# Scheduled process step timings and workstations

After Skyplanner has scheduled your process steps into the timeline you might want to fetch the start, end times and workstation data for the steps into you ERP-system. This can be done using the /jobs-endpoint.

#### Fetching process step scheduling times

By giving the GET-request done to the /jobs-endpoint the URL-parameter **job_parts=true** your return response will include some additional data:

![](https://skyplanner.ai/wp-content/uploads/2025/03/image-43-528x1024.png)
**Fig 1.** Job data with job parts

With the **job_parts=true** parameter you get also the entities called **job parts** linked to the job.

Job parts are represented in the Skyplanner UI by the "chunks" a job is splitted:

![](https://skyplanner.ai/wp-content/uploads/2025/03/image-44-1024x137.png)
**Fig 2.** Job splitted into parts

Each job part has a **planned_start_time**, a **planned_end_time** and a **planned_duration**. If you want to find out when the job is scheduled to be started your integration logic needs to look through each job part and find the **planned_start_time** with the earliest value. And for the job's end time you will have to look for the **planned_end_time** with the latest value.

**Note:** do not assume that the first job part has the earliest **planned_start_time** and the last part has the latest **planned_end_time**! This is not always the case.

From the job_parts you can also find the duration of each part in the **planned_duration** field. This value is in seconds.

#### Fetching the assigned workstation of a scheduled process step

In the job part data (Fig 1.) you can find the workstation the part is planned to be completed in the **planned_workstation_id** value.

With the **workstation_id** value you can fetch the workstation from the /workstations-endpoint:

![](https://skyplanner.ai/wp-content/uploads/2025/03/image-45.png)
**Fig 3.** Fetching a workstation

If you've linked the corresponding workstation in your ERP system to Skyplanner's workstation via its external ID, you can find it in the response. This allows you to update the workstation in your ERP if Skyplanner has reassigned the process step to a different workstation.