---
title: How to Start a job in the Timer
description: "To start a job in the Timer: - Go to **Timer** and look for the job you need to start. In this example, we will start P5. - Now the job has started. - If you go to the GANTT…"
url: "https://skyplanner.ai/docs/how-to-start-a-job-in-the-timer/"
updated: "2025-03-31"
category: Timer and Reports
---

# How to Start a job in the Timer

To start a job in the Timer:

- Go to **Timer** and look for the job you need to start. In this example, we will start P5.
- Now the job has started.
- If you go to the GANTT Timeline, you will see that the job will appear in salmon the default color SkyPlanner gives to running and locked jobs.

![](https://skyplanner.ai/wp-content/uploads/2025/03/Start-a-job-in-the-timer-1024x535.png)
