---
title: How to assign a Tool to a Workstation
description: "To add or change a tool's workstation: - Go to** Resources** and select **Tools**. - In the **Tool management panel**, click on the tool you want to add a workstation. - Select the workstation that can use this tool. - You can also…"
url: "https://skyplanner.ai/docs/how-to-assign-a-tool-to-a-workstation/"
updated: "2025-06-13"
category: Resources / Tools
---

# How to assign a Tool to a Workstation

To add or change a tool's workstation:

- Go to** Resources** and select **Tools**.
- In the **Tool management panel**, click on the tool you want to add a workstation.
- Select the workstation that can use this tool.
- You can also change the workstation of a tool by pressing **X**on the selected workstations on your right. Remember that a tool can also have several workstations, so do not think there is a limit to just one.
-  Finally, click **Save**. 

![](https://skyplanner.ai/wp-content/uploads/2025/02/tool-workstation-selection-add-1024x589.png)
