---
title: Add a quick note to a production process step
description: "[How to add a note to a process step](https://www.youtube.com/embed/KgwClqOdLb0?feature=oembed) Quick notes can be small messages that help operators communicate more effectively and precisely about certain work events—for example, notifying them that a part must be replaced or must undergo maintenance…"
url: "https://skyplanner.ai/docs/add-a-quick-note-to-a-production-process-step/"
updated: "2025-03-20"
category: Gantt Timeline / Basic Use
tags:
  - Communication
  - Gantt Chart
  - Introduction video
  - Process Steps
---

# Add a quick note to a production process step

[How to add a note to a process step](https://www.youtube.com/embed/KgwClqOdLb0?feature=oembed)

Quick notes can be small messages that help operators communicate more effectively and precisely about certain work events—for example, notifying them that a part must be replaced or must undergo maintenance soon.

![](https://skyplanner.ai/wp-content/uploads/2025/02/image-60.png)

To add a quick note: 

- Go to the process step you want to add a note in the GANTT Timeline.
- Right-click on it and select the Add / Remove note option. 

![](https://skyplanner.ai/wp-content/uploads/2025/02/image-61-1024x376.png)

A new window will appear; add the message you want. Then click **Save**. 

![](https://skyplanner.ai/wp-content/uploads/2025/02/image-62.png)

Now, that process step has a note. To view it, you need to double-click on the process step to see the details. 

![](https://skyplanner.ai/wp-content/uploads/2025/02/image-63.png)

If you need to edit or remove the note, repeat this process. 

Reminder: This note will appear only in the order's process step you select.
