{"id":100152,"date":"2026-10-16T17:01:26","date_gmt":"2026-10-16T17:01:26","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=100152"},"modified":"2026-10-16T17:01:46","modified_gmt":"2026-10-16T17:01:46","slug":"auftragsbestand","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/de\/ressourcen\/auftragsbestand\/","title":{"rendered":"Auftragsbestand: Was er f\u00fcr Ihre Fertigung bedeutet"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Auftragsbestand: Was er f\u00fcr Ihre Fertigung bedeutet<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/de\/\">Startseite<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/de\/ressourcen\/\">Ressourcen<\/a> &raquo; Auftragsbestand: Was er f\u00fcr Ihre Fertigung bedeutet<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Gesch\u00e4tzte Lesezeit: <\/span><span class=\"yoast-reading-time__reading-time\">8<\/span><span class=\"yoast-reading-time__time-unit\"> Minuten<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p><strong>Der Auftragsbestand umfasst angenommene Kundenauftr\u00e4ge, die noch nicht erf\u00fcllt sind.<\/strong> In der Fertigung wird er \u00fcblicherweise als noch zu liefernde Auftr\u00e4ge, Mengen oder Auftragswerte erfasst. Ein Teil der Auftr\u00e4ge wurde m\u00f6glicherweise noch nicht begonnen, ein anderer befindet sich bereits in der Fertigung oder wartet auf den Versand.<\/p>\n\n\n<p>Ein Auftragsbestand ist nicht automatisch ein Problem. Er kann f\u00fcr eine gesunde Auftragslage mit gutem Vorlauf stehen. F\u00fcr die Produktion ist entscheidend, ob sich die verbleibenden Arbeiten rechtzeitig abschlie\u00dfen lassen, um die bereits zugesagten Liefertermine einzuhalten.<\/p>\n\n\n<p>Die Gesamth\u00f6he des Auftragsbestands allein beantwortet diese Frage nicht. SkyPlanner APS verkn\u00fcpft die daf\u00fcr noch erforderlichen Produktionsarbeiten mit der verf\u00fcgbaren Kapazit\u00e4t. So arbeiten alle mit einem gemeinsamen Produktionsplan statt mit einer weiteren Liste, die Sie bei jedem vorgezogenen Lieferwunsch neu aufbauen m\u00fcssen.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Was geh\u00f6rt zum Auftragsbestand?<\/h2>\n\n\n<p>Erfassen Sie angenommene Auftr\u00e4ge, f\u00fcr die noch eine Lieferverpflichtung besteht \u2013 auch die Restmenge eines teilweise ausgelieferten Auftrags. Angebote, Anfragen und unbest\u00e4tigte Verkaufschancen sollten Sie getrennt betrachten: Sie k\u00f6nnen f\u00fcr die k\u00fcnftige Planung wichtig sein, sind aber nicht mit verbindlichen Kundenauftr\u00e4gen gleichzusetzen.<\/p>\n\n\n<p>Angenommen, ein Kunde bestellt 100 Geh\u00e4use und Sie liefern 40 davon aus. Dann verbleiben f\u00fcr diesen Auftrag 60 Geh\u00e4use im Auftragsbestand, nicht die urspr\u00fcnglichen 100. Allein die Fertigung der \u00fcbrigen 60 bedeutet noch nicht, dass die Lieferverpflichtung erf\u00fcllt ist. M\u00f6glicherweise m\u00fcssen sie noch gepr\u00fcft, verpackt oder versendet werden.<\/p>\n\n\n<p>F\u00fcr eine konsistente mengenbezogene Betrachtung gilt:<\/p>\n\n\n<p><strong>Auftragsbestand am Periodenende = Auftragsbestand am Periodenanfang + neu angenommene Mengen \u2212 gelieferte Mengen \u2212 stornierte Mengen<\/strong>. Weitere vereinbarte Auftrags\u00e4nderungen werden als Korrekturen ber\u00fccksichtigt.<\/p>\n\n\n<p>Wenden Sie diese Rechnung auf ein Produkt oder eine andere sinnvolle gemeinsame Einheit an. Unterschiedliche Produkte zu einer einzigen St\u00fcckzahl zu addieren, kann mehr verschleiern als verdeutlichen. Der Wert des Auftragsbestands gibt der Gesch\u00e4ftsleitung einen kaufm\u00e4nnischen \u00dcberblick, ist aber kein Ma\u00df f\u00fcr die noch ben\u00f6tigten Maschinenstunden.