---
title: How to change the color for running jobs in the GANTT Timeline
description: "In SkyPlanner, by default, running jobs appear salmon. To change this: - Go to Production Planning and click on the **gear icon**. - A new window will appear with the **Global Rules**. On top, click on the tab **User Interface**.…"
url: "https://skyplanner.ai/docs/how-to-change-the-color-for-running-jobs-in-the-gantt-timeline/"
updated: "2025-09-16"
category: Gantt Timeline / User Interface
---

# How to change the color for running jobs in the GANTT Timeline

In SkyPlanner, by default, running jobs appear salmon. To change this:

- Go to Production Planning and click on the **gear icon**.
- A new window will appear with the **Global Rules**. On top, click on the tab **User Interface**.
- Look for the field **Define color for running jobs. Check the box and select a color.**
- Finally, click **Save**.

Now, your running jobs will appear in the color you selected.

![](https://skyplanner.ai/wp-content/uploads/2025/03/Colors-for-Running-jobs-1024x644.png)
