{"id":3102,"date":"2022-04-21T17:29:20","date_gmt":"2022-04-21T17:29:20","guid":{"rendered":"https:\/\/skyplanner.ai\/eigenschaften\/"},"modified":"2026-09-22T12:38:43","modified_gmt":"2026-09-22T12:38:43","slug":"funktionen","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/de\/funktionen\/","title":{"rendered":"Funktionen"},"content":{"rendered":"\n<div class=\"wp-block-group sp-features-v2 sp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\" data-screen-label=\"Hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-hero__grid\">\n      <div class=\"fx-hero__copy sp-min0\">\n<p class=\"fx-eyebrow\">KI-gest\u00fctzte Produktionsplanung f\u00fcr Hersteller<\/p>\n<h1 class=\"wp-block-heading fx-hero__title\">In Sekunden geplant. <span class=\"hl\">Sie behalten die Kontrolle.<\/span><\/h1>\n<p class=\"fx-hero__sub\">SkyPlanner APS verwandelt Ihre Auftr\u00e4ge, Kapazit\u00e4t, Materialien und Priorit\u00e4ten in einen realistischen Plan gegen begrenzte Kapazit\u00e4ten. Arcturus, unsere interne KI-Engine, berechnet ihn in Sekunden und h\u00e4lt ihn aktuell, wenn sich die Produktion \u00e4ndert. Sie entscheiden, was gesperrt, was verschoben und was akzeptiert wird.<\/p>\n\n        <div class=\"fx-hero__actions\">\n          <a class=\"sp-btn sp-btn--green sp-btn--lg\" href=\"#start\">Kostenlose Testversion starten<\/a>\n          <a class=\"sp-btn sp-btn--outline sp-btn--lg\" href=\"https:\/\/skyplanner.ai\/de\/kontakt-vertrieb\/\">Live-Demo buchen<\/a>\n        <\/div>\n      <\/div>\n\n      <div class=\"fx-hero__media sp-min0\">\n<figure class=\"fx-shot\" style=\"margin:0\">\n          <div class=\"fx-shot__bar\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Produktionsplanung<\/span><\/div>\n          <img decoding=\"sync\" loading=\"eager\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner Gantt-Zeitachse mit geplanten Produktionsaufgaben \u00fcber Arbeitsstationsspuren hinweg, mit Abh\u00e4ngigkeitspfeilen, die Prozessschritte verbinden, und einer Auftragsliste darunter.\">\n        <\/figure>\n        <div class=\"fx-hero__badge\">\n          <span class=\"ico ico--crown\"><svg viewBox=\"0 0 54 44\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" aria-hidden=\"true\"><g transform=\"translate(0,-7.165)\" fill=\"#303AF2\"><path d=\"M50.6,16.5L50.6,16.5c-2.5-1.4-5.7-0.6-7.1,1.9c-1.4,2.5-0.6,5.7,1.9,7.1c2.5,1.4,5.7,0.6,7.1-1.9c0,0,0,0,0,0C53.9,21.1,53,17.9,50.6,16.5z\"><\/path><path d=\"M9.7,18.4c-1.4-2.5-4.6-3.3-7.1-1.9c-2.5,1.4-3.3,4.6-1.9,7.1s4.6,3.3,7.1,1.9c1.2-0.7,2.1-1.8,2.4-3.1C10.5,21,10.4,19.6,9.7,18.4z\"><\/path><circle cx=\"26.5\" cy=\"14.4\" r=\"5.2\"><\/circle><path d=\"M44.2,27.6c-2.5-1.4-5.7-0.6-7.1,1.9c0,0,0,0,0,0l-1.8,3l-4.2-7.2c-0.9-1.6-2.7-2.6-4.5-2.6h-0.1c-1.9,0-3.6,1-4.5,2.6l-4.1,7.2l-1.8-3c-1.4-2.5-4.6-3.3-7.1-1.9c0,0,0,0,0,0l0,0c-2.5,1.4-3.3,4.6-1.9,7.1c0,0,0,0,0,0l4.7,8.2l0,0l1.5,2.6c0.1,0.2,0.2,0.3,0.3,0.5l0.1,0.1c0.1,0.1,0.2,0.2,0.3,0.3l0.1,0.1c0.1,0.1,0.2,0.2,0.4,0.3l0.1,0.1c0.1,0.1,0.3,0.2,0.5,0.3l0,0c0.4,0.2,0.8,0.4,1.2,0.6h0c0.1,0,0.3,0.1,0.4,0.1l0.1,0l0.3,0.1l0.2,0h1l0.2,0l0.3-0.1l0.1,0c0.1,0,0.3-0.1,0.4-0.1h0c2.3-1,4.7-1.6,7.2-1.7c2.4,0.1,4.8,0.7,7,1.7h0c0.1,0,0.3,0.1,0.4,0.1l0.1,0l0.3,0.1l0.2,0h1l0.2,0l0.3-0.1l0.1,0c0.1,0,0.3-0.1,0.4-0.1h0c0.4-0.1,0.8-0.3,1.2-0.6l0,0c0.2-0.1,0.3-0.2,0.5-0.3l0.1-0.1c0.1-0.1,0.2-0.2,0.3-0.3l0.1-0.1c0.1-0.1,0.2-0.2,0.3-0.3c0,0,0.1-0.1,0.1-0.1c0.1-0.2,0.2-0.3,0.4-0.5l0,0l1.5-2.6l0,0l4.8-8.2C47.5,32.2,46.6,29,44.2,27.6L44.2,27.6z\"><\/path><\/g><\/svg><\/span>\n          <div><b>Ein Klick plant alles neu<\/b><small>Der King button, angetrieben von Arcturus<\/small><\/div>\n        <\/div>\n      <\/div>\n    <\/div>\n    <div class=\"fxv-herometa\">\n<p class=\"fxv-heromicro\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>30 Tage kostenlos. Keine Kreditkarte.<\/p>\n<p class=\"fx-hero__devices\">\n        <svg viewBox=\"0 0 24 24\" fill=\"none\" aria-hidden=\"true\"><rect x=\"2.5\" y=\"4\" width=\"19\" height=\"12\" rx=\"1.5\" stroke=\"currentColor\" stroke-width=\"1.7\"><\/rect><path d=\"M9 20h6M12 16v4\" stroke=\"currentColor\" stroke-width=\"1.7\" stroke-linecap=\"round\"><\/path><\/svg>\n        <svg viewBox=\"0 0 24 24\" fill=\"none\" aria-hidden=\"true\"><rect x=\"4\" y=\"2.5\" width=\"16\" height=\"19\" rx=\"2\" stroke=\"currentColor\" stroke-width=\"1.7\"><\/rect><path d=\"M10.5 18.5h3\" stroke=\"currentColor\" stroke-width=\"1.7\" stroke-linecap=\"round\"><\/path><\/svg>\n        <svg viewBox=\"0 0 24 24\" fill=\"none\" aria-hidden=\"true\"><rect x=\"7\" y=\"2.5\" width=\"10\" height=\"19\" rx=\"2.2\" stroke=\"currentColor\" stroke-width=\"1.7\"><\/rect><path d=\"M10.5 18.5h3\" stroke=\"currentColor\" stroke-width=\"1.7\" stroke-linecap=\"round\"><\/path><\/svg>\n        Desktop, Tablet und Smartphone.\n      <\/p>\n    <\/div>\n<ul class=\"wp-block-list fx-micro\">\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>KI-Feinplanung gegen begrenzte Kapazit\u00e4ten<\/li>\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>Gantt-Zeitachse<\/li>\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>ERP-Integrationen &amp; REST API<\/li>\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>29 unterst\u00fctzte Sprachen<\/li>\n    <\/ul>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group fxv-proof\" data-screen-label=\"Proof strip\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fxv-proof__row\">\n      <div class=\"fxv-proof__item\"><span class=\"fxv-proof__big\"><span data-countup=\"\" data-to=\"90\" data-suffix=\"%\">90%<\/span><\/span><span class=\"fxv-proof__lab\">effizientere Produktion, Laboratory &amp; Allied<\/span><\/div>\n      <div class=\"fxv-proof__item\"><span class=\"fxv-proof__big\"><span data-countup=\"\" data-to=\"99.2\" data-suffix=\"%\">99.2%<\/span><\/span><span class=\"fxv-proof__lab\">Lieferzuverl\u00e4ssigkeit, Piristeel<\/span><\/div>\n      <div class=\"fxv-proof__item\"><span class=\"fxv-proof__big\"><span data-countup=\"\" data-to=\"4\" data-prefix=\"\" data-suffix=\" hours\">4 Stunden<\/span><\/span><span class=\"fxv-proof__lab\">t\u00e4glich eingesparte Planungsarbeit, Piristeel<\/span><\/div>\n      <div class=\"fxv-proof__item\"><span class=\"fxv-proof__big\">In Sekunden<\/span><span class=\"fxv-proof__lab\">dringende Neuplanungen, die eine Stunde dauerten, Fredman Operations<\/span><\/div>\n    <\/div>\n<p class=\"fxv-proof__note\">Ergebnisse, berichtet von SkyPlanner-Kunden Laboratory &amp; Allied, Piristeel und Fredman Operations. Jede Fabrik ist anders.<\/p>\n  <\/div>\n<\/div><\/section>\n\n\n\n<div class=\"wp-block-group fx-subnav\" role=\"navigation\" aria-label=\"On this page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-subnav__row\">\n      <a href=\"#why\" data-target=\"why\">Warum APS<\/a>\n      <a href=\"#how\" data-target=\"how\">So funktioniert es<\/a>\n      <a href=\"#visibility\" data-target=\"visibility\">Transparenz<\/a>\n      <a href=\"#autopilot\" data-target=\"autopilot\">Autopilot<\/a>\n      <a href=\"#priorities\" data-target=\"priorities\">Priorit\u00e4ten<\/a>\n      <a href=\"#similar-jobs\" data-target=\"similar-jobs\">\u00c4hnliche Auftr\u00e4ge<\/a>\n      <a href=\"#routing\" data-target=\"routing\">Arbeitsplan-Editor<\/a>\n      <a href=\"#mobile\" data-target=\"mobile\">Fertigung<\/a>\n      <a href=\"#dashboards\" data-target=\"dashboards\">Berichte<\/a>\n      <a href=\"#capacity\" data-target=\"capacity\">Kapazit\u00e4t &amp; Materialien<\/a>\n      <a href=\"#delivery\" data-target=\"delivery\">Liefertermine<\/a>\n      <a href=\"#roles\" data-target=\"roles\">F\u00fcr Ihr Team<\/a>\n      <a href=\"#assistant\" data-target=\"assistant\">KI-Agent<\/a>\n      <a href=\"#integrations\" data-target=\"integrations\">Integrationen<\/a>\n      <a href=\"#compare\" data-target=\"compare\">Vergleichen<\/a>\n      <a href=\"#allfeatures\" data-target=\"allfeatures\">Alle Funktionen<\/a>\n      <a href=\"#faq\" data-target=\"faq\">FAQ<\/a>\n    <\/div>\n  <\/div>\n<\/div><\/div>\n\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"why\" data-screen-label=\"Why planning breaks\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-head\">\n<p class=\"fx-eyebrow\">Warum Produktionsplanung scheitert<\/p>\n<h2 class=\"wp-block-heading\">Reale Fabriken folgen keinem festen Plan<\/h2>\n<p>Ein Plan, der gestern korrekt aussah, kann heute falsch sein. Die meisten Planungstools k\u00f6nnen nicht schnell genug reagieren, wenn sich die Produktion \u00e4ndert.<\/p>\n    <\/div>\n    <div class=\"fx-pain\">\n      <article class=\"fx-pain__card\"><span class=\"fx-pain__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M13 2L4.5 13.5H11l-1 8.5L19.5 10H13z\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n<p class=\"fx-pain__t\">Eilauftr\u00e4ge treffen ein<\/p>\n<p class=\"fx-pain__b\">Ein priorisierter Auftrag trifft mitten in der Woche ein, und alle sp\u00e4teren Auftr\u00e4ge m\u00fcssen um ihn herum verschoben werden.<\/p>\n<\/article>\n      <article class=\"fx-pain__card\"><span class=\"fx-pain__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M3 8l9-5 9 5v8l-9 5-9-5z\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linejoin=\"round\"><\/path><path d=\"M3 8l9 5 9-5M12 13v8\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n<p class=\"fx-pain__t\">Materialien fehlen<\/p>\n<p class=\"fx-pain__b\">Ein Fertigungsauftrag ist eingeplant, aber das Material oder die Bestellung ist noch nicht eingetroffen, sodass er in Wirklichkeit gar nicht laufen kann.<\/p>\n<\/article>\n      <article class=\"fx-pain__card\"><span class=\"fx-pain__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 21V3m0 0l11 3.5L6 10\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n<p class=\"fx-pain__t\">Priorit\u00e4ten \u00e4ndern sich st\u00e4ndig<\/p>\n<p class=\"fx-pain__b\">Kunden-, Termin- und Durchlaufzeitdruck \u00e4ndern sich st\u00e4ndig, daher muss der Plan entsprechend neu gewichtet werden.<\/p>\n<\/article>\n      <article class=\"fx-pain__card\"><span class=\"fx-pain__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M3 17h4v4H3zm7-6h4v10h-4zm7-7h4v17h-4z\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n<p class=\"fx-pain__t\">Arbeitsstationen sind \u00fcberlastet<\/p>\n<p class=\"fx-pain__b\">Zwei Fertigungsauftr\u00e4ge ben\u00f6tigen gleichzeitig dieselbe Maschine, und niemand erkennt den Konflikt, bis die Produktion bereits im R\u00fcckstand ist.<\/p>\n<\/article>\n      <article class=\"fx-pain__card\"><span class=\"fx-pain__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><rect x=\"3\" y=\"3\" width=\"18\" height=\"18\" rx=\"2\" stroke=\"currentColor\" stroke-width=\"2\"><\/rect><path d=\"M3 9h18M9 3v18\" stroke=\"currentColor\" stroke-width=\"2\"><\/path><\/svg><\/span>\n<p class=\"fx-pain__t\">Excel &amp; ERP sto\u00dfen an ihre Grenzen<\/p>\n<p class=\"fx-pain__b\">Tabellenkalkulationen k\u00f6nnen nicht gegen begrenzte Kapazit\u00e4ten planen. ERP und MES verfolgen Auftr\u00e4ge, planen aber selten gegen reale Restriktionen.<\/p>\n<\/article>\n      <article class=\"fx-pain__card\"><span class=\"fx-pain__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><circle cx=\"5\" cy=\"6\" r=\"2.5\" stroke=\"currentColor\" stroke-width=\"2\"><\/circle><circle cx=\"19\" cy=\"18\" r=\"2.5\" stroke=\"currentColor\" stroke-width=\"2\"><\/circle><path d=\"M7.5 6H14a3 3 0 013 3v6.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n<p class=\"fx-pain__t\">Abh\u00e4ngigkeiten gehen verloren<\/p>\n<p class=\"fx-pain__b\">Prozessschritte, R\u00fcstzeiten und Arbeitspl\u00e4ne haben eine Reihenfolge. Wird sie unterbrochen, verz\u00f6gert sich der gesamte Fertigungsauftrag.<\/p>\n<\/article>\n    <\/div>\n    <div class=\"fx-pain__foot\">\n      <svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M12 2a10 10 0 100 20 10 10 0 000-20zm0 6v5m0 3h.01\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\"><\/path><\/svg>\n<p><b>SkyPlanner ist genau daf\u00fcr entwickelt.<\/b> Arcturus berechnet einen kapazit\u00e4tsgepr\u00fcften Plan anhand von Materialien, Kapazit\u00e4t und Priorit\u00e4ten neu, sobald sich die Realit\u00e4t \u00e4ndert, und der Planer entscheidet, was akzeptiert wird.<\/p>\n    <\/div>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"how\" style=\"background:var(--sp-bg-alt)\" data-screen-label=\"How it works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-head fx-head--center\">\n<p class=\"fx-eyebrow fx-eyebrow--center\">So funktioniert es<\/p>\n<h2 class=\"wp-block-heading\">Drei Schritte zu einem Live-Plan<\/h2>\n<p>Sie brauchen kein gro\u00dfes Projekt, um Nutzen zu erzielen. Beschreiben Sie Ihre Produktion einmal, lassen Sie die Auftr\u00e4ge weiter eingehen und \u00fcberlassen Sie Arcturus die Feinplanung.<\/p>\n    <\/div>\n\n    <div class=\"fxv-how\">\n      <div class=\"fxv-how__step\">\n        <div class=\"fxv-how__num\">1<\/div>\n<h3 class=\"wp-block-heading fxv-how__t\">Beschreiben Sie Ihre Produktion einmal<\/h3>\n<p class=\"fxv-how__b\">Ihre Arbeitsstationen, Schichten und Produkte mit ihren Prozessschritten. In diesem Teil helfen Ihnen unser visueller Editor, Tutorial-Videos und der integrierte KI-Agent am meisten. Die meisten Fabriken starten mit einer Produktlinie, nicht mit dem gesamten Werk.<\/p>\n        <div class=\"fxv-how__slot\"><img decoding=\"async\" loading=\"lazy\" width=\"1280\" height=\"586\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/21-5c990f2c-7c1f-4d7d-9980-ad09b5003c75.png\" alt=\"Visueller Routing-Editor von SkyPlanner: Prozessschritt-Karten f\u00fcr Welding und Packing f\u00fcr drei Teilprodukte, verbunden durch Pfeile, die in einen Sawing-Schritt und danach in Machining zusammenlaufen und zeigen, wie Teilprodukte in das fertige Produkt einflie\u00dfen.