---
title: How to use the Running timelock in one specific workstation
description: "The**Running Timelock** is a feature prohibiting changes in a defined time interval in workstations. We have seen how this feature works by using Global Rules and how this applies to all workstations. Nevertheless, you can also apply this feature to…"
url: "https://skyplanner.ai/docs/how-to-use-the-running-timelock-in-one-specific-workstation/"
updated: "2025-04-10"
category: Gantt Timeline / Workstation Rules
tags:
  - Capacities
  - Workstations
---

# How to use the Running timelock in one specific workstation

The**Running Timelock** is a feature prohibiting changes in a defined time interval in workstations. We have seen how this feature works by using Global Rules and how this applies to all workstations. Nevertheless, you can also apply this feature to only ONE specific workstation.

- First, let’s go to **Production Scheduling**.
- Once there, click on the workstation you want to apply the **Running Time Lock**.
- Right-click on the workstation and select **Workstation Rules**.

![](https://skyplanner.ai/wp-content/uploads/2025/03/workstation-rules-timelock.png)

- Once there, look for the Running timelock and write the amount of hours you want that workstation to be locked for changes.
- Finally, click **Save**.

![](https://skyplanner.ai/wp-content/uploads/2025/03/timelock-for-specific-workstation-1024x753.png)

If you check on the GANTT Timeline, the jobs that are locked in the period you selected look salmon.   

![](https://skyplanner.ai/wp-content/uploads/2025/03/example-of-timelock-in-specific-workstation-1024x589.png)
