---
title: ShopFloorApp and Timer
description: "**Tracking time on the shop floor shouldn’t slow things down—it should make work more efficient.** With **SkyPlanner’s ShopFloor module**, employees can easily log their time on different tasks using a simple timer. Every time entry is recorded in real-time, so…"
url: "https://skyplanner.ai/docs/shoopflor-and-timer/"
updated: "2025-03-19"
category: Timer and Reports
---

# ShopFloorApp and Timer

**Tracking time on the shop floor shouldn’t slow things down—it should make work more efficient.** With **SkyPlanner’s ShopFloor module**, employees can easily log their time on different tasks using a simple timer. Every time entry is recorded in real-time, so you always have a clear view of what’s happening on the production floor.

In this video, we’ll show you how to use the timer and time logs to track tasks, start, pause, and stop work easily. Keeping accurate records helps you spot delays, improve workflow, and make better scheduling decisions.

[Production Timer: Optimize Your Workforce](https://www.youtube.com/embed/NKsp0cZk8qA?feature=oembed)
