{"id":96584,"date":"2026-10-08T07:53:30","date_gmt":"2026-10-08T07:53:30","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=96584"},"modified":"2026-10-19T14:43:24","modified_gmt":"2026-10-19T14:43:24","slug":"ordreproduktion","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/da\/ressourcer\/ordreproduktion\/","title":{"rendered":"Ordreproduktion: mindre lager, bedre leveringsl\u00f8fter"},"content":{"rendered":"<div class=\"gb-container gb-container-mto01 article-main-content-container\">\n<div class=\"gb-container gb-container-mto01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Ordreproduktion: mindre lager, bedre leveringsl\u00f8fter<\/h1>\n\n<div class=\"gb-container gb-container-mto02\">\n<div class=\"gb-container gb-container-mto02\">\n\n<p><a href=\"\/da\/\">Hjem<\/a> &raquo; <a href=\"\/da\/ressourcer\/\">Ressourcer<\/a> &raquo; Ordreproduktion: mindre lager, bedre leveringsl\u00f8fter<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__descriptive-text\">Ansl\u00e5et l\u00e6setid: <\/span><span class=\"yoast-reading-time__reading-time\">8<\/span><span class=\"yoast-reading-time__time-unit\"> Minutter<\/span><\/p>\n\n<\/div>\n<\/div>\n<div class=\"gb-container gb-container-mto03\">\n<div class=\"gb-container gb-container-mto03\">\n\n<p>En kunde bestiller et kabinet i en st\u00f8rrelse, du sj\u00e6ldent s\u00e6lger. Det giver mening f\u00f8rst at fremstille det, n\u00e5r ordren er kommet ind: Du undg\u00e5r at fylde lageret med varianter, som m\u00e5ske aldrig bliver solgt. Men kunden vil stadig have en leveringsdato, og ressourcen til overfladebehandling er allerede fuldt booket.<\/p>\n\n\n<p>Det er den centrale afvejning ved <strong>ordreproduktion<\/strong>. Du producerer f\u00e6rre f\u00e6rdigvarer til lager p\u00e5 forh\u00e5nd, men kunderne m\u00e5 vente, mens deres ordrer g\u00e5r gennem produktionen. Det afg\u00f8rende er at vide, hvad der er plads til i fabrikken \u2013 ikke kun hvad du kan fremstille.<\/p>\n\n\n<p>SkyPlanner giver dig en praktisk m\u00e5de at h\u00e5ndtere den afvejning p\u00e5. Arcturus, systemets kunstige intelligens til detailplanl\u00e6gning, beregner produktionsr\u00e6kkef\u00f8lgen ud fra din kapacitet, dine materialer og dine prioriteter. Du kan se planen p\u00e5 en Gantt-tidslinje og love leveringsdatoer med et klarere overblik over det arbejde, der ligger forude.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Hvad betyder ordreproduktion?<\/h2>\n\n\n<p>Ordreproduktion (MTO) er en produktionsstrategi, hvor en kundeordre s\u00e6tter fremstillingen i gang. I stedet for at producere f\u00e6rdigvarer ud fra den forventede eftersp\u00f8rgsel og s\u00e6lge dem fra lager fremstiller du produkterne i den m\u00e6ngde og efter den specifikation, kunden har bestilt.<\/p>\n\n\n<p>Produktet beh\u00f8ver ikke at v\u00e6re en helt ny konstruktion. En producent kan bruge et eksisterende design, en stykliste og en produktionsrute og derefter fremstille en bestemt st\u00f8rrelse, overflade eller seriest\u00f8rrelse p\u00e5 bestilling. Det afg\u00f8rende er <strong>hvad der s\u00e6tter produktionen i gang<\/strong>, ikke hvor unikt produktet er.<\/p>\n\n\n<p>Forestil dig en pladebearbejdningsvirksomhed, der tilbyder kabinetter til udstyr i forskellige dimensioner og med forskellige overfladebehandlinger. Virksomheden har g\u00e6ngse pladematerialer p\u00e5 lager, men begynder f\u00f8rst at sk\u00e6re, bukke og overfladebehandle et kabinet, n\u00e5r kundens ordre er modtaget. Det er MTO: R\u00e5materialet kan godt v\u00e6re p\u00e5 lager, selv om det f\u00e6rdige kabinet ikke er det.<\/p>\n\n\n<p>En nyttig m\u00e5de at skelne mellem produktionsstrategierne p\u00e5 er at sp\u00f8rge, hvad der stadig skal g\u00f8res, n\u00e5r ordren kommer ind:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Strategi<\/th><th>Arbejde, som kundeordren s\u00e6tter i gang<\/th><th>Centralt sp\u00f8rgsm\u00e5l i planl\u00e6gningen<\/th><\/tr><\/thead><tbody><tr><td>Lagerproduktion (MTS)<\/td><td>Plukke og sende et f\u00e6rdigt produkt, der er fremstillet til forventet eftersp\u00f8rgsel<\/td><td>Hvilke f\u00e6rdigvarer skal vi have p\u00e5 lager, og i hvilke m\u00e6ngder?