<\/p>\n\n\n<p>Legen Sie eindeutig fest, ab welchem Ereignis ein Auftrag in Ihrer Auswertung als erf\u00fcllt gilt, etwa mit dem Versand oder der Lieferung beim Kunden, und bleiben Sie dabei. Andernfalls k\u00f6nnen Vertrieb und Produktion scheinbar zu widerspr\u00fcchlichen Ergebnissen kommen, nur weil sie unterschiedliche Dinge z\u00e4hlen.<\/p>\n\n\n<p>Drei Abgrenzungen helfen, den Auftragsbestand richtig einzuordnen:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Auftragsbestand und \u00fcberf\u00e4llige Auftr\u00e4ge:<\/strong> Ein Auftrag, der n\u00e4chsten Monat f\u00e4llig ist, kann zum Auftragsbestand geh\u00f6ren, ohne versp\u00e4tet zu sein. \u00dcberf\u00e4llig ist nur der Teil, dessen vereinbarter Erf\u00fcllungstermin bereits verstrichen ist.<\/li><li><strong>Auftragsbestand und unfertige Erzeugnisse:<\/strong> WIP bezeichnet bereits begonnene, aber noch nicht abgeschlossene Arbeiten. Zum Auftragsbestand k\u00f6nnen auch noch nicht begonnene Auftr\u00e4ge und fertige Erzeugnisse geh\u00f6ren, die auf ihre Auslieferung warten. Umgekehrt kann die Fertigung auf Lager als WIP z\u00e4hlen, ohne zum Bestand best\u00e4tigter Kundenauftr\u00e4ge zu geh\u00f6ren.<\/li><li><strong>Auftragsbestand und Lieferr\u00fcckstand:<\/strong> Als Lieferr\u00fcckstand wird \u00fcblicherweise ein Auftrag bezeichnet, der derzeit nicht aus dem verf\u00fcgbaren Lagerbestand bedient werden kann. Der Auftragsbestand ist weiter gefasst: Er umfasst auch Auftr\u00e4ge, die zur regul\u00e4ren Erf\u00fcllung zu einem sp\u00e4teren Termin angenommen wurden.<\/li><\/ul>\n\n\n<p>Deshalb sinkt der Auftragsbestand nicht einfach dadurch, dass Sie mehr Arbeitsg\u00e4nge starten. Entscheidend ist, die richtigen Auftr\u00e4ge fertigzustellen und auszuliefern.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Warum derselbe Auftragsbestand sehr unterschiedlich viel Arbeit bedeuten kann<\/h2>\n\n\n<p>Angenommen, Ihre Fertigung hat drei offene Auftr\u00e4ge f\u00fcr Geh\u00e4use. Je nach Bearbeitungsstand fallen daf\u00fcr ganz unterschiedliche Restarbeiten an.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Auftragsstatus<\/th><th>Was noch zu tun ist<\/th><th>Frage f\u00fcr die Planung<\/th><\/tr><\/thead><tbody><tr><td>Angenommen, noch nicht begonnen<\/td><td>Schneiden, Biegen, Beschichten und Montieren<\/td><td>Wo l\u00e4sst sich die gesamte Arbeitsgangfolge unter Ber\u00fccksichtigung bestehender Zusagen einplanen?<\/td><\/tr><tr><td>Teilweise gefertigt<\/td><td>Beschichten und Montieren<\/td><td>Wann ist Kapazit\u00e4t f\u00fcr die Beschichtung frei, und kann die Montage rechtzeitig folgen?<\/td><\/tr><tr><td>Fertigung abgeschlossen<\/td><td>Verpacken und Versenden<\/td><td>Was verhindert, dass der fertige Auftrag versendet wird?<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Alle drei geh\u00f6ren zum noch nicht ausgelieferten Auftragsbestand. Doch nicht f\u00fcr alle ist noch einmal die vollst\u00e4ndige Arbeitsgangfolge erforderlich. W\u00fcrden Sie den urspr\u00fcnglichen Fertigungsaufwand erneut einplanen, setzten Sie den Kapazit\u00e4tsbedarf zu hoch an. Lie\u00dfen Sie den noch nicht begonnenen Auftrag au\u00dfer Acht, w\u00e4re er zu niedrig.