{"id":96556,"date":"2026-10-08T07:20:14","date_gmt":"2026-10-08T07:20:14","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=96556"},"modified":"2026-10-08T10:45:53","modified_gmt":"2026-10-08T10:45:53","slug":"rustzeitoptimierung","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/de\/ressourcen\/rustzeitoptimierung\/","title":{"rendered":"SMED: R\u00fcstzeitoptimierung durch kl\u00fcgere Reihenfolgeplanung"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">SMED: R\u00fcstzeitoptimierung durch kl\u00fcgere Reihenfolgeplanung<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/de\/\">Startseite<\/a> &raquo; <a href=\"\/de\/ressourcen\/\">Ressourcen<\/a> &raquo; SMED: R\u00fcstzeitoptimierung durch kl\u00fcgere Reihenfolgeplanung<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Gesch\u00e4tzte Lesezeit: <\/span><span class=\"yoast-reading-time__reading-time\">9<\/span><span class=\"yoast-reading-time__time-unit\"> Minuten<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Die verf\u00fcgbare Zeit einer Maschine geht entweder in die Fertigung von Teilen oder in die Vorbereitung des n\u00e4chsten Arbeitsgangs. Wenn Umr\u00fcstungen zu viel davon beanspruchen, stellen sich zwei verschiedene Fragen: L\u00e4sst sich jede einzelne Umr\u00fcstung verk\u00fcrzen \u2013 und kann die Planung durch eine bessere Reihenfolge der Arbeitsg\u00e4nge manche Wechsel ganz vermeiden?<\/p>\n\n\n<p>Die erste Frage beantwortet SMED, die zweite die \u00e4hnlichkeitsbasierte Reihenfolgeplanung. Beides l\u00e4sst sich kombinieren, die Wirkung sollten Sie aber getrennt messen \u2013 damit ein k\u00fcrzerer Stillstand nicht mit einer Umr\u00fcstung verwechselt wird, die gar nicht erst stattfinden musste.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Was SMED ver\u00e4ndert und was die Reihenfolgeplanung ver\u00e4ndert<\/h2>\n\n\n<p>In der Fertigung bereitet eine Umr\u00fcstung eine Anlage darauf vor, von einem Produkt oder Teil auf ein anderes zu wechseln. Dazu k\u00f6nnen das Wechseln von Werkzeugen, das Vorbereiten von Vorrichtungen, das Anpassen von Einstellungen und das Anfahren des n\u00e4chsten Produkts bis zur einwandfreien Produktion geh\u00f6ren.<\/p>\n\n\n<p>SMED steht f\u00fcr Single-Minute Exchange of Die. Laut Lean Enterprise Institute ist es ein Ansatz, die Umr\u00fcstzeit zu senken, indem internes vom externen R\u00fcsten getrennt wird und geeignete interne T\u00e4tigkeiten in externe Arbeit \u00fcberf\u00fchrt werden. Der Name verweist auf das Ziel einer einstelligen Minutenzahl, also weniger als 10 Minuten. Das hei\u00dft nicht, dass jede Umr\u00fcstung eine Minute dauert, und ein garantiertes Ergebnis ist es ebenfalls nicht.<\/p>\n\n\n<p>Der praktische Unterschied ist einfach:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>SMED verk\u00fcrzt den Aufwand einer notwendigen Umr\u00fcstung.<\/li><li>Die Reihenfolgeplanung kann wiederholte Wechsel einer ausgew\u00e4hlten Eigenschaft vermeiden, indem \u00e4hnliche Arbeitsg\u00e4nge hintereinander eingeplant werden.<\/li><\/ul>\n\n\n<p>Auch ein gut abgestimmter Plan kommt nicht ohne echte Umr\u00fcstungen aus. Werkzeuge m\u00fcssen vorbereitet, die Anlage muss korrekt eingestellt werden, und das n\u00e4chste Produkt muss seine Qualit\u00e4tsanforderungen erf\u00fcllen.<\/p>\n\n\n<h2 class=\"wp-block-heading\">R\u00fcstzeit messen, bevor Sie den Prozess \u00e4ndern<\/h2>\n\n\n<p>Beginnen Sie mit einer wiederkehrenden Umr\u00fcstung, die das Team von Anfang bis Ende beobachten kann. Halten Sie die aktuelle Vorgehensweise fest, bevor Sie entscheiden, welche T\u00e4tigkeiten Sie \u00e4ndern.<\/p>\n\n\n<p>Legen Sie einheitliche Messgrenzen fest. Der LeanProduction-SMED-Leitfaden von Vorne misst die Umr\u00fcstzeit vom letzten Gutteil des vorherigen Produkts bei voller Produktionsgeschwindigkeit bis zum ersten Gutteil des n\u00e4chsten Produkts bei voller Produktionsgeschwindigkeit. Der Wiederanlauf der Maschine ist nicht das Ende der Umr\u00fcstung, solange die Produktion noch nicht wieder einwandfrei l\u00e4uft.