\"><\/div>\n        <svg class=\"fxv-how__arrow\" width=\"26\" height=\"20\" viewBox=\"0 0 26 20\" fill=\"none\"><path d=\"M2 10h20m0 0l-7-7m7 7l-7 7\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>\n      <\/div>\n      <div class=\"fxv-how__step\">\n        <div class=\"fxv-how__num\">2<\/div>\n<h3 class=\"wp-block-heading fxv-how__t\">Lassen Sie Auftr\u00e4ge weiter eingehen<\/h3>\n<p class=\"fxv-how__b\">Geben Sie sie ein, importieren Sie eine CSV, oder verbinden Sie sp\u00e4ter Ihr ERP. Jeder Auftrag kennt sein Produkt, seine Menge und seinen F\u00e4lligkeitstermin. Das ist alles, was Arcturus braucht.<\/p>\n        <div class=\"fxv-how__slot\" aria-label=\"Orders enter SkyPlanner by manual entry, CSV import, or ERP and API connection\">\n          <div class=\"fxv-src\" role=\"img\" aria-label=\"Orders enter SkyPlanner by manual entry, CSV import, or ERP and API connection\">\n            <div class=\"fxv-src__in\">\n              <span class=\"fxv-src__chip\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 3h9l3 3v11H4z\" stroke=\"currentColor\" stroke-width=\"1.6\" stroke-linejoin=\"round\"><\/path><path d=\"M7 9h6M7 12h6\" stroke=\"currentColor\" stroke-width=\"1.6\" stroke-linecap=\"round\"><\/path><\/svg><b>Manuell<\/b><\/span>\n              <span class=\"fxv-src__chip\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 3h8l4 4v10H4z\" stroke=\"currentColor\" stroke-width=\"1.6\" stroke-linejoin=\"round\"><\/path><path d=\"M6.5 13.5l1.5-3 1.5 2 1.3-2.5 1.7 3.5\" stroke=\"currentColor\" stroke-width=\"1.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><b>CSV<\/b><\/span>\n              <span class=\"fxv-src__chip\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><rect x=\"3\" y=\"4\" width=\"14\" height=\"5\" rx=\"1.4\" stroke=\"currentColor\" stroke-width=\"1.6\"><\/rect><rect x=\"3\" y=\"11\" width=\"14\" height=\"5\" rx=\"1.4\" stroke=\"currentColor\" stroke-width=\"1.6\"><\/rect><path d=\"M6 6.5h.01M6 13.5h.01\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\"><\/path><\/svg><b>ERP \/ API<\/b><\/span>\n            <\/div>\n            <svg class=\"fxv-src__merge\" width=\"20\" height=\"18\" viewBox=\"0 0 20 18\" fill=\"none\" aria-hidden=\"true\"><path d=\"M10 1v12m0 0l-5-5m5 5l5-5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>\n            <div class=\"fxv-src__out\">\n              <svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M3.5 7.5L12 3l8.5 4.5M3.5 7.5L12 12m-8.5-4.5v9L12 21m0-9l8.5-4.5M12 12v9m8.5-13.5v9L12 21\" stroke=\"currentColor\" stroke-width=\"1.6\" stroke-linejoin=\"round\"><\/path><\/svg>\n              <b>Auftr\u00e4ge<\/b>\n            <\/div>\n          <\/div>\n        <\/div>\n        <svg class=\"fxv-how__arrow\" width=\"26\" height=\"20\" viewBox=\"0 0 26 20\" fill=\"none\"><path d=\"M2 10h20m0 0l-7-7m7 7l-7 7\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>\n      <\/div>\n      <div class=\"fxv-how__step\">\n        <div class=\"fxv-how__num\">3<\/div>\n<h3 class=\"wp-block-heading fxv-how__t\">Arcturus plant, Sie steuern<\/h3>\n<p class=\"fxv-how__b\">Die Engine erstellt in wenigen Augenblicken einen kapazit\u00e4tsgepr\u00fcften Plan innerhalb Ihrer realen Grenzen: Kapazit\u00e4t, Schichten, Materialien, R\u00fcstzeiten, Werkzeuge und Abh\u00e4ngigkeiten. Sie passen Priorit\u00e4ten an, sperren, was sich nicht verschieben darf, und akzeptieren den Plan. Wenn sich etwas \u00e4ndert, plant sie neu.<\/p>\n        <div class=\"fxv-how__slot\"><img decoding=\"async\" loading=\"lazy\" width=\"1204\" height=\"674\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/22-be3a6ec5-5d91-47ee-9dde-f5e8c10e9461.png\" alt=\"Nahaufnahme der SkyPlanner Gantt-Zeitleiste: farbcodierte Fertigungsauftragsbalken (versp\u00e4tete Fertigungsauftr\u00e4ge in Rot, ein ausgew\u00e4hlter Fertigungsauftrag in Orange, geplante Fertigungsauftr\u00e4ge in Dunkelblau) mit einem Abh\u00e4ngigkeitspfeil, der einen Fertigungsauftrag mit seinem n\u00e4chsten Prozessschritt verbindet und die Live-Produktionsplanung zeigt.\"><\/div>\n        <svg class=\"fxv-how__arrow\" width=\"26\" height=\"20\" viewBox=\"0 0 26 20\" fill=\"none\"><path d=\"M2 10h20m0 0l-7-7m7 7l-7 7\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>\n      <\/div>\n    <\/div>\n\n<p class=\"fxv-howline\">\n      <svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>\n      Kein ERP erforderlich, um zu starten. Kein Training von KI-Modellen mit Ihren Daten. Ihr erster Plan kann mit Demodaten in wenigen Minuten laufen.\n    <\/p>\n\n<figure class=\"fxv-quote\">\n      <div class=\"fxv-quote__mark\">\u201c<\/div>\n<blockquote class=\"fxv-quote__txt\">Die Effizienz in der Produktion ist um 90% gestiegen. Die Bestandskontrolle hat sich verbessert, und die Vertriebsleistung, also p\u00fcnktliche Warenlieferung und p\u00fcnktliche Berichte an die Kunden, ist tats\u00e4chlich um 50% gestiegen.<\/blockquote>\n<figcaption class=\"fxv-quote__who\">\u2014 <b>Abdul Rucyinga<\/b>, Head of IT, Laboratory &amp; Allied Limited<span class=\"fxv-quote__ctx\">Kenias gr\u00f6\u00dfter Pharmahersteller, ~1.000 Mitarbeiter, Nairobi<\/span><\/figcaption>\n    <\/figure>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"visibility\" style=\"background:var(--sp-bg-alt)\" data-screen-label=\"Production visibility\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-head\">\n<p class=\"fx-eyebrow\">Produktion sehen statt raten<\/p>\n<h2 class=\"wp-block-heading\">Die gesamte Produktion in einer Ansicht<\/h2>\n<p>Was gerade l\u00e4uft, wo die Engp\u00e4sse sind, was versp\u00e4tet ist und welche Kapazit\u00e4t frei ist. Eine Ansicht zeigt alles, auch wie sich eine \u00c4nderung durch den gesamten Plan zieht, damit Sie sofort reagieren k\u00f6nnen, statt es zu sp\u00e4t zu erfahren.<\/p>\n    <\/div>\n\n    <div class=\"fx-vis\">\n      <div class=\"fx-vis__copy sp-min0\">\n<ul class=\"wp-block-list fx-vis__list\">\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M3 12a9 9 0 1018 0 9 9 0 00-18 0zm9-5v5l3 2\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n            <span><b>Was gerade l\u00e4uft<\/b><span class=\"t\">Jeder laufende Auftrag und sein Prozessschritt, live im gesamten Werk.<\/span><\/span>\n          <\/li>\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M4 18V9m5 9V5m5 13v-6m5 6V8\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n            <span><b>Wo die Engp\u00e4sse liegen<\/b><span class=\"t\">\u00dcberlastete Arbeitsstationen fallen auf, bevor sie Verz\u00f6gerungen verursachen.<\/span><\/span>\n          <\/li>\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M12 3a9 9 0 109 9\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\"><\/path><path d=\"M12 7v5l4 2\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n            <span><b>Was versp\u00e4tet ist<\/b><span class=\"t\">Auftr\u00e4ge, die ihren Termin zu verfehlen drohen, werden markiert statt versteckt.<\/span><\/span>\n          <\/li>\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><rect x=\"3\" y=\"4\" width=\"18\" height=\"16\" rx=\"2\" stroke=\"currentColor\" stroke-width=\"2\"><\/rect><path d=\"M3 10h18\" stroke=\"currentColor\" stroke-width=\"2\"><\/path><\/svg><\/span>\n            <span><b>Welche Kapazit\u00e4t frei ist<\/b><span class=\"t\">Freie Zeit an jeder Station, damit Sie wissen, was Sie noch annehmen k\u00f6nnen.<\/span><\/span>\n          <\/li>\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M3 7h11m0 0l-4-4m4 4l-4 4M21 17H10m0 0l4-4m-4 4l4 4\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n            <span><b>Wie sich eine \u00c4nderung auswirkt<\/b><span class=\"t\">Verschieben Sie einen Auftrag und sehen Sie sofort die Auswirkung auf den gesamten Plan.<\/span><\/span>\n          <\/li>\n        <\/ul>\n      <\/div>\n\n      <div class=\"fx-vis__media sp-min0\">\n<figure class=\"fx-vis__frame\">\n          <img fetchpriority=\"high\" decoding=\"sync\" loading=\"eager\" width=\"2182\" height=\"1310\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/23-ad101a05-aabc-4460-81fe-4472d2f225ba.png\" alt=\"SkyPlanner Produktionsplanungsansicht: die vollst\u00e4ndige App mit einer linken Navigationsleiste, Arbeitsstationsspuren (Saw, CNC Machine, Welding und Packing) und farbcodierten Auftragsbalken, Abh\u00e4ngigkeitspfeilen, die zeigen, wie ein neu geplanter Auftrag zwischen Stationen verschoben wird, sowie den Steuerelementen Reschedule all und Autopilot unten, der gesamte Produktionsplan in einer Ansicht.\">\n        <\/figure>\n<p class=\"fx-cap\">Eine Ansicht: Auslastung der Arbeitsstationen, Auftragsstatus und wie die Arbeit von Schritt zu Schritt flie\u00dft.<\/p>\n      <\/div>\n\n<p class=\"fx-vis__note fx-vis__note--full\">Kein R\u00e4tselraten mehr \u00fcber den Produktionsstatus. <b>Sie sehen ihn, und Sie k\u00f6nnen reagieren.<\/b><\/p>\n    <\/div>\n\n<figure class=\"fxv-quote\">\n      <div class=\"fxv-quote__mark\">\u201c<\/div>\n<blockquote class=\"fxv-quote__txt\">SkyPlanner gibt Ihnen die Grundlage f\u00fcr den gesamten Plan. Jeder im Unternehmen kann sehen, wo die Dinge stehen: welche Kapazit\u00e4t vorhanden ist, wie viel erreicht wurde und wie hoch die Auslastungsrate ist.<\/blockquote>\n<figcaption class=\"fxv-quote__who\">\u2014 <b>Anu J\u00e4rvinen<\/b>, Produktionsleiterin, Fredman Operations Oy<span class=\"fxv-quote__ctx\">Hersteller von Lebensmittelverpackungen, Rauma, Finnland<\/span><\/figcaption>\n    <\/figure>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"autopilot\" data-screen-label=\"Reschedule all &amp; Autopilot\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-king\">\n      <div class=\"fx-king__copy sp-min0\">\n<p class=\"fx-eyebrow\">Reschedule all &amp; Autopilot<\/p>\n<h2 class=\"wp-block-heading\">Alles mit einem Klick neu planen. Oder Autopilot.<\/h2>\n<p class=\"fx-king__lead\">Wenn sich etwas \u00e4ndert, dr\u00fccken Sie <b>Reschedule all<\/b>. Arcturus berechnet den gesamten Plan in Sekunden neu, richtet ihn wieder an Ihren Priorit\u00e4ten aus, und jeder Bediener sieht, was als N\u00e4chstes zu tun ist.<\/p>\n<ul class=\"wp-block-list fx-king__points\">\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M3 10a7 7 0 0 1 12-5m1-3v4h-4M17 10a7 7 0 0 1-12 5m-1 3v-4h4\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n            <span><b>Ein Klick, und der gesamte Plan ist aktuell<\/b><span class=\"t\">Eine \u00c4nderung wirkt sich auf jede Arbeitsstation aus; Arcturus balanciert den Plan in Sekunden neu aus.<\/span><\/span>\n          <\/li>\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M10 2l2.4 5 5.5.5-4.2 3.6 1.3 5.4L10 18.6 4.9 16l1.3-5.4L2 7l5.5-.5z\" fill=\"currentColor\"><\/path><\/svg><\/span>\n            <span><b>Autopilot h\u00e4lt den Plan f\u00fcr Sie aktuell<\/b><span class=\"t\">Schalten Sie ihn ein, und Arcturus pr\u00fcft die Situation bei jeder relevanten \u00c4nderung: neue Auftr\u00e4ge, abgeschlossene Arbeit, Kapazit\u00e4tsausf\u00e4lle, Materialverz\u00f6gerungen. Wenn sich nichts ge\u00e4ndert hat, bewegt sich nichts. Wenn sich etwas ge\u00e4ndert hat, erfolgt eine gezielte Neuplanung, sogar um 2 Uhr nachts, w\u00e4hrend Sie schlafen.<\/span><\/span>\n          <\/li>\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M10 2a6 6 0 0 0-6 6v2H3v8h14v-8h-1V8a6 6 0 0 0-6-6zm-4 8V8a4 4 0 0 1 8 0v2H6z\" fill=\"currentColor\"><\/path><\/svg><\/span>\n            <span><b>Ihre Grenzen, Ihre Kontrolle<\/b><span class=\"t\">Frieren Sie die n\u00e4chste Schicht ein oder sch\u00fctzen Sie bestimmte Auftr\u00e4ge. Ihre Sperren und Regeln gelten immer, auch wenn Autopilot eingeschaltet ist.<\/span><\/span>\n          <\/li>\n        <\/ul>\n<p class=\"fx-king__fact\">Bei Laboratory &amp; Allied steht ein Drei-Monats-Plan f\u00fcr rund 50 Arbeitsstationen in weniger als einer halben Stunde, von der Auftragseingabe bis zum fertig optimierten Plan.<\/p>\n      <\/div>\n\n      <div class=\"fx-king__visual sp-min0\">\n        <div class=\"apx-card\">\n          <div class=\"apx-card__glow\"><\/div>\n          <span class=\"apx-tag\"><svg viewBox=\"0 0 54 44\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" aria-hidden=\"true\"><g transform=\"translate(0,-7.165)\" fill=\"#303AF2\"><path d=\"M50.6,16.5L50.6,16.5c-2.5-1.4-5.7-0.6-7.1,1.9c-1.4,2.5-0.6,5.7,1.9,7.1c2.5,1.4,5.7,0.6,7.1-1.9c0,0,0,0,0,0C53.9,21.1,53,17.9,50.6,16.5z\"><\/path><path d=\"M9.7,18.4c-1.4-2.5-4.6-3.3-7.1-1.9c-2.5,1.4-3.3,4.6-1.9,7.1s4.6,3.3,7.1,1.9c1.2-0.7,2.1-1.8,2.4-3.1C10.5,21,10.4,19.6,9.7,18.4z\"><\/path><circle cx=\"26.5\" cy=\"14.4\" r=\"5.2\"><\/circle><path d=\"M44.2,27.6c-2.5-1.4-5.7-0.6-7.1,1.9c0,0,0,0,0,0l-1.8,3l-4.2-7.2c-0.9-1.6-2.7-2.6-4.5-2.6h-0.1c-1.9,0-3.6,1-4.5,2.6l-4.1,7.2l-1.8-3c-1.4-2.5-4.6-3.3-7.1-1.9c0,0,0,0,0,0l0,0c-2.5,1.4-3.3,4.6-1.9,7.1c0,0,0,0,0,0l4.7,8.2l0,0l1.5,2.6c0.1,0.2,0.2,0.3,0.3,0.5l0.1,0.1c0.1,0.1,0.2,0.2,0.3,0.3l0.1,0.1c0.1,0.1,0.2,0.2,0.4,0.3l0.1,0.1c0.1,0.1,0.3,0.2,0.5,0.3l0,0c0.4,0.2,0.8,0.4,1.2,0.6h0c0.1,0,0.3,0.1,0.4,0.1l0.1,0l0.3,0.1l0.2,0h1l0.2,0l0.3-0.1l0.1,0c0.1,0,0.3-0.1,0.4-0.1h0c2.3-1,4.7-1.6,7.2-1.7c2.4,0.1,4.8,0.7,7,1.7h0c0.1,0,0.3,0.1,0.4,0.1l0.1,0l0.3,0.1l0.2,0h1l0.2,0l0.3-0.1l0.1,0c0.1,0,0.3-0.1,0.4-0.1h0c0.4-0.1,0.8-0.3,1.2-0.6l0,0c0.2-0.1,0.3-0.2,0.5-0.3l0.1-0.1c0.1-0.1,0.2-0.2,0.3-0.3l0.1-0.1c0.1-0.1,0.2-0.2,0.3-0.3c0,0,0.1-0.1,0.1-0.1c0.1-0.2,0.2-0.3,0.4-0.5l0,0l1.5-2.6l0,0l4.8-8.2C47.5,32.2,46.6,29,44.2,27.6L44.2,27.6z\"><\/path><\/g><\/svg>Der King button<\/span>\n\n          <div class=\"apx-stage\">\n            <div class=\"kbtn\" role=\"img\" aria-label=\"Reschedule all button on the Gantt timeline\">\n              <span class=\"kbtn__main\">\n                <span class=\"kbtn__crown\"><svg viewBox=\"0 0 54 44\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" aria-hidden=\"true\"><g transform=\"translate(0,-7.165)\" fill=\"#303AF2\"><path d=\"M50.6,16.5L50.6,16.5c-2.5-1.4-5.7-0.6-7.1,1.9c-1.4,2.5-0.6,5.7,1.9,7.1c2.5,1.4,5.7,0.6,7.1-1.9c0,0,0,0,0,0C53.9,21.1,53,17.9,50.6,16.5z\"><\/path><path d=\"M9.7,18.4c-1.4-2.5-4.6-3.3-7.1-1.9c-2.5,1.4-3.3,4.6-1.9,7.1s4.6,3.3,7.1,1.9c1.2-0.7,2.1-1.8,2.4-3.1C10.5,21,10.4,19.6,9.7,18.4z\"><\/path><circle cx=\"26.5\" cy=\"14.4\" r=\"5.2\"><\/circle><path d=\"M44.2,27.6c-2.5-1.4-5.7-0.6-7.1,1.9c0,0,0,0,0,0l-1.8,3l-4.2-7.2c-0.9-1.6-2.7-2.6-4.5-2.6h-0.1c-1.9,0-3.6,1-4.5,2.6l-4.1,7.2l-1.8-3c-1.4-2.5-4.6-3.3-7.1-1.9c0,0,0,0,0,0l0,0c-2.5,1.4-3.3,4.6-1.9,7.1c0,0,0,0,0,0l4.7,8.2l0,0l1.5,2.6c0.1,0.2,0.2,0.3,0.3,0.5l0.1,0.1c0.1,0.1,0.2,0.2,0.3,0.3l0.1,0.1c0.1,0.1,0.2,0.2,0.4,0.3l0.1,0.1c0.1,0.1,0.3,0.2,0.5,0.3l0,0c0.4,0.2,0.8,0.4,1.2,0.6h0c0.1,0,0.3,0.1,0.4,0.1l0.1,0l0.3,0.1l0.2,0h1l0.2,0l0.3-0.1l0.1,0c0.1,0,0.3-0.1,0.4-0.1h0c2.3-1,4.7-1.6,7.2-1.7c2.4,0.1,4.8,0.7,7,1.7h0c0.1,0,0.3,0.1,0.4,0.1l0.1,0l0.3,0.1l0.2,0h1l0.2,0l0.3-0.1l0.1,0c0.1,0,0.3-0.1,0.4-0.1h0c0.4-0.1,0.8-0.3,1.2-0.6l0,0c0.2-0.1,0.3-0.2,0.5-0.3l0.1-0.1c0.1-0.1,0.2-0.2,0.3-0.3l0.1-0.1c0.1-0.1,0.2-0.2,0.3-0.3c0,0,0.1-0.1,0.1-0.1c0.1-0.2,0.2-0.3,0.4-0.5l0,0l1.5-2.6l0,0l4.8-8.2C47.5,32.2,46.6,29,44.2,27.6L44.2,27.6z\"><\/path><\/g><\/svg><\/span>\n                <span class=\"kbtn__label\">Reschedule all<\/span>\n              <\/span>\n              <span class=\"kbtn__sep\"><\/span>\n              <span class=\"kbtn__time\">\n                <span class=\"kbtn__clock\"><svg viewBox=\"0 0 24 24\" fill=\"none\" aria-hidden=\"true\"><circle cx=\"12\" cy=\"12\" r=\"9\" fill=\"currentColor\"><\/circle><path d=\"M12 7.2v5l3.2 2\" stroke=\"#fff\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n                <span class=\"kbtn__spin\"><svg viewBox=\"0 0 13 18\" fill=\"none\" aria-hidden=\"true\"><path d=\"M3 6l3.5-3.5L10 6M3 12l3.5 3.5L10 12\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n              <\/span>\n            <\/div>\n          <\/div>\n<p class=\"apx-hint\">Ein Klick, und Arcturus berechnet den <b>gesamten Plan in Sekunden<\/b> neu.