03b1 \u03b5\u03be\u03b5\u03c4\u03ac\u03c3\u03bf\u03c5\u03bc\u03b5 \u03c4\u03b7 \u03b4\u03bf\u03bc\u03ae \u03c4\u03c9\u03bd \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03c9\u03bd \u03c4\u03bf\u03c5 Skyplanner \u03ba\u03b1\u03b9 \u03c4\u03b7 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b1 \u03b5\u03bd\u03c3\u03c9\u03bc\u03ac\u03c4\u03c9\u03c3\u03b7\u03c2 \u03bc\u03b5 \u03c0\u03b5\u03c1\u03b9\u03c3\u03c3\u03cc\u03c4\u03b5\u03c1\u03b5\u03c2 \u03bb\u03b5\u03c0\u03c4\u03bf\u03bc\u03ad\u03c1\u03b5\u03b9\u03b5\u03c2. <\/p>\n\n<h4 class=\"wp-block-heading\" id=\"h-data-structure\">\u0394\u03bf\u03bc\u03ae \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03c9\u03bd<\/h4>\n\n<p>\u03a0\u03c1\u03ce\u03c4\u03b1 \u03b8\u03b1 \u03b4\u03bf\u03cd\u03bc\u03b5 \u03c0\u03ce\u03c2 \u03b5\u03af\u03bd\u03b1\u03b9 \u03b4\u03bf\u03bc\u03b7\u03bc\u03ad\u03bd\u03b7 \u03bc\u03b9\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1 Skyplanner. \u03a4\u03b1 <a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">\u03c3\u03b7\u03bc\u03b5\u03af\u03b1 API<\/a> \u03b3\u03b9\u03b1 \u03c4\u03b9\u03c2 \u03bf\u03bd\u03c4\u03cc\u03c4\u03b7\u03c4\u03b5\u03c2 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03c9\u03bd \u03c0\u03bf\u03c5 \u03b1\u03bd\u03b1\u03c6\u03ad\u03c1\u03bf\u03bd\u03c4\u03b1\u03b9 \u03b5\u03b4\u03ce \u03b5\u03c0\u03b9\u03c3\u03b7\u03bc\u03b1\u03af\u03bd\u03bf\u03bd\u03c4\u03b1\u03b9 \u03c9\u03c2 \u03b5\u03be\u03ae\u03c2: <mark style=\"background-color:var(--contrast-3)\" class=\"has-inline-color\">\/phaser-orders<\/mark> <\/p>\n<div class=\"gb-container gb-container-baeff0eb\">\n<div class=\"gb-container gb-container-2a966a6e\">\n\n<p>\u03a3\u03c4\u03bf \u03b1\u03bd\u03ce\u03c4\u03b5\u03c1\u03bf \u03b5\u03c0\u03af\u03c0\u03b5\u03b4\u03bf \u03ad\u03c7\u03bf\u03c5\u03bc\u03b5 \u03c4\u03b7\u03bd <strong>\u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1<\/strong><mark style=\"background-color:var(--contrast-3)\" class=\"has-inline-color\">(\/phaser-orders<\/mark>)<\/p>\n\n\n\n<p>\u039a\u03ac\u03b8\u03b5 <strong>\u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1<\/strong> <em>\u03c0\u03c1\u03ad\u03c0\u03b5\u03b9 \u03bd\u03b1 <\/em>\u03ad\u03c7\u03b5\u03b9 \u03ad\u03bd\u03b1\u03bd <strong>\u03c0\u03b5\u03bb\u03ac\u03c4\u03b7<\/strong><mark style=\"background-color:var(--contrast-3)\" class=\"has-inline-color\">(\/customers<\/mark>).<\/p>\n\n\n\n<p>\u039a\u03ac\u03b8\u03b5 <strong>\u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1<\/strong> \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03ad\u03c7\u03b5\u03b9 \u03c0\u03bf\u03bb\u03bb\u03b1\u03c0\u03bb\u03ac <strong>\u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2<\/strong><mark style=\"background-color:var(--contrast-3)\" class=\"has-inline-color\">(\/phaser-order-rows<\/mark>)<\/p>\n\n\n\n<p>\u03a3\u03b5 \u03ba\u03ac\u03b8\u03b5 <strong>\u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03bf \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2<\/strong> <em>\u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1<\/em> \u03b5\u03c0\u03b9\u03c3\u03c5\u03bd\u03ac\u03c0\u03c4\u03b5\u03c4\u03b1\u03b9 \u03ad\u03bd\u03b1 <strong>\u03c0\u03c1\u03bf\u03ca\u03cc\u03bd<\/strong><mark style=\"background-color:var(--contrast-3)\" class=\"has-inline-color\">(\/products<\/mark>), \u03b1\u03bb\u03bb\u03ac \u03b1\u03c5\u03c4\u03cc \u03b4\u03b5\u03bd \u03b5\u03af\u03bd\u03b1\u03b9 \u03c5\u03c0\u03bf\u03c7\u03c1\u03b5\u03c9\u03c4\u03b9\u03ba\u03cc. \u039a\u03ac\u03b8\u03b5 <g id=\"gid_4\">\u03c0\u03c1\u03bf\u03ca\u03cc\u03bd<\/g> \u03ad\u03c7\u03b5\u03b9 \u03ad\u03bd\u03b1 <g id=\"gid_5\">\u03b1\u03c0\u03cc\u03b8\u03b5\u03bc\u03b1<\/g><g id=\"gid_6\">(\/saldos<\/g>). \u03a3\u03b7\u03bc\u03b5\u03b9\u03ce\u03c3\u03c4\u03b5 \u03cc\u03c4\u03b9 \u03b7 \u03bf\u03bd\u03c4\u03cc\u03c4\u03b7\u03c4\u03b1 stock \u03b4\u03b7\u03bc\u03b9\u03bf\u03c5\u03c1\u03b3\u03b5\u03af\u03c4\u03b1\u03b9 \u03b1\u03c5\u03c4\u03cc\u03bc\u03b1\u03c4\u03b1 \u03cc\u03c4\u03b1\u03bd \u03b4\u03b7\u03bc\u03b9\u03bf\u03c5\u03c1\u03b3\u03b5\u03af\u03c4\u03b1\u03b9 \u03ad\u03bd\u03b1 \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd \u03bc\u03b5 \u03c4\u03bf API.  <\/p>\n\n\n\n<p>\u039a\u03ac\u03b8\u03b5 <strong>\u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03bf \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2<\/strong> \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03ad\u03c7\u03b5\u03b9 \u03c0\u03bf\u03bb\u03bb\u03b1\u03c0\u03bb\u03ad\u03c2 <strong>\u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2<\/strong> (\u03ae \u03b1\u03bb\u03bb\u03b9\u03ce\u03c2 \u03b2\u03ae\u03bc\u03b1\u03c4\u03b1 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b1\u03c2)<mark style=\"background-color:var(--contrast-3)\" class=\"has-inline-color\">(\/phaser-jobs<\/mark>).