<\/p>\n\n\n<p>Nun bittet der Kunde mit dem teilweise gefertigten Auftrag um eine fr\u00fchere Lieferung. Diesen Auftrag bei der Beschichtung vorzuziehen, scheint zun\u00e4chst sinnvoll. Doch auch der noch nicht begonnene Auftrag ben\u00f6tigt sp\u00e4ter dieselbe Beschichtungsressource und muss anschlie\u00dfend noch rechtzeitig vor seinem zugesagten Termin montiert werden.<\/p>\n\n\n<p>Sie m\u00fcssen die Folgen f\u00fcr beide Auftr\u00e4ge erkennen k\u00f6nnen \u2013 nicht nur, ob sich bei der Beschichtung noch eine Charge einschieben l\u00e4sst. Dem fertig produzierten Auftrag, der auf den Versand wartet, hilft eine beschleunigte Fertigung dagegen \u00fcberhaupt nicht.<\/p>\n\n\n<p><strong>Betrachten Sie Lieferzusagen und Restarbeiten gemeinsam.<\/strong> So erkennen Sie, ob als N\u00e4chstes eine Plan\u00e4nderung, eine Kapazit\u00e4tsentscheidung oder schlicht der Versand eines fertigen Auftrags sinnvoll ist.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mit SkyPlanner vom Auftragsbestand zum Produktionsplan<\/h2>\n\n\n<p>Kundenauftr\u00e4ge und Lieferungen k\u00f6nnen Sie weiterhin in Ihrem ERP verwalten. \u00dcber seine offene REST API l\u00e4sst sich SkyPlanner an jedes ERP oder MES anbinden und verbindet vorhandene Auftrags- und Produktionsdaten mit der <a href=\"https:\/\/skyplanner.ai\/de\/ressourcen\/was-ist-feinplanung\/\">Feinplanung<\/a>. So k\u00f6nnen Sie die anstehenden Arbeiten planen, ohne das System zu ersetzen, in dem die vertraglichen Zusagen erfasst sind.<\/p>\n\n\n<p>Die Planungsdaten beschreiben, was noch zu tun ist: Arbeitsg\u00e4nge mit ihrer Reihenfolge und Dauer, geeignete Arbeitsstationen, Arbeitsschichten, Bediener und Priorit\u00e4ten. Arcturus, die Planungs-KI von SkyPlanner, plant diese Arbeiten unter Ber\u00fccksichtigung der hinterlegten Kapazit\u00e4ten und Abh\u00e4ngigkeiten ein. Ist die materialabh\u00e4ngige Planung aktiviert, flie\u00dft auch die Materialverf\u00fcgbarkeit in die Berechnung ein.<\/p>\n\n\n<p>F\u00fcr die Geh\u00e4usefertigung bedeutet das, die noch erforderlichen Schneid-, Biege-, Beschichtungs- und Montagearbeiten f\u00fcr alle angenommenen Auftr\u00e4ge zu planen. Statt Liefertermine aus der H\u00f6he des Auftragsbestands abzusch\u00e4tzen, k\u00f6nnen Sie die eingeplanten Arbeiten bis zu ihrem voraussichtlichen Abschluss verfolgen.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Noch nicht eingeplante Arbeiten in den Plan aufnehmen<\/h3>\n\n\n<p>Angenommen hei\u00dft nicht zwangsl\u00e4ufig eingeplant. Behalten Sie auch die Arbeiten im Blick, die noch nicht im Plan stehen. Sonst kann ein \u00fcbersichtliches Gantt-Diagramm dar\u00fcber hinwegt\u00e4uschen, dass au\u00dferhalb des Plans noch Zusagen auf ihre Einplanung warten.<\/p>\n\n\n<p>In SkyPlanner k\u00f6nnen Sie gezielt bislang nicht eingeplante Arbeitsg\u00e4nge ausw\u00e4hlen und einplanen. Auch der Assistent bietet daf\u00fcr eine entsprechende Aktion. Nach der Einplanung sind diese Arbeiten Teil des Produktionsplans und lassen sich gemeinsam mit den bereits eingeplanten Arbeitsg\u00e4ngen pr\u00fcfen.<\/p>\n\n\n<p>Das ist etwas anderes als <strong>Alles neu planen<\/strong>: Diese Funktion berechnet die bereits auf der Zeitachse liegenden Arbeitsg\u00e4nge neu. Mit der erstmaligen Einplanung nehmen Sie Arbeiten in den Plan auf; mit der Neuplanung passen Sie bereits eingeplante Arbeiten an ge\u00e4nderte Bedingungen an.