<\/p>\n\n          <div class=\"apx-or\"><span>oder einmal einstellen und laufen lassen<\/span><\/div>\n\n          <div class=\"apx-auto\">\n            <span class=\"apx-auto__ic\"><svg viewBox=\"0 0 24 24\" fill=\"none\" aria-hidden=\"true\"><circle cx=\"12\" cy=\"12\" r=\"9\" fill=\"currentColor\"><\/circle><path d=\"M12 7.2v5l3.2 2\" stroke=\"#fff\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n            <div class=\"apx-auto__txt\">\n              <b>Autopilot<\/b>\n              <span>Schalten Sie ihn \u00fcber das Timer-Symbol bei Reschedule&nbsp;all ein. Danach plant er automatisch neu, innerhalb Ihrer Grenzen.<\/span>\n            <\/div>\n            <span class=\"apx-switch\" role=\"img\" aria-label=\"Autopilot ist eingeschaltet\"><span class=\"apx-switch__knob\"><\/span><\/span>\n          <\/div>\n<p class=\"apx-card__cap\"><span class=\"apx-on\">Eingeschaltet.<\/span> Arcturus h\u00e4lt Ihre Produktion optimiert, auch wenn Sie nicht da sind.<\/p>\n        <\/div>\n      <\/div>\n    <\/div>\n<p class=\"fx-king__tag fx-king__tag--below\">Produktionsplanung macht nur dann Freude, wenn Sie sie nicht von Hand erledigen m\u00fcssen.<\/p>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"priorities\" style=\"background:var(--sp-bg-alt)\" data-screen-label=\"Priority weighting\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-prio\">\n      <div class=\"fx-prio__copy sp-min0\">\n<p class=\"fx-eyebrow\">Priorit\u00e4ten, die die KI leiten<\/p>\n<h2 class=\"wp-block-heading\">Sie setzen Priorit\u00e4ten, Arcturus plant passend dazu.<\/h2>\n<p style=\"font:var(--sp-body-lg);color:var(--sp-text-muted);margin:0\">SkyPlanner verwendet ein mehrstufiges Priorit\u00e4tssystem, in dem sogar Priorit\u00e4ten Priorit\u00e4ten haben. Sie gewichten, was z\u00e4hlt: Durchlaufzeit, Fertigstellungstermine, Kundenpriorit\u00e4t, Auftragspriorit\u00e4t, das Zusammenhalten <a href=\"#similar-jobs\">\u00e4hnlicher Auftr\u00e4ge<\/a>. Arcturus sucht dann nach dem Plan, der am besten zu der von Ihnen festgelegten Balance passt.<\/p>\n<ul class=\"wp-block-list fx-prio__points\">\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 14V8m6 6V4m6 12v-8\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n            <span><b>Gewichtet, nicht nur ein oder aus<\/b><span class=\"t\">Jede Regel hat eine Gewichtung, sodass Sie Zielkonflikte austarieren, statt nur Funktionen ein- und auszuschalten.<\/span><\/span>\n          <\/li>\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M10 2v9m0 0l3.5-3.5M10 11L6.5 7.5M4 16h12\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n            <span><b>Der Planer f\u00fchrt, die KI folgt<\/b><span class=\"t\">Ihre Priorit\u00e4ten bestimmen, wie Arcturus plant, nicht umgekehrt.<\/span><\/span>\n          <\/li>\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M3 10a7 7 0 0 1 12-5m1-3v4h-4M17 10a7 7 0 0 1-12 5m-1 3v-4h4\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n            <span><b>Priorit\u00e4t \u00e4ndern, sofort neu planen<\/b><span class=\"t\">Passen Sie die Gewichtungen an, und Arcturus berechnet den Plan f\u00fcr Sie neu.<\/span><\/span>\n          <\/li>\n        <\/ul>\n      <\/div>\n\n      <div class=\"fx-prio__media sp-min0\">\n<figure class=\"fx-shot\" style=\"margin:0\">\n          <div class=\"fx-shot__bar\"><i><\/i><i><\/i><i><\/i><span>Globale Regeln \u00b7 Planungspriorit\u00e4ten<\/span><\/div>\n          <img decoding=\"async\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/24-a92f8f0b-9f2d-43d3-a50a-d2d6cccaab86.png\" alt=\"SkyPlanner-Panel f\u00fcr globale Regeln: eine Liste von Planungspriorit\u00e4ten, Lead time, Produktionsaufgaben nach Fertigstellungstermin geordnet, Jede Produktionsaufgabe rechtzeitig abgeschlossen, Kundenpriorit\u00e4ten, Produktionsaufgabenpriorit\u00e4ten, \u00c4hnliche Produktionsaufgaben nacheinander, jeweils mit eigenem Gewichtungsregler auf eine andere St\u00e4rke eingestellt.\">\n        <\/figure>\n<p class=\"fx-cap\">Jede Planungspriorit\u00e4t hat ihren eigenen Gewichtungsregler. Erh\u00f6hen oder senken Sie einen Wert, und der n\u00e4chste Plan spiegelt das neue Gleichgewicht wider.<\/p>\n      <\/div>\n    <\/div>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" data-screen-label=\"CTA band\" style=\"padding-block:0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fxv-ctaband\">\n      <div class=\"fxv-ctaband__lead\">\n<p class=\"fxv-ctaband__t\">Sehen Sie, wie Ihre eigenen Auftr\u00e4ge auf diese Weise geplant werden. <span>Starten Sie mit Demodaten in wenigen Minuten.<\/span><\/p>\n<p class=\"fxv-ctaband__micro\">30 Tage kostenlos. Keine Kreditkarte. Startet auf dem Desktop.<\/p>\n      <\/div>\n      <div class=\"fxv-ctaband__actions\">\n        <a class=\"sp-btn sp-btn--green sp-btn--lg\" href=\"#start\">Kostenlose Testversion starten<\/a>\n        <a class=\"sp-btn sp-btn--white sp-btn--lg\" href=\"https:\/\/skyplanner.ai\/de\/kontakt-vertrieb\/\">Demo buchen<\/a>\n      <\/div>\n    <\/div>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"similar-jobs\" data-screen-label=\"Similar jobs in succession\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-head\">\n<p class=\"fx-eyebrow\">\u00c4hnliche Auftr\u00e4ge nacheinander<\/p>\n<h2 class=\"wp-block-heading\">R\u00fcstzeit produziert nichts. Planen Sie weniger davon ein.<\/h2>\n<p>Jedes Waschen, jeder Farbwechsel und jeder Werkzeugwechsel ist bezahlte Zeit ohne Ausbringung. Kennzeichnen Sie Ihre Produkte mit Eigenschaften wie Farbe, Material, Werkzeug oder Abmessung, und Arcturus plant Auftr\u00e4ge, die eine Eigenschaft teilen, direkt hintereinander ein. Die Lackierlinie f\u00e4hrt Blau nach Blau, statt zwischen jedem Auftrag zu waschen, und die Presse beh\u00e4lt dasselbe Werkzeug f\u00fcr die ganze Gruppe.<\/p>\n    <\/div>\n\n    <div class=\"fx-shift__points\" style=\"margin-bottom:38px\">\n      <div class=\"fx-shift__pt\">\n        <span class=\"ic\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M3 12.5V5a2 2 0 0 1 2-2h7.5L21 11.5a2 2 0 0 1 0 2.8l-6.7 6.7a2 2 0 0 1-2.8 0L3 12.5z\" stroke=\"currentColor\" stroke-width=\"1.9\" stroke-linejoin=\"round\"><\/path><circle cx=\"8\" cy=\"8\" r=\"1.6\" fill=\"currentColor\"><\/circle><\/svg><\/span>\n        <b>Sie definieren, was \u00e4hnlich bedeutet<\/b>\n        <span>F\u00fcgen Sie Ihren Produkten Eigenschaften hinzu: Farbe, Material, Werkzeug, Form, Abmessung. Jede Arbeitsstation gruppiert nach der Eigenschaft, die an dieser Station relevant ist, mit eigener Umr\u00fcstzeit zwischen unterschiedlichen Auftr\u00e4gen.<\/span>\n      <\/div>\n      <div class=\"fx-shift__pt\">\n        <span class=\"ic\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M12 3v18M5 7h14\" stroke=\"currentColor\" stroke-width=\"1.9\" stroke-linecap=\"round\"><\/path><path d=\"M5 7l-2.5 5.5a3 3 0 0 0 5 0L5 7zm14 0l-2.5 5.5a3 3 0 0 0 5 0L19 7z\" stroke=\"currentColor\" stroke-width=\"1.9\" stroke-linejoin=\"round\"><\/path><path d=\"M9 21h6\" stroke=\"currentColor\" stroke-width=\"1.9\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n        <b>Gegen Ihre Termine gewichtet<\/b>\n        <span>\u00c4hnliche Auftr\u00e4ge nacheinander ist eine der dynamischen Priorit\u00e4ten, keine grobe B\u00fcndelungsregel. Arcturus w\u00e4gt die eingesparte R\u00fcstzeit gegen F\u00e4lligkeitstermine, Kundenpriorit\u00e4ten und alles andere ab, was Sie festgelegt haben, sodass die Gruppierung nie unbemerkt den Plan \u00fcbernimmt.<\/span>\n      <\/div>\n      <div class=\"fx-shift__pt\">\n        <span class=\"ic\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M4 20V10m5 10V4m5 16v-7m5 7V8\" stroke=\"currentColor\" stroke-width=\"1.9\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n        <b>Mehr Kapazit\u00e4t aus denselben Maschinen<\/b>\n        <span>Jede vermiedene Umr\u00fcstung gibt der Produktion Minuten zur\u00fcck. \u00dcber eine Woche summieren sich die nicht durchgef\u00fchrten Waschvorg\u00e4nge und Werkzeugwechsel zu echter Kapazit\u00e4t, ohne eine einzige neue Maschine zu kaufen.<\/span>\n      <\/div>\n    <\/div>\n\n<figure class=\"fx-shot\" style=\"margin:0\">\n      <div class=\"fx-shot__bar\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Arbeitsstations-Zeitachse<\/span><\/div>\n      <img decoding=\"sync\" loading=\"eager\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/25-dd3d0a31-f2d8-4ba9-98fe-1e65ad7efacd.png\" alt=\"SkyPlanner Gantt-Zeitleiste, die \u00e4hnliche, nacheinander auf einer Arbeitsstation geplante Produktionsaufgaben zeigt, gruppiert nach gemeinsamer Eigenschaft.\">\n    <\/figure>\n    <div class=\"fxv-capwrap\">\n<p class=\"fx-cap\" style=\"display:inline-flex\">Gleiche Farbe, gleiches Werkzeug, gleiches Material: Arcturus reiht sie so aneinander, dass die Arbeitsstation einmal umr\u00fcstet, nicht f\u00fcnfmal.<\/p>\n      <div>\n        <a class=\"fxv-watchlink\" href=\"https:\/\/www.youtube.com\/watch?v=rW8g5D3ALs4\" target=\"_blank\" rel=\"noopener\">\n          <svg viewBox=\"0 0 20 20\" fill=\"none\"><circle cx=\"10\" cy=\"10\" r=\"8\" stroke=\"currentColor\" stroke-width=\"1.8\"><\/circle><path d=\"M8 6.5l5 3.5-5 3.5z\" fill=\"currentColor\"><\/path><\/svg>\n          Ansehen: \u00c4hnliche Auftr\u00e4ge nacheinander (5 min)\n        <\/a>\n      <\/div>\n    <\/div>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"routing\" data-screen-label=\"Visual routing editor\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-routing__head\">\n<p class=\"fx-eyebrow\">Visuelle Produkt- und Projektmodellierung<\/p>\n<h2 class=\"wp-block-heading\">Erstellen Sie Produkte und Projekte so, wie Sie sie sich vorstellen<\/h2>\n<p style=\"font:var(--sp-body-lg);color:var(--sp-text-muted);margin:0\">Der visuelle Editor von SkyPlanner erm\u00f6glicht es Ihnen, als verbundenen Ablauf abzubilden, wie ein Produkt tats\u00e4chlich hergestellt wird (Teilprodukte, Prozessschritte und ihre Reihenfolge). Was Sie zeichnen, wird zum Arbeitsplan, nach dem Arcturus plant. Derselbe Editor plant ganze Projekte, nicht nur einzelne Auftr\u00e4ge, sodass mehrstufige Arbeit mit vielen Abh\u00e4ngigkeiten \u00fcbersichtlich und einfach zu entwerfen bleibt.<\/p>\n      <div class=\"fx-routing__chips\">\n        <span class=\"fx-chip\">Produkte &amp; ganze Projekte<\/span>\n        <span class=\"fx-chip\">Teilprodukte &amp; Baugruppen<\/span>\n        <span class=\"fx-chip\">Prozessschritte in Reihenfolge<\/span>\n        <span class=\"fx-chip\">Schrittdauern &amp; R\u00fcstzeiten<\/span>\n        <span class=\"fx-chip\">Abh\u00e4ngigkeiten zwischen Schritten<\/span>\n        <span class=\"fx-chip\">Vor der Planung pr\u00fcfen<\/span>\n      <\/div>\n    <\/div>\n\n    <div class=\"fx-routing__shot\">\n<figure class=\"fx-shot\" style=\"margin:0\">\n        <div class=\"fx-shot__bar\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Visueller Editor \u00b7 Projekt-Arbeitsplan<\/span><\/div>\n        <img decoding=\"async\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/26-a17c38a6-0df3-418d-805d-3c293086ebaf.png\" alt=\"Visueller Editor von SkyPlanner f\u00fcr Projekt 1001: viele Prozessschrittkarten wie S\u00e4gen, Bearbeiten, Schwei\u00dfen und Verpacken, durch Pfeile verbunden, mit Teilprodukten links, die \u00fcber mehrere Stufen zum fertigen Projekt rechts zusammengef\u00fchrt werden. Jede Karte zeigt ihre Schrittnummer und geplante Dauer.\">\n      <\/figure>\n<p class=\"fx-cap\">Ein ganzes Projekt in einer Ansicht: Jede Karte ist ein Prozessschritt, und die Pfeile legen die Reihenfolge fest, der Teilprodukte und Stufen folgen m\u00fcssen, bevor das Projekt abgeschlossen ist.<\/p>\n    <\/div>\n\n    <div class=\"fx-routing__legend\">\n      <div class=\"fx-routing__leg\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><span><b>Von Ihrem Team gezeichnet, nicht von der KI.