---
title: Quick Log Mode Introduction
description: "The Quick Log mode is a workstation setting that enables marking tasks  as completed immediately and  without a separate start log. [The quick log mode](https://www.youtube.com/embed/YEHT-8zKzsU?feature=oembed)"
url: "https://skyplanner.ai/docs/quick-log-mode-introduction/"
updated: "2025-06-13"
category: Resources / Workstations
---

# Quick Log Mode Introduction

The Quick Log mode is a workstation setting that enables marking tasks  as completed immediately and  without a separate start log.

[The quick log mode](https://www.youtube.com/embed/YEHT-8zKzsU?feature=oembed)
