# How to activate Workstation Capacity graph in the GANTT Timeline

By default, SkyPlanner doesn't have activated the Workstation Capacity graph in the GANTT Timeline.

If you wish to activate it:

- Go to **Home**and select and click your user on the top right.
- A dropdown menu will appear, select **Settings**.

![](https://skyplanner.ai/wp-content/uploads/2025/04/workstation-graph-footer-seeting-1024x589.png)

- Once in the **Settings panel**, select the**Production Planning** tab and look for "**Show footer capacities**."
- Check on the box and finally, click **Save**.

Now you will be able to see this option in the footer of your GANTT Timeline.

![](https://skyplanner.ai/wp-content/uploads/2025/04/workstation-capacity-footer-setting-1024x589.png)

![](https://skyplanner.ai/wp-content/uploads/2025/04/Capacity-graph-footer-on-gantt-timeline-1024x589.png)