<\/b> Arbeitspl\u00e4ne spiegeln wider, wie Ihre Fabrik das Produkt wirklich herstellt; Sie behalten die Kontrolle \u00fcber das Modell.<\/span><\/div>\n      <div class=\"fx-routing__leg\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><span><b>Teilprodukte flie\u00dfen in das Hauptprodukt ein.<\/b> Zweige werden in der richtigen Reihenfolge zusammengef\u00fchrt, sodass Baugruppen und Abh\u00e4ngigkeiten explizit sind.<\/span><\/div>\n      <div class=\"fx-routing__leg\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><span><b>\u00dcberpr\u00fcft, bevor die Planung erfolgt.<\/b> Pr\u00fcfen Sie den Arbeitsplan visuell und lassen Sie Arcturus anschlie\u00dfend auf dieser Basis planen.<\/span><\/div>\n      <div class=\"fx-routing__leg\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><span><b>Ideal f\u00fcr Projekte, nicht nur f\u00fcr Auftr\u00e4ge.<\/b> Planen Sie mehrstufige Projektarbeit auf dieselbe visuelle Weise. Wenn sich ein Schritt \u00e4ndert, plant Arcturus anhand der Abh\u00e4ngigkeiten neu, sodass die Auswirkung auf das gesamte Projekt sichtbar bleibt.<\/span><\/div>\n    <\/div>\n\n<p class=\"fx-model__note\" style=\"margin-top:30px\">Dies ist der Schritt, \u00fcber den sich neue Nutzer am meisten Gedanken machen. In der Praxis zeichnen Sie ihn: Karten sind Prozessschritte, Pfeile zeigen die Reihenfolge, in der sie ablaufen. Der KI-Agent und unsere Tutorial-Videos f\u00fchren Sie durch Ihr erstes Produkt, und die begleitete Einf\u00fchrung ist verf\u00fcgbar, wenn Sie m\u00f6chten, dass ein Experte es gemeinsam mit Ihnen macht.<\/p>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"mobile\" style=\"background:var(--sp-surface-blue)\" data-screen-label=\"Shop-floor devices\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-dev\">\n      <div class=\"fx-dev__copy sp-min0\">\n<p class=\"fx-eyebrow\">In der Fertigung<\/p>\n<h2 class=\"wp-block-heading\">Bediener nutzen es per Smartphone oder Tablet<\/h2>\n<p style=\"font:var(--sp-body-lg);color:var(--sp-text-muted);margin:0\">Die Time Logs-Ansicht gibt jedem Bediener eine eigene Arbeitswarteschlange und einen Timer, der mit einem Fingertipp startet. So starten, stoppen und best\u00e4tigen sie die Arbeit direkt an der Maschine, auf jedem Bildschirm in der Fertigung.<\/p>\n<ul class=\"wp-block-list fx-dev__points\">\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M3 5h14M3 10h10M3 15h7\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n            <span><b>Eine Arbeitswarteschlange pro Arbeitsstation<\/b><span class=\"t\">Jeder Bediener sieht nur die Aufgaben f\u00fcr seine Stationen, in der geplanten Reihenfolge.<\/span><\/span>\n          <\/li>\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><circle cx=\"10\" cy=\"11\" r=\"6.5\" stroke=\"currentColor\" stroke-width=\"1.8\"><\/circle><path d=\"M10 8v3M8 2.5h4\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n            <span><b>Ein-Tipp-Timer &amp; Schnellerfassung<\/b><span class=\"t\">Starten, stoppen und Mengen direkt an der Maschine best\u00e4tigen.<\/span><\/span>\n          <\/li>\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M3 10a7 7 0 0 1 12-5m1-3v4h-4M17 10a7 7 0 0 1-12 5m-1 3v-4h4\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n            <span><b>Status flie\u00dft zur\u00fcck in die Planung<\/b><span class=\"t\">Jede Buchung aktualisiert Fortschritt und Plan in Echtzeit.<\/span><\/span>\n          <\/li>\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M3 16l4-4 3 3 6-7\" stroke=\"currentColor\" stroke-width=\"1.9\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><path d=\"M3 19h14\" stroke=\"currentColor\" stroke-width=\"1.9\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n            <span><b>Das System lernt aus erfassten Stunden<\/b><span class=\"t\">SkyPlanner prognostiziert die Dauer von Prozessschritten anhand Ihrer eigenen Historie, sodass Sch\u00e4tzungen mit der Zeit realistischer werden.<\/span><\/span>\n          <\/li>\n        <\/ul>\n      <\/div>\n\n      <div class=\"fx-dev__media sp-min0\">\n        <div class=\"fx-dev__stage\">\n          <div class=\"fx-phone\">\n            <span class=\"fx-phone__island\"><\/span>\n            <div class=\"fx-phone__screen\">\n              <img decoding=\"sync\" loading=\"eager\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/27-39dbe9c1-81b6-4bc8-ad9c-4ad9e35e26c8.png\" alt=\"SkyPlanner Time Logs auf einem Smartphone: eine Arbeitswarteschlange f\u00fcr S\u00e4gen mit einer gro\u00dfen Start-Timer-Schaltfl\u00e4che und Aufgabenkarten, die Kunde, Arbeitsnummer, geplante Stunden und Mengen anzeigen.\">\n            <\/div>\n          <\/div>\n          <div class=\"fx-tablet\">\n            <span class=\"fx-tablet__cam\"><\/span>\n            <div class=\"fx-tablet__screen\">\n              <img decoding=\"sync\" loading=\"eager\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/28-f84ab9ff-d5c6-40a2-bb24-0241eda4a6a8.png\" alt=\"SkyPlanner Time Logs auf einem Tablet: ein zweispaltiges Raster aus Aufgabenkarten, die jeweils Prozessschritt, Kunde, Arbeitsnummer und eine Start-Timer-Schaltfl\u00e4che anzeigen.\">\n            <\/div>\n          <\/div>\n        <\/div>\n<p class=\"fx-dev__cap fx-cap\" style=\"justify-content:center\">Dieselbe Time Logs-Ansicht, angepasst an den Bildschirm, den jeder Bediener zur Hand hat.<\/p>\n      <\/div>\n    <\/div>\n\n<figure class=\"fxv-quote\">\n      <div class=\"fxv-quote__mark\">\u201c<\/div>\n<blockquote class=\"fxv-quote__txt\">SkyPlanner hat die Echtzeittransparenz in der Produktion verbessert und die Arbeitszeit, die durch Arbeitserfassung und Berichterstattung in der Fertigung verloren ging, weitgehend reduziert. Au\u00dferdem hat es unsere Bestandsgenauigkeit deutlich verbessert und die M\u00f6glichkeit menschlicher Fehler im Produktionsmanagement beseitigt.<\/blockquote>\n<figcaption class=\"fxv-quote__who\">\u2014 <b>Jussi Yli-Renko<\/b>, Produktionsplanungsmanager, Piristeel Oy<span class=\"fxv-quote__ctx\">Hersteller von Dachsicherheitsprodukten, Kauhava, Finnland<\/span><\/figcaption>\n    <\/figure>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"dashboards\" style=\"background:var(--sp-bg-alt)\" data-screen-label=\"Reports &amp; dashboards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-head\">\n<p class=\"fx-eyebrow\">Berichte &amp; Dashboards<\/p>\n<h2 class=\"wp-block-heading\">Erstellen Sie die Produktionsansichten, die Sie wirklich m\u00f6chten<\/h2>\n<p>Ein Drag-and-drop-Dashboard verwandelt die Daten von SkyPlanner in die Fertigungsberichte, die Ihnen wichtig sind (Auslastung, Verz\u00f6gerungen, Effizienz, Lieferzuverl\u00e4ssigkeit und mehr), so angeordnet, wie Ihr Team sie liest.<\/p>\n    <\/div>\n\n<figure class=\"fx-shot\" style=\"margin:0 0 28px\">\n      <div class=\"fx-shot__bar\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Reporting-Dashboard<\/span><\/div>\n      <img decoding=\"sync\" loading=\"eager\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/29-431a8fa8-41b2-437c-9428-38233a3c2dda.png\" alt=\"SkyPlanner Reporting-Dashboard mit Filtersteuerungen und Widgets: Stundenkarten f\u00fcr Kapazit\u00e4t und Auslastung, eine Anzeige f\u00fcr den Auslastungsfaktor, gestartete\/abgeschlossene Aufgaben, Anzeigen f\u00fcr erfasst vs. Kapazit\u00e4t und aktive Aufgaben sowie ein Balkendiagramm des Auslastungsfaktors nach Datum.\">\n    <\/figure>\n\n    <div class=\"fx-chips\" style=\"margin-bottom:8px\">\n      <span class=\"fx-chip\">Auslastung &amp; Kapazit\u00e4t<\/span><span class=\"fx-chip\">Versp\u00e4tete Auftr\u00e4ge<\/span><span class=\"fx-chip\">Effizienz: geplant vs. tats\u00e4chlich<\/span><span class=\"fx-chip\">Lieferzuverl\u00e4ssigkeit<\/span><span class=\"fx-chip\">Auftr\u00e4ge in Bearbeitung<\/span><span class=\"fx-chip\">OEE<\/span><span class=\"fx-chip\">Qualit\u00e4tsberichte<\/span>\n    <\/div>\n\n    <div class=\"fx-shift__points\">\n      <div class=\"fx-shift__pt\">\n        <span class=\"ic\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><rect x=\"3.5\" y=\"3.5\" width=\"7\" height=\"9\" rx=\"1.5\" stroke=\"currentColor\" stroke-width=\"1.9\"><\/rect><rect x=\"13.5\" y=\"3.5\" width=\"7\" height=\"5\" rx=\"1.5\" stroke=\"currentColor\" stroke-width=\"1.9\"><\/rect><rect x=\"13.5\" y=\"11.5\" width=\"7\" height=\"9\" rx=\"1.5\" stroke=\"currentColor\" stroke-width=\"1.9\"><\/rect><rect x=\"3.5\" y=\"15.5\" width=\"7\" height=\"5\" rx=\"1.5\" stroke=\"currentColor\" stroke-width=\"1.9\"><\/rect><\/svg><\/span>\n        <b>Drag-and-drop-Widgets<\/b>\n        <span>W\u00e4hlen Sie aus einer umfangreichen Widget-Bibliothek und ordnen Sie jedes Dashboard per Drag-and-drop f\u00fcr jeden Datumsbereich an.<\/span>\n      <\/div>\n      <div class=\"fx-shift__pt\">\n        <span class=\"ic\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><circle cx=\"9\" cy=\"8\" r=\"3.2\" stroke=\"currentColor\" stroke-width=\"1.9\"><\/circle><path d=\"M3.5 19a5.5 5.5 0 0 1 11 0M16 6.5a3 3 0 0 1 0 5.4M16.5 19a5.5 5.5 0 0 0-1.6-3.9\" stroke=\"currentColor\" stroke-width=\"1.9\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n        <b>Ein Dashboard pro Person<\/b>\n        <span>Jeder Nutzer hat sein eigenes, und Sie k\u00f6nnen so viele verschiedene Dashboards erstellen, wie Sie ben\u00f6tigen.<\/span>\n      <\/div>\n      <div class=\"fx-shift__pt\">\n        <span class=\"ic\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><rect x=\"2.5\" y=\"4\" width=\"19\" height=\"12\" rx=\"1.8\" stroke=\"currentColor\" stroke-width=\"1.9\"><\/rect><path d=\"M8 20h8M12 16v4\" stroke=\"currentColor\" stroke-width=\"1.9\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n        <b>Auf dem Produktionsbildschirm anzeigen<\/b>\n        <span>Lassen Sie ein Dashboard auf einem TV in der Fertigung laufen, damit alle den Produktionsstatus live sehen.<\/span>\n      <\/div>\n    <\/div>\n\n<p class=\"fx-shift__note\">Individuelle Berichte, Ihre Datumsbereiche, Ihr Layout. <b>Produktionstransparenz, die Sie selbst einrichten<\/b>, ohne darauf zu warten, dass jemand einen Bericht f\u00fcr Sie erstellt.<\/p>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"capacity\" data-screen-label=\"Model your factory\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-head\">\n<p class=\"fx-eyebrow\">Kapazit\u00e4t &amp; Materialien<\/p>\n<h2 class=\"wp-block-heading\">Die Grenzen, innerhalb derer Arcturus plant<\/h2>\n<p>Echte Schichten und echte Materialien entscheiden, was Sie tats\u00e4chlich produzieren k\u00f6nnen. Modellieren Sie beides einmal, und sie werden zu den Restriktionen, die jeder Plan einh\u00e4lt.<\/p>\n    <\/div>\n\n    <div class=\"fx-model\">\n      <div class=\"fx-model__col\">\n<figure class=\"fx-shot\" style=\"margin:0 0 22px\">\n          <div class=\"fx-shot__bar\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Planung von Arbeitsstationen<\/span><\/div>\n          <img decoding=\"sync\" loading=\"eager\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/30-6ad607aa-dea2-49ba-b035-25d3a4545b66.png\" alt=\"SkyPlanner Planungskalender f\u00fcr Arbeitsstationen: eine Wochenansicht mit Zeilen f\u00fcr S\u00e4ge-, CNC-, Schwei\u00df- und Verpackungsstationen, wobei jeder Tag einen Block f\u00fcr die Fr\u00fch- und die Sp\u00e4tschicht zeigt.\">\n        <\/figure>\n        <div class=\"fx-model__sub\">\n          <span class=\"ic\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><rect x=\"3.5\" y=\"5\" width=\"17\" height=\"16\" rx=\"2\" stroke=\"currentColor\" stroke-width=\"1.9\"><\/rect><path d=\"M3.5 9h17M8 3v4m8-4v4\" stroke=\"currentColor\" stroke-width=\"1.9\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n<h3 class=\"wp-block-heading\">Schichten &amp; Kapazit\u00e4t<\/h3>\n        <\/div>\n<ul class=\"wp-block-list fx-model__bul\">\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><span><b>Wiederkehrende Schichten, einmal festgelegt:<\/b> Fr\u00fch- und Sp\u00e4tschichten wiederholen sich in einem w\u00f6chentlichen Zyklus, ohne Standardwerte neu anzulegen.<\/span><\/li>\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><span><b>Ausnahmen im Kalender:<\/b> Schichten f\u00fcr Feiertage, \u00dcberstunden oder einen Ausfall hinzuf\u00fcgen, bearbeiten oder entfernen.<\/span><\/li>\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><span><b>Personen zuweisen, Dienstpl\u00e4ne erhalten:<\/b> W\u00e4hlen Sie, wer in welcher Schicht arbeitet, und Personen- sowie Maschinenpl\u00e4ne werden automatisch erstellt.<\/span><\/li>\n        <\/ul>\n      <\/div>\n\n      <div class=\"fx-model__col\">\n<figure class=\"fx-shot\" style=\"margin:0 0 22px\">\n          <div class=\"fx-shot__bar\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Lager<\/span><\/div>\n          <img decoding=\"sync\" loading=\"eager\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/31-d5ae0129-5aed-432b-afeb-e7c30c7842c1.png\" alt=\"SkyPlanner Lagerliste mit Produkten und Materialien, mit einer Bestand-Spalte, die kumulierte Salden zeigt; die meisten Zeilen sind gr\u00fcn, zwei negative Zeilen sind rot hervorgehoben.\">\n        <\/figure>\n        <div class=\"fx-model__sub\">\n          <span class=\"ic\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M4 7l8-4 8 4v10l-8 4-8-4z\" stroke=\"currentColor\" stroke-width=\"1.9\" stroke-linejoin=\"round\"><\/path><path d=\"M4 7l8 4 8-4M12 11v10\" stroke=\"currentColor\" stroke-width=\"1.9\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n<h3 class=\"wp-block-heading\">Materialien &amp; Bestand<\/h3>\n        <\/div>\n<ul class=\"wp-block-list fx-model__bul\">\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><span><b>Best\u00e4nde, Meldebest\u00e4nde und Einkauf:<\/b> laufende Best\u00e4nde, Meldebest\u00e4nde und Bestellungen an einem Ort.