<\/p>\n\n\n<p>Erfassen Sie neben der gesamten Dauer auch:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>Jede T\u00e4tigkeit, ihre Dauer und wer sie ausf\u00fchrt.<\/li><li>Die Werkzeuge, Materialien und Vorrichtungen, die f\u00fcr den n\u00e4chsten Arbeitsgang ben\u00f6tigt werden.<\/li><li>Zeit f\u00fcr Suchen, Warten, Nachstellen oder das Korrigieren der ersten Teile.<\/li><li>T\u00e4tigkeiten, die eine stillstehende Anlage erfordern, und solche, die sich gefahrlos bei laufender Anlage erledigen lassen.<\/li><\/ul>\n\n\n<p>Behalten Sie die externe Vorbereitung im Blick. Wird eine T\u00e4tigkeit aus dem Stillstand herausverlegt, kann das Maschinenzeit freisetzen, ohne den Personalaufwand daf\u00fcr zu beseitigen. Eine brauchbare Ausgangsbasis unterscheidet deshalb zwischen dem Anlagenstillstand und dem gesamten Vorbereitungsaufwand des Teams.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mit SMED jede Umr\u00fcstung verk\u00fcrzen<\/h2>\n\n\n<p>Gehen Sie die Umr\u00fcstung gemeinsam mit den Personen durch, die sie ausf\u00fchren. Ziel ist eine wiederholbare, sichere Methode \u2013 kein schnellerer Wiederanlauf, der dem n\u00e4chsten Bediener Qualit\u00e4tsprobleme hinterl\u00e4sst.<\/p>\n\n\n<h3 class=\"wp-block-heading\">1. Interne und externe R\u00fcstt\u00e4tigkeiten trennen<\/h3>\n\n\n<p>Interne R\u00fcstt\u00e4tigkeiten setzen eine stillstehende Anlage voraus. Externe R\u00fcstt\u00e4tigkeiten lassen sich bei laufender Anlage ausf\u00fchren.<\/p>\n\n\n<p>Beobachten Sie die gesamte Umr\u00fcstung und zerlegen Sie sie in einzelne T\u00e4tigkeiten. Ordnen Sie jede T\u00e4tigkeit danach ein, was tats\u00e4chlich den Stillstand erfordert \u2013 und gehen Sie nicht davon aus, dass alles, was heute w\u00e4hrend des Stillstands geschieht, auch dorthin geh\u00f6rt.<\/p>\n\n\n<p>Die Suche nach dem n\u00e4chsten Werkzeug zum Beispiel findet heute vielleicht erst nach dem Maschinenstopp statt. Das bedeutet nicht zwingend, dass daf\u00fcr die Maschine stehen muss. Das Ausbauen eines montierten Werkzeugs dagegen kann erfordern, dass die Anlage stillgesetzt und gesichert wird.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Geeignete Vorbereitung aus dem Stillstand herausverlegen<\/h3>\n\n\n<p>Bereiten Sie den n\u00e4chsten Arbeitsgang vor, bevor der aktuelle endet, sofern das sicher und praktikabel ist. Im LeanProduction-Leitfaden geh\u00f6ren dazu das Bereitlegen von Werkzeugen und Materialien, das Pr\u00fcfen von Teilen und das Vorbereiten einer zus\u00e4tzlichen Vorrichtung \u2013 so wird die Vorbereitung aus dem Stillstand herausverlegt.<\/p>\n\n\n<p>Pr\u00fcfen Sie, ob alle ben\u00f6tigten Teile vorhanden und einsatzbereit sind. L\u00e4sst sich eine Vorrichtung separat vorbereiten, beurteilen Sie, ob dadurch Arbeit aus der Zeit des Maschinenstillstands entf\u00e4llt.<\/p>\n\n\n<p>Umgehen Sie keine Schutzeinrichtungen, Absicherungsverfahren oder notwendigen Qualit\u00e4tspr\u00fcfungen. Eine T\u00e4tigkeit eignet sich nur dann f\u00fcr das externe R\u00fcsten, wenn das Team sie sicher und ohne St\u00f6rung des laufenden Betriebs ausf\u00fchren kann.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Die verbleibende interne Arbeit vereinfachen<\/h3>\n\n\n<p>Pr\u00fcfen Sie die T\u00e4tigkeiten, die weiterhin einen Stillstand erfordern. Verbessern Sie die Verf\u00fcgbarkeit der Werkzeuge, standardisieren Sie den Ablauf und reduzieren Sie unn\u00f6tiges Nachjustieren. Bewerten Sie ge\u00e4nderte Befestigungen oder parallele Arbeit anhand der Anlagen- und Sicherheitsanforderungen des Standorts.<\/p>\n\n\n<p>Testen Sie die \u00fcberarbeitete Methode an einer vollst\u00e4ndigen Umr\u00fcstung, einschlie\u00dflich der R\u00fcckkehr zur einwandfreien Produktion. Dokumentieren Sie den Ablauf, damit die Verbesserung nicht davon abh\u00e4ngt, dass sich ein Bediener an eine informelle Abk\u00fcrzung erinnert.<\/p>\n\n\n<p>Messen Sie erneut mit denselben Messgrenzen wie bei der Ausgangsbasis. Bewahren Sie die Beobachtungen zusammen mit der dokumentierten Methode auf und nutzen Sie sie, um die R\u00fcstzeit-Annahmen in der Produktionsplanung zu aktualisieren.