---
title: How to Disallow multi logging
description: "To avoid a user starting multiple jobs at the same time instead of the first one that needs to be completed: - Go to **Timer**. - On the top, click on your user. - A dropdown menu will appear. Select…"
url: "https://skyplanner.ai/docs/how-to-disallow-multi-logging/"
updated: "2025-04-01"
category: Timer and Reports
---

# How to Disallow multi logging

To avoid a user starting multiple jobs at the same time instead of the first one that needs to be completed:

- Go to **Timer**.
- On the top, click on your user.
- A dropdown menu will appear. Select **Settings**.
- Now you will be taken to the settings panel. Click on the **Timer tab**.
- Look for the field **Disallow multi logging**.
- Finally, click save on the bottom left.

Now, a job cannot start unless the previous is completed.

![](https://skyplanner.ai/wp-content/uploads/2025/03/Disallow-multilogin-1024x535.png)
