---
title: How to prohibit changes in an Order 
description: "If you want to prohibit changes in the process steps of an order: - Go to **Production Scheduling** - In the GANTT Timeline, look for the order you wish to prohibit changes. - Right-click on the order and select **Job…"
url: "https://skyplanner.ai/docs/how-to-prohibit-changes-in-an-order/"
updated: "2025-04-09"
category: Gantt Timeline / Job Rules
tags:
  - Capacities
---

# How to prohibit changes in an Order 

If you want to prohibit changes in the process steps of an order:

- Go to **Production Scheduling**
- In the GANTT Timeline, look for the order you wish to prohibit changes.
- Right-click on the order and select **Job Rules**.

![](https://skyplanner.ai/wp-content/uploads/2025/03/Job-rules-prohibit-changes-in-an-order-1024x589.png)

- Go to the **order tier** and check the “**Changes prohibited”** box to lock the jobs.

![](https://skyplanner.ai/wp-content/uploads/2025/03/Changes-prohibited-in-an-order-1024x627.png)

- Finally, click **Save**.

By default, **SkyPlanner** shows locked jobs in a salmon color.

![](https://skyplanner.ai/wp-content/uploads/2025/03/locked-order-salmon-1024x589.png)
