---
title: How to add a Tool to a Product
description: "If you need to assign a tool to an existing product, follow these steps: ![](https://skyplanner.ai/wp-content/uploads/2025/02/add-a-tool-to-a-product-1024x589.png) - Go to **Warehouse**and select **Products**. - Find the product in the list to which you want to assign a tool and click on it.…"
url: "https://skyplanner.ai/docs/how-to-add-a-tool-to-an-existing-product/"
updated: "2025-06-13"
category: Resources / Tools
---

# How to add a Tool to a Product

If you need to assign a tool to an existing product, follow these steps:

![](https://skyplanner.ai/wp-content/uploads/2025/02/add-a-tool-to-a-product-1024x589.png)

- Go to **Warehouse**and select **Products**.
- Find the product in the list to which you want to assign a tool and click on it.
- You will be redirected to the **product management panel**. Click on the **Tools** tab.
- New options will appear. Click on the **"Add/Remove Tools"** button.

![](https://skyplanner.ai/wp-content/uploads/2025/02/product-tool-panel-1024x446.png)

- A pop-up window will appear, asking you to **select the tool(s)** you want to attach to this product.
- Click **Save** to confirm.

Now, this tool will automatically be attached to your product whenever you create a new order.