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Auswirkungen auf Liefertermine pr\u00fcfen statt nur die n\u00e4chste L\u00fccke suchen<\/h3>\n\n\n<p>Die Gantt-Zeitachse zeigt, wo und wann Arbeitsg\u00e4nge eingeplant sind. Mit dem <a href=\"https:\/\/skyplanner.ai\/de\/ressourcen\/kapazitatsplanung-produktion\/\">\u00dcberblick \u00fcber Kapazit\u00e4t und Auslastung<\/a> erkennen Sie, welche Ressourcen bereits belegt sind und wo die verbleibenden Arbeiten um verf\u00fcgbare Zeit konkurrieren.<\/p>\n\n\n<p>Verfolgen Sie im Geh\u00e4usebeispiel die Arbeitsgangfolge von der Beschichtung bis zur Montage. Ein fr\u00fcheres Zeitfenster f\u00fcr die Beschichtung hilft nur, wenn auch die nachfolgenden Arbeitsg\u00e4nge den gew\u00fcnschten Fertigstellungstermin erm\u00f6glichen. Ber\u00fccksichtigen Sie Verpackung, Transport und alle weiteren Verpflichtungen nach der Fertigung, bevor Sie dem Kunden einen Liefertermin best\u00e4tigen.<\/p>\n\n\n<p>Vertrieb und Produktion k\u00f6nnen dann \u00fcber einen berechneten Plan sprechen, statt jeweils eigene Vermutungen dar\u00fcber auszutauschen, wie ausgelastet die Fertigung wohl ist.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Neu berechnen statt von Hand neu aufbauen<\/h3>\n\n\n<p>W\u00fcnscht der Kunde einen fr\u00fcheren Termin, passen Sie die entsprechende Priorit\u00e4t an und lassen Arcturus die eingeplanten Arbeiten neu berechnen. Pr\u00fcfen Sie die betroffenen Fertigstellungstermine, bevor Sie eine neue Zusage machen. Mit Priorit\u00e4ten und Fixierungen geben Sie die Rahmenbedingungen vor; die Software \u00fcbernimmt die damit zusammenh\u00e4ngende Planungsarbeit.<\/p>\n\n\n<p>Halten Sie auch den Fertigungsfortschritt aktuell. Abgeschlossene Arbeitsg\u00e4nge und \u00c4nderungen der verf\u00fcgbaren Kapazit\u00e4t beeinflussen, was noch m\u00f6glich ist. Bei aktiviertem Autopilot k\u00f6nnen konfigurierte Ereignisse oder zeitgesteuerte L\u00e4ufe eine Neuplanung ausl\u00f6sen, ohne dass Sie st\u00e4ndig manuell eingreifen m\u00fcssen.<\/p>\n\n\n<p>So verbringen Sie weniger Zeit damit, Arbeitsg\u00e4nge zwischen Warteschlangen zu verschieben, und haben mehr Zeit, aus dem Ergebnis die richtigen Entscheidungen abzuleiten. Sie k\u00f6nnen eine Lieferanfrage beantworten, w\u00e4hrend der Kunde noch auf Ihre R\u00fcckmeldung wartet \u2013 statt erst nach einer weiteren Runde manueller Berechnungen.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Fredman: Lieferausk\u00fcnfte auf Basis transparenter Kapazit\u00e4ten<\/h2>\n\n\n<p>Steigende Auftragsmengen f\u00fchrten bei Fredman Operations, einem finnischen Hersteller lebensmittelsicherer K\u00fcchen- und Verpackungsl\u00f6sungen, zu genau diesem Problem. Arbeitskarten wurden manuell zwischen dem L7 ERP und der Produktionsmanagementsoftware LTR \u00fcbertragen. Dem Planer fehlte der genaue \u00dcberblick dar\u00fcber, wann Maschinen wieder frei wurden und welche Kapazit\u00e4t je Schicht verf\u00fcgbar war. Dringende Umplanungen konnten eine Stunde oder l\u00e4nger dauern.<\/p>\n\n\n<p>Mit SkyPlanner f\u00fchrt Fredman Maschinen, freie und belegte Kapazit\u00e4ten sowie den Fortschritt der Arbeitsg\u00e4nge in einer Gantt-Ansicht zusammen. Die Schichtkapazit\u00e4t flie\u00dft in die t\u00e4gliche Planung ein, und das Produktionsteam sieht den geplanten Beginn und das geplante Ende jedes Arbeitsgangs.<\/p>\n\n\n<p>Fredman berichtet, dass der Vertrieb auf Basis der Kapazit\u00e4tsdaten Lieferzusagen bis zu sechs Monate im Voraus machen kann. Anfragen zu Plan\u00e4nderungen werden in Sekunden statt in Stunden beantwortet. Au\u00dferdem ben\u00f6tigt das Unternehmen nach eigenen Angaben weniger \u00dcberstunden.