---
title: What is Price per Unit?
description: "Price per unit is a SkyPlanner feature that will calculate how much your production will cost in a basic way. You can set this up when creating a new product or material or edit existing ones. ### How to set…"
url: "https://skyplanner.ai/docs/what-is-price-per-unit/"
updated: "2025-09-11"
category: Warehouse / Products
---

# What is Price per Unit?

Price per unit is a SkyPlanner feature that will calculate how much your production will cost in a basic way.

You can set this up when creating a new product or material or edit existing ones.

### How to set up Price per Unit?

- Go to an existing product or material, click the three dots icon on the right side, and select edit, or if it is a new addition, click **+ Create product / + Create material**.
- The product settings window will pop up. Look for Price per Unit.

![](https://skyplanner.ai/wp-content/uploads/2025/03/Price-per-unit-product-settings.png)

- Write the price per unit.
- Next, click **Save**. 