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Vermeidbare Umr\u00fcstungen mit einer besseren Reihenfolge der Arbeitsg\u00e4nge verringern<\/h2>\n\n\n<p>Sobald der notwendige Umr\u00fcstaufwand klar ist, schauen Sie sich die Reihenfolge an, in der die Arbeitsg\u00e4nge an der Maschine ankommen. \u00c4hnlichkeit kann vom Material, von der Farbe oder von den Abmessungen abh\u00e4ngen \u2013 nicht nur von einem gemeinsamen Produktcode.<\/p>\n\n\n<p>Ein Beispiel: Die Arbeitsg\u00e4nge wechseln sich zwischen zwei Materialien ab. B\u00fcndelt man zuerst alle Arbeitsg\u00e4nge f\u00fcr das eine Material und danach die f\u00fcr das andere, lassen sich wiederholte Materialwechsel vermeiden. Das ist ein Beispiel f\u00fcr die Reihenfolgeplanung, kein Kundenergebnis und kein Versprechen, dass jede R\u00fcstung entf\u00e4llt.<\/p>\n\n\n<p>W\u00e4hlen Sie eine \u00c4hnlichkeitseigenschaft, die die Vorbereitung an dieser Arbeitsstation tats\u00e4chlich beeinflusst. Zwei Arbeitsg\u00e4nge mit demselben Material k\u00f6nnen trotzdem unterschiedliche Werkzeuge oder Einstellungen erfordern. Sie zu b\u00fcndeln beseitigt nicht jede andere Ursache f\u00fcr Umr\u00fcstaufwand.<\/p>\n\n\n<p>SMED und Reihenfolgeplanung brauchen deshalb unterschiedliche Kennzahlen. Ein k\u00fcrzerer einzelner Stillstand weist auf eine verbesserte Umr\u00fcstmethode hin. Weniger Wechsel der ausgew\u00e4hlten Eigenschaft weisen auf eine verbesserte Reihenfolge hin. Beides kann helfen, aber keines von beiden belegt f\u00fcr sich genommen, dass der gesamte Produktionsplan besser ist.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Termine und nutzbare Kapazit\u00e4t in die Entscheidung einbeziehen<\/h2>\n\n\n<p>Eine lange Folge \u00e4hnlicher Arbeitsg\u00e4nge kann R\u00fcstzeit sparen und trotzdem die falsche Produktionsentscheidung sein. Sie kann einen dringenden Auftrag nach hinten schieben oder sich auf Material st\u00fctzen, das zum geplanten Start der Folge nicht verf\u00fcgbar ist.<\/p>\n\n\n<p>Stellen Sie den m\u00f6glichen R\u00fcstzeitvorteil den <a href=\"\/de\/ressourcen\/make-to-order\/\">Fertigstellungsterminen der Auftr\u00e4ge<\/a>, der Materialverf\u00fcgbarkeit und der nutzbaren Kapazit\u00e4t der Arbeitsstationen gegen\u00fcber. Legen Sie fest, welche Priorit\u00e4ten f\u00fcr die aktuelle Auslastung z\u00e4hlen, bevor Sie die Reihenfolge \u00e4ndern.<\/p>\n\n\n<p>Die Dynamic Priorities von SkyPlanner umfassen Faktoren wie Durchlaufzeit, Fertigstellungstermin, Kundenbedeutung und Dauer. Die Planer legen die Priorit\u00e4ten fest; die KI richtet sich beim Erstellen des Plans danach. \u00c4hnlichkeit ist eine Planungspr\u00e4ferenz, die gegen den Rest der Produktion abzuw\u00e4gen ist \u2013 keine Anweisung, jeden \u00e4hnlichen Arbeitsgang ungeachtet der Folgen zu b\u00fcndeln.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u00c4hnlichkeitsbasierte Reihenfolgeplanung in SkyPlanner konfigurieren<\/h2>\n\n\n<p>SkyPlanner kann Arbeitsg\u00e4nge nach einer Eigenschaft der Arbeitsstation b\u00fcndeln, etwa nach Farbe, Abmessungen oder Material. Die dokumentierten \u00c4hnlichkeitseinstellungen kombinieren die Wahl der Eigenschaft, die R\u00fcstzeit f\u00fcr abweichende Arbeitsg\u00e4nge und eine Priorit\u00e4tsgewichtung f\u00fcr aufeinanderfolgende \u00e4hnliche Arbeitsg\u00e4nge.<\/p>\n\n\n<p>So konfigurieren Sie diesen Ansatz:<\/p>\n\n\n<p>1. Legen Sie in Dynamic Priorities fest, wie wichtig der Faktor Allow similar jobs ist.<\/p>\n\n\n<p>2. \u00d6ffnen Sie die Einstellungen der Arbeitsstation und aktivieren Sie Allow similarity.<\/p>\n\n\n<p>3. Tragen Sie unter Setup time for differing jobs (min) die Zeit ein, die der Wechsel zwischen unterschiedlichen Eigenschaften ben\u00f6tigt.<\/p>\n\n\n<p>4. W\u00e4hlen Sie die Eigenschaft unter Type of similar jobs.<\/p>\n\n\n<p>5. Legen Sie die Priorit\u00e4tsgewichtung Similar jobs in succession fest.<\/p>\n\n\n<p>6. Speichern Sie die Einstellungen und berechnen Sie den Plan neu.