---
title: How to add a Process Step
description: "**Process steps play a key role in scheduling.** In this video tutorial, you will learn how to create a new process step, assign workstations that can perform it, and add it to a product. [How to add process steps in…"
url: "https://skyplanner.ai/docs/how-to-add-a-process-step/"
updated: "2025-03-17"
category: Video Guides
---

# How to add a Process Step

**Process steps play a key role in scheduling.**

In this video tutorial, you will learn how to create a new process step, assign workstations that can perform it, and add it to a product.

[How to add process steps in SkyPlanner](https://www.youtube.com/embed/6pPW1oMR-9U?feature=oembed)
