---
title: How to add Material to an existing Product
description: "[Material Management: Check your inventory in advance](https://www.youtube.com/embed/C2QxeuRFfbI?feature=oembed) To add material to a product: - Go to Warehouse and select **Product**. - Once there, look for the product you want to add material to. Click on it.   - On the **Product…"
url: "https://skyplanner.ai/docs/how-to-add-material-to-an-existing-product/"
updated: "2025-09-16"
category: Warehouse / Materials
---

# How to add Material to an existing Product

[Material Management: Check your inventory in advance](https://www.youtube.com/embed/C2QxeuRFfbI?feature=oembed)

To add material to a product:

- Go to Warehouse and select **Product**.
- Once there, look for the product you want to add material to. Click on it.  
- On the **Product panel**, click on the **Materials tab**. After that, click on **+ Add Material**.

![](https://skyplanner.ai/wp-content/uploads/2025/04/Add-materials-to-a-product-1024x589.png)

- A new window will pop up.

![](https://skyplanner.ai/wp-content/uploads/2025/04/Add-material-panel.png)

- Select the material and define the required quantity to manufacture one product. Once done, click **Save**.
- You can add as many materials as needed to produce this item by repeating the steps.

Now, whenever you create a new Order and select this product for Order item, these materials will appear linked to the product.

You can learn more in "**[Consider the materials](https://skyplanner.ai/docs/consider-the-materials/)**"