<\/p>\n\n\n<p>Verwenden Sie eine gemessene R\u00fcstzeit-Annahme, die zur Arbeitsstation und zur gew\u00e4hlten Eigenschaft passt. Die Einstellung unterst\u00fctzt eine r\u00fcstzeitbewusste Reihenfolgeplanung; sie beschleunigt nicht den physischen Werkzeug- oder Materialwechsel. Diese Arbeit zu verbessern bleibt Aufgabe der Umr\u00fcstmethode und des Produktionsteams.<\/p>\n\n\n<p>R\u00fcstzeiteinsparungen m\u00fcssen zum Rest des Plans passen. Die <a href=\"\/de\/\">Feinplanungssoftware<\/a> von SkyPlanner erstellt den Produktionsplan auf Basis der Priorit\u00e4ten, die Sie festlegen. SkyPlanner l\u00e4sst sich \u00fcber die offene REST API in jedes ERP- oder MES-System integrieren, sodass Sie die <a href=\"\/de\/ressourcen\/was-ist-feinplanung\/\">Feinplanung anbinden<\/a> k\u00f6nnen \u2013 an die Systeme, in denen Ihre Produktionsdaten liegen.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pr\u00fcfen, ob der neue Plan die Produktion verbessert<\/h2>\n\n\n<p>Vergleichen Sie nach der \u00c4nderung von Methode oder Reihenfolge die tats\u00e4chliche Anzahl der Umr\u00fcstungen und die dadurch verursachte Stillstandszeit der Produktion \u00fcber vergleichbare Auslastungen hinweg. Pr\u00fcfen Sie au\u00dferdem die Auftragsfertigstellung und die R\u00fcckkehr zur einwandfreien Produktion nach jeder Umr\u00fcstung.<\/p>\n\n\n<p>Stellen Sie drei Fragen:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>Wurden die notwendigen Umr\u00fcstungen bei gleichen Messgrenzen k\u00fcrzer?<\/li><li>Hat die neue Reihenfolge Wechsel der ausgew\u00e4hlten Eigenschaft vermieden?<\/li><li>Hat der Plan den n\u00f6tigen Ausgleich zwischen Fertigstellungsterminen, verf\u00fcgbarem Material und Kapazit\u00e4t gehalten?<\/li><\/ul>\n\n\n<p>Weniger Umr\u00fcstungen reichen nicht aus, wenn Auftr\u00e4ge lediglich sp\u00e4ter fertig werden oder die Anlaufqualit\u00e4t sinkt. Halten Sie die \u00fcberarbeitete Methode dokumentiert und aktualisieren Sie die in der Planung verwendete R\u00fcstzeit, sobald sich die Messung verbessert. Dies ist ein Bewertungsprozess f\u00fcr die Produktion und keine Aussage, dass SkyPlanner die Umr\u00fcstzeit automatisch misst.<\/p>\n\n\n<p>M\u00f6chten Sie \u00e4hnlichkeitsbasierte Feinplanung f\u00fcr Ihre Produktion besprechen? <a href=\"\/de\/kontakt-vertrieb\/\">Demo buchen<\/a>. Bringen Sie die Eigenschaft mit, die Ihre Wechsel ausl\u00f6st, Ihre gemessene Umr\u00fcstzeit und Ihre wichtigsten Terminpriorit\u00e4ten.<\/p>\n\n\n<h2 class=\"wp-block-heading\">H\u00e4ufig gestellte Fragen<\/h2>\n\n\n<h3 class=\"wp-block-heading\">Was ist SMED in der Fertigung?<\/h3>\n\n\n<p>SMED ist eine Methode, um die Umr\u00fcstzeit von Anlagen zu verk\u00fcrzen. Sie trennt interne T\u00e4tigkeiten, die eine stillstehende Anlage erfordern, von externen T\u00e4tigkeiten, die bei laufender Anlage m\u00f6glich sind. Das Team verlegt geeignete Vorbereitung aus dem Stillstand heraus und vereinfacht die verbleibende Arbeit.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Hei\u00dft SMED, dass jede Umr\u00fcstung nur eine Minute dauert?<\/h3>\n\n\n<p>Nein. Single-Minute Exchange of Die steht f\u00fcr ein Ziel im einstelligen Minutenbereich, also unter 10 Minuten. Das Verfahren verspricht keine Umr\u00fcstung in einer Minute und garantiert auch nicht, dass jeder Prozess dieses Ziel erreicht.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Wie misst man die R\u00fcst- oder Umr\u00fcstzeit?<\/h3>\n\n\n<p>Legen Sie eine einheitliche Messgrenze fest: vom letzten Gutteil des vorherigen Produkts bei voller Produktionsgeschwindigkeit bis zum ersten Gutteil des n\u00e4chsten Produkts bei voller Produktionsgeschwindigkeit. Erfassen Sie neben der Gesamtzeit auch die einzelnen T\u00e4tigkeiten. Beenden Sie die Messung nicht schon beim Neustart der Maschine, wenn die Produktion noch nicht wieder auf akzeptablem Niveau l\u00e4uft.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Was unterscheidet internes von externem R\u00fcsten?