---
title: How to activate Ghost Jobs in SkyPlanner
description: "Ghost jobs is a feature that lets you see how your production planning was before the new optimal draft. This feature is not active by default in the trial, but you can easily change that: - Go to **Home** and…"
url: "https://skyplanner.ai/docs/how-to-activate-ghost-jobs-in-skyplanner/"
updated: "2025-04-01"
category: Gantt Timeline / User Interface
---

# How to activate Ghost Jobs in SkyPlanner

Ghost jobs is a feature that lets you see how your production planning was before the new optimal draft.

This feature is not active by default in the trial, but you can easily change that:

- Go to **Home** and click on your username on the top.
- A dropdown menu will appear, click on**Settings**.
- Scroll down to look for “**Show ghosts**” or use the search field and write “**Show ghosts.**”
- Click on the box.

![](https://skyplanner.ai/wp-content/uploads/2025/03/show-ghost-settings.png)

- Finally, click **Save** on the bottom left.

![](https://skyplanner.ai/wp-content/uploads/2025/03/Activate-ghost-jobs-1024x589.png)
