---
title: How to add a Default Shift
description: "If you want to create a Default Shift: - Go to** Resources** and select** Default Shifts**. - Next, you will see the **Default Shift panel**, where you can visualize the shifts you have created. If you are new to**SkyPlanner**, this section will have…"
url: "https://skyplanner.ai/docs/how-to-add-a-default-shift/"
updated: "2025-06-13"
category: Resources / Default Shifts
---

# How to add a Default Shift

If you want to create a Default Shift:

- Go to** Resources** and select** Default Shifts**.
- Next, you will see the **Default Shift panel**, where you can visualize the shifts you have created. If you are new to**SkyPlanner**, this section will have morning and evening shifts.

![](https://skyplanner.ai/wp-content/uploads/2025/02/image-44-1024x397.png)

- On the top right, click on **+ Add workshift**. A new shift will appear. Give this shift a name, a schedule, and a color code. 

![](https://skyplanner.ai/wp-content/uploads/2025/02/image-45-1024x334.png)

- Repeat this step if you have two shifts or more. When you have all the workshifts you need, click **Save**. 

Now you have your workshifts ready. 