<\/span><\/li>\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><span><b>Zuk\u00fcnftiger Bestand, simuliert:<\/b> Die Planung projiziert k\u00fcnftige Best\u00e4nde aus Lagerbestand, Bestellungen, Reservierungen und Verbrauch.<\/span><\/li>\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><span><b>Reagiert auf Materialverz\u00f6gerungen:<\/b> Wenn sich eine Lieferung versp\u00e4tet, verschiebt Arcturus den Fertigungsauftrag auf den Zeitpunkt, an dem das Material verf\u00fcgbar ist.<\/span><\/li>\n        <\/ul>\n      <\/div>\n\n<p class=\"fx-model__note\">Zusammen bilden Kapazit\u00e4t und Materialien die Grenzen, <b>innerhalb derer Arcturus plant<\/b>, sodass eine kurze Schicht oder eine versp\u00e4tete Lieferung keinen Dominoeffekt im gesamten Plan ausl\u00f6st.<\/p>\n    <\/div>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"delivery\" style=\"background:var(--sp-bg-alt)\" data-screen-label=\"Delivery dates\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-head\">\n<p class=\"fx-eyebrow\">Vertrieb und Produktion, ein Plan<\/p>\n<h2 class=\"wp-block-heading\">Liefertermine zusagen, die Sie einhalten k\u00f6nnen<\/h2>\n<p>F\u00fcgen Sie eine Verkaufschance als simulierten Auftrag hinzu, und Arcturus plant sie gegen Ihre reale Auslastung, Kapazit\u00e4t und Materialien ein. Der Vertrieb sieht ein realistisches Lieferdatum, bevor etwas zugesagt wird, und kann daf\u00fcr Kapazit\u00e4t reservieren, wenn Sie m\u00f6chten. Wenn der Abschluss zustande kommt, wird die Verkaufschance mit einer Status\u00e4nderung zum Produktionsauftrag. Bei Fredman Operations sagt der Vertrieb jetzt Liefertermine mit Kapazit\u00e4tstransparenz sechs Monate im Voraus zu, und ein aktualisiertes Angebot, das fr\u00fcher eine Stunde manueller Berechnung erforderte, kommt in Sekunden aus dem System.<\/p>\n    <\/div>\n    <div class=\"fxv-deliver\">\n      <div class=\"fxv-deliver__copy sp-min0\">\n<ul class=\"wp-block-list fxv-deliver__bul\">\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><span>Liefertermine aus dem echten Plan zusagen, nicht aus dem Bauchgef\u00fchl.<\/span><\/li>\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><span>Sehen Sie, was die Annahme eines Eilauftrags mit jeder anderen Zusage macht.<\/span><\/li>\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><span>Lieferzuverl\u00e4ssigkeit ist das Ergebnis, das Kunden zuerst bemerken.<\/span><\/li>\n        <\/ul>\n      <\/div>\n      <div class=\"fxv-deliver__media sp-min0\">\n<figure class=\"fx-shot\" style=\"margin:0\">\n          <div class=\"fx-shot__bar\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Planung von Verkaufschancen<\/span><\/div>\n          <img decoding=\"sync\" loading=\"lazy\" width=\"2056\" height=\"890\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/32-08986976-4342-44ff-a97f-fa730beb26c8.png\" alt=\"SkyPlanner Gantt-Zeitachse mit einer Verkaufschance, die als simulierter Auftrag eingeplant ist: Zeilen f\u00fcr Arbeitsstationen f\u00fcr S\u00e4ge, CNC, Schwei\u00dfen und Verpackung zeigen eingeplante Balken f\u00fcr Produktionsauftr\u00e4ge, versp\u00e4tete Produktionsauftr\u00e4ge sind rot markiert, und ein hervorgehobener simulierter Produktionsauftrag in Blau zeigt, wo er im Plan landen w\u00fcrde.\">\n        <\/figure>\n      <\/div>\n    <\/div>\n<figure class=\"fxv-quote\">\n      <div class=\"fxv-quote__mark\">\u201c<\/div>\n<blockquote class=\"fxv-quote__txt\">Der Wert, den SkyPlanner uns bringt, ist, dass es ein Tool ist, das im t\u00e4glichen Einsatz funktioniert, insbesondere beim Festlegen von Lieferterminen.<\/blockquote>\n<figcaption class=\"fxv-quote__who\">\u2014 <b>Tommi M\u00e4nnist\u00f6<\/b>, Produktionsplanungsmanager, Eskomatic Oy<span class=\"fxv-quote__ctx\">Lohnfertigung, Turku, Finnland<\/span><\/figcaption>\n    <\/figure>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"roles\" data-screen-label=\"Role value\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-head\">\n<p class=\"fx-eyebrow\">F\u00fcr jedes Team im Plan entwickelt<\/p>\n<h2 class=\"wp-block-heading\">Ein Plan f\u00fcr jedes beteiligte Team<\/h2>\n<p>Vier Teams mit vier unterschiedlichen Zielen (Planung, \u00dcberblick, Ausf\u00fchrung und Integration), die mit demselben Plan arbeiten.<\/p>\n    <\/div>\n    <div class=\"fx-roles\">\n\n      <article class=\"fx-role\">\n        <div class=\"fx-role__top\">\n          <span class=\"fx-role__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M3 5h18M3 12h12M3 19h7\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\"><\/path><circle cx=\"19\" cy=\"17\" r=\"3\" stroke=\"currentColor\" stroke-width=\"2\"><\/circle><\/svg><\/span>\n<p class=\"fx-role__role\">Produktionsplaner<\/p>\n        <\/div>\n<p class=\"fx-role__out\">Erstellen Sie einen realistischen Plan, planen Sie neu, wenn sich die Realit\u00e4t \u00e4ndert, und behalten Sie die Kontrolle \u00fcber Priorit\u00e4ten und Sperren.<\/p>\n<ul class=\"wp-block-list fx-role__list\">\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>Gantt-Anpassungen per Drag-and-drop<\/li>\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>Dynamische Priorit\u00e4ten &amp; Aufgabensperren<\/li>\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>Neue Pl\u00e4ne vergleichen und akzeptieren<\/li>\n        <\/ul>\n        <a class=\"fx-role__link\" href=\"#visibility\">Planer-Workflow ansehen <svg width=\"16\" height=\"16\" viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8h9m0 0l-4-4m4 4l-4 4\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/a>\n      <\/article>\n\n      <article class=\"fx-role fx-role--green\">\n        <div class=\"fx-role__top\">\n          <span class=\"fx-role__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M3 20V10m6 10V4m6 16v-7m6 7V8\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n<p class=\"fx-role__role\">Betriebsleiter<\/p>\n        <\/div>\n<p class=\"fx-role__out\">Erkennen Sie Auslastung, Verz\u00f6gerungen, Engp\u00e4sse und Plan\u00e4nderungen, bevor sie Probleme verursachen.<\/p>\n<ul class=\"wp-block-list fx-role__list\">\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>Transparenz \u00fcber Kapazit\u00e4t &amp; Auslastung<\/li>\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>Status: versp\u00e4tet \/ geplant \/ ungeplant<\/li>\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>Schnellere Reaktion auf St\u00f6rungen<\/li>\n        <\/ul>\n        <a class=\"fx-role__link\" href=\"#visibility\">Produktionstransparenz ansehen <svg width=\"16\" height=\"16\" viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8h9m0 0l-4-4m4 4l-4 4\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/a>\n      <\/article>\n\n      <article class=\"fx-role fx-role--orange\">\n        <div class=\"fx-role__top\">\n          <span class=\"fx-role__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><circle cx=\"12\" cy=\"12\" r=\"8\" stroke=\"currentColor\" stroke-width=\"2\"><\/circle><path d=\"M12 8v4l3 2\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n<p class=\"fx-role__role\">Shopfloor-Team<\/p>\n        <\/div>\n<p class=\"fx-role__out\">Wissen, was als N\u00e4chstes zu tun ist, Arbeit starten und stoppen und den Status aktuell halten.<\/p>\n<ul class=\"wp-block-list fx-role__list\">\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>Klare Arbeitswarteschlange f\u00fcr die n\u00e4chste Aufgabe<\/li>\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>Produktionstimer &amp; schnelle Protokollierung<\/li>\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>Fortschrittsfeedback in Echtzeit<\/li>\n        <\/ul>\n        <a class=\"fx-role__link\" href=\"#mobile\">Shopfloor-Ablauf ansehen <svg width=\"16\" height=\"16\" viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8h9m0 0l-4-4m4 4l-4 4\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/a>\n      <\/article>\n\n      <article class=\"fx-role fx-role--purple\">\n        <div class=\"fx-role__top\">\n          <span class=\"fx-role__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M9 6a3 3 0 11-6 0 3 3 0 016 0zm12 12a3 3 0 11-6 0 3 3 0 016 0zM6 9v3a3 3 0 003 3h6\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n<p class=\"fx-role__role\">IT \/ ERP-Verantwortlicher<\/p>\n        <\/div>\n<p class=\"fx-role__out\">Verbinden Sie die Planung mit bestehenden Systemen, damit SkyPlanner nicht zu einem Planungssilo wird.<\/p>\n<ul class=\"wp-block-list fx-role__list\">\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>REST API &amp; Webhooks<\/li>\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>CSV- \/ Datenimport<\/li>\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>Projektspezifische Integrationsservices<\/li>\n        <\/ul>\n        <a class=\"fx-role__link\" href=\"#integrations\">Integrationsablauf ansehen <svg width=\"16\" height=\"16\" viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8h9m0 0l-4-4m4 4l-4 4\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/a>\n      <\/article>\n\n    <\/div>\n\n<figure class=\"fxv-quote\">\n      <div class=\"fxv-quote__mark\">\u201c<\/div>\n<blockquote class=\"fxv-quote__txt\">Die Liefertreue, intern und extern, hat sich seit der Einf\u00fchrung von SkyPlanner erheblich verbessert. SkyPlanner hat die gesamte Produktion praktisch in jeder Hinsicht transparenter gemacht.<\/blockquote>\n<figcaption class=\"fxv-quote__who\">\u2014 <b>Mikko Jokitalo<\/b>, Produktionsplaner, Piristeel Oy<span class=\"fxv-quote__ctx\">Hersteller von Dachsicherheitsprodukten, Kauhava, Finnland<\/span><\/figcaption>\n    <\/figure>\n\n    <div class=\"sp-btn-toolbar\" style=\"margin-top:36px\">\n      <a class=\"sp-btn sp-btn--green\" href=\"#start\">Kostenlose Testversion starten<\/a>\n      <a class=\"sp-btn sp-btn--outline\" href=\"https:\/\/skyplanner.ai\/de\/kontakt-vertrieb\/\">Live-Demo buchen<\/a>\n    <\/div>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"cases\" data-screen-label=\"In daily use\" style=\"padding-block:var(--sp-space-20)\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-head fx-head--center\">\n<p class=\"fx-eyebrow fx-eyebrow--center\">Im t\u00e4glichen Einsatz<\/p>\n<h2 class=\"wp-block-heading\">Hersteller, die mit SkyPlanner arbeiten<\/h2>\n<p>Von familiengef\u00fchrten Maschinenbaubetrieben in Finnland bis zum gr\u00f6\u00dften Pharmahersteller Kenias.<\/p>\n    <\/div>\n    <div class=\"fxv-cases__grid fxv-cases__grid--four\">\n      <article class=\"fxv-case\" data-story-href>\n<p class=\"fxv-case__name\">Laboratory &amp; Allied Limited<\/p>\n<p class=\"fxv-case__meta\">Pharmazeutika \u00b7 ~1.000 Mitarbeiter \u00b7 SkyPlanner seit 2025<\/p>\n<p class=\"fxv-case__body\">90% effizientere Produktion und 50% h\u00f6here Termintreue.<\/p>\n        <span class=\"fxv-vh\">Erfolgsgeschichte lesen<\/span>\n      <\/article>\n      <article class=\"fxv-case\" data-story-href>\n<p class=\"fxv-case__name\">Piristeel Oy<\/p>\n<p class=\"fxv-case__meta\">Dachsicherheitsprodukte \u00b7 ~100 Mitarbeiter \u00b7 SkyPlanner seit 2023<\/p>\n<p class=\"fxv-case__body\">99,2% Lieferzuverl\u00e4ssigkeit und bis zu vier Stunden Planungsarbeit jeden Tag eingespart.<\/p>\n        <span class=\"fxv-vh\">Erfolgsgeschichte lesen<\/span>\n      <\/article>\n      <article class=\"fxv-case\" data-story-href>\n<p class=\"fxv-case__name\">Eskomatic Oy<\/p>\n<p class=\"fxv-case__meta\">Lohnfertigung \u00b7 88 Mitarbeiter \u00b7 SkyPlanner seit 2021<\/p>\n<p class=\"fxv-case__body\">Weniger Stillst\u00e4nde wegen Materialmangel und genauere Liefertermine f\u00fcr Kunden.<\/p>\n        <span class=\"fxv-vh\">Erfolgsgeschichte lesen<\/span>\n      <\/article>\n      <article class=\"fxv-case\" data-story-href>\n<p class=\"fxv-case__name\">Fredman Operations Oy<\/p>\n<p class=\"fxv-case__meta\">Lebensmittelverpackungen \u00b7 ~70 Mitarbeiter \u00b7 SkyPlanner seit 2025<\/p>\n<p class=\"fxv-case__body\">Der Vertrieb sagt Liefertermine mit Kapazit\u00e4tstransparenz sechs Monate im Voraus zu.<\/p>\n        <span class=\"fxv-vh\">Erfolgsgeschichte lesen<\/span>\n      <\/article>\n    <\/div>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"assistant\" style=\"background:var(--sp-bg-alt)\" data-screen-label=\"SkyPlanner Agent\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-assist\">\n      <div class=\"fx-assist__copy sp-min0\">\n<p class=\"fx-eyebrow\">SkyPlanner Agent<span class=\"fx-assist__beta\">BETA<\/span><\/p>\n<h2 class=\"wp-block-heading\">SkyPlanner einfach auf Zuruf bedienen<\/h2>\n<p class=\"fx-head__lead\" style=\"font:var(--sp-body-lg);color:var(--sp-text-muted);margin:0 0 24px\">Bitten Sie den Agenten in einfachen Worten, einen Auftrag zu erstellen, den Produktionsstatus zu pr\u00fcfen oder ungeplante Auftr\u00e4ge einzuplanen. Er erledigt die Aufgabe und zeigt Ihnen genau, was er getan hat. Au\u00dferdem erkl\u00e4rt er, wie SkyPlanner funktioniert, und hilft Ihnen bei der Konfiguration, sodass Sie die Software per Anfrage nutzen k\u00f6nnen, statt Men\u00fcs zu durchsuchen.<\/p>\n<ul class=\"wp-block-list fx-assist__points\">\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n            <span><b>Er erledigt echte Arbeit auf Anfrage<\/b><span class=\"t\">Auftr\u00e4ge anlegen, Status pr\u00fcfen, offene Arbeit einplanen. Der Agent handelt und meldet zur\u00fcck, was er ge\u00e4ndert hat.<\/span><\/span>\n          <\/li>\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M10 10a3 3 0 1 0 0-6 3 3 0 0 0 0 6zM3 17a7 7 0 0 1 14 0\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n            <span><b>F\u00fcr alle, nicht nur f\u00fcr t\u00e4gliche Nutzer<\/b><span class=\"t\">Manager und F\u00fchrungskr\u00e4fte k\u00f6nnen direkt fragen, statt jedes Men\u00fc und jede Einstellung zu lernen.