<\/h3>\n\n\n<p>Internes R\u00fcsten erfordert, dass die Anlage steht. Externes R\u00fcsten l\u00e4sst sich durchf\u00fchren, w\u00e4hrend die Anlage l\u00e4uft. Wer Vorbereitungen aus dem Stillstand herausverlagert, muss die Sicherheitsanforderungen der Anlage einhalten und darf notwendige Qualit\u00e4tspr\u00fcfungen nicht umgehen.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kann die Reihenfolgeplanung der Arbeitsg\u00e4nge SMED ersetzen?<\/h3>\n\n\n<p>Nein. Durch das B\u00fcndeln \u00e4hnlicher Arbeitsg\u00e4nge lassen sich manche wiederholten Merkmalswechsel vermeiden. SMED verbessert die praktische Arbeit bei den Umr\u00fcstungen, die dennoch bleiben. Beides muss zum Produktionsplan passen.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Wie hilft SkyPlanner, unn\u00f6tige R\u00fcstvorg\u00e4nge zu reduzieren?<\/h3>\n\n\n<p>In SkyPlanner w\u00e4hlen Planer an einer Arbeitsstation eine \u00c4hnlichkeitseigenschaft aus, legen f\u00fcr abweichende Arbeitsg\u00e4nge eine R\u00fcstzeit fest und gewichten aufeinanderfolgende \u00e4hnliche Arbeitsg\u00e4nge in den Priorit\u00e4ten. Das unterst\u00fctzt eine r\u00fcstzeitbewusste Reihenfolgeplanung. Die physische Umr\u00fcstarbeit an der Maschine wird dadurch allein jedoch nicht k\u00fcrzer.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Sollten \u00e4hnliche Arbeitsg\u00e4nge immer zusammen laufen?<\/h3>\n\n\n<p>Nein. Planer m\u00fcssen auch Fertigstellungstermine, Material und Kapazit\u00e4t ber\u00fccksichtigen. \u00c4hnliche Arbeitsg\u00e4nge zu b\u00fcndeln lohnt sich, wenn der R\u00fcstvorteil zu diesen Priorit\u00e4ten passt und nicht wichtigere Arbeit verz\u00f6gert.<\/p>\n\n<\/div>\n<\/div>\n\n<script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"What is SMED in manufacturing?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"SMED is a method for reducing equipment changeover time. It separates internal tasks, which require stopped equipment, from external tasks, which can happen while equipment runs. The team moves suitable preparation outside the stoppage and simplifies the remaining work.\"}},{\"@type\":\"Question\",\"name\":\"Does SMED mean every changeover takes one minute?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"No. Single-Minute Exchange of Die refers to a target of single-digit minutes, or less than 10 minutes. It does not promise a one-minute changeover or guarantee that every process reaches that target.\"}},{\"@type\":\"Question\",\"name\":\"How do you measure setup or changeover time?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Use a consistent boundary from the last good part of the previous product at full production speed to the first good part of the next product at full production speed. Record the individual tasks as well as the total time. Do not stop measuring at machine restart if acceptable production has not returned.\"}},{\"@type\":\"Question\",\"name\":\"What is the difference between internal and external setup?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Internal setup requires the equipment to be stopped. External setup can be performed while it runs. Moving preparation outside the stoppage must respect the equipment's safety requirements and must not bypass necessary quality checks.\"}},{\"@type\":\"Question\",\"name\":\"Can job sequencing replace SMED?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"No. Sequencing can avoid some repeated property changes by grouping similar jobs. SMED improves the physical work of the changeovers that remain. Both need to fit the production plan.\"}},{\"@type\":\"Question\",\"name\":\"How does SkyPlanner help reduce unnecessary setups?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"SkyPlanner lets planners select a similarity property at a workstation, define setup time for differing jobs and weight consecutive similar jobs in the priorities. This supports setup-aware job sequencing. It does not shorten the machine's physical changeover work by itself.\"}},{\"@type\":\"Question\",\"name\":\"Should similar jobs always run together?