---
title: How to activate Show person in running jobs
description: Show person in running jobs is a setting that lets you see who is taking care of a running job (or who started it) in the GANTT Timeline. This setting is inactive in the trial, but you can easily enable…
url: "https://skyplanner.ai/docs/how-to-activate-show-person-in-running-jobs/"
updated: "2025-04-01"
category: Gantt Timeline / User Interface
---

# How to activate Show person in running jobs

Show person in running jobs is a setting that lets you see who is taking care of a running job (or who started it) in the GANTT Timeline. This setting is inactive in the trial, but you can easily enable it.

![](https://skyplanner.ai/wp-content/uploads/2025/03/Example-of-Show-person-in-running-job.png)

To do this:

- Go to **Home** and click on your username on the top.
- A dropdown menu will appear, click on**Settings**.
- Scroll down to look for “**Show person in running jobs**” or use the search field and write “**Show person in running jobs**.”
- Click on the box.

![](https://skyplanner.ai/wp-content/uploads/2025/03/Show-person-in-running-jobs-settings.png)

- Finally, click **Save** on the bottom left.

![](https://skyplanner.ai/wp-content/uploads/2025/03/Active-Show-person-in-running-jobs-1024x589.png)
