# Introduction to SkyPlanner’s GANTT Timelime

SkyPlanner's GANTT Timeline is a **user-friendly** tool that makes it easy to visualize and manage project schedules. This basic tutorial will introduce you to the timeline's resources and fundamental concepts and show you **how this core feature works**. It focuses **only on basic aspects** of the GANTT Timeline and **does not cover all features**.

[An Introduction to GANTT Timeline Basics - Production Scheduling with AI](https://www.youtube.com/embed/kXGpkplB_7I?feature=oembed)

Our visual and user-friendly**GANTT timeline** lets you track and control the AI’s operation. You can easily retrieve details about your production with the help of AI.

On top of that, you can see the dates and times of your production. 

![](https://skyplanner.ai/wp-content/uploads/2025/01/GANTT-TIMELINE-1024x494.png)

Below, you will find **Unscheduled**, **Scheduled**, and** Late **tabs, which open up on selection.

![](https://skyplanner.ai/wp-content/uploads/2025/01/Unschedule-bar.png)

The **Unscheduled tab** shows all jobs that have yet to be planned or got unscheduled. You can reschedule these tasks again.

The **Scheduled tab** is next to it. It contains all the scheduled jobs, which you can see on the **GANTT Timeline**.

Finally, the **Late tab** contains jobs starting after the planned end time because of insufficient material amount, late purchase arrivals, or other factors. 