<\/p>\n\n\n\n<p>\u039a\u03ac\u03b8\u03b5 <strong>\u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1<\/strong> <em>\u03c0\u03c1\u03ad\u03c0\u03b5\u03b9 \u03bd\u03b1 <\/em>\u03ad\u03c7\u03b5\u03b9 \u03ad\u03bd\u03b1 <strong>\u03c3\u03c4\u03ac\u03b4\u03b9\u03bf \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2<\/strong><mark style=\"background-color:var(--contrast-3)\" class=\"has-inline-color\">(\/workstages<\/mark>).<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"655\" height=\"1024\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/02\/phaser-order.drawio-1-655x1024.png\" alt=\"\" class=\"wp-image-53804\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/02\/phaser-order.drawio-1-655x1024.png 655w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/02\/phaser-order.drawio-1-192x300.png 192w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/02\/phaser-order.drawio-1-768x1200.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/02\/phaser-order.drawio-1-328x512.png 328w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/02\/phaser-order.drawio-1.png 801w\" sizes=\"(max-width: 655px) 100vw, 655px\" \/><figcaption class=\"wp-element-caption\"><strong>\u03a3\u03c7. 1<\/strong> \u0394\u03bf\u03bc\u03ae \u03c4\u03b7\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03c9\u03bd \u03c3\u03c7\u03b5\u03c4\u03b9\u03ba\u03ce\u03bd \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03c9\u03bd<\/figcaption><\/figure>\n\n\n\n<p><\/p>\n\n<\/div>\n<\/div>\n<h4 class=\"wp-block-heading\" id=\"h-integration-workflow\">\u03a1\u03bf\u03ae \u03b5\u03c1\u03b3\u03b1\u03c3\u03b9\u03ce\u03bd \u03b5\u03bd\u03c3\u03c9\u03bc\u03ac\u03c4\u03c9\u03c3\u03b7\u03c2<\/h4>\n\n<p>\u0391\u03ba\u03bf\u03bb\u03bf\u03c5\u03b8\u03b5\u03af \u03ad\u03bd\u03b1 \u03c0\u03b1\u03c1\u03ac\u03b4\u03b5\u03b9\u03b3\u03bc\u03b1 \u03b2\u03ae\u03bc\u03b1 \u03c0\u03c1\u03bf\u03c2 \u03b2\u03ae\u03bc\u03b1 \u03b3\u03b9\u03b1 \u03c4\u03bf \u03c0\u03ce\u03c2 \u03b8\u03b1 \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03c3\u03b1\u03c4\u03b5 \u03bd\u03b1 \u03b4\u03bf\u03bc\u03ae\u03c3\u03b5\u03c4\u03b5 \u03c4\u03b7\u03bd \u03b5\u03bd\u03c3\u03c9\u03bc\u03ac\u03c4\u03c9\u03c3\u03ae \u03c3\u03b1\u03c2 \u03b1\u03c0\u03cc \u03c4\u03bf \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1 ERP \u03c3\u03b1\u03c2 \u03c3\u03c4\u03bf Skyplanner.<\/p>\n\n<ol class=\"wp-block-list\">\n<li>\u039b\u03ae\u03c8\u03b7 \u03c0\u03c9\u03bb\u03ae\u03c3\u03b5\u03c9\u03bd\/\u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03b9\u03ce\u03bd \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2 \u03b1\u03c0\u03cc \u03c4\u03bf ERP<\/li>\n\n\n\n<li>\u0394\u03b7\u03bc\u03b9\u03bf\u03c5\u03c1\u03b3\u03af\u03b1 <strong>\u03c0\u03b5\u03bb\u03ac\u03c4\u03b7 <\/strong>(\u03bb\u03ac\u03b2\u03b5\u03c4\u03b5 \u03c4\u03bf \u03b1\u03bd\u03b1\u03b3\u03bd\u03c9\u03c1\u03b9\u03c3\u03c4\u03b9\u03ba\u03cc \u03c0\u03b5\u03bb\u03ac\u03c4\u03b7 \u03c3\u03c4\u03b7\u03bd \u03b1\u03c0\u03ac\u03bd\u03c4\u03b7\u03c3\u03b7)<\/li>\n\n\n\n<li>\u0394\u03b7\u03bc\u03b9\u03bf\u03c5\u03c1\u03b3\u03af\u03b1 <strong>\u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2<\/strong> \u03bc\u03b5 \u03b1\u03bd\u03b1\u03b3\u03bd\u03c9\u03c1\u03b9\u03c3\u03c4\u03b9\u03ba\u03cc \u03c0\u03b5\u03bb\u03ac\u03c4\u03b7 (\u03bb\u03ac\u03b2\u03b5\u03c4\u03b5 \u03b1\u03bd\u03b1\u03b3\u03bd\u03c9\u03c1\u03b9\u03c3\u03c4\u03b9\u03ba\u03cc \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 \u03c3\u03c4\u03b7\u03bd \u03b1\u03c0\u03ac\u03bd\u03c4\u03b7\u03c3\u03b7)<\/li>\n\n\n\n<li>\u039b\u03ae\u03c8\u03b7 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03c9\u03bd \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03c9\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 \u03c0\u03c9\u03bb\u03ae\u03c3\u03b5\u03c9\u03bd\/\u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2 \u03b1\u03c0\u03cc \u03c4\u03bf ERP<\/li>\n\n\n\n<li>\u0394\u03b7\u03bc\u03b9\u03bf\u03c5\u03c1\u03b3\u03af\u03b1 <strong>\u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03bf\u03c2<\/strong> (\u03bb\u03ac\u03b2\u03b5\u03c4\u03b5 \u03c4\u03bf \u03b1\u03bd\u03b1\u03b3\u03bd\u03c9\u03c1\u03b9\u03c3\u03c4\u03b9\u03ba\u03cc \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03bf\u03c2 \u03c3\u03c4\u03b7\u03bd \u03b1\u03c0\u03ac\u03bd\u03c4\u03b7\u03c3\u03b7)<\/li>\n\n\n\n<li>\u0394\u03b7\u03bc\u03b9\u03bf\u03c5\u03c1\u03b3\u03af\u03b1 <strong>\u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03bf\u03c5 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2<\/strong> \u03bc\u03b5 \u03b1\u03bd\u03b1\u03b3\u03bd\u03c9\u03c1\u03b9\u03c3\u03c4\u03b9\u03ba\u03cc \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 \u03ba\u03b1\u03b9 \u03ac\u03bb\u03bb\u03b1 