---
title: Inventory Transaction Iconography
description: "![](https://skyplanner.ai/wp-content/uploads/2025/04/Transaction-iconography-1024x163.png) ![](https://skyplanner.ai/wp-content/uploads/2025/04/deposit.png) **The plus icon** represents a **purchase transaction**. This means materials or products have been ordered and are currently **pending arrival** at the warehouse. (**Pending action**). This action appears green on the list. ![](https://skyplanner.ai/wp-content/uploads/2025/04/withdrawl.png) **The minus icon** indicates that…"
url: "https://skyplanner.ai/docs/inventory-transaction-iconography/"
updated: "2025-04-08"
category: Warehouse / Inventory Transactions
---

# Inventory Transaction Iconography

![](https://skyplanner.ai/wp-content/uploads/2025/04/Transaction-iconography-1024x163.png)

![](https://skyplanner.ai/wp-content/uploads/2025/04/deposit.png)

**The plus icon** represents a **purchase transaction**. This means materials or products have been ordered and are currently **pending arrival** at the warehouse. (**Pending action**). This action appears green on the list.

![](https://skyplanner.ai/wp-content/uploads/2025/04/withdrawl.png)

**The minus icon** indicates that **materials have been removed** from the warehouse for reasons **other than manufacturing**, such as testing, maintenance, or internal use. (**Withdrawl action**). This action appears in red on the list.

![](https://skyplanner.ai/wp-content/uploads/2025/04/Product-material-new.png)

**The list icon** shows that **materials or products have been received** into the warehouse, whether they were produced in-house or purchased from an external supplier. This action appears in blue on the list.
