---
title: How to hide Workstations in GANTT Timeline
description: "For hiding a workstation in the GANTT Timeline: - Click on  the **All workstations button** on the left side of your GANTT Timeline. ![](https://cdn-assets.productfruits.com/40d47083-db8c-4b13-ad3b-0f8d7ce141aa) - A menu will appear; click on the Box of the workstation(s) you want to hide. They…"
url: "https://skyplanner.ai/docs/how-to-hide-workstations-in-gantt-timeline/"
updated: "2025-03-09"
category: Gantt Timeline / Workstations and workstation groups
tags:
  - Gantt Chart
  - Workstations
---

# How to hide Workstations in GANTT Timeline

For hiding a workstation in the GANTT Timeline:

- Click on  the **All workstations button** on the left side of your GANTT Timeline.

![](https://cdn-assets.productfruits.com/40d47083-db8c-4b13-ad3b-0f8d7ce141aa)

- A menu will appear; click on the Box of the workstation(s) you want to hide. They will become white on the menu.

![](https://skyplanner.ai/wp-content/uploads/2025/02/image-95.png)

- Finally, click anywhere else on the GANTT Timeline to close the menu and see only the desired workstations. Remember, you can change this option at anytime.

![](https://skyplanner.ai/wp-content/uploads/2025/02/image-96-1024x130.png)