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03b1 (\u03bb\u03ae\u03c8\u03b7 \u03b1\u03bd\u03b1\u03b3\u03bd\u03c9\u03c1\u03b9\u03c3\u03c4\u03b9\u03ba\u03bf\u03cd \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03bf\u03c5 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 \u03c3\u03c4\u03b7\u03bd \u03b1\u03c0\u03ac\u03bd\u03c4\u03b7\u03c3\u03b7)<\/li>\n\n\n\n<li>\u039b\u03ae\u03c8\u03b7 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03c9\u03bd \u03b2\u03ae\u03bc\u03b1\u03c4\u03bf\u03c2 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b1\u03c2 \u03b1\u03c0\u03cc \u03c4\u03bf ERP<\/li>\n\n\n\n<li>\u0394\u03b7\u03bc\u03b9\u03bf\u03c5\u03c1\u03b3\u03af\u03b1 <strong>\u03c3\u03ba\u03b7\u03bd\u03ae\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2<\/strong> (\u03bb\u03ac\u03b2\u03b5\u03c4\u03b5 \u03c4\u03bf \u03b1\u03bd\u03b1\u03b3\u03bd\u03c9\u03c1\u03b9\u03c3\u03c4\u03b9\u03ba\u03cc \u03c3\u03ba\u03b7\u03bd\u03ae\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2 \u03c3\u03c4\u03b7\u03bd \u03b1\u03c0\u03ac\u03bd\u03c4\u03b7\u03c3\u03b7)<\/li>\n\n\n\n<li>\u0394\u03b7\u03bc\u03b9\u03bf\u03c5\u03c1\u03b3\u03af\u03b1 <strong>\u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2<\/strong> \u03bc\u03b5 \u03b1\u03bd\u03b1\u03b3\u03bd\u03c9\u03c1\u03b9\u03c3\u03c4\u03b9\u03ba\u03cc \u03c3\u03c4\u03ac\u03b4\u03b9\u03bf\u03c5 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2 \u03ba\u03b1\u03b9 \u03ac\u03bb\u03bb\u03b1 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03b1<\/li>\n<\/ol>\n\n<h4 class=\"wp-block-heading\" id=\"h-extra-tips\">\u0395\u03c0\u03b9\u03c0\u03bb\u03ad\u03bf\u03bd \u03c3\u03c5\u03bc\u03b2\u03bf\u03c5\u03bb\u03ad\u03c2<\/h4>\n\n<h5 class=\"wp-block-heading\" id=\"h-on-deleting\">\u039a\u03b1\u03c4\u03ac \u03c4\u03b7 \u03b4\u03b9\u03b1\u03b3\u03c1\u03b1\u03c6\u03ae<\/h5>\n\n<p>\u0397 \u03b4\u03b9\u03b1\u03b3\u03c1\u03b1\u03c6\u03ae phaser-orders, phaser-order-items \u03ae phaser-jobs \u03bc\u03ad\u03c3\u03c9 \u03c4\u03bf\u03c5 API (\u03ba\u03b1\u03b9 \u03b1\u03c0\u03cc \u03c4\u03bf UI) \u03b3\u03af\u03bd\u03b5\u03c4\u03b1\u03b9 \u03bc\u03b5 \u03c4\u03c1\u03cc\u03c0\u03bf <em>soft delete<\/em>. \u0391\u03c5\u03c4\u03cc \u03c3\u03b7\u03bc\u03b1\u03af\u03bd\u03b5\u03b9 \u03cc\u03c4\u03b9 \u03c4\u03b1 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03b1 \u03b4\u03b5\u03bd \u03b4\u03b9\u03b1\u03b3\u03c1\u03ac\u03c6\u03bf\u03bd\u03c4\u03b1\u03b9 \u03c0\u03c1\u03b1\u03b3\u03bc\u03b1\u03c4\u03b9\u03ba\u03ac \u03b1\u03c0\u03cc \u03c4\u03b7 \u03b2\u03ac\u03c3\u03b7 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03c9\u03bd, \u03b1\u03bb\u03bb\u03ac \u03b5\u03c0\u03b9\u03c3\u03b7\u03bc\u03b1\u03af\u03bd\u03bf\u03bd\u03c4\u03b1\u03b9 \u03c9\u03c2 <g id=\"gid_1\">\u03b1\u03c1\u03c7\u03b5\u03b9\u03bf\u03b8\u03b5\u03c4\u03b7\u03bc\u03ad\u03bd\u03b1<\/g>. \u03a3\u03c4\u03b7\u03bd \u03c0\u03c1\u03b1\u03b3\u03bc\u03b1\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1, \u03c4\u03bf \u03c7\u03b1\u03c1\u03b1\u03ba\u03c4\u03b7\u03c1\u03b9\u03c3\u03c4\u03b9\u03ba\u03cc <g id=\"gid_2\">is_archive<\/g> \u03c4\u03b7\u03c2 \u03bf\u03bd\u03c4\u03cc\u03c4\u03b7\u03c4\u03b1\u03c2 \u03c4\u03af\u03b8\u03b5\u03c4\u03b1\u03b9 \u03c3\u03b5 true \u03cc\u03c4\u03b1\u03bd \u03b4\u03b9\u03b1\u03b3\u03c1\u03ac\u03c6\u03b5\u03c4\u03b1\u03b9. \u0397 \u03c0\u03c1\u03cc\u03c3\u03b2\u03b1\u03c3\u03b7 \u03c3\u03c4\u03b9\u03c2 \u03b1\u03c1\u03c7\u03b5\u03b9\u03bf\u03b8\u03b5\u03c4\u03b7\u03bc\u03ad\u03bd\u03b5\u03c2\/\u03b4\u03b9\u03b1\u03b3\u03c1\u03b1\u03bc\u03bc\u03ad\u03bd\u03b5\u03c2 \u03bf\u03bd\u03c4\u03cc\u03c4\u03b7\u03c4\u03b5\u03c2 \u03b5\u03be\u03b1\u03ba\u03bf\u03bb\u03bf\u03c5\u03b8\u03b5\u03af \u03bd\u03b1 \u03b5\u03af\u03bd\u03b1\u03b9 \u03b4\u03c5\u03bd\u03b1\u03c4\u03ae \u03bc\u03b5 \u03c4\u03bf API \u03c7\u03c1\u03b7\u03c3\u03b9\u03bc\u03bf\u03c0\u03bf\u03b9\u03ce\u03bd\u03c4\u03b1\u03c2 \u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03ac\u03bc\u03b5\u03c4\u03c1\u03bf <g id=\"gid_3\">include_archived<\/g>. \u038c\u03c4\u03b1\u03bd include_archived=true, \u03bc\u03b9\u03b1 \u03b1\u03af\u03c4\u03b7\u03c3\u03b7 GET \u03b8\u03b1 \u03b1\u03bd\u03b1\u03ba\u03c4\u03ae\u03c3\u03b5\u03b9 \u03c4\u03b7\u03bd \u03bf\u03bd\u03c4\u03cc\u03c4\u03b7\u03c4\u03b1 \u03b1\u03ba\u03cc\u03bc\u03b7 \u03ba\u03b1\u03b9 \u03b1\u03bd \u03ad\u03c7\u03b5\u03b9 \u03b1\u03c1\u03c7\u03b5\u03b9\u03bf\u03b8\u03b5\u03c4\u03b7\u03b8\u03b5\u03af.    <\/p>\n\n<p><strong>\u03a3\u03b7\u03bc\u03b5\u03b9\u03ce\u03c3\u03c4\u03b5 \u03cc\u03c4\u03b9 \u03b7 \u03b1\u03c0\u03b1\u03bb\u03ae \u03b4\u03b9\u03b1\u03b3\u03c1\u03b1\u03c6\u03ae \u03b4\u03b5\u03bd \u03b5\u03af\u03bd\u03b1\u03b9 \u03b4\u03b9\u03b1\u03b8\u03ad\u03c3\u03b9\u03bc\u03b7 \u03c3\u03b5 \u03ba\u03ac\u03b8\u03b5 \u03c4\u03b5\u03bb\u03b9\u03ba\u03cc \u03c3\u03b7\u03bc\u03b5\u03af\u03bf API! \u0395\u03c0\u03bf\u03bc\u03ad\u03bd\u03c9\u03c2, \u03c0\u03c1\u03ad\u03c0\u03b5\u03b9 \u03bd\u03b1 \u03b5\u03af\u03c3\u03c4\u03b5 \u03c0\u03c1\u03bf\u03c3\u03b5\u03ba\u03c4\u03b9\u03ba\u03bf\u03af, \u03ba\u03b1\u03b8\u03ce\u03c2 \u03b7 \u03b4\u03b9\u03b1\u03b3\u03c1\u03b1\u03c6\u03ae \u03b3\u03b9\u03b1 \u03c0\u03b1\u03c1\u03ac\u03b4\u03b5\u03b9\u03b3\u03bc\u03b1 \u03c0\u03b5\u03bb\u03b1\u03c4\u03ce\u03bd, \u03b1\u03bd\u03b8\u03c1\u03ce\u03c0\u03c9\u03bd \u03ba.\u03bb\u03c0. \u03b5\u03af\u03bd\u03b1\u03b9 \u03bc\u03cc\u03bd\u03b9\u03bc\u03b7! <\/strong><\/p>\n\n<h5 class=\"wp-block-heading\" id=\"h-using-default-process-steps-for-you-order-item\">\u03a7\u03c1\u03ae\u03c3\u03b7 \u03c0\u03c1\u03bf\u03b5\u03c0\u03b9\u03bb\u03b5\u03b3\u03bc\u03ad\u03bd\u03c9\u03bd \u03b2\u03b7\u03bc\u03ac\u03c4\u03c9\u03bd \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b1\u03c2 \u03b3\u03b9\u03b1 \u03c4\u03bf \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03bf \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 \u03c3\u03b1\u03c2<\/h5>\n\n<p>\u0395\u03ac\u03bd \u03ad\u03c7\u03b5\u03c4\u03b5 \u03b4\u03b7\u03bc\u03b9\u03bf\u03c5\u03c1\u03b3\u03ae\u03c3\u03b5\u03b9 \u03ba\u03ac\u03c0\u03bf\u03b9\u03b1 \u03c0\u03c1\u03bf\u03b5\u03c0\u03b9\u03bb\u03b5\u03b3\u03bc\u03ad\u03bd\u03b1 \u03b2\u03ae\u03bc\u03b1\u03c4\u03b1 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b1\u03c2 \u03b3\u03b9\u03b1 \u03c4\u03bf \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd \u03c0\u03bf\u03c5 \u03c0\u03b1\u03c1\u03ac\u03b3\u03b5\u03b9 \u03c4\u03bf \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03bf \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 \u03c3\u03b1\u03c2, \u03bc\u03c0\u03bf\u03c1\u03b5\u03af\u03c4\u03b5 \u03bd\u03b1 \u03c0\u03b5\u03af\u03c4\u03b5 \u03c3\u03c4\u03bf \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1 \u03bd\u03b1 \u03bc\u03b5\u03c4\u03b1\u03c6\u03ad\u03c1\u03b5\u03b9 \u03c4\u03b1 \u03c0\u03c1\u03bf\u03b5\u03c0\u03b9\u03bb\u03b5\u03b3\u03bc\u03ad\u03bd\u03b1 \u03b2\u03ae\u03bc\u03b1\u03c4\u03b1 \u03c3\u03c4\u03bf \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03bf \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 \u03bc\u03b5 \u03c4\u03bf API \u03c7\u03c1\u03b7\u03c3\u03b9\u03bc\u03bf\u03c0\u03bf\u03b9\u03ce\u03bd\u03c4\u03b1\u03c2 \u03c4\u03bf \u03c7\u03b1\u03c1\u03b1\u03ba\u03c4\u03b7\u03c1\u03b9\u03c3\u03c4\u03b9\u03ba\u03cc <strong>get_default_steps<\/strong>.<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"616\" height=\"451\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/02\/image-158.png\" alt=\"\" class=\"wp-image-54937\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/02\/image-158.png 616w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/02\/image-158-300x220.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/02\/image-158-360x264.png 360w\" sizes=\"(max-width: 616px) 100vw, 616px\" \/><figcaption class=\"wp-element-caption\"><strong>\u03a3\u03c7\u03ae\u03bc\u03b1 2.<\/strong>  \u0394\u03b7\u03bc\u03b9\u03bf\u03c5\u03c1\u03b3\u03af\u03b1 \u03bd\u03ad\u03bf\u03c5 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03bf\u03c5 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 \u03bc\u03b5 \u03c0\u03c1\u03bf\u03b5\u03c0\u03b9\u03bb\u03b5\u03b3\u03bc\u03ad\u03bd\u03b1 \u03b2\u03ae\u03bc\u03b1\u03c4\u03b1 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b1\u03c2<\/figcaption><\/figure>\n\n<h5 class=\"wp-block-heading\" id=\"h-adding-materials-to-order-item\">\u03a0\u03c1\u03bf\u03c3\u03b8\u03ae\u03ba\u03b7 \u03c5\u03bb\u03b9\u03ba\u03ce\u03bd \u03c3\u03b5 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03bf \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2<\/h5>\n\n<p>\u0395\u03ac\u03bd \u03ad\u03c7\u03b5\u03c4\u03b5 \u03b5\u03c0\u03b9\u03c3\u03c5\u03bd\u03ac\u03c8\u03b5\u03b9 \u03c5\u03bb\u03b9\u03ba\u03ac \u03c3\u03c4\u03bf \u03c0\u03b1\u03c1\u03b1\u03b3\u03cc\u03bc\u03b5\u03bd\u03bf \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd, \u03b1\u03c5\u03c4\u03ac \u03b5\u03c0\u03b9\u03c3\u03c5\u03bd\u03ac\u03c0\u03c4\u03bf\u03bd\u03c4\u03b1\u03b9 \u03b1\u03c5\u03c4\u03cc\u03bc\u03b1\u03c4\u03b1 \u03c3\u03c4\u03b7 \u03c3\u03b5\u03b9\u03c1\u03ac \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2.<\/p>\n\n<p>\u03a9\u03c3\u03c4\u03cc\u03c3\u03bf, \u03b5\u03ac\u03bd \u03b4\u03b5\u03bd \u03b8\u03ad\u03bb\u03b5\u03c4\u03b5 \u03bd\u03b1 \u03c7\u03c1\u03b7\u03c3\u03b9\u03bc\u03bf\u03c0\u03bf\u03b9\u03ae\u03c3\u03b5\u03c4\u03b5 \u03c4\u03b1 \u03c5\u03bb\u03b9\u03ba\u03ac \u03c0\u03bf\u03c5 \u03c3\u03c5\u03bd\u03b4\u03ad\u03bf\u03bd\u03c4\u03b1\u03b9 \u03bc\u03b5 \u03c4\u03bf \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd (\u03b3\u03b9\u03b1 \u03c0\u03b1\u03c1\u03ac\u03b4\u03b5\u03b9\u03b3\u03bc\u03b1, \u03b5\u03ac\u03bd \u03c4\u03bf \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd \u03b5\u03af\u03bd\u03b1\u03b9 \u03b5\u03b9\u03b4\u03b9\u03ba\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1 \u03ba\u03b1\u03b9 \u03b8\u03ad\u03bb\u03b5\u03c4\u03b5 \u03bd\u03b1 \u03c7\u03c1\u03b7\u03c3\u03b9\u03bc\u03bf\u03c0\u03bf\u03b9\u03ae\u03c3\u03b5\u03c4\u03b5 \u03b4\u03b9\u03b1\u03c6\u03bf\u03c1\u03b5\u03c4\u03b9\u03ba\u03ac \u03c5\u03bb\u03b9\u03ba\u03ac \u03ba.