---
title: How to Create a Workstation Group in the GANTT Timeline
description: "If you need to create a workstation group in the GANTT Timeline: - Click on the **All workstations button** All workstations on the left side if your GANTT Timeline. ![](https://cdn-assets.productfruits.com/7f44b9b4-9fb6-4e28-827e-2e644e24ade8) - A menu will appear; click on **+** **Create Group**.…"
url: "https://skyplanner.ai/docs/how-to-create-a-workstation-group-in-the-gantt-timeline/"
updated: "2025-03-09"
category: Gantt Timeline / Workstations and workstation groups
tags:
  - Gantt Chart
  - Workstations
---

# How to Create a Workstation Group in the GANTT Timeline

If you need to create a workstation group in the GANTT Timeline:

- Click on the **All workstations button** All workstations on the left side if your GANTT Timeline.

![](https://cdn-assets.productfruits.com/7f44b9b4-9fb6-4e28-827e-2e644e24ade8)

- A menu will appear; click on **+** **Create Group**.

![](https://cdn-assets.productfruits.com/4fb39ea2-e99a-40fb-a4cd-ade80b859a14)

![](https://skyplanner.ai/wp-content/uploads/2025/02/image-97.png)

- A new window will appear. Name this group and select the workstations that will be part of it. Click**Save**. 

![](https://skyplanner.ai/wp-content/uploads/2025/02/image-98.png)

Now, you will see this group on your workstation menu.

![](https://skyplanner.ai/wp-content/uploads/2025/02/image-99.png)
