# How to move a job to another workstation

SkyPlanner will consider the priorities you have set in Global Rules, but there are situations in which a production planner can decide that a job is better if it is done elsewhere than the one proposed by the AI.

When you want to move a job to another workstation:

- Go to **Production Scheduling**.
- Once there, look for the job you want to move to another workstation.
- Right-click on the job, and look for “**Move Job to workstation**.”
- A list of all your workstations will appear. Select the one you desire.
- You will see that the job will be positioned in your selected workstation as a draft. **Click Accept**.

Note: If your job is overlapping with the previous job that was in that workstation. Click on the **King Button**to fix this.

![](https://skyplanner.ai/wp-content/uploads/2025/04/Move-job-to-another-workstation-1024x589.png)