<\/span><\/span>\n          <\/li>\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M10 2a6 6 0 0 0-6 6c0 4 6 10 6 10s6-6 6-10a6 6 0 0 0-6-6z\" stroke=\"currentColor\" stroke-width=\"1.7\"><\/path><circle cx=\"10\" cy=\"8\" r=\"2\" stroke=\"currentColor\" stroke-width=\"1.7\"><\/circle><\/svg><\/span>\n            <span><b>Er schult und konfiguriert w\u00e4hrend der Nutzung<\/b><span class=\"t\">Ein Experte, der SkyPlanner erkl\u00e4rt, Ihnen bei der Einrichtung hilft und das Onboarding f\u00fcr neue Nutzer erleichtert.<\/span><\/span>\n          <\/li>\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><circle cx=\"10\" cy=\"10\" r=\"7.5\" stroke=\"currentColor\" stroke-width=\"1.7\"><\/circle><path d=\"M10 6v4l2.5 2\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n            <span><b>Rund um die Uhr verf\u00fcgbar, in Ihrer Sprache<\/b><span class=\"t\">Er merkt sich Ihren Produktionskontext und antwortet in der Sprache, die Ihr Team spricht, 24\/7.<\/span><\/span>\n          <\/li>\n        <\/ul>\n<p class=\"fx-assist__guard\">Der Agent handelt auf Ihre Anfrage hin und zeigt, was er getan hat, damit Sie die Kontrolle behalten. Er unterst\u00fctzt Ihr Team. Er betreibt die Fabrik nicht eigenst\u00e4ndig.<\/p>\n      <\/div>\n\n      <div class=\"fx-assist__panel-wrap sp-min0\">\n        <div class=\"fx-assist__shot\">\n          <img decoding=\"sync\" loading=\"eager\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/33-0298ed80-92e8-41bf-aaf2-843615249f53.png\" alt=\"SkyPlanner Agent Chat-Panel. Der Nutzer fragt: &#x27;K\u00f6nnen Sie einen neuen Auftrag f\u00fcr Produkt P-2 f\u00fcr den Kunden ACME Ltd mit einer Lieferzeit von zwei Wochen anlegen?&#x27; Der Agent antwortet, dass er den Auftrag erstellt hat, und listet Auftragsnummer, Kunde, Produkt, Lieferdatum sowie die automatisch hinzugef\u00fcgten Prozessschritte und Unterpositionen auf. Anschlie\u00dfend bietet er an, die Auftragsdetails zu pr\u00fcfen oder den Auftrag f\u00fcr die Planung vorzubereiten.\">\n        <\/div>\n<p class=\"fx-cap\" style=\"text-align:center;max-width:384px;margin-left:auto;margin-right:auto\">Fragen Sie in einfachen Worten. Hier erstellt der Agent einen neuen Auftrag und listet genau auf, was er eingerichtet hat.<\/p>\n      <\/div>\n    <\/div>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"integrations\" data-screen-label=\"Integration dataflow\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-head fx-head--center\">\n<p class=\"fx-eyebrow fx-eyebrow--center\">Datenfluss der Integration<\/p>\n<h2 class=\"wp-block-heading\">Nie wieder ein Planungssilo<\/h2>\n<p>Nutzen Sie es eigenst\u00e4ndig, mit importierten Daten oder verbunden mit bestehenden Systemen \u00fcber REST API, Webhooks, Datenimport und projektspezifische Integrationsservices. Laboratory &amp; Allied hat SkyPlanner weitgehend selbst mit <a href=\"\/de\/integrationen\/erp\/sap-business-one\/\">SAP Business One<\/a> auf HANA und Power BI verbunden; die Zuordnung der Datenfl\u00fcsse war f\u00fcr ihr IT-Team schnell erledigt.<\/p>\n    <\/div>\n\n    <div class=\"fx-data\">\n      <div class=\"fx-data__col\">\n<p class=\"fx-data__lab\">Quellen rein<\/p>\n<h3 class=\"wp-block-heading\">ERP \u00b7 MES \u00b7 CSV \u00b7 Manuell<\/h3>\n<ul class=\"wp-block-list fx-data__items\">\n<li>Auftr\u00e4ge &amp; Nachfrage<\/li>\n<li>Produkte &amp; Strukturen<\/li>\n<li>Materialien &amp; Bestand<\/li>\n<li>Kunden &amp; F\u00e4lligkeitstermine<\/li>\n        <\/ul>\n      <\/div>\n      <div class=\"fx-data__col fx-data__col--mid\">\n<p class=\"fx-data__lab\">SkyPlanner APS<\/p>\n<h3 class=\"wp-block-heading\">Plant die Produktion<\/h3>\n        <div class=\"fx-data__chips\">\n          <span>Auftr\u00e4ge<\/span><span>Produkte<\/span><span>Materialien<\/span><span>Arbeitsstationen<\/span><span>Prozessschritte<\/span><span>Kapazit\u00e4t<\/span><span>Priorit\u00e4ten<\/span><span>Feinplan<\/span>\n        <\/div>\n      <\/div>\n      <div class=\"fx-data__col\">\n<p class=\"fx-data__lab\">Erkenntnisse raus<\/p>\n<h3 class=\"wp-block-heading\">ERP \u00b7 Berichte \u00b7 Management<\/h3>\n<ul class=\"wp-block-list fx-data__items\">\n<li>Geplante Start- &amp; Endzeiten<\/li>\n<li>Time Logs<\/li>\n<li>Fortschritt &amp; Status<\/li>\n<li>Planaktualisierungen &amp; Berichte<\/li>\n        <\/ul>\n      <\/div>\n    <\/div>\n\n    <div class=\"fx-data__methods\">\n      <span>REST API<\/span><span>Webhooks<\/span><span>CSV \/ Datenimport<\/span><span>Projektspezifische Integrationsservices<\/span>\n    <\/div>\n\n    <div class=\"fx-logos\">\n<p class=\"fx-logos__lab\">Beispiele f\u00fcr Systeme, die Hersteller zusammen mit SkyPlanner betreiben. Die Integration wird projektbezogen umgesetzt und ist kein zertifizierter nativer Connector f\u00fcr jedes System.<\/p>\n      <div class=\"fx-logos__row\">\n        <img decoding=\"sync\" loading=\"eager\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/03-7588ca1b-9f98-41a8-afd1-d0ff541ae494.png\" alt=\"SAP\">\n        <img decoding=\"sync\" loading=\"eager\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/04-feb7074e-04ff-4289-8ddc-738277a8e35a.png\" alt=\"Microsoft Dynamics 365\">\n        <img decoding=\"sync\" loading=\"eager\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/08-f0ebc421-8270-403b-95ef-baaf46819cc2.png\" alt=\"Odoo\">\n        <img decoding=\"sync\" loading=\"eager\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/06-3fd1befa-779f-4179-9c01-91c641a429ec.png\" alt=\"Epicor\">\n        <img decoding=\"sync\" loading=\"eager\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/05-6211607b-8b7f-45d4-b974-3ee857676e36.png\" alt=\"Infor\">\n        <img decoding=\"sync\" loading=\"eager\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/07-e69be7b0-1bb8-4540-836f-b148c41d60db.png\" alt=\"Sage\">\n      <\/div>\n<p class=\"fx-logos__note\">Namen und Logos von Drittanbietern werden nur als sachlicher Integrations- \/ Kompatibilit\u00e4tskontext gezeigt. Sie bedeuten keine Partnerschaft, Zertifizierung oder Empfehlung.<\/p>\n    <\/div>\n\n    <div style=\"text-align:center;margin-top:36px\">\n      <a class=\"sp-btn sp-btn--blue\" href=\"https:\/\/skyplanner.ai\/de\/integrationen\/\">Integrationen entdecken<\/a>\n    <\/div>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"compare\" style=\"background:var(--sp-bg-alt)\" data-screen-label=\"Comparison\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-head\">\n<p class=\"fx-eyebrow\">Warum nicht einfach in Excel, ERP oder einem Projekttool planen?<\/p>\n<h2 class=\"wp-block-heading\">F\u00fcr die Planung entwickelt, nicht nur f\u00fcr die Nachverfolgung<\/h2>\n<p>Tabellenkalkulationen, ERP\/MES und Projekttools leisten jeweils echte Arbeit. SkyPlanner wurde eigens f\u00fcr die kapazit\u00e4tsgepr\u00fcfte, materialgenaue Feinplanung entwickelt, f\u00fcr die diese Tools nicht gedacht sind.<\/p>\n    <\/div>\n\n    <div class=\"fx-compare-wrap\">\n<table class=\"fx-compare\">\n<thead>\n<tr>\n            <th><\/th>\n            <th>Excel \/ Tabellen<\/th>\n            <th>ERP \/ MES<\/th>\n            <th>Projekttools<\/th>\n            <th class=\"fx-compare__sp\"><span class=\"fx-compare__sp-name\">SkyPlanner APS<\/span><span class=\"fx-compare__sp-tag\">Speziell f\u00fcr Feinplanung entwickelt<\/span><\/th>\n          <\/tr>\n        <\/thead>\n<tbody>\n<tr>\n            <th>Feinplanung gegen begrenzte Kapazit\u00e4ten <span style=\"font-weight:400;color:var(--sp-text-muted)\">(Kapazit\u00e4t wird nie \u00fcberbucht)<\/span><\/th>\n            <td class=\"fx-ico-cell\"><span class=\"fx-no\">\u2014<\/span><\/td>\n            <td><span class=\"fx-part\">Begrenzt<\/span><\/td>\n            <td class=\"fx-ico-cell\"><span class=\"fx-no\">\u2014<\/span><\/td>\n            <td class=\"fx-compare__sp\"><svg class=\"fx-yes\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M5 12.5l4.5 4.5L19 7\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/td>\n          <\/tr>\n<tr>\n            <th>Reagiert auf \u00c4nderungen <span style=\"font-weight:400;color:var(--sp-text-muted)\">(Neuplanung in Sekunden, keine manuelle Nacharbeit)<\/span><\/th>\n            <td><span class=\"fx-part\">Manuell<\/span><\/td>\n            <td><span class=\"fx-part\">Batch-L\u00e4ufe<\/span><\/td>\n            <td><span class=\"fx-part\">Manuell<\/span><\/td>\n            <td class=\"fx-compare__sp\"><svg class=\"fx-yes\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M5 12.5l4.5 4.5L19 7\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/td>\n          <\/tr>\n<tr>\n            <th>Planung mit Materialverf\u00fcgbarkeit <span style=\"font-weight:400;color:var(--sp-text-muted)\">(Bestand, Bestellungen, zuk\u00fcnftige Salden)<\/span><\/th>\n            <td class=\"fx-ico-cell\"><span class=\"fx-no\">\u2014<\/span><\/td>\n            <td><span class=\"fx-part\">Nur Bestand<\/span><\/td>\n            <td class=\"fx-ico-cell\"><span class=\"fx-no\">\u2014<\/span><\/td>\n            <td class=\"fx-compare__sp\"><svg class=\"fx-yes\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M5 12.5l4.5 4.5L19 7\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/td>\n          <\/tr>\n<tr>\n            <th>R\u00fcckmeldungen aus der Fertigung aktualisieren den Plan live<\/th>\n            <td class=\"fx-ico-cell\"><span class=\"fx-no\">\u2014<\/span><\/td>\n            <td><span class=\"fx-part\">Unterschiedlich<\/span><\/td>\n            <td class=\"fx-ico-cell\"><span class=\"fx-no\">\u2014<\/span><\/td>\n            <td class=\"fx-compare__sp\"><svg class=\"fx-yes\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M5 12.5l4.5 4.5L19 7\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/td>\n          <\/tr>\n<tr>\n            <th>Gewichtete Priorit\u00e4ten und Abw\u00e4gungen<\/th>\n            <td><span class=\"fx-part\">Manuell<\/span><\/td>\n            <td class=\"fx-ico-cell\"><span class=\"fx-no\">\u2014<\/span><\/td>\n            <td><span class=\"fx-part\">Grundfunktionen<\/span><\/td>\n            <td class=\"fx-compare__sp\"><svg class=\"fx-yes\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M5 12.5l4.5 4.5L19 7\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/td>\n          <\/tr>\n<tr>\n            <th>R\u00fcstzeiten, Werkzeuge, Subunternehmer und Batch-Auftr\u00e4ge modelliert<\/th>\n            <td class=\"fx-ico-cell\"><span class=\"fx-no\">\u2014<\/span><\/td>\n            <td><span class=\"fx-part\">Teilweise<\/span><\/td>\n            <td class=\"fx-ico-cell\"><span class=\"fx-no\">\u2014<\/span><\/td>\n            <td class=\"fx-compare__sp\"><svg class=\"fx-yes\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M5 12.5l4.5 4.5L19 7\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/td>\n          <\/tr>\n<tr>\n            <th>Lieferterminsimulation f\u00fcr Verkaufschancen<\/th>\n            <td class=\"fx-ico-cell\"><span class=\"fx-no\">\u2014<\/span><\/td>\n            <td class=\"fx-ico-cell\"><span class=\"fx-no\">\u2014<\/span><\/td>\n            <td class=\"fx-ico-cell\"><span class=\"fx-no\">\u2014<\/span><\/td>\n            <td class=\"fx-compare__sp\"><svg class=\"fx-yes\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M5 12.5l4.5 4.5L19 7\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/td>\n          <\/tr>\n<tr>\n            <th>Zeit bis zum ersten Plan <span style=\"font-weight:400;color:var(--sp-text-muted)\">(Minuten mit Demodaten, kein monatelanges Projekt)<\/span><\/th>\n            <td><span class=\"fx-part\">Schnell, manuell<\/span><\/td>\n            <td><span class=\"fx-part\">Monate<\/span><\/td>\n            <td><span class=\"fx-part\">Tage<\/span><\/td>\n            <td class=\"fx-compare__sp\"><span style=\"font-family:var(--sp-font-medium)\">Minuten<\/span><\/td>\n          <\/tr>\n        <\/tbody>\n      <\/table>\n    <\/div>\n<p class=\"fx-compare__hint\">Auf kleinen Bildschirmen l\u00e4sst sich die Tabelle seitlich scrollen. Der Vergleich spiegelt die typische Nutzung wider, nicht ein bestimmtes Produkt.<\/p>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"allfeatures\" data-screen-label=\"Every capability\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-head fx-head--center\">\n<h2 class=\"wp-block-heading\">Was SkyPlanner kann<\/h2>\n<p>Die kurze Liste. Wenn Sie etwas vermissen, fragen Sie uns einfach. Auf eine Seite passt nicht alles.<\/p>\n    <\/div>\n    <div class=\"fxv-az\">\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Alternative Arbeitsstationen.<\/b><span class=\"az-d\">Ein Arbeitsgang kann auf jeder geeigneten Station laufen, und Arcturus nutzt die, die zuerst frei ist.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Autopilot-Neuplanung.<\/b><span class=\"az-d\">Der Plan aktualisiert sich bei jeder relevanten \u00c4nderung selbst, innerhalb Ihrer Grenzen.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Planung von Batch-Auftr\u00e4gen.<\/b><span class=\"az-d\">Teile aus mehreren Auftr\u00e4gen, die gemeinsam laufen, werden als ein Auftrag eingeplant.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Bulldozer.<\/b><span class=\"az-d\">Schiebt noch nicht gestartete Arbeit aus der Vergangenheit nach vorn auf den aktuellen Zeitpunkt.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Kapazit\u00e4tsplanung und wiederkehrende Schichten.<\/b><span class=\"az-d\">Schichten wiederholen sich in einem w\u00f6chentlichen Zyklus und definieren, wie viel Sie produzieren k\u00f6nnen.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Planvergleich.<\/b><span class=\"az-d\">Pr\u00fcfen Sie einen vorgeschlagenen Plan im direkten Vergleich mit dem aktuellen, bevor Sie ihn akzeptieren.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>CSV- und Datenimport.<\/b><span class=\"az-d\">Importieren Sie Auftr\u00e4ge, Produkte und Materialien ohne Integrationsprojekt.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Benutzerdefinierte Dashboards und Berichte.