---
title: How to add JIT Philosophy in one specific Order
description: There are manufacturing companies that work with a Hybrid Philosophy (Just in Time and ASAP) So, how do I select which jobs go to ASAP and which ones to JIT? In this example, we will teach you how to change…
url: "https://skyplanner.ai/docs/how-to-add-jit-philosophy-in-one-specific-order/"
updated: "2025-04-09"
category: Gantt Timeline / Job Rules
---

# How to add JIT Philosophy in one specific Order

There are manufacturing companies that work with a Hybrid Philosophy (Just in Time and ASAP)

So, how do I select which jobs go to ASAP and which ones to JIT? In this example, we will teach you how to change one order into JIT.

By default, in**SkyPlanner**, all jobs are scheduled using the ASAP philosophy, but let’s change that for one order.

- Go to **Production Scheduling.**
- Select the order you want to adapt to the JIT philosophy. Right-click on it and **select job rules**.

![](https://skyplanner.ai/wp-content/uploads/2025/03/Job-Rules-selection.png)

- Once inside, go to the Order Item Level and uncheck the box **Default scheduling direction forward**.
- Finally, click **Save**.

![](https://skyplanner.ai/wp-content/uploads/2025/03/JIT-in-specific-order-1024x522.png)

- Now, click on **King Button** to update your schedule.

If you look at your GANTT Timeline, your job is scheduled close to the delivery date.

![](https://skyplanner.ai/wp-content/uploads/2025/03/JIT-order-example-1024x589.png)