<\/td><\/tr><tr><td><a href=\"\/da\/ressourcer\/montage-efter-ordre\/\">Montage efter ordre (ATO)<\/a><\/td><td>Samle det f\u00e6rdige produkt af klargjorte komponenter eller delmontager<\/td><td>Er de n\u00f8dvendige komponenter og montagekapaciteten til r\u00e5dighed?<\/td><\/tr><tr><td>Ordreproduktion (MTO)<\/td><td>Fremstille det bestilte produkt ud fra et eksisterende design og en fastlagt rute<\/td><td>Hvorn\u00e5r er der plads til de n\u00f8dvendige operationer i produktionen?<\/td><\/tr><tr><td><a href=\"\/da\/ressourcer\/engineer-to-order\/\">Engineer to order (ETO)<\/a><\/td><td>Designe eller konstruere produktet og derefter fremstille det<\/td><td>Hvorn\u00e5r er konstruktionen klar, og hvilket arbejde kr\u00e6ver den?<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>MTO er heller ikke det samme som en job shop. MTO beskriver ordrens rolle i at s\u00e6tte produktionen i gang, mens en job shop er et produktionsmilj\u00f8, hvor opgaver kan f\u00f8lge forskellige ruter gennem f\u00e6lles ressourcer. En fabrik kan v\u00e6re begge dele. Vores <a href=\"\/da\/ressourcer\/planlaegning-af-ordreproduktion\/\">guide til detailplanl\u00e6gning i en job shop<\/a> gennemg\u00e5r denne udfordring med forskellige produktionsruter.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Hvorn\u00e5r er ordreproduktion det rette valg?<\/h2>\n\n\n<p>MTO er attraktivt, n\u00e5r det er dyrt at have alle f\u00e6rdige varianter p\u00e5 lager, eftersp\u00f8rgslen efter de enkelte varianter er uj\u00e6vn, og kunderne er villige til at vente p\u00e5 produktionen. Det giver dig mulighed for at tilbyde et bredere sortiment uden at fremstille alle mulige produkter p\u00e5 forh\u00e5nd.<\/p>\n\n\n<p>Fordelen er tydeligst p\u00e5 f\u00e6rdigvarelageret: F\u00e6rre produkter ligger usolgte hen, fordi du har sk\u00f8nnet forkert p\u00e5 fordelingen mellem varianterne. Arbejdet er knyttet til en konkret kundeordre, som kan angive de \u00f8nskede dimensioner, materialer eller overfladebehandlinger.<\/p>\n\n\n<p>Prisen er genneml\u00f8bstiden. Ved MTS kan produktet allerede v\u00e6re klar til afsendelse. Ved MTO omfatter kundens ventetid b\u00e5de fremstillingen og k\u00f8erne mellem operationerne. Ordretilgangen kan ogs\u00e5 give en uj\u00e6vn belastning: En stille uge kan blive fulgt af flere ordrer, der konkurrerer om den samme ressource.<\/p>\n\n\n<p><strong>MTO betyder ikke, at lageret er tomt, eller at de samlede omkostninger automatisk bliver lavere.<\/strong> Der kan stadig v\u00e6re behov for r\u00e5varer, indk\u00f8bte dele og varer under fremstilling. Sm\u00e5 serier kan kr\u00e6ve hyppige omstillinger. Hvis kunderne har brug for omg\u00e5ende afsendelse og regelm\u00e6ssigt k\u00f8ber det samme standardprodukt, kan <a href=\"\/da\/ressourcer\/produktion-til-lager\/\">lagerproduktion af det p\u00e5g\u00e6ldende produkt<\/a> v\u00e6re et bedre valg.<\/p>\n\n\n<p>Du beh\u00f8ver ikke at tvinge hele fabrikken ind i \u00e9n model. Standardprodukter kan produceres til lager, mens varianter med mere uforudsigelig eftersp\u00f8rgsel fremstilles p\u00e5 ordre. En <a href=\"\/da\/ressourcer\/master-production-schedule\/\">hovedproduktionsplan<\/a> hj\u00e6lper med at koble det samlede produktsortiment til det arbejde, produktionen skal udf\u00f8re.<\/p>\n\n\n<h2 class=\"wp-block-heading\">En ordre skal have plads i planen, ikke kun en leveringsdato<\/h2>\n\n\n<p>Lad os vende tilbage til den t\u00e6nkte kabinetproducent. En ny ordre skal sk\u00e6res, bukkes og overfladebehandles. Materialet er klar, og der er ledig kapacitet til sk\u00e6ring, s\u00e5 salgsafdelingen er fristet til at love hurtig levering. Men kapaciteten til overfladebehandling er allerede reserveret til andre kunder.