<\/b><span class=\"az-d\">Erstellen Sie die Produktionsansichten, die Sie m\u00f6chten, mit Drag-and-drop-Widgets.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Drag-and-drop-Gantt-Zeitachse.<\/b><span class=\"az-d\">Verschieben, sperren und passen Sie Arbeitsg\u00e4nge direkt auf der Zeitachse manuell an.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Dauervorhersage aus Zeiterfassungen.<\/b><span class=\"az-d\">Gesch\u00e4tzte Schrittzeiten werden anhand Ihrer eigenen Historie realistischer.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Dynamische mehrstufige Priorit\u00e4ten.<\/b><span class=\"az-d\">Gewichten Sie Durchlaufzeit, F\u00e4lligkeitstermine, Kunden und Auftr\u00e4ge, um den Plan zu steuern.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Leistungsgrade.<\/b><span class=\"az-d\">Hinterlegen Sie einen Leistungsgrad pro Station, Mitarbeiter oder Schicht, damit der Plan der Realit\u00e4t entspricht.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Planung mit Materialverf\u00fcgbarkeit.<\/b><span class=\"az-d\">Bestand, Bestellungen und k\u00fcnftige Best\u00e4nde bestimmen mit, wann ein Auftrag laufen kann.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Mobile Zeiterfassung.<\/b><span class=\"az-d\">Bediener starten, stoppen und best\u00e4tigen Arbeit per Smartphone oder Tablet.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Vorw\u00e4rts- und R\u00fcckw\u00e4rtsterminierung.<\/b><span class=\"az-d\">Terminieren Sie vorw\u00e4rts ab heute oder r\u00fcckw\u00e4rts vom F\u00e4lligkeitstermin.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Fertigstellungsgrad des Prozessschritts.<\/b><span class=\"az-d\">Starten Sie den n\u00e4chsten Schritt beispielsweise bei 10% Fertigstellung des vorherigen.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>REST API und Webhooks.<\/b><span class=\"az-d\">Verbinden Sie SkyPlanner in beide Richtungen mit Ihren eigenen Systemen.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Rollierende Zeitsperre.<\/b><span class=\"az-d\">Fixieren Sie die n\u00e4chsten Stunden des Plans, damit sie unver\u00e4ndert bleiben.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Planung von Verkaufschancen.<\/b><span class=\"az-d\">Simulieren Sie ein Angebot gegen die reale Auslastung, um einen Termin zuzusagen, den Sie einhalten k\u00f6nnen.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Optimierung von R\u00fcst- und Abr\u00fcstzeiten.<\/b><span class=\"az-d\">Reihen Sie Auftr\u00e4ge so aneinander, dass weniger Umr\u00fcstzeit zwischen ihnen anf\u00e4llt.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>\u00c4hnliche Auftr\u00e4ge nacheinander.<\/b><span class=\"az-d\">Gruppieren Sie Auftr\u00e4ge mit gleicher Farbe, gleichem Werkzeug oder Material, um Umr\u00fcstungen zu reduzieren.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>SkyPlanner Agent (BETA).<\/b><span class=\"az-d\">Bitten Sie in einfachen Worten darum, Aufgaben auszuf\u00fchren, den Status zu pr\u00fcfen und die Software kennenzulernen.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Planung von Subunternehmern.<\/b><span class=\"az-d\">Externe Arbeit wird wie jede andere Arbeitsstation im Ablauf geplant.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Aufgaben- und Auftragssperren.<\/b><span class=\"az-d\">Fixieren Sie alles, was sich nicht verschieben darf, und der Plan arbeitet darum herum.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Werkzeug- und Formenverwaltung.<\/b><span class=\"az-d\">Ein gemeinsam genutztes Werkzeug oder eine gemeinsam genutzte Form kann nicht an zwei Orten gleichzeitig sein.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Benutzerrollen und Berechtigungen.<\/b><span class=\"az-d\">Geben Sie jeder Person den Zugriff, den ihre Aufgabe erfordert.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>29 Sprachen.<\/b><span class=\"az-d\">Ihr Team arbeitet in der Sprache, die es spricht.<\/span><\/div><\/div>\n    <\/div>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"start\" data-screen-label=\"Implementation ladder\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-head fx-head--center\">\n<p class=\"fx-eyebrow fx-eyebrow--center\">Einfach starten, ausbauen, sobald sich der Nutzen zeigt<\/p>\n<h2 class=\"wp-block-heading\">Klein anfangen, verbinden, wenn Sie bereit sind<\/h2>\n<p>SkyPlanner kann als eigenst\u00e4ndige Planungsumgebung starten und zu einem vernetzten Produktionsplanungs-Workflow wachsen.<\/p>\n    <\/div>\n\n    <div class=\"fx-ladder\">\n      <div class=\"fx-rung\"><div class=\"fx-rung__dot\">1<\/div>\n<p class=\"fx-rung__t\">Mit Demodaten testen<\/p>\n<p class=\"fx-rung__b\">Sehen Sie die Gantt-Zeitachse mit Beispielauftr\u00e4gen.<\/p>\n<\/div>\n      <div class=\"fx-rung\"><div class=\"fx-rung__dot\">2<\/div>\n<p class=\"fx-rung__t\">Arbeitsstationen &amp; Schritte modellieren<\/p>\n<p class=\"fx-rung__b\">Beschreiben Sie Ihre realen Stationen und Ihren Prozessablauf.<\/p>\n<\/div>\n      <div class=\"fx-rung\"><div class=\"fx-rung__dot\">3<\/div>\n<p class=\"fx-rung__t\">Auftr\u00e4ge erstellen oder importieren<\/p>\n<p class=\"fx-rung__b\">Manuell hinzuf\u00fcgen oder aus CSV importieren.<\/p>\n<\/div>\n      <div class=\"fx-rung\"><div class=\"fx-rung__dot\">4<\/div>\n<p class=\"fx-rung__t\">Planen &amp; pr\u00fcfen<\/p>\n<p class=\"fx-rung__b\">F\u00fchren Sie Arcturus aus, pr\u00fcfen und passen Sie den Plan an.<\/p>\n<\/div>\n      <div class=\"fx-rung\"><div class=\"fx-rung__dot\">5<\/div>\n<p class=\"fx-rung__t\">Mehr Tiefe hinzuf\u00fcgen<\/p>\n<p class=\"fx-rung__b\">Materialien, Werkzeuge, Priorit\u00e4ten und Shopfloor-Protokollierung.<\/p>\n<\/div>\n      <div class=\"fx-rung fx-rung--last\"><div class=\"fx-rung__dot\">6<\/div>\n<p class=\"fx-rung__t\">ERP \/ MES verbinden<\/p>\n<p class=\"fx-rung__b\">Integrieren Sie, wenn Sie bereit sind, nicht vorher.<\/p>\n<\/div>\n    <\/div>\n\n    <div class=\"fxv-paths\">\n      <div class=\"fxv-path fxv-path--primary\">\n        <span class=\"fxv-path__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M12 3l8 4.5v9L12 21l-8-4.5v-9L12 3z\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linejoin=\"round\"><\/path><path d=\"M12 12l8-4.5M12 12v9M12 12L4 7.5\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n<h3 class=\"wp-block-heading fxv-path__t\">In Eigenregie<\/h3>\n<p class=\"fxv-path__b\">Kostenlose 30-Tage-Testversion mit Einf\u00fchrung in Eigenregie f\u00fcr bis zu 20 Arbeitsstationen. Demodaten, Videos und der KI-Agent inklusive.<\/p>\n        <a class=\"sp-btn sp-btn--green fxv-path__btn\" href=\"https:\/\/skyplanner.ai\/de\/testversion\/\">Kostenlose Testversion starten<\/a>\n      <\/div>\n      <div class=\"fxv-path\">\n        <span class=\"fxv-path__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><circle cx=\"9\" cy=\"8\" r=\"3.2\" stroke=\"currentColor\" stroke-width=\"1.8\"><\/circle><path d=\"M3.5 19a5.5 5.5 0 0 1 11 0M16 6.5a3 3 0 0 1 0 5.4M16.5 19a5.5 5.5 0 0 0-1.6-3.9\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n<h3 class=\"wp-block-heading fxv-path__t\">Gemeinsam mit uns<\/h3>\n<p class=\"fxv-path__b\">Begleitete Einf\u00fchrung: Ein Experte plant die Einrichtung mit Ihnen, importiert Daten und schult Ihr Team. Der h\u00e4ufigste Weg f\u00fcr gr\u00f6\u00dfere Produktionsumgebungen.<\/p>\n        <a class=\"sp-btn sp-btn--outline fxv-path__btn\" href=\"https:\/\/skyplanner.ai\/de\/assistierte-onboarding-dienste\/\">Begleitete Einf\u00fchrung ansehen<\/a>\n      <\/div>\n      <div class=\"fxv-path\">\n        <span class=\"fxv-path__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M12 2a6 6 0 0 0-6 6c0 4.5 6 12 6 12s6-7.5 6-12a6 6 0 0 0-6-6z\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linejoin=\"round\"><\/path><circle cx=\"12\" cy=\"8\" r=\"2.2\" stroke=\"currentColor\" stroke-width=\"1.8\"><\/circle><\/svg><\/span>\n<h3 class=\"wp-block-heading fxv-path__t\">Mit einem Partner vor Ort<\/h3>\n<p class=\"fxv-path__b\">SkyPlanner-Partner und -Experten sind in mehr als 30 L\u00e4ndern verf\u00fcgbar.<\/p>\n        <a class=\"sp-btn sp-btn--outline fxv-path__btn\" href=\"https:\/\/skyplanner.ai\/de\/kontakt-vertrieb\/\">Lokalen Partner anfragen<\/a>\n      <\/div>\n    <\/div>\n<p class=\"fxv-pathnote\">30 Tage kostenlos. Keine Kreditkarte. Startet auf dem Desktop. Die Einf\u00fchrung in Eigenregie deckt bis zu 20 Arbeitsstationen ab; gr\u00f6\u00dfere Umgebungen laufen \u00fcber die begleitete Einf\u00fchrung.<\/p>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\" data-screen-label=\"FAQ\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-head fx-head--center\">\n<p class=\"fx-eyebrow fx-eyebrow--center\">Fragen, die K\u00e4ufer stellen<\/p>\n<h2 class=\"wp-block-heading\">Die Fragen, die fr\u00fch beantwortet werden sollten<\/h2>\n    <\/div>\n    <div class=\"sp-faq fx-faq\">\n      <div class=\"sp-faq__item\">\n<h3 class=\"wp-block-heading sp-faq__q\">Ben\u00f6tigen wir eine ERP-Integration, um loszulegen?<svg class=\"sp-faq__chev\" viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M4 6l4 4 4-4\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/h3>\n<p class=\"sp-faq__a\">Nein. SkyPlanner funktioniert eigenst\u00e4ndig. Sie k\u00f6nnen Auftr\u00e4ge eintippen oder aus CSV importieren und Ihr ERP sp\u00e4ter \u00fcber die REST API, Webhooks oder ein Integrationsprojekt anbinden. Viele Kunden arbeiten in den ersten Monaten ohne jegliche Integration.<\/p>\n      <\/div>\n      <div class=\"sp-faq__item\">\n<h3 class=\"wp-block-heading sp-faq__q\">Wie lange dauert es, bis wir unsere eigene Produktion eingeplant sehen?<svg class=\"sp-faq__chev\" viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M4 6l4 4 4-4\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/h3>\n<p class=\"sp-faq__a\">Mit Demodaten: Minuten. Mit Ihren eigenen Daten besteht die Arbeit darin, Ihre Arbeitsstationen, Schichten und Produkte mit ihren Prozessschritten zu beschreiben. Eine einfache Produktion ist an einem Tag beschrieben, komplexere Umgebungen dauern l\u00e4nger. Der integrierte KI-Agent, Tutorial-Videos und der Leitfaden \u201eErste Schritte\u201c f\u00fchren Sie hindurch, und eine begleitete Einf\u00fchrung ist verf\u00fcgbar, wenn Sie es lieber mit einem Experten machen m\u00f6chten.<\/p>\n      <\/div>\n      <div class=\"sp-faq__item\">\n<h3 class=\"wp-block-heading sp-faq__q\">\u00c4ndert die KI meinen Plan ohne R\u00fcckfrage?<svg class=\"sp-faq__chev\" viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M4 6l4 4 4-4\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/h3>\n<p class=\"sp-faq__a\">Nur innerhalb der Grenzen, die Sie festlegen. Sie k\u00f6nnen jede Aufgabe oder jeden Auftrag sperren, die n\u00e4chsten Stunden oder Schichten mit der rollierenden Zeitsperre einfrieren und einen neuen Plan vergleichen, bevor Sie ihn akzeptieren. Autopilot ist optional, und selbst wenn er eingeschaltet ist, gelten Ihre Sperren und Regeln immer.<\/p>\n      <\/div>\n      <div class=\"sp-faq__item\">\n<h3 class=\"wp-block-heading sp-faq__q\">Woher wei\u00df Arcturus, was unsere Produktion kann und was nicht?<svg class=\"sp-faq__chev\" viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M4 6l4 4 4-4\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/h3>\n<p class=\"sp-faq__a\">Sie beschreiben es einmal: Arbeitsstationen, Schichten, Prozessschritte und deren Reihenfolge, R\u00fcst- und Abr\u00fcstzeiten, Materialien, Werkzeuge und Subunternehmer. Arcturus behandelt all das als feste Grenzen und plant innerhalb dieser Grenzen.<\/p>\n      <\/div>\n      <div class=\"sp-faq__item\">\n<h3 class=\"wp-block-heading sp-faq__q\">Was kostet SkyPlanner?<svg class=\"sp-faq__chev\" viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M4 6l4 4 4-4\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/h3>\n<p class=\"sp-faq__a\">Pl\u00e4ne beginnen bei 199&nbsp;\u20ac pro Monat inklusive 5 Arbeitsstationen. Auf der Preisseite finden Sie die aktuellen Stufen, was jeweils enthalten ist und die Kosten zus\u00e4tzlicher Arbeitsstationen.<\/p>\n      <\/div>\n      <div class=\"sp-faq__item\">\n<h3 class=\"wp-block-heading sp-faq__q\">Werden unsere Produktionsdaten zum Trainieren von KI-Modellen verwendet?<svg class=\"sp-faq__chev\" viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M4 6l4 4 4-4\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/h3>\n<p class=\"sp-faq__a\">Nein. Arcturus erfordert kein Training mit Ihren Daten und wird w\u00e4hrend des Betriebs nicht mit Kundendaten nachtrainiert. Die Planung l\u00e4uft auf Ihrem eigenen Produktionsmodell und Ihren Regeln.<\/p>\n      <\/div>\n      <div class=\"sp-faq__item\">\n<h3 class=\"wp-block-heading sp-faq__q\">Unsere Produktion ist kompliziert. Subunternehmer, gemeinsam genutzte Formen, Batch-Auftr\u00e4ge. Kann SkyPlanner damit umgehen?<svg class=\"sp-faq__chev\" viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M4 6l4 4 4-4\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/h3>\n<p class=\"sp-faq__a\">Ja, das sind benannte Funktionen, keine Workarounds. Subunternehmer werden wie Arbeitsstationen eingeplant, Werkzeuge und Formen k\u00f6nnen nicht gleichzeitig an zwei Orten sein, und Batch-Auftr\u00e4ge, die Teile aus mehreren Auftr\u00e4gen kombinieren, werden als ein einziger eingeplant.<\/p>\n      <\/div>\n      <div class=\"sp-faq__item\">\n<h3 class=\"wp-block-heading sp-faq__q\">Was ist in der kostenlosen Testversion enthalten?<svg class=\"sp-faq__chev\" viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M4 6l4 4 4-4\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/h3>\n<p class=\"sp-faq__a\">30 Tage, kostenlos, keine Kreditkarte. Die Einf\u00fchrung in Eigenregie deckt bis zu 20 Arbeitsstationen ab. Wenn Ihre Produktion mehr ben\u00f6tigt, empfehlen wir die begleitete Einf\u00fchrung, damit die Einrichtung vom ersten Tag an richtig gemacht wird.