description: "If you wish to see the Workstation capacity graph in the Gantt Timeline: - Go to**Production Scheduling**. - Right click on the workstation you want to see the capacity graph. - A dropdown menu will appear, select **Workstation capacity**. ![](https://skyplanner.ai/wp-content/uploads/2025/04/workstation-capacity-menu.png)…"
url: "https://skyplanner.ai/docs/how-to-see-a-workstation-capacity-graph/"
updated: "2025-04-14"
category: Gantt Timeline / User Interface
---

# How to see a Workstation Capacity graph

If you wish to see the Workstation capacity graph in the Gantt Timeline:

- Go to**Production Scheduling**.
- Right click on the workstation you want to see the capacity graph.
- A dropdown menu will appear, select **Workstation capacity**.

![](https://skyplanner.ai/wp-content/uploads/2025/04/workstation-capacity-menu.png)

Now, at the bottom, you will see the capacity graph for this workstation.

You can see the capacity for up to 8 weeks.

[Learn how to add a Workstation capacity graph in the GANTT Timeline.](https://skyplanner.ai/docs/how-to-activate-workstation-capacity-graph-in-the-gantt-timeline/)

![](https://skyplanner.ai/wp-content/uploads/2025/04/workstation-capacity-graph-1024x589.png)