<\/p>\n\n\n<p>Det l\u00f8ser ikke konflikten at begynde sk\u00e6ringen med det samme. Det skaber m\u00e5ske blot endnu en del, der venter p\u00e5 overfladebehandling. Det relevante sp\u00f8rgsm\u00e5l er, om <strong>hele produktionsruten<\/strong> kan gennemf\u00f8res til tiden sammen med de ordrer, du allerede har lovet at levere.<\/p>\n\n\n<p>Saml disse oplysninger for hver ny ordre:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Det n\u00f8dvendige arbejde:<\/strong> den korrekte specifikation, m\u00e6ngde og operationsr\u00e6kkef\u00f8lge samt bearbejdnings- og omstillingstider.<\/li><li><strong>De ressourcer, der kan udf\u00f8re arbejdet:<\/strong> egnede arbejdsstationer, skiftehold, operat\u00f8rer og eventuelt n\u00f8dvendigt v\u00e6rkt\u00f8j.<\/li><li><strong>Materialernes tilg\u00e6ngelighed:<\/strong> den aktuelle lagerbeholdning og det tidspunkt, hvor indk\u00f8bte materialer eller komponenter forventes at v\u00e6re til r\u00e5dighed.<\/li><li><strong>Eksisterende forpligtelser:<\/strong> de operationer, der allerede konkurrerer om ressourcerne, og deres prioriteter.<\/li><li><strong>Tiden frem til levering:<\/strong> tid til de resterende produktionstrin samt kontrol, pakning og transport, hvor det er n\u00f8dvendigt.<\/li><\/ul>\n\n\n<p><a href=\"\/da\/ressourcer\/produktionsordre\/\">Produktionsordren<\/a> indeholder oplysningerne om, hvordan opgaven skal udf\u00f8res. <a href=\"\/da\/ressourcer\/hvad-er-finplanlaegning-i-produktionen\/\">Detailplanl\u00e6gning<\/a> kobler arbejdet til den tid, der er til r\u00e5dighed. En \u00f8nsket leveringsdato g\u00f8r ingen af delene i sig selv.<\/p>\n\n\n<p>Hvis den \u00f8nskede dato ikke kan passes ind, skal du stadig tr\u00e6ffe en beslutning. En anden egnet arbejdsstation, et \u00e6ndret skiftehold eller en anden prioritet kan hj\u00e6lpe. Ellers m\u00e5 du aftale en senere dato, inden kunden baserer sine planer p\u00e5 et l\u00f8fte, du ikke kan holde. Hvis en f\u00e6lles operation gentagne gange forsinker leverancerne, b\u00f8r du unders\u00f8ge <a href=\"\/da\/ressourcer\/flaskehals-i-produktionen\/\">flaskehalsen i produktionen<\/a> frem for at frigive mere arbejde til k\u00f8en.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Lad SkyPlanner beregne planen, mens du fastl\u00e6gger prioriteterne<\/h2>\n\n\n<p>Udfordringen er ikke at kontrollere oplysningerne \u00e9n gang, men at bevare sammenh\u00e6ngen mellem dem, n\u00e5r nye ordrer kommer ind, datoerne for materialernes tilg\u00e6ngelighed \u00e6ndres, og produktionen tager l\u00e6ngere tid end planlagt. N\u00e5r hver opgave flyttes manuelt mellem maskinernes k\u00f8er, f\u00e5r planl\u00e6ggeren ansvaret for b\u00e5de at holde beregningen ajour og tr\u00e6ffe beslutningerne.<\/p>\n\n\n<p><a href=\"\/da\/\">SkyPlanner APS<\/a> overtager beregningen af produktionsplanen. Du definerer arbejdsstationer, skiftehold, operat\u00f8rer, materialer og prioriteter og angiver procestrin og varigheder for hvert produkt. Arcturus planl\u00e6gger arbejdet ud fra den konfigurerede kapacitet og de fastlagte afh\u00e6ngigheder. Gantt-visningen viser r\u00e6kkef\u00f8lgen p\u00e5 tv\u00e6rs af arbejdsstationerne, s\u00e5 du kan f\u00f8lge kabinettet fra sk\u00e6ring til overfladebehandling i stedet for at kontrollere hver k\u00f8 for sig.<\/p>\n\n\n<p>I eksemplet med kabinetterne betyder det, at belastningen p\u00e5 overfladebehandlingen indg\u00e5r i planen fra starten. Hvis en hasteordre skal have forrang, \u00e6ndrer du prioriteten og genberegner planen. Derefter ser du, hvorn\u00e5r de \u00f8vrige ordrer nu bliver f\u00e6rdige, f\u00f8r du bekr\u00e6fter det nye leveringsl\u00f8fte. Fordelen er ikke kun et hurtigere svar til \u00e9n kunde: Du kan se, hvad svaret betyder for de kunder, der allerede venter.