\u03bb\u03c0.), \u03bc\u03c0\u03bf\u03c1\u03b5\u03af\u03c4\u03b5 \u03bd\u03b1 \u03c7\u03c1\u03b7\u03c3\u03b9\u03bc\u03bf\u03c0\u03bf\u03b9\u03ae\u03c3\u03b5\u03c4\u03b5 \u03c4\u03bf \u03c7\u03b1\u03c1\u03b1\u03ba\u03c4\u03b7\u03c1\u03b9\u03c3\u03c4\u03b9\u03ba\u03cc <strong>use_custom_materials<\/strong>.<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"625\" height=\"473\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/02\/image-159.png\" alt=\"\" class=\"wp-image-54968\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/02\/image-159.png 625w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/02\/image-159-300x227.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/02\/image-159-360x272.png 360w\" sizes=\"(max-width: 625px) 100vw, 625px\" \/><figcaption class=\"wp-element-caption\"><strong>\u03a3\u03c7\u03ae\u03bc\u03b1 3.<\/strong>  \u0394\u03b7\u03bc\u03b9\u03bf\u03c5\u03c1\u03b3\u03af\u03b1 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03bf\u03c5 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 \u03c7\u03c9\u03c1\u03af\u03c2 \u03c7\u03c1\u03ae\u03c3\u03b7 \u03c4\u03c9\u03bd \u03c0\u03c1\u03bf\u03b5\u03c0\u03b9\u03bb\u03b5\u03b3\u03bc\u03ad\u03bd\u03c9\u03bd \u03c5\u03bb\u03b9\u03ba\u03ce\u03bd<\/figcaption><\/figure>\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u0395\u03b4\u03ce \u03bc\u03c0\u03bf\u03c1\u03b5\u03af\u03c4\u03b5 \u03bd\u03b1 \u03b2\u03c1\u03b5\u03af\u03c4\u03b5 \u03ad\u03bd\u03b1\u03bd \u03b1\u03bd\u03b1\u03bb\u03c5\u03c4\u03b9\u03ba\u03cc \u03bf\u03b4\u03b7\u03b3\u03cc \u03b3\u03b9\u03b1 \u03c4\u03bf \u03c0\u03ce\u03c2 \u03bd\u03b1 \u03b4\u03b7\u03bc\u03b9\u03bf\u03c5\u03c1\u03b3\u03ae\u03c3\u03b5\u03c4\u03b5 \u03bc\u03b9\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1 \u03c3\u03c4\u03bf Skyplanner \u03bc\u03b5 \u03cc\u03bb\u03b1 \u03c4\u03b1 \u03c3\u03c7\u03b5\u03c4\u03b9\u03ba\u03ac \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03b1. \u039a\u03ac\u03c0\u03bf\u03b9\u03b1 \u03b1\u03c0\u03cc \u03b1\u03c5\u03c4\u03ac \u03ad\u03c7\u03bf\u03c5\u03bd \u03ba\u03b1\u03bb\u03c5\u03c6\u03b8\u03b5\u03af \u03c3\u03c4\u03bf \u03c3\u03b5\u03bc\u03b9\u03bd\u03ac\u03c1\u03b9\u03bf \u03b5\u03bd\u03c3\u03c9\u03bc\u03ac\u03c4\u03c9\u03c3\u03b7\u03c2, \u03b1\u03bb\u03bb\u03ac \u03b5\u03b4\u03ce \u03b8\u03b1 \u03b5\u03be\u03b5\u03c4\u03ac\u03c3\u03bf\u03c5\u03bc\u03b5 \u03c4\u03b7 \u03b4\u03bf\u03bc\u03ae \u03c4\u03c9\u03bd \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03c9\u03bd \u03c4\u03bf\u03c5 Skyplanner \u03ba\u03b1\u03b9 \u03c4\u03b7 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b1 \u03b5\u03bd\u03c3\u03c9\u03bc\u03ac\u03c4\u03c9\u03c3\u03b7\u03c2 \u03bc\u03b5 \u03c0\u03b5\u03c1\u03b9\u03c3\u03c3\u03cc\u03c4\u03b5\u03c1\u03b5\u03c2 \u03bb\u03b5\u03c0\u03c4\u03bf\u03bc\u03ad\u03c1\u03b5\u03b9\u03b5\u03c2. \u0394\u03bf\u03bc\u03ae \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03c9\u03bd \u03a0\u03c1\u03ce\u03c4\u03b1 \u03b8\u03b1 \u03b4\u03bf\u03cd\u03bc\u03b5 \u03c0\u03ce\u03c2 \u03b5\u03af\u03bd\u03b1\u03b9 \u03b4\u03bf\u03bc\u03b7\u03bc\u03ad\u03bd\u03b7 \u03bc\u03b9\u03b1 &#8230; <a title=\"\u0394\u03b7\u03bc\u03b9\u03bf\u03c5\u03c1\u03b3\u03af\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/el\/docs\/%ce%b4%ce%b7%ce%bc%ce%b9%ce%bf%cf%85%cf%81%ce%b3%ce%af%ce%b1-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%ce%b3%ce%b5%ce%bb%ce%af%ce%b1%cf%82\/\" aria-label=\"Read more about \u0394\u03b7\u03bc\u03b9\u03bf\u03c5\u03c1\u03b3\u03af\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2\">Read more<\/a><\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"doc_category":[635],"doc_tag":[636,1524],"class_list":["post-61329","docs","type-docs","status-publish","hentry","doc_category-635","doc_tag-api-el","doc_tag-1524"],"acf":[],"year_month":"2026-11","word_count":44,"total_views":"200","reactions":{"happy":"0","normal":"0","sad":"0"},"author_info":{"name":"Sami","author_nicename":"sami","author_url":"https:\/\/skyplanner.ai\/el\/author\/sami\/"},"doc_category_info":[{"term_name":"\u0395\u03bd\u03c3\u03c9\u03bc\u03b1\u03c4\u03ce\u03c3\u03b5\u03b9\u03c2","term_url":"https:\/\/skyplanner.ai\/el\/docs-category\/%ce%b5%ce%bd%cf%83%cf%89%ce%bc%ce%b1%cf%84%cf%8e%cf%83%ce%b5%ce%b9%cf%82\/"}],"doc_tag_info":[{"term_name":"API","term_url":"https:\/\/skyplanner.ai\/el\/docs-tag\/api-el\/"},{"term_name":"\u0395\u03bd\u03c3\u03c9\u03bc\u03ac\u03c4\u03c9\u03c3\u03b7","term_url":"https:\/\/skyplanner.ai\/el\/docs-tag\/%ce%b5%ce%bd%cf%83%cf%89%ce%bc%ce%ac%cf%84%cf%89%cf%83%ce%b7\/"}],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\u0394\u03b7\u03bc\u03b9\u03bf\u03c5\u03c1\u03b3\u03af\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 &#8211; SkyPlanner<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/el\/docs\/%ce%b4%ce%b7%ce%bc%ce%b9%ce%bf%cf%85%cf%81%ce%b3%ce%af%ce%b1-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%ce%b3%ce%b5%ce%bb%ce%af%ce%b1%cf%82\/\" \/>\n<meta property=\"og:locale\" content=\"el_GR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u0394\u03b7\u03bc\u03b9\u03bf\u03c5\u03c1\u03b3\u03af\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2\" \/>\n<meta property=\"og:description\" content=\"\u0395\u03b4\u03ce \u03bc\u03c0\u03bf\u03c1\u03b5\u03af\u03c4\u03b5 \u03bd\u03b1 \u03b2\u03c1\u03b5\u03af\u03c4\u03b5 \u03ad\u03bd\u03b1\u03bd \u03b1\u03bd\u03b1\u03bb\u03c5\u03c4\u03b9\u03ba\u03cc \u03bf\u03b4\u03b7\u03b3\u03cc \u03b3\u03b9\u03b1 \u03c4\u03bf \u03c0\u03ce\u03c2 \u03bd\u03b1 \u03b4\u03b7\u03bc\u03b9\u03bf\u03c5\u03c1\u03b3\u03ae\u03c3\u03b5\u03c4\u03b5 \u03bc\u03b9\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1 \u03c3\u03c4\u03bf Skyplanner \u03bc\u03b5 \u03cc\u03bb\u03b1 \u03c4\u03b1 \u03c3\u03c7\u03b5\u03c4\u03b9\u03ba\u03ac \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03b1. \u039a\u03ac\u03c0\u03bf\u03b9\u03b1 \u03b1\u03c0\u03cc \u03b1\u03c5\u03c4\u03ac \u03ad\u03c7\u03bf\u03c5\u03bd \u03ba\u03b1\u03bb\u03c5\u03c6\u03b8\u03b5\u03af \u03c3\u03c4\u03bf \u03c3\u03b5\u03bc\u03b9\u03bd\u03ac\u03c1\u03b9\u03bf \u03b5\u03bd\u03c3\u03c9\u03bc\u03ac\u03c4\u03c9\u03c3\u03b7\u03c2, \u03b1\u03bb\u03bb\u03ac \u03b5\u03b4\u03ce \u03b8\u03b1 \u03b5\u03be\u03b5\u03c4\u03ac\u03c3\u03bf\u03c5\u03bc\u03b5 \u03c4\u03b7 \u03b4\u03bf\u03bc\u03ae \u03c4\u03c9\u03bd \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03c9\u03bd \u03c4\u03bf\u03c5 Skyplanner \u03ba\u03b1\u03b9 \u03c4\u03b7 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b1 \u03b5\u03bd\u03c3\u03c9\u03bc\u03ac\u03c4\u03c9\u03c3\u03b7\u03c2 \u03bc\u03b5 \u03c0\u03b5\u03c1\u03b9\u03c3\u03c3\u03cc\u03c4\u03b5\u03c1\u03b5\u03c2 \u03bb\u03b5\u03c0\u03c4\u03bf\u03bc\u03ad\u03c1\u03b5\u03b9\u03b5\u03c2. \u0394\u03bf\u03bc\u03ae \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03c9\u03bd \u03a0\u03c1\u03ce\u03c4\u03b1 \u03b8\u03b1 \u03b4\u03bf\u03cd\u03bc\u03b5 \u03c0\u03ce\u03c2 \u03b5\u03af\u03bd\u03b1\u03b9 \u03b4\u03bf\u03bc\u03b7\u03bc\u03ad\u03bd\u03b7 \u03bc\u03b9\u03b1 ... Read more\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/el\/docs\/%ce%b4%ce%b7%ce%bc%ce%b9%ce%bf%cf%85%cf%81%ce%b3%ce%af%ce%b1-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%ce%b3%ce%b5%ce%bb%ce%af%ce%b1%cf%82\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:modified_time\" content=\"2025-10-07T10:48:02+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/02\/phaser-order.drawio-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"801\" \/>\n\t<meta property=\"og:image:height\" content=\"1252\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/docs\\\/%ce%b4%ce%b7%ce%bc%ce%b9%ce%bf%cf%85%cf%81%ce%b3%ce%af%ce%b1-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%ce%b3%ce%b5%ce%bb%ce%af%ce%b1%cf%82\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/docs\\\/%ce%b4%ce%b7%ce%bc%ce%b9%ce%bf%cf%85%cf%81%ce%b3%ce%af%ce%b1-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%ce%b3%ce%b5%ce%bb%ce%af%ce%b1%cf%82\\\/\",\"name\":\"\u0394\u03b7\u03bc\u03b9\u03bf\u03c5\u03c1\u03b3\u03af\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/docs\\\/%ce%b4%ce%b7%ce%bc%ce%b9%ce%bf%cf%85%cf%81%ce%b3%ce%af%ce%b1-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%ce%b3%ce%b5%ce%bb%ce%af%ce%b1%cf%82\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/docs\\\/%ce%b4%ce%b7%ce%bc%ce%b9%ce%bf%cf%85%cf%81%ce%b3%ce%af%ce%b1-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%ce%b3%ce%b5%ce%bb%ce%af%ce%b1%cf%82\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2025\\\/02\\\/phaser-order.drawio-1-655x1024.png\",\"datePublished\":\"2025-02-27T10:19:54+00:00\",\"dateModified\":\"2025-10-07T10:48:02+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/docs\\\/%ce%b4%ce%b7%ce%bc%ce%b9%ce%bf%cf%85%cf%81%ce%b3%ce%af%ce%b1-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%ce%b3%ce%b5%ce%bb%ce%af%ce%b1%cf%82\\\/#breadcrumb\"},\"inLanguage\":\"el\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/el\\\/docs\\\/%ce%b4%ce%b7%ce%bc%ce%b9%ce%bf%cf%85%cf%81%ce%b3%ce%af%ce%b1-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%ce%b3%ce%b5%ce%bb%ce%af%ce%b1%cf%82\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"el\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/docs\\\/%ce%b4%ce%b7%ce%bc%ce%b9%ce%bf%cf%85%cf%81%ce%b3%ce%af%ce%b1-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%ce%b3%ce%b5%ce%bb%ce%af%ce%b1%cf%82\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2025\\\/02\\\/phaser-order.drawio-1-655x1024.