---
title: What is and how to manage Workstation Efficiencies
description: "**Workstation efficiencies is a SkyPlanner feature that lets you set how well different workstations perform compared to each other.** Not all machines or shifts work at the same speed, and this tool helps you reflect those real-world differences in your…"
url: "https://skyplanner.ai/docs/what-is-and-how-to-manage-workstation-efficiencies/"
updated: "2025-09-09"
category: Video Guides
---

# What is and how to manage Workstation Efficiencies

**Workstation efficiencies is a SkyPlanner feature that lets you set how well different workstations perform compared to each other.** Not all machines or shifts work at the same speed, and this tool helps you reflect those real-world differences in your production schedule.

For example, if you have two welding workstations and one can finish a welding task in 30 minutes, but another takes an hour, **SkyPlanner** will use this information to create a more accurate and efficient plan.

You can manage the efficiencies in percentages.

Note: It’s important to set workstation efficiencies **before** you begin scheduling jobs—if jobs are already planned, you’ll need to unschedule them first to make changes. That’s why we recommend configuring this at the start to ensure everything runs smoothly from day one.

Let’s take a look at how to set it up.

[How to set Workstation Efficiencies](https://www.youtube.com/embed/XKgclQjlkXs?feature=oembed)