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"No. Planners also need to consider completion dates, materials and capacity. Grouping similar jobs is useful when its preparation benefit fits those priorities, rather than delaying more important work.\"}}]}<\/script>\n\n","protected":false},"excerpt":{"rendered":"<p>SMED: R\u00fcstzeitoptimierung durch kl\u00fcgere Reihenfolgeplanung Startseite &raquo; Ressourcen &raquo; SMED: R\u00fcstzeitoptimierung durch kl\u00fcgere Reihenfolgeplanung Die verf\u00fcgbare Zeit einer Maschine geht entweder in die Fertigung von Teilen oder in die Vorbereitung des n\u00e4chsten Arbeitsgangs. Wenn Umr\u00fcstungen zu viel davon beanspruchen, stellen sich zwei verschiedene Fragen: L\u00e4sst sich jede einzelne Umr\u00fcstung verk\u00fcrzen \u2013 und kann die Planung &#8230; <a title=\"SMED: R\u00fcstzeitoptimierung durch kl\u00fcgere Reihenfolgeplanung\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/de\/ressourcen\/rustzeitoptimierung\/\" aria-label=\"Mehr Informationen \u00fcber SMED: R\u00fcstzeitoptimierung durch kl\u00fcgere Reihenfolgeplanung\">Weiterlesen &#8230;<\/a><\/p>\n","protected":false},"author":3,"featured_media":97039,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2524,308],"tags":[],"class_list":["post-96556","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-scheduling","category-ressourcen","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>SMED: R\u00fcstzeitoptimierung durch kl\u00fcgere Reihenfolge &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"R\u00fcstzeitoptimierung mit SMED: \u00e4hnliche Arbeitsg\u00e4nge b\u00fcndeln, unn\u00f6tige Umr\u00fcstungen vermeiden. So unterst\u00fctzt SkyPlanner die r\u00fcstzeitbewusste Feinplanung.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/de\/ressourcen\/rustzeitoptimierung\/\" \/>\n<meta property=\"og:locale\" content=\"de_DE\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SMED: R\u00fcstzeitoptimierung durch kl\u00fcgere Reihenfolgeplanung\" \/>\n<meta property=\"og:description\" content=\"R\u00fcstzeitoptimierung mit SMED: \u00e4hnliche Arbeitsg\u00e4nge b\u00fcndeln, unn\u00f6tige Umr\u00fcstungen vermeiden. So unterst\u00fctzt SkyPlanner die r\u00fcstzeitbewusste Feinplanung.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/de\/ressourcen\/rustzeitoptimierung\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-08T07:20:14+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-08T10:45:53+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Verfasst von\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Gesch\u00e4tzte Lesezeit\" \/>\n\t<meta name=\"twitter:data2\" content=\"10\u00a0Minuten\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/ressourcen\\\/rustzeitoptimierung\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/ressourcen\\\/rustzeitoptimierung\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"SMED: R\u00fcstzeitoptimierung durch kl\u00fcgere Reihenfolgeplanung\",\"datePublished\":\"2026-10-08T07:20:14+00:00\",\"dateModified\":\"2026-10-08T10:45:53+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/ressourcen\\\/rustzeitoptimierung\\\/\"},\"wordCount\":2023,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/ressourcen\\\/rustzeitoptimierung\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-setup-time-hero.png\",\"articleSection\":[\"APS &amp; Scheduling\",\"Ressourcen\"],\"inLanguage\":\"de\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/ressourcen\\\/rustzeitoptimierung\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/ressourcen\\\/rustzeitoptimierung\\\/\",\"name\":\"SMED: R\u00fcstzeitoptimierung durch kl\u00fcgere Reihenfolge &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/ressourcen\\\/rustzeitoptimierung\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/ressourcen\\\/rustzeitoptimierung\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-setup-time-hero.png\",\"datePublished\":\"2026-10-08T07:20:14+00:00\",\"dateModified\":\"2026-10-08T10:45:53+00:00\",\"description\":\"R\u00fcstzeitoptimierung mit SMED: \u00e4hnliche Arbeitsg\u00e4nge b\u00fcndeln, unn\u00f6tige Umr\u00fcstungen vermeiden. So unterst\u00fctzt SkyPlanner die r\u00fcstzeitbewusste Feinplanung.