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2025\\\/02\\\/phaser-order.drawio-1-655x1024.png\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/docs\\\/%ce%b4%ce%b7%ce%bc%ce%b9%ce%bf%cf%85%cf%81%ce%b3%ce%af%ce%b1-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%ce%b3%ce%b5%ce%bb%ce%af%ce%b1%cf%82\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Docs\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/docs\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"\u0394\u03b7\u03bc\u03b9\u03bf\u03c5\u03c1\u03b3\u03af\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"el\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"el\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\u0394\u03b7\u03bc\u03b9\u03bf\u03c5\u03c1\u03b3\u03af\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 &#8211; SkyPlanner","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/el\/docs\/%ce%b4%ce%b7%ce%bc%ce%b9%ce%bf%cf%85%cf%81%ce%b3%ce%af%ce%b1-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%ce%b3%ce%b5%ce%bb%ce%af%ce%b1%cf%82\/","og_locale":"el_GR","og_type":"article","og_title":"\u0394\u03b7\u03bc\u03b9\u03bf\u03c5\u03c1\u03b3\u03af\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2","og_description":"\u0395\u03b4\u03ce \u03bc\u03c0\u03bf\u03c1\u03b5\u03af\u03c4\u03b5 \u03bd\u03b1 \u03b2\u03c1\u03b5\u03af\u03c4\u03b5 \u03ad\u03bd\u03b1\u03bd \u03b1\u03bd\u03b1\u03bb\u03c5\u03c4\u03b9\u03ba\u03cc \u03bf\u03b4\u03b7\u03b3\u03cc \u03b3\u03b9\u03b1 \u03c4\u03bf \u03c0\u03ce\u03c2 \u03bd\u03b1 \u03b4\u03b7\u03bc\u03b9\u03bf\u03c5\u03c1\u03b3\u03ae\u03c3\u03b5\u03c4\u03b5 \u03bc\u03b9\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1 \u03c3\u03c4\u03bf Skyplanner \u03bc\u03b5 \u03cc\u03bb\u03b1 \u03c4\u03b1 \u03c3\u03c7\u03b5\u03c4\u03b9\u03ba\u03ac \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03b1. \u039a\u03ac\u03c0\u03bf\u03b9\u03b1 \u03b1\u03c0\u03cc \u03b1\u03c5\u03c4\u03ac \u03ad\u03c7\u03bf\u03c5\u03bd \u03ba\u03b1\u03bb\u03c5\u03c6\u03b8\u03b5\u03af \u03c3\u03c4\u03bf \u03c3\u03b5\u03bc\u03b9\u03bd\u03ac\u03c1\u03b9\u03bf \u03b5\u03bd\u03c3\u03c9\u03bc\u03ac\u03c4\u03c9\u03c3\u03b7\u03c2, \u03b1\u03bb\u03bb\u03ac \u03b5\u03b4\u03ce \u03b8\u03b1 \u03b5\u03be\u03b5\u03c4\u03ac\u03c3\u03bf\u03c5\u03bc\u03b5 \u03c4\u03b7 \u03b4\u03bf\u03bc\u03ae \u03c4\u03c9\u03bd \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03c9\u03bd \u03c4\u03bf\u03c5 Skyplanner \u03ba\u03b1\u03b9 \u03c4\u03b7 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b1 \u03b5\u03bd\u03c3\u03c9\u03bc\u03ac\u03c4\u03c9\u03c3\u03b7\u03c2 \u03bc\u03b5 \u03c0\u03b5\u03c1\u03b9\u03c3\u03c3\u03cc\u03c4\u03b5\u03c1\u03b5\u03c2 \u03bb\u03b5\u03c0\u03c4\u03bf\u03bc\u03ad\u03c1\u03b5\u03b9\u03b5\u03c2. \u0394\u03bf\u03bc\u03ae \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03c9\u03bd \u03a0\u03c1\u03ce\u03c4\u03b1 \u03b8\u03b1 \u03b4\u03bf\u03cd\u03bc\u03b5 \u03c0\u03ce\u03c2 \u03b5\u03af\u03bd\u03b1\u03b9 \u03b4\u03bf\u03bc\u03b7\u03bc\u03ad\u03bd\u03b7 \u03bc\u03b9\u03b1 ... Read more","og_url":"https:\/\/skyplanner.ai\/el\/docs\/%ce%b4%ce%b7%ce%bc%ce%b9%ce%bf%cf%85%cf%81%ce%b3%ce%af%ce%b1-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%ce%b3%ce%b5%ce%bb%ce%af%ce%b1%cf%82\/","og_site_name":"SkyPlanner","article_modified_time":"2025-10-07T10:48:02+00:00","og_image":[{"width":801,"height":1252,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/02\/phaser-order.drawio-1.png","type":"image\/png"}],"twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/el\/docs\/%ce%b4%ce%b7%ce%bc%ce%b9%ce%bf%cf%85%cf%81%ce%b3%ce%af%ce%b1-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%ce%b3%ce%b5%ce%bb%ce%af%ce%b1%cf%82\/","url":"https:\/\/skyplanner.ai\/el\/docs\/%ce%b4%ce%b7%ce%bc%ce%b9%ce%bf%cf%85%cf%81%ce%b3%ce%af%ce%b1-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%ce%b3%ce%b5%ce%bb%ce%af%ce%b1%cf%82\/","name":"\u0394\u03b7\u03bc\u03b9\u03bf\u03c5\u03c1\u03b3\u03af\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/el\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/el\/docs\/%ce%b4%ce%b7%ce%bc%ce%b9%ce%bf%cf%85%cf%81%ce%b3%ce%af%ce%b1-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%ce%b3%ce%b5%ce%bb%ce%af%ce%b1%cf%82\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/el\/docs\/%ce%b4%ce%b7%ce%bc%ce%b9%ce%bf%cf%85%cf%81%ce%b3%ce%af%ce%b1-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%ce%b3%ce%b5%ce%bb%ce%af%ce%b