<\/p>\n\n\n<p>Planl\u00e6gning med hensyn til materialer tager endnu en almindelig MTO-udfordring med i samme beregning. N\u00e5r denne regel er aktiveret, tager Arcturus hensyn til materialernes tilg\u00e6ngelighed i stedet for at planl\u00e6gge, som om alle materialer er klar. Leveringsdatoerne p\u00e5 indk\u00f8bsordrer angiver, hvorn\u00e5r materialerne forventes at v\u00e6re til r\u00e5dighed; n\u00e5r du bekr\u00e6fter, at materialerne er modtaget, opdateres lagerbeholdningen. Det er vigtigt at holde datoerne ajour, n\u00e5r en leverand\u00f8rforsinkelse \u00e6ndrer, hvad der kan produceres som det n\u00e6ste.<\/p>\n\n\n<p>Du bestemmer fortsat prioriteterne og bruger l\u00e5sninger til at fastholde dine planl\u00e6gningsbeslutninger. Arcturus beregner planen inden for de rammer. Systemet kan ikke skabe manglende fysisk kapacitet, men det kan give dig et klarere grundlag for at beslutte, om du skal \u00e6ndre planen eller leveringsl\u00f8ftet.<\/p>\n\n\n<p>SkyPlanner kan integreres med ethvert ERP- eller MES-system via sit \u00e5bne REST API. Du kan koble eksisterende ordre- og produktionsdata til planen uden at g\u00f8re en udskiftning af ERP-systemet til foruds\u00e6tningen for bedre MTO-planl\u00e6gning.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Hvilken forskel overblikket over kapaciteten gjorde hos Fredman Operations<\/h2>\n\n\n<p>Fredman Operations, der fremstiller f\u00f8devaresikre k\u00f8kken- og emballagel\u00f8sninger, havde brug for et klarere overblik over kapaciteten, efterh\u00e5nden som ordrem\u00e6ngden voksede. Arbejdskort blev overf\u00f8rt manuelt fra virksomhedens L7 ERP til produktionsstyringen i LTR, og planl\u00e6ggeren prioriterede opgaver uden pr\u00e6cist at kunne se, hvorn\u00e5r maskinerne blev ledige, eller hvor meget kapacitet der var p\u00e5 de enkelte skiftehold. En akut omplanl\u00e6gning kunne tage en time eller mere.<\/p>\n\n\n<p>Virksomheden valgte SkyPlanner p\u00e5 grund af den overskuelige, f\u00e6lles Gantt-visning og koblede sine L7- og LTR-systemer sammen. Maskiner, ledig og booket kapacitet samt opgavernes fremdrift blev nu synlige i \u00e9t samlet overblik. Produktionsmedarbejderne kunne se planlagte start- og sluttider, mens salgsafdelingen fik et bedre grundlag for at love leveringsdatoer.<\/p>\n\n\n<p>I Fredmans kundehistorie beskriver virksomheden mindre overarbejde og hurtigere reaktioner p\u00e5 \u00e6ndringer i planen. For en virksomhed med ordreproduktion er den relevante pointe sammenh\u00e6ngen mellem produktion og salg: Et leveringsl\u00f8fte er lettere at st\u00e5 inde for, n\u00e5r alle kan se kapaciteten bag det. <a href=\"\/da\/kundehistorier\/fredman-operations\/\">L\u00e6s kundehistorien om Fredman Operations<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Se, hvor din n\u00e6ste ordre kan passe ind<\/h2>\n\n\n<p>Ordreproduktion hj\u00e6lper dig med at undg\u00e5 at opbygge et lager af de forkerte f\u00e6rdigvarer. En realistisk produktionsplan hj\u00e6lper dig med at undg\u00e5, at lagerproblemet blot bliver erstattet af en ophobning af forsinkede kundeordrer.<\/p>\n\n\n<p><a href=\"\/da\/kontakt-salg\/\">Book en demo<\/a> for at se, hvordan SkyPlanner kan h\u00e5ndtere din produktion. Medbring en typisk produktionsrute, den ressource, flest ordrer konkurrerer om, og et eksempel p\u00e5 en nylig \u00e6ndring, der rykkede leveringsdatoerne. Det giver os et godt udgangspunkt for at vise, hvordan Arcturus og Gantt-planen kan g\u00f8re din hverdag som planl\u00e6gger lettere.<\/p>\n\n\n<p>Vil du hellere udforske systemet f\u00f8rst? <a href=\"\/da\/proeveperiode\/\">Pr\u00f8v SkyPlanner med demodata<\/a>, og se, hvordan ordrer og kapacitet h\u00e6nger sammen i planen.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ofte stillede sp\u00f8rgsm\u00e5l<\/h2>\n\n\n<h3 class=\"wp-block-heading\">Betyder ordreproduktion, at hvert produkt er specialdesignet?<\/h3>\n\n\n<p>Nej. Et MTO-produkt kan bygge p\u00e5 et eksisterende design og en fast produktionsrute, hvor fremstillingen f\u00f8rst g\u00e5r i gang, n\u00e5r kunden afgiver en ordre. Hvis ordren ogs\u00e5 s\u00e6tter nyt konstruktionsarbejde i gang, er ordrebaseret konstruktion en mere passende betegnelse.