---
title: Allow moving jobs to other more appropriate workstations
description: "Opting for this option allows the AI to flexibly choose from various workstations for task completion based on your inputs about where each job can be done. You can assign specific tasks to suitable resources, and **SkyPlanner's AI** will then select the…"
url: "https://skyplanner.ai/docs/allow-moving-jobs-to-other-more-appropriate-workstations/"
updated: "2025-06-11"
category: Gantt Timeline / Workstation Rules
tags:
  - Gantt Chart
  - Process Steps
  - Workstations
---

# Allow moving jobs to other more appropriate workstations

Opting for this option allows the AI to flexibly choose from various workstations for task completion based on your inputs about where each job can be done. You can assign specific tasks to suitable resources, and **SkyPlanner's AI** will then select the optimal workstation, considering the current production flow. 

Moreover, by defining efficiency ratings for each workstation, you ensure that the AI optimizes the use of every resource, enhancing overall production efficiency smartly and seamlessly.

To activate this: 

- In the **GANTT Timeline**, click on the**Gear icon**. 
- A new window will appear with the **Global rules**. 

![](https://skyplanner.ai/wp-content/uploads/2025/02/image-115-1024x618.png)

- Look for **Allow moving jobs to other more appropriate workstations** option and check on the box. 

![](https://skyplanner.ai/wp-content/uploads/2025/02/image-116.png)

- Finally, click **Save**.