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/ressourcen\\\/rustzeitoptimierung\\\/#breadcrumb\"},\"inLanguage\":\"de\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/de\\\/ressourcen\\\/rustzeitoptimierung\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"de\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/ressourcen\\\/rustzeitoptimierung\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-setup-time-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-setup-time-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Machining fixtures and a wrench prepared beside a workbench for a production changeover.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/ressourcen\\\/rustzeitoptimierung\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"SMED: R\u00fcstzeitoptimierung durch kl\u00fcgere Reihenfolgeplanung\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"de\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"de\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skyplanner-aps\\\/\",\"https:\\\/\\\/www.youtube.com\\\/@SkyPlannerAPS\",\"https:\\\/\\\/www.capterra.com\\\/p\\\/265911\\\/SkyPlanner-APS\\\/\",\"https:\\\/\\\/www.trustradius.com\\\/products\\\/skyplanner-aps\\\/reviews\",\"https:\\\/\\\/www.saasworthy.com\\\/product\\\/skyplanner-aps\",\"https:\\\/\\\/sourceforge.net\\\/software\\\/product\\\/SkyPlanner-APS\\\/\",\"https:\\\/\\\/www.g2.com\\\/products\\\/skyplanner-aps\\\/\",\"https:\\\/\\\/www.getapp.com\\\/project-management-planning-software\\\/a\\\/skyplanner-aps\\\/\",\"https:\\\/\\\/www.softwareadvice.com\\\/cmms\\\/skyplanner-aps-profile\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"de\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"SMED: R\u00fcstzeitoptimierung durch kl\u00fcgere Reihenfolge &#8211; SkyPlanner","description":"R\u00fcstzeitoptimierung mit SMED: \u00e4hnliche Arbeitsg\u00e4nge b\u00fcndeln, unn\u00f6tige Umr\u00fcstungen vermeiden. So unterst\u00fctzt SkyPlanner die r\u00fcstzeitbewusste Feinplanung.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/de\/ressourcen\/rustzeitoptimierung\/","og_locale":"de_DE","og_type":"article","og_title":"SMED: R\u00fcstzeitoptimierung durch kl\u00fcgere Reihenfolgeplanung","og_description":"R\u00fcstzeitoptimierung mit SMED: \u00e4hnliche Arbeitsg\u00e4nge b\u00fcndeln, unn\u00f6tige Umr\u00fcstungen vermeiden. So unterst\u00fctzt SkyPlanner die r\u00fcstzeitbewusste Feinplanung.","og_url":"https:\/\/skyplanner.ai\/de\/ressourcen\/rustzeitoptimierung\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-08T07:20:14+00:00","article_modified_time":"2026-10-08T10:45:53+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Verfasst von":"Jussi M\u00e4ntyl\u00e4","Gesch\u00e4tzte Lesezeit":"10\u00a0Minuten"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/de\/ressourcen\/rustzeitoptimierung\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/de\/ressourcen\/rustzeitoptimierung\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/de\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"SMED: R\u00fcstzeitoptimierung durch kl\u00fcgere Reihenfolgeplanung","datePublished":"2026-10-08T07:20:14+00:00","dateModified":"2026-10-08T10:45:53+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/de\/ressourcen\/rustzeitoptimierung\/"},"wordCount":2023,"publisher":{"@id":"https:\/\/skyplanner.ai\/de\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/de\/ressourcen\/rustzeitoptimierung\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero.png","articleSection":["APS &amp; Scheduling","Ressourcen"],"inLanguage":"de"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/de\/ressourcen\/rustzeitoptimierung\/","url":"https:\/\/skyplanner.ai\/de\/ressourcen\/rustzeitoptimierung\/","name":"SMED: R\u00fcstzeitoptimierung durch kl\u00fcgere Reihenfolge &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/de\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/de\/ressourcen\/rustzeitoptimierung\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/de\/ressourcen\/rustzeitoptimierung\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero.png","datePublished":"2026-10-08T07:20:14+00:00","dateModified":"2026-10-08T10:45:53+00:00","description":"R\u00fcstzeitoptimierung mit SMED: \u00e4hnliche Arbeitsg\u00e4nge b\u00fcndeln, unn\u00f6tige Umr\u00fcstungen vermeiden. So unterst\u00fctzt SkyPlanner die r\u00fcstzeitbewusste Feinplanung.