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kan en virksomhed med ordreproduktion have materialer p\u00e5 lager?<\/h3>\n\n\n<p>Ja. MTO beskriver, hvorn\u00e5r fremstillingen s\u00e6ttes i gang, og udelukker ikke lagerbeholdninger. Almindelige r\u00e5materialer og indk\u00f8bte dele kan holdes p\u00e5 lager, s\u00e5 produktionen kan starte hurtigere. Det f\u00e6rdige produkt fremstilles til en kundeordre og ikke ud fra en prognose for eftersp\u00f8rgslen efter f\u00e6rdigvarer.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Hvorfor kan leveringsdatoerne \u00e6ndre sig ved ordreproduktion?<\/h3>\n\n\n<p>Ordrerne deler ressourcer. Forsinkede materialer, tab af kapacitet eller \u00e6ndrede prioriteter kan forskyde en operation og p\u00e5virke det efterf\u00f8lgende arbejde. N\u00e5r planen genberegnes, bliver konsekvenserne synlige, s\u00e5 planl\u00e6ggeren kan reagere og om n\u00f8dvendigt justere de lovede leveringsdatoer.<\/p>\n\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n\n<script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"Does make to order mean every product is custom-designed?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"No. An MTO product can use an established design and production route, with manufacturing starting only after the customer places an order. If that order also triggers new product engineering, engineer to order is the more appropriate description.\"}},{\"@type\":\"Question\",\"name\":\"Can a make-to-order manufacturer keep materials in stock?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Yes. MTO describes when manufacturing is triggered, not a ban on inventory. Common raw materials and purchased parts can be stocked so production can start sooner. The finished product is made for a customer order rather than for forecast finished-goods demand.\"}},{\"@type\":\"Question\",\"name\":\"Why can make-to-order delivery dates change?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Orders share resources. A material delay, lost capacity or priority change can move an operation and affect later work. Recalculating the schedule makes those consequences visible so the planner can respond and update commitments when needed.\"}}]}<\/script>\n\n","protected":false},"excerpt":{"rendered":"<p>Ordreproduktion: mindre lager, bedre leveringsl\u00f8fter Hjem &raquo; Ressourcer &raquo; Ordreproduktion: mindre lager, bedre leveringsl\u00f8fter En kunde bestiller et kabinet i en st\u00f8rrelse, du sj\u00e6ldent s\u00e6lger. Det giver mening f\u00f8rst at fremstille det, n\u00e5r ordren er kommet ind: Du undg\u00e5r at fylde lageret med varianter, som m\u00e5ske aldrig bliver solgt. Men kunden vil stadig have en &#8230; <a title=\"Ordreproduktion: mindre lager, bedre leveringsl\u00f8fter\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/da\/ressourcer\/ordreproduktion\/\" aria-label=\"Read more about Ordreproduktion: mindre lager, bedre leveringsl\u00f8fter\">L\u00e6s Mere<\/a><\/p>\n","protected":false},"author":3,"featured_media":97068,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2519,307],"tags":[],"class_list":["post-96584","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-og-planlaegning","category-ressourcer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Ordreproduktion: mindre lager, bedre leveringsl\u00f8fter &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"Ordreproduktion mindsker f\u00e6rdigvarelageret, men kr\u00e6ver trov\u00e6rdige leveringsdatoer. Se, hvordan SkyPlanner oms\u00e6tter ordrebogen til en realistisk plan.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/da\/ressourcer\/ordreproduktion\/\" \/>\n<meta property=\"og:locale\" content=\"da_DK\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ordreproduktion: mindre lager, bedre leveringsl\u00f8fter\" \/>\n<meta property=\"og:description\" content=\"Ordreproduktion mindsker f\u00e6rdigvarelageret, men kr\u00e6ver trov\u00e6rdige leveringsdatoer. Se, hvordan SkyPlanner oms\u00e6tter ordrebogen til en realistisk plan.