<\/p>\n\n\n<p>Die Erfahrungen von Fredman zeigen den praktischen Nutzen, wenn Auftragsbestand und Produktion miteinander verkn\u00fcpft sind: Alle Beteiligten erhalten schneller eine gemeinsame Antwort darauf, welche Auftr\u00e4ge die Fertigung wann \u00fcbernehmen kann. Mehr \u00fcber die Erfahrungen des Teams lesen Sie im <a href=\"https:\/\/skyplanner.ai\/de\/kundenberichte\/fredman-operations\/\">vollst\u00e4ndigen SkyPlanner-Erfahrungsbericht von Fredman Operations<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Was tun, wenn die Kapazit\u00e4t f\u00fcr den Auftragsbestand nicht reicht?<\/h2>\n\n\n<p>Ein besserer Produktionsplan kann vorhandene Kapazit\u00e4ten wirksamer nutzen. Er kann einer \u00fcberlasteten Beschichtungsanlage aber keine unbegrenzten Betriebsstunden verschaffen.<\/p>\n\n\n<p>Ermitteln Sie anhand des Plans, welche Lieferzusagen gef\u00e4hrdet sind und was ihrer rechtzeitigen Einplanung entgegensteht. Treffen Sie dann eine gezielte Entscheidung:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>\u00c4ndern Sie Priorit\u00e4ten, wenn die kaufm\u00e4nnische Abw\u00e4gung daf\u00fcr spricht, und pr\u00fcfen Sie dabei die Auswirkungen auf andere Auftr\u00e4ge.<\/li><li>Erweitern Sie die personell besetzten Betriebszeiten oder nutzen Sie eine freigegebene alternative Ressource, sofern sich der Engpass damit tats\u00e4chlich entlasten l\u00e4sst.<\/li><li>Beheben Sie Materialengp\u00e4sse oder andere Probleme, die den Produktionsstart verhindern, statt blockierte Arbeitsg\u00e4nge immer wieder zu verschieben.<\/li><li>Vereinbaren Sie mit dem Kunden einen neuen Liefertermin oder eine f\u00fcr ihn sinnvolle Teillieferung, wenn sich die urspr\u00fcngliche Zusage nicht mehr einhalten l\u00e4sst.<\/li><\/ul>\n\n\n<p>Betrachten Sie \u00fcberf\u00e4llige Auftr\u00e4ge getrennt von k\u00fcnftigen Lieferverpflichtungen. Auch wenn der gesamte Auftragsbestand sinkt, kann sich dahinter verbergen, dass sich die Lieferung f\u00fcr einen einzelnen Kunden immer weiter versp\u00e4tet. Umgekehrt kann ein wachsender Auftragsbestand beherrschbar sein, wenn die anstehenden Arbeiten durch die k\u00fcnftig verf\u00fcgbaren Kapazit\u00e4ten abgedeckt sind.<\/p>\n\n\n<p>Das Ziel ist nicht ein m\u00f6glichst kleiner Auftragsbestand. Entscheidend ist ein Auftragsbestand, bei dem Sie Ihre Verpflichtungen \u00fcberblicken und rentabel erf\u00fcllen k\u00f6nnen.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Erkennen Sie, welche Liefertermine Sie bei Ihrem Auftragsbestand zusagen k\u00f6nnen<\/h2>\n\n\n<p>Wenn Ihr Planer bei der Anfrage nach einer fr\u00fcheren Lieferung noch immer auf Tabellen zur\u00fcckgreifen muss, ist SkyPlanner der passende n\u00e4chste Schritt. SkyPlanner f\u00fchrt die verbleibenden Produktionsarbeiten, Kapazit\u00e4ten und Priorit\u00e4ten in einem Plan zusammen. So hat Ihr Team eine Grundlage f\u00fcr die n\u00e4chste Entscheidung \u00fcber einen Liefertermin.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/de\/kontakt-vertrieb\/\">Buchen Sie eine SkyPlanner-Demo<\/a> und nehmen Sie einen typischen Auftrag als Beispiel, zusammen mit der Ressource, die er mit anderen Auftr\u00e4gen teilt, und einer aktuellen Anfrage nach einer fr\u00fcheren Lieferung. Anhand dieser Beispiele l\u00e4sst sich gut zeigen, wie sich der Plan ver\u00e4ndert und welche anderen Lieferzusagen davon betroffen sind. Oder <a href=\"https:\/\/skyplanner.ai\/de\/testversion\/\">testen Sie SkyPlanner mit Demodaten<\/a>, um zun\u00e4chst die Planungsumgebung kennenzulernen.