---
title: How to split Jobs across multiple Workstations
description: "In manufacturing, dividing complex tasks across multiple workstations can enhance efficiency. SkyPlanner's AI, **Arcturus**, intelligently manages this by considering **dynamic priorities** and the specific requirements of each job. [How to split a job into multiple workstations](https://www.youtube.com/embed/OMGx97MvdWY?feature=oembed) ### Dynamic Priorities Influence…"
url: "https://skyplanner.ai/docs/how-to-split-jobs-across-multiple-workstations/"
updated: "2025-03-19"
category: Gantt Timeline / Job Rules
---

# How to split Jobs across multiple Workstations

In manufacturing, dividing complex tasks across multiple workstations can enhance efficiency. SkyPlanner's AI, **Arcturus**, intelligently manages this by considering **dynamic priorities** and the specific requirements of each job.

[How to split a job into multiple workstations](https://www.youtube.com/embed/OMGx97MvdWY?feature=oembed)

### Dynamic Priorities Influence Job Splitting

Arcturus evaluates the priorities you've set within SkyPlanner to determine the optimal approach to splitting jobs. This ensures that critical tasks receive the attention they need, aligning with your production goals.​

### Intelligent Allocation Based on Remaining Work

When a job has minimal hours left—such as 8 hours—Arcturus may assign the entire task to a single workstation. This strategy minimizes setup times and maintains workflow continuity. However, if you prefer to distribute the remaining work across multiple stations, SkyPlanner allows you to adjust these allocations manually.