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/da\/ressourcer\/ordreproduktion\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-08T07:53:30+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-19T14:43:24+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Skrevet af\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimeret l\u00e6setid\" \/>\n\t<meta name=\"twitter:data2\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/ordreproduktion\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/ordreproduktion\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Ordreproduktion: mindre lager, bedre leveringsl\u00f8fter\",\"datePublished\":\"2026-10-08T07:53:30+00:00\",\"dateModified\":\"2026-10-19T14:43:24+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/ordreproduktion\\\/\"},\"wordCount\":1971,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/ordreproduktion\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-make-to-order-hero.png\",\"articleSection\":[\"APS og planl\u00e6gning\",\"ressourcer\"],\"inLanguage\":\"da-DK\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/ordreproduktion\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/ordreproduktion\\\/\",\"name\":\"Ordreproduktion: mindre lager, bedre leveringsl\u00f8fter &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/ordreproduktion\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/ordreproduktion\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-make-to-order-hero.png\",\"datePublished\":\"2026-10-08T07:53:30+00:00\",\"dateModified\":\"2026-10-19T14:43:24+00:00\",\"description\":\"Ordreproduktion mindsker f\u00e6rdigvarelageret, men kr\u00e6ver trov\u00e6rdige leveringsdatoer. Se, hvordan SkyPlanner oms\u00e6tter ordrebogen til en realistisk plan.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/ordreproduktion\\\/#breadcrumb\"},\"inLanguage\":\"da-DK\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/ordreproduktion\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"da-DK\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/ordreproduktion\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-make-to-order-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-make-to-order-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"One custom housing waits while another occupies the finishing resource needed to complete both orders.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/ordreproduktion\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Ordreproduktion: mindre lager, bedre leveringsl\u00f8fter\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"da-DK\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"da-DK\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"da-DK\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Ordreproduktion: mindre lager, bedre leveringsl\u00f8fter &#8211; SkyPlanner","description":"Ordreproduktion mindsker f\u00e6rdigvarelageret, men kr\u00e6ver trov\u00e6rdige leveringsdatoer. Se, hvordan SkyPlanner oms\u00e6tter ordrebogen til en realistisk plan.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/da\/ressourcer\/ordreproduktion\/","og_locale":"da_DK","og_type":"article","og_title":"Ordreproduktion: mindre lager, bedre leveringsl\u00f8fter","og_description":"Ordreproduktion mindsker f\u00e6rdigvarelageret, men kr\u00e6ver trov\u00e6rdige leveringsdatoer. Se, hvordan SkyPlanner oms\u00e6tter ordrebogen til en realistisk plan.","og_url":"https:\/\/skyplanner.ai\/da\/ressourcer\/ordreproduktion\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-08T07:53:30+00:00","article_modified_time":"2026-10-19T14:43:24+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Skrevet af":"Jussi M\u00e4ntyl\u00e4","Estimeret l\u00e6setid":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/ordreproduktion\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/ordreproduktion\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/da\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Ordreproduktion: mindre lager, bedre leveringsl\u00f8fter","datePublished":"2026-10-08T07:53:30+00:00","dateModified":"2026-10-19T14:43:24+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/ordreproduktion\/"},"wordCount":1971,"publisher":{"@id":"https:\/\/skyplanner.ai\/da\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/ordreproduktion\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png","articleSection":["APS og planl\u00e6gning","ressourcer"],"inLanguage":"da-DK"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/ordreproduktion\/","url":"https:\/\/skyplanner.ai\/da\/ressourcer\/ordreproduktion\/","name":"Ordreproduktion: mindre lager, bedre leveringsl\u00f8fter &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/da\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/ordreproduktion\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/ordreproduktion\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png","datePublished":"2026-10-08T07:53:30+00:00","dateModified":"2026-10-19T14:43:24+00:00","description":"Ordreproduktion mindsker f\u00e6rdigvarelageret, men kr\u00e6ver trov\u00e6rdige leveringsdatoer. Se, hvordan SkyPlanner oms\u00e6tter ordrebogen til en realistisk plan.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/ordreproduktion\/#breadcrumb"},"inLanguage":"da-DK","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/da\/ressourcer\/ordreproduktion\/"]}]},{"@type":"ImageObject","inLanguage":"da-DK","@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/ordreproduktion\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png","width":1672,"height":941,"caption":"One custom housing waits while another occupies the finishing resource needed to complete both orders."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/ordreproduktion\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/da\/"},{"@type":"ListItem","position":2,"name":"Ordreproduktion: mindre lager, bedre leveringsl\u00f8fter"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/da\/#website","url":"https:\/\/skyplanner.ai\/da\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/da\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/da\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"da-DK"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/da\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/da\/","logo":{"@type":"ImageObject","inLanguage":"da-DK","@id":"https:\/\/skyplanner.ai\/da\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/da\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/da\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"da-DK","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/da\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Ordreproduktion: mindre lager, bedre leveringsl\u00f8fter Hjem &raquo; Ressourcer &raquo; Ordreproduktion: mindre lager, bedre leveringsl\u00f8fter En kunde bestiller et kabinet i en st\u00f8rrelse, du sj\u00e6ldent s\u00e6lger. Det giver mening f\u00f8rst at fremstille det, n\u00e5r ordren er kommet ind: Du undg\u00e5r at fylde lageret med varianter, som m\u00e5ske aldrig bliver solgt. Men kunden vil stadig have en&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/posts\/96584","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/comments?post=96584"}],"version-history":[{"count":2,"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/posts\/96584\/revisions"}],"predecessor-version":[{"id":96874,"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/posts\/96584\/revisions\/96874"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/media\/97068"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/media?parent=96584"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/categories?post=96584"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/tags?post=96584"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}