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Auftragsbestand: Was er f\u00fcr Ihre Fertigung bedeutet Startseite &raquo; Ressourcen &raquo; Auftragsbestand: Was er f\u00fcr Ihre Fertigung bedeutet Der Auftragsbestand umfasst angenommene Kundenauftr\u00e4ge, die noch nicht erf\u00fcllt sind. In der Fertigung wird er \u00fcblicherweise als noch zu liefernde Auftr\u00e4ge, Mengen oder Auftragswerte erfasst. Ein Teil der Auftr\u00e4ge wurde m\u00f6glicherweise noch nicht begonnen, ein anderer befindet &#8230; <a title=\"Auftragsbestand: Was er f\u00fcr Ihre Fertigung bedeutet\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/de\/ressourcen\/auftragsbestand\/\" aria-label=\"Mehr Informationen \u00fcber Auftragsbestand: Was er f\u00fcr Ihre Fertigung bedeutet\">Weiterlesen &#8230;<\/a><\/p>\n","protected":false},"author":3,"featured_media":100177,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2524,308],"tags":[],"class_list":["post-100152","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-und-feinplanung","category-ressourcen","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Auftragsbestand: Was er f\u00fcr Ihre Fertigung bedeutet<\/title>\n<meta name=\"description\" content=\"Wachsender Auftragsbestand ist kein Lieferplan. SkyPlanner zeigt offene Arbeit und verkn\u00fcpft Auftr\u00e4ge mit Kapazit\u00e4t und belastbaren Terminen.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/de\/ressourcen\/auftragsbestand\/\" \/>\n<meta property=\"og:locale\" content=\"de_DE\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Auftragsbestand: Was er f\u00fcr Ihre Fertigung bedeutet\" \/>\n<meta property=\"og:description\" content=\"Wachsender Auftragsbestand ist kein Lieferplan. SkyPlanner zeigt offene Arbeit und verkn\u00fcpft Auftr\u00e4ge mit Kapazit\u00e4t und belastbaren Terminen.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/de\/ressourcen\/auftragsbestand\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-16T17:01:26+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-16T17:01:46+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Verfasst von\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Gesch\u00e4tzte Lesezeit\" \/>\n\t<meta name=\"twitter:data2\" content=\"10\u00a0Minuten\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/ressourcen\\\/auftragsbestand\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/ressourcen\\\/auftragsbestand\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Auftragsbestand: Was er f\u00fcr Ihre Fertigung bedeutet\",\"datePublished\":\"2026-10-16T17:01:26+00:00\",\"dateModified\":\"2026-10-16T17:01:46+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/ressourcen\\\/auftragsbestand\\\/\"},\"wordCount\":1981,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/ressourcen\\\/auftragsbestand\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/order-backlog-hero.png\",\"articleSection\":[\"APS und Feinplanung\",\"Ressourcen\"],\"inLanguage\":\"de\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/ressourcen\\\/auftragsbestand\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/ressourcen\\\/auftragsbestand\\\/\",\"name\":\"Auftragsbestand: Was er f\u00fcr Ihre Fertigung bedeutet\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/ressourcen\\\/auftragsbestand\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/ressourcen\\\/auftragsbestand\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/order-backlog-hero.png\",\"datePublished\":\"2026-10-16T17:01:26+00:00\",\"dateModified\":\"2026-10-16T17:01:46+00:00\",\"description\":\"Wachsender Auftragsbestand ist kein Lieferplan. SkyPlanner zeigt offene Arbeit und verkn\u00fcpft Auftr\u00e4ge mit Kapazit\u00e4t und belastbaren Terminen.