---
title: Assembly Jobs (Batch Production / Nesting)
description: "**Assembly jobs is a SkyPlanner feature that lets you combine the same process step from different orders into one job.** This is useful when you can handle multiple orders at the same time using the same material or setup. For…"
url: "https://skyplanner.ai/docs/assembly-jobs-batch-production-nesting/"
updated: "2025-06-13"
category: Orders / Assembly Jobs
---

# Assembly Jobs (Batch Production / Nesting)

**Assembly jobs is a SkyPlanner feature that lets you combine the same process step from different orders into one job.**

This is useful when you can handle multiple orders at the same time using the same material or setup. For example, if you’re cutting a large sheet of wood for several orders, you can do it all at once instead of repeating the same step multiple times.

This type of work is often called **batch jobs** or **nesting**—where parts for different orders are produced together to save time and materials. Another example: a painter spraying the same color on parts from several orders in one go.

In **SkyPlanner**, assembly jobs make it easy to manage this kind of work, and the AI will help schedule it most efficiently for your production plan.

[Assembly Jobs: Save time and reduce costs in your processes](https://www.youtube.com/embed/i5i94qP5VZo?feature=oembed)