<\/p>\n      <\/div>\n      <div class=\"sp-faq__item\">\n<h3 class=\"wp-block-heading sp-faq__q\">Wer entwickelt SkyPlanner?<svg class=\"sp-faq__chev\" viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M4 6l4 4 4-4\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/h3>\n<p class=\"sp-faq__a\">Skycode Oy, ein finnisches Softwareunternehmen in Vaasa, entwickelt SkyPlanner seit 2018. SkyPlanner wird weltweit an Hersteller verkauft und von ihnen genutzt, unterst\u00fctzt 29 Sprachen und hat Partner und Experten in mehr als 30 L\u00e4ndern.<\/p>\n      <\/div>\n      <div class=\"sp-faq__item\">\n<h3 class=\"wp-block-heading sp-faq__q\">Kann SkyPlanner R\u00fcst- und Umr\u00fcstzeiten reduzieren?<svg class=\"sp-faq__chev\" viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M4 6l4 4 4-4\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/h3>\n<p class=\"sp-faq__a\">Ja. Sie geben Produkten Eigenschaften wie Farbe, Material oder Werkzeug, und jede Arbeitsstation kann Auftr\u00e4ge gruppieren, die eine Eigenschaft teilen, sodass Umr\u00fcstungen einmal pro Gruppe erfolgen statt zwischen jedem Auftrag. Es ist eine gewichtete Priorit\u00e4t: Arcturus w\u00e4gt die eingesparte R\u00fcstzeit gegen F\u00e4lligkeitstermine und Ihre anderen Priorit\u00e4ten ab. Viele Fabriken nutzen es f\u00fcr Lackierlinien, Werkzeug- und Formenwechsel sowie Waschvorg\u00e4nge zwischen Materialtypen.<\/p>\n      <\/div>\n      <div class=\"sp-faq__item\">\n<h3 class=\"wp-block-heading sp-faq__q\">Was passiert, wenn die Testversion endet?<svg class=\"sp-faq__chev\" viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M4 6l4 4 4-4\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/h3>\n<p class=\"sp-faq__a\">Es wird nichts berechnet, weil wir nie nach einer Karte gefragt haben. Wenn Sie weitermachen m\u00f6chten, w\u00e4hlen Sie einen Plan auf der Preisseite. Wenn nicht, endet die Testversion einfach.<\/p>\n      <\/div>\n    <\/div>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" data-screen-label=\"Closing quote\" style=\"padding-bottom:0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n<figure class=\"fxv-closequote\">\n<blockquote>\u201eDie Wirksamkeit von SkyPlanner beruht darauf, dass das System einfach funktioniert. Es gibt keine St\u00f6rungen, deren Behebung Zeit frisst.\u201c<\/blockquote>\n<figcaption>\u2014 <b>Tommi M\u00e4nnist\u00f6<\/b>, Produktionsplanungsmanager, Eskomatic Oy<\/figcaption>\n    <\/figure>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" data-screen-label=\"Final CTA\" style=\"padding-bottom:var(--sp-space-30)\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-final\">\n      <div class=\"fx-final__body\">\n<h2 class=\"wp-block-heading\">Sehen Sie Ihre eigene Produktion eingeplant<\/h2>\n<p>Bringen Sie Ihre echten Planungsprobleme in eine Live-Demo mit, und wir zeigen, wie Auftr\u00e4ge, Kapazit\u00e4t, Materialien und Priorit\u00e4ten zu einem einzigen Plan werden, den Sie kontrollieren. Oder \u00fcberspringen Sie den Termin und probieren Sie es noch heute selbst aus.<\/p>\n        <div class=\"fx-final__actions\">\n          <a class=\"sp-btn sp-btn--green sp-btn--lg\" href=\"#start\">Kostenlose Testversion starten<\/a>\n          <a class=\"sp-btn sp-btn--white sp-btn--lg\" href=\"https:\/\/skyplanner.ai\/de\/kontakt-vertrieb\/\">Demo buchen<\/a>\n          <a class=\"sp-btn sp-btn--ghost-onblue sp-btn--lg\" href=\"https:\/\/skyplanner.ai\/de\/videos\/#fulldemo\">Zuerst die 50-min\u00fctige Produkttour ansehen<\/a>\n        <\/div>\n<p class=\"fxv-heromicro\" style=\"color:rgba(255,255,255,0.72)\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>30 Tage kostenlos. Keine Kreditkarte. Startet auf dem Desktop.<\/p>\n      <\/div>\n      <div class=\"fx-final__media\">\n        <img decoding=\"sync\" loading=\"eager\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/34-5e9142a1-876e-46ad-a3e8-eb31a25e2093.png\" alt=\"SkyPlanner-Zeitleiste f\u00fcr die Produktionsplanung mit einer Auftragsliste, die einen echten Kundenplan darstellt.\">\n      <\/div>\n    <\/div>\n  <\/div>\n<\/div><\/section>\n\n<\/div><\/div>\n\n\n","protected":false},"excerpt":{"rendered":"<p>KI-gest\u00fctzte Produktionsplanung f\u00fcr Hersteller In Sekunden geplant. Sie behalten die Kontrolle. SkyPlanner APS verwandelt Ihre Auftr\u00e4ge, Kapazit\u00e4t, Materialien und Priorit\u00e4ten in einen realistischen Plan gegen begrenzte Kapazit\u00e4ten. Arcturus, unsere interne KI-Engine, berechnet ihn in Sekunden und h\u00e4lt ihn aktuell, wenn sich die Produktion \u00e4ndert. Sie entscheiden, was gesperrt, was verschoben und was akzeptiert wird. Kostenlose &#8230; <a title=\"Funktionen\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/de\/funktionen\/\" aria-label=\"Mehr Informationen \u00fcber Funktionen\">Weiterlesen &#8230;<\/a><\/p>\n","protected":false},"author":1,"featured_media":3037,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-3102","page","type-page","status-publish","has-post-thumbnail"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>SkyPlanner APS-Funktionen: KI-gest\u00fctzte Produktionsplanung, Gantt, Autopilot &amp; mehr<\/title>\n<meta name=\"description\" content=\"Sehen Sie jede SkyPlanner APS-Funktion: kapazit\u00e4tsgepr\u00fcfte KI-Feinplanung mit Arcturus, Live-Gantt-Zeitachse, Autopilot-Neuplanung, materialbewusste Planung, Zeiterfassung in der Fertigung und ERP-Integrationen. Kostenlose 30-Tage-Testversion.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/de\/funktionen\/\" \/>\n<meta property=\"og:locale\" content=\"de_DE\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Funktionen\" \/>\n<meta property=\"og:description\" content=\"Sehen Sie jede SkyPlanner APS-Funktion: kapazit\u00e4tsgepr\u00fcfte KI-Feinplanung mit Arcturus, Live-Gantt-Zeitachse, Autopilot-Neuplanung, materialbewusste Planung, Zeiterfassung in der Fertigung und ERP-Integrationen. Kostenlose 30-Tage-Testversion.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/de\/funktionen\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-22T12:38:43+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/03\/Staright-old-production-planning.png\" \/>\n\t<meta property=\"og:image:width\" content=\"956\" \/>\n\t<meta property=\"og:image:height\" content=\"653\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Gesch\u00e4tzte Lesezeit\" \/>\n\t<meta name=\"twitter:data1\" content=\"7\u00a0Minuten\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/funktionen\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/funktionen\\\/\",\"name\":\"SkyPlanner APS-Funktionen: KI-gest\u00fctzte Produktionsplanung, Gantt, Autopilot & mehr\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/funktionen\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/funktionen\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/03\\\/Staright-old-production-planning.png\",\"datePublished\":\"2022-04-21T17:29:20+00:00\",\"dateModified\":\"2026-09-22T12:38:43+00:00\",\"description\":\"Sehen Sie jede SkyPlanner APS-Funktion: kapazit\u00e4tsgepr\u00fcfte KI-Feinplanung mit Arcturus, Live-Gantt-Zeitachse, Autopilot-Neuplanung, materialbewusste Planung, Zeiterfassung in der Fertigung und ERP-Integrationen. Kostenlose 30-Tage-Testversion.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/funktionen\\\/#breadcrumb\"},\"inLanguage\":\"de\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/de\\\/funktionen\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"de\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/funktionen\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/03\\\/Staright-old-production-planning.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/03\\\/Staright-old-production-planning.png\",\"width\":956,\"height\":653,\"caption\":\"SkyPlanner APS - Production planning and scheduling with AI\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/funktionen\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Funktionen\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"de\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"de\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/de\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"SkyPlanner APS-Funktionen: KI-gest\u00fctzte Produktionsplanung, Gantt, Autopilot & mehr","description":"Sehen Sie jede SkyPlanner APS-Funktion: kapazit\u00e4tsgepr\u00fcfte KI-Feinplanung mit Arcturus, Live-Gantt-Zeitachse, Autopilot-Neuplanung, materialbewusste Planung, Zeiterfassung in der Fertigung und ERP-Integrationen. Kostenlose 30-Tage-Testversion.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/de\/funktionen\/","og_locale":"de_DE","og_type":"article","og_title":"Funktionen","og_description":"Sehen Sie jede SkyPlanner APS-Funktion: kapazit\u00e4tsgepr\u00fcfte KI-Feinplanung mit Arcturus, Live-Gantt-Zeitachse, Autopilot-Neuplanung, materialbewusste Planung, Zeiterfassung in der Fertigung und ERP-Integrationen. Kostenlose 30-Tage-Testversion.","og_url":"https:\/\/skyplanner.ai\/de\/funktionen\/","og_site_name":"SkyPlanner","article_modified_time":"2026-09-22T12:38:43+00:00","og_image":[{"width":956,"height":653,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/03\/Staright-old-production-planning.png","type":"image\/png"}],"twitter_card":"summary_large_image","twitter_misc":{"Gesch\u00e4tzte Lesezeit":"7\u00a0Minuten"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/de\/funktionen\/","url":"https:\/\/skyplanner.ai\/de\/funktionen\/","name":"SkyPlanner APS-Funktionen: KI-gest\u00fctzte Produktionsplanung, Gantt, Autopilot & mehr","isPartOf":{"@id":"https:\/\/skyplanner.ai\/de\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/de\/funktionen\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/de\/funktionen\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/03\/Staright-old-production-planning.png","datePublished":"2022-04-21T17:29:20+00:00","dateModified":"2026-09-22T12:38:43+00:00","description":"Sehen Sie jede SkyPlanner APS-Funktion: kapazit\u00e4tsgepr\u00fcfte KI-Feinplanung mit Arcturus, Live-Gantt-Zeitachse, Autopilot-Neuplanung, materialbewusste Planung, Zeiterfassung in der Fertigung und ERP-Integrationen. Kostenlose 30-Tage-Testversion.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/de\/funktionen\/#breadcrumb"},"inLanguage":"de","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/de\/funktionen\/"]}]},{"@type":"ImageObject","inLanguage":"de","@id":"https:\/\/skyplanner.ai\/de\/funktionen\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/03\/Staright-old-production-planning.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/03\/Staright-old-production-planning.png","width":956,"height":653,"caption":"SkyPlanner APS - Production planning and scheduling with AI"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/de\/funktionen\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/de\/"},{"@type":"ListItem","position":2,"name":"Funktionen"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/de\/#website","url":"https:\/\/skyplanner.ai\/de\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/de\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/de\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"de"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/de\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/de\/","logo":{"@type":"ImageObject","inLanguage":"de","@id":"https:\/\/skyplanner.ai\/de\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/de\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/03\/Staright-old-production-planning.png",956,653,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/03\/Staright-old-production-planning-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/03\/Staright-old-production-planning-300x205.png",300,205,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/03\/Staright-old-production-planning-768x525.png",768,525,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/03\/Staright-old-production-planning.png",956,653,false],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/03\/Staright-old-production-planning.png",956,653,false],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/03\/Staright-old-production-planning.png",956,653,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/03\/Staright-old-production-planning.png",360,246,false]},"uagb_author_info":{"display_name":"skyplanner","author_link":"https:\/\/skyplanner.ai\/de\/author\/skyplanner\/"},"uagb_comment_info":0,"uagb_excerpt":"KI-gest\u00fctzte Produktionsplanung f\u00fcr Hersteller In Sekunden geplant. Sie behalten die Kontrolle. SkyPlanner APS verwandelt Ihre Auftr\u00e4ge, Kapazit\u00e4t, Materialien und Priorit\u00e4ten in einen realistischen Plan gegen begrenzte Kapazit\u00e4ten. Arcturus, unsere interne KI-Engine, berechnet ihn in Sekunden und h\u00e4lt ihn aktuell, wenn sich die Produktion \u00e4ndert. Sie entscheiden, was gesperrt, was verschoben und was akzeptiert wird. Kostenlose&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/de\/wp-json\/wp\/v2\/pages\/3102","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/de\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/de\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/de\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/de\/wp-json\/wp\/v2\/comments?post=3102"}],"version-history":[{"count":3,"href":"https:\/\/skyplanner.ai\/de\/wp-json\/wp\/v2\/pages\/3102\/revisions"}],"predecessor-version":[{"id":95800,"href":"https:\/\/skyplanner.ai\/de\/wp-json\/wp\/v2\/pages\/3102\/revisions\/95800"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/de\/wp-json\/wp\/v2\/media\/3037"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/de\/wp-json\/wp\/v2\/media?parent=3102"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}