# How to remove Overtime

If you need to remove overtime, follow these simple steps:

- Go to **Resources** and select **Personnel Scheduling**.
- In the calendar, locate the **day and workstation** with the extra shift. In this example, we will remove the **overtime** on**Saturday** for **Saw 1.**

![](https://skyplanner.ai/wp-content/uploads/2025/02/Remove-Overtime-SkyPlanner-1024x529.png)

**Tip:** If your company has many workstations, use the **search option** in the top-left corner to find it faster.

![](https://skyplanner.ai/wp-content/uploads/2025/02/Select-Workstation-Shift-Scheduling-1024x333.png)

- Once you find the correct workstation, **click on the (X) icon** to delete the extra shift.

![](https://skyplanner.ai/wp-content/uploads/2025/02/Remove-Overtime-X-icon.png)

Done! The overtime shift is now removed.

Go to the **Gantt timeline**, and you will see that the extra shift is no longer scheduled.

**Remember:** Click the **king button** to optimize your scheduling every time you make a change.