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/ressourcen\\\/auftragsbestand\\\/#breadcrumb\"},\"inLanguage\":\"de\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/de\\\/ressourcen\\\/auftragsbestand\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"de\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/ressourcen\\\/auftragsbestand\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/order-backlog-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/order-backlog-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Sheet-metal blanks, partly finished enclosures and packed products show different remaining work in an order backlog.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/ressourcen\\\/auftragsbestand\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Auftragsbestand: Was er f\u00fcr Ihre Fertigung bedeutet\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"de\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"de\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"de\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Auftragsbestand: Was er f\u00fcr Ihre Fertigung bedeutet","description":"Wachsender Auftragsbestand ist kein Lieferplan. SkyPlanner zeigt offene Arbeit und verkn\u00fcpft Auftr\u00e4ge mit Kapazit\u00e4t und belastbaren Terminen.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/de\/ressourcen\/auftragsbestand\/","og_locale":"de_DE","og_type":"article","og_title":"Auftragsbestand: Was er f\u00fcr Ihre Fertigung bedeutet","og_description":"Wachsender Auftragsbestand ist kein Lieferplan. SkyPlanner zeigt offene Arbeit und verkn\u00fcpft Auftr\u00e4ge mit Kapazit\u00e4t und belastbaren Terminen.","og_url":"https:\/\/skyplanner.ai\/de\/ressourcen\/auftragsbestand\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-16T17:01:26+00:00","article_modified_time":"2026-10-16T17:01:46+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Verfasst von":"Jussi M\u00e4ntyl\u00e4","Gesch\u00e4tzte Lesezeit":"10\u00a0Minuten"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/de\/ressourcen\/auftragsbestand\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/de\/ressourcen\/auftragsbestand\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/de\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Auftragsbestand: Was er f\u00fcr Ihre Fertigung bedeutet","datePublished":"2026-10-16T17:01:26+00:00","dateModified":"2026-10-16T17:01:46+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/de\/ressourcen\/auftragsbestand\/"},"wordCount":1981,"publisher":{"@id":"https:\/\/skyplanner.ai\/de\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/de\/ressourcen\/auftragsbestand\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero.png","articleSection":["APS und Feinplanung","Ressourcen"],"inLanguage":"de"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/de\/ressourcen\/auftragsbestand\/","url":"https:\/\/skyplanner.ai\/de\/ressourcen\/auftragsbestand\/","name":"Auftragsbestand: Was er f\u00fcr Ihre Fertigung bedeutet","isPartOf":{"@id":"https:\/\/skyplanner.ai\/de\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/de\/ressourcen\/auftragsbestand\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/de\/ressourcen\/auftragsbestand\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero.png","datePublished":"2026-10-16T17:01:26+00:00","dateModified":"2026-10-16T17:01:46+00:00","description":"Wachsender Auftragsbestand ist kein Lieferplan. SkyPlanner zeigt offene Arbeit und verkn\u00fcpft Auftr\u00e4ge mit Kapazit\u00e4t und belastbaren Terminen.