---
title: Minimum Production Quantity
description: "### What is Minimum Production Quantity? Minimum Production Quantity is a feature in SkyPlanner that allows you to set the minimum number of units that must be produced when you produce it. ### How to set up Minimum Production Quantity?…"
url: "https://skyplanner.ai/docs/minimum-production-quantity/"
updated: "2025-06-13"
category: Warehouse / Products
---

# Minimum Production Quantity

### What is Minimum Production Quantity?

Minimum Production Quantity is a feature in SkyPlanner that allows you to set the minimum number of units that must be produced when you produce it.

### How to set up Minimum Production Quantity?

- Go to an existing product, click the three dots icon on the right side, and select edit, or if it is a new addition, click **+ Create product**.
- The product settings window will pop up. Look for the Minimum Production Quantity Field. 

![](https://skyplanner.ai/wp-content/uploads/2025/03/Product-settings-minimum-production-quantity.png)

- Write the minimum amount it needs to be produced and fill in the rest of this product's information if it is new. 
- Next, click **Save**. 