1%cf%82\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/02\/phaser-order.drawio-1-655x1024.png","datePublished":"2025-02-27T10:19:54+00:00","dateModified":"2025-10-07T10:48:02+00:00","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/el\/docs\/%ce%b4%ce%b7%ce%bc%ce%b9%ce%bf%cf%85%cf%81%ce%b3%ce%af%ce%b1-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%ce%b3%ce%b5%ce%bb%ce%af%ce%b1%cf%82\/#breadcrumb"},"inLanguage":"el","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/el\/docs\/%ce%b4%ce%b7%ce%bc%ce%b9%ce%bf%cf%85%cf%81%ce%b3%ce%af%ce%b1-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%ce%b3%ce%b5%ce%bb%ce%af%ce%b1%cf%82\/"]}]},{"@type":"ImageObject","inLanguage":"el","@id":"https:\/\/skyplanner.ai\/el\/docs\/%ce%b4%ce%b7%ce%bc%ce%b9%ce%bf%cf%85%cf%81%ce%b3%ce%af%ce%b1-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%ce%b3%ce%b5%ce%bb%ce%af%ce%b1%cf%82\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/02\/phaser-order.drawio-1-655x1024.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/02\/phaser-order.drawio-1-655x1024.png"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/el\/docs\/%ce%b4%ce%b7%ce%bc%ce%b9%ce%bf%cf%85%cf%81%ce%b3%ce%af%ce%b1-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%ce%b3%ce%b5%ce%bb%ce%af%ce%b1%cf%82\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/el\/"},{"@type":"ListItem","position":2,"name":"Docs","item":"https:\/\/skyplanner.ai\/el\/docs\/"},{"@type":"ListItem","position":3,"name":"\u0394\u03b7\u03bc\u03b9\u03bf\u03c5\u03c1\u03b3\u03af\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/el\/#website","url":"https:\/\/skyplanner.ai\/el\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/el\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/el\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"el"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/el\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/el\/","logo":{"@type":"ImageObject","inLanguage":"el","@id":"https:\/\/skyplanner.ai\/el\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/el\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Sami","author_link":"https:\/\/skyplanner.ai\/el\/author\/sami\/"},"uagb_comment_info":0,"uagb_excerpt":"\u0395\u03b4\u03ce \u03bc\u03c0\u03bf\u03c1\u03b5\u03af\u03c4\u03b5 \u03bd\u03b1 \u03b2\u03c1\u03b5\u03af\u03c4\u03b5 \u03ad\u03bd\u03b1\u03bd \u03b1\u03bd\u03b1\u03bb\u03c5\u03c4\u03b9\u03ba\u03cc \u03bf\u03b4\u03b7\u03b3\u03cc \u03b3\u03b9\u03b1 \u03c4\u03bf \u03c0\u03ce\u03c2 \u03bd\u03b1 \u03b4\u03b7\u03bc\u03b9\u03bf\u03c5\u03c1\u03b3\u03ae\u03c3\u03b5\u03c4\u03b5 \u03bc\u03b9\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1 \u03c3\u03c4\u03bf Skyplanner \u03bc\u03b5 \u03cc\u03bb\u03b1 \u03c4\u03b1 \u03c3\u03c7\u03b5\u03c4\u03b9\u03ba\u03ac \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03b1. \u039a\u03ac\u03c0\u03bf\u03b9\u03b1 \u03b1\u03c0\u03cc \u03b1\u03c5\u03c4\u03ac \u03ad\u03c7\u03bf\u03c5\u03bd \u03ba\u03b1\u03bb\u03c5\u03c6\u03b8\u03b5\u03af \u03c3\u03c4\u03bf \u03c3\u03b5\u03bc\u03b9\u03bd\u03ac\u03c1\u03b9\u03bf \u03b5\u03bd\u03c3\u03c9\u03bc\u03ac\u03c4\u03c9\u03c3\u03b7\u03c2, \u03b1\u03bb\u03bb\u03ac \u03b5\u03b4\u03ce \u03b8\u03b1 \u03b5\u03be\u03b5\u03c4\u03ac\u03c3\u03bf\u03c5\u03bc\u03b5 \u03c4\u03b7 \u03b4\u03bf\u03bc\u03ae \u03c4\u03c9\u03bd \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03c9\u03bd \u03c4\u03bf\u03c5 Skyplanner \u03ba\u03b1\u03b9 \u03c4\u03b7 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b1 \u03b5\u03bd\u03c3\u03c9\u03bc\u03ac\u03c4\u03c9\u03c3\u03b7\u03c2 \u03bc\u03b5 \u03c0\u03b5\u03c1\u03b9\u03c3\u03c3\u03cc\u03c4\u03b5\u03c1\u03b5\u03c2 \u03bb\u03b5\u03c0\u03c4\u03bf\u03bc\u03ad\u03c1\u03b5\u03b9\u03b5\u03c2. \u0394\u03bf\u03bc\u03ae \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03c9\u03bd \u03a0\u03c1\u03ce\u03c4\u03b1 \u03b8\u03b1 \u03b4\u03bf\u03cd\u03bc\u03b5 \u03c0\u03ce\u03c2 \u03b5\u03af\u03bd\u03b1\u03b9 \u03b4\u03bf\u03bc\u03b7\u03bc\u03ad\u03bd\u03b7 \u03bc\u03b9\u03b1&hellip;","knowledge_base_info":[],"knowledge_base_slug":[],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/docs\/61329","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/docs"}],"about":[{"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/types\/docs"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/comments?post=61329"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/docs\/61329\/revisions"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/media?parent=61329"}],"wp:term":[{"taxonomy":"doc_category","embeddable":true,"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/doc_category?post=61329"},{"taxonomy":"doc_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/doc_tag?post=61329"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}