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/de\/ressourcen\/auftragsbestand\/#breadcrumb"},"inLanguage":"de","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/de\/ressourcen\/auftragsbestand\/"]}]},{"@type":"ImageObject","inLanguage":"de","@id":"https:\/\/skyplanner.ai\/de\/ressourcen\/auftragsbestand\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero.png","width":1672,"height":941,"caption":"Sheet-metal blanks, partly finished enclosures and packed products show different remaining work in an order backlog."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/de\/ressourcen\/auftragsbestand\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/de\/"},{"@type":"ListItem","position":2,"name":"Auftragsbestand: Was er f\u00fcr Ihre Fertigung bedeutet"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/de\/#website","url":"https:\/\/skyplanner.ai\/de\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/de\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/de\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"de"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/de\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/de\/","logo":{"@type":"ImageObject","inLanguage":"de","@id":"https:\/\/skyplanner.ai\/de\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/de\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/de\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"de","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/de\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Auftragsbestand: Was er f\u00fcr Ihre Fertigung bedeutet Startseite &raquo; Ressourcen &raquo; Auftragsbestand: Was er f\u00fcr Ihre Fertigung bedeutet Der Auftragsbestand umfasst angenommene Kundenauftr\u00e4ge, die noch nicht erf\u00fcllt sind. In der Fertigung wird er \u00fcblicherweise als noch zu liefernde Auftr\u00e4ge, Mengen oder Auftragswerte erfasst. Ein Teil der Auftr\u00e4ge wurde m\u00f6glicherweise noch nicht begonnen, ein anderer befindet&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/de\/wp-json\/wp\/v2\/posts\/100152","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/de\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/de\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/de\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/de\/wp-json\/wp\/v2\/comments?post=100152"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/de\/wp-json\/wp\/v2\/posts\/100152\/revisions"}],"predecessor-version":[{"id":100214,"href":"https:\/\/skyplanner.ai\/de\/wp-json\/wp\/v2\/posts\/100152\/revisions\/100214"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/de\/wp-json\/wp\/v2\/media\/100177"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/de\/wp-json\/wp\/v2\/media?parent=100152"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/de\/wp-json\/wp\/v2\/categories?post=100152"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/de\/wp-json\/wp\/v2\/tags?post=100152"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}