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/de\/ressourcen\/rustzeitoptimierung\/#breadcrumb"},"inLanguage":"de","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/de\/ressourcen\/rustzeitoptimierung\/"]}]},{"@type":"ImageObject","inLanguage":"de","@id":"https:\/\/skyplanner.ai\/de\/ressourcen\/rustzeitoptimierung\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero.png","width":1672,"height":941,"caption":"Machining fixtures and a wrench prepared beside a workbench for a production changeover."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/de\/ressourcen\/rustzeitoptimierung\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/de\/"},{"@type":"ListItem","position":2,"name":"SMED: R\u00fcstzeitoptimierung durch kl\u00fcgere Reihenfolgeplanung"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/de\/#website","url":"https:\/\/skyplanner.ai\/de\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/de\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/de\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"de"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/de\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/de\/","logo":{"@type":"ImageObject","inLanguage":"de","@id":"https:\/\/skyplanner.ai\/de\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/de\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882","https:\/\/www.linkedin.com\/company\/skyplanner-aps\/","https:\/\/www.youtube.com\/@SkyPlannerAPS","https:\/\/www.capterra.com\/p\/265911\/SkyPlanner-APS\/","https:\/\/www.trustradius.com\/products\/skyplanner-aps\/reviews","https:\/\/www.saasworthy.com\/product\/skyplanner-aps","https:\/\/sourceforge.net\/software\/product\/SkyPlanner-APS\/","https:\/\/www.g2.com\/products\/skyplanner-aps\/","https:\/\/www.getapp.com\/project-management-planning-software\/a\/skyplanner-aps\/","https:\/\/www.softwareadvice.com\/cmms\/skyplanner-aps-profile\/"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/de\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"de","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/de\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"SMED: R\u00fcstzeitoptimierung durch kl\u00fcgere Reihenfolgeplanung Startseite &raquo; Ressourcen &raquo; SMED: R\u00fcstzeitoptimierung durch kl\u00fcgere Reihenfolgeplanung Die verf\u00fcgbare Zeit einer Maschine geht entweder in die Fertigung von Teilen oder in die Vorbereitung des n\u00e4chsten Arbeitsgangs. Wenn Umr\u00fcstungen zu viel davon beanspruchen, stellen sich zwei verschiedene Fragen: L\u00e4sst sich jede einzelne Umr\u00fcstung verk\u00fcrzen \u2013 und kann die Planung&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/de\/wp-json\/wp\/v2\/posts\/96556","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/de\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/de\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/de\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/de\/wp-json\/wp\/v2\/comments?post=96556"}],"version-history":[{"count":2,"href":"https:\/\/skyplanner.ai\/de\/wp-json\/wp\/v2\/posts\/96556\/revisions"}],"predecessor-version":[{"id":96755,"href":"https:\/\/skyplanner.ai\/de\/wp-json\/wp\/v2\/posts\/96556\/revisions\/96755"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/de\/wp-json\/wp\/v2\/media\/97039"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/de\/wp-json\/wp\/v2\/media?parent=96556"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/de\/wp-json\/wp\/v2\/categories?post=96556"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/de\/wp-json\/wp\/v2\/tags?post=96556"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}