{"id":111690,"date":"2026-10-28T03:02:21","date_gmt":"2026-10-28T03:02:21","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=111690"},"modified":"2026-10-28T03:02:38","modified_gmt":"2026-10-28T03:02:38","slug":"tokassesystem","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/da\/ressourcer\/tokassesystem\/","title":{"rendered":"Tokassesystem: Hold sm\u00e5dele klar til produktionen"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Tokassesystem: Hold sm\u00e5dele klar til produktionen<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/da\/\">Hjem<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/da\/ressourcer\/\">Ressourcer<\/a> &raquo; Tokassesystem: Hold sm\u00e5dele klar til produktionen<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Ansl\u00e5et l\u00e6setid: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> Minutter<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>En montagestation l\u00f8ber t\u00f8r for en lille del. Der er flere p\u00e5 lager et sted p\u00e5 fabrikken, men nogen skal finde dem, bede om genopfyldning og bringe dem hen til operat\u00f8ren. En billig komponent har netop kostet v\u00e6rdifuld produktionstid.<\/p>\n\n\n<p>Et tokassesystem synligg\u00f8r behovet, f\u00f8r arbejdsstationen l\u00f8ber t\u00f8r. Operat\u00f8rerne tager dele fra \u00e9n kasse, mens den anden st\u00e5r klar som reserve. N\u00e5r den f\u00f8rste kasse er tom, udl\u00f8ser det genopfyldning. Den anden forsyner produktionen, indtil nye dele er fremme.<\/p>\n\n\n<p>Det afg\u00f8rende er ikke, om I har to kasser, men om genopfyldningen n\u00e5r tilbage, f\u00f8r reserven er brugt op. For dele, I fremstiller p\u00e5 maskiner, som ogs\u00e5 bruges til andre opgaver, hj\u00e6lper SkyPlanner APS jer med at besvare det sp\u00f8rgsm\u00e5l. Systemet planl\u00e6gger accepterede genopfyldningsopgaver sammen med kundeordrerne, s\u00e5 de ikke blot st\u00e5r p\u00e5 en s\u00e6rskilt genopfyldningsliste.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Hvad er et tokassesystem?<\/h2>\n\n\n<p>Et <strong>tokassesystem<\/strong> er en visuel metode til genopfyldning, hvor to fastlagte m\u00e6ngder af samme vare indg\u00e5r i en l\u00f8bende cyklus af forbrug og genopfyldning. Den ene kasse forsyner forbrugsstedet. N\u00e5r den er tom, bruges et kort, den tomme kasse eller et andet aftalt signal til at anmode om genopfyldning, og operat\u00f8ren begynder at tage fra den anden kasse.<\/p>\n\n\n<p>Den anden kasse d\u00e6kker forbruget, mens genopfyldningen er undervejs. Fordelen er enkel: Operat\u00f8ren beh\u00f8ver ikke at t\u00e6lle alle de resterende dele for at vide, hvorn\u00e5r det er tid til genopfyldning. Det fysiske skift g\u00f8r behovet tydeligt.<\/p>\n\n\n<p>I produktionen er metoden is\u00e6r nyttig til fastg\u00f8relsesdele, fittings og andre sm\u00e5dele, der bruges regelm\u00e6ssigt. Genopfyldningen kan komme fra et centrallager, en ekstern leverand\u00f8r eller en intern produktionsproces. Hvor delene kommer fra, afg\u00f8r arbejdet bag signalet, men behovet for en p\u00e5lidelig reaktion er det samme.<\/p>\n\n\n<h3 class=\"wp-block-heading\">S\u00e5dan fungerer cyklussen med ens m\u00e6ngder<\/h3>\n\n\n<p>Brug to kasser med samme standardm\u00e6ngde til et enkelt pilotfors\u00f8g:<\/p>\n\n\n<p>1. <strong>Tag kun fra \u00e9n kasse.<\/strong> Mark\u00e9r tydeligt den anden som reserve, s\u00e5 den ikke bruges som et alternativt plukkested.<\/p>\n\n\n<p>2. <strong>Giv signal, n\u00e5r den aktive kasse er tom.<\/strong> Flyt den tomme kasse eller dens kort til det aftalte opsamlingssted, eller registr\u00e9r den aftalte elektroniske anmodning.<\/p>\n\n\n<p>3. <strong>Skift til den fyldte reservekasse.<\/strong> Produktionen forts\u00e6tter, mens den genopfyldningsansvarlige s\u00f8rger for nye dele.<\/p>\n\n\n<p>4. <strong>Bekr\u00e6ft, at genopfyldningen bliver h\u00e5ndteret.<\/strong> Den ansvarlige modtager kvitterer for signalet og fastl\u00e6gger, hvorn\u00e5r brugbare dele forventes at v\u00e6re tilbage.<\/p>\n\n\n<p>5. <strong>S\u00e6t den genopfyldte kasse tilbage som reserve.<\/strong> Kontroll\u00e9r vare og m\u00e6ngde, genetabl\u00e9r m\u00e6rkningen, og afslut registreringen af genopfyldningen. Forts\u00e6t med at tage fra den aktive kasse, indtil den er tom.<\/p>\n\n\n<p>Derefter bytter kasserne rolle igen. Undg\u00e5 l\u00f8bende at fylde den aktive kasse op. Det kan skjule, at kassen bliver t\u00f8mt \u2013 netop den h\u00e6ndelse, der skal udl\u00f8se genopfyldningen.<\/p>\n\n\n<h2 class=\"wp-block-heading\">V\u00e6lg dele, hvor forbrug og forsyning passer til metoden<\/h2>\n\n\n<p>Start med dele, der bruges regelm\u00e6ssigt, er tydeligt identificeret og kan genopfyldes fra en p\u00e5lidelig kilde. De bedst egnede dele er nemme at h\u00e5ndtere i en standardm\u00e6ngde og har samme specifikation fra opgave til opgave.<\/p>\n\n\n<p>En billig del kan v\u00e6re velegnet, selv om mangel p\u00e5 den stopper en dyr operation. Indk\u00f8bsprisen fort\u00e6ller ikke, hvad det koster at l\u00f8be t\u00f8r. Omvendt kan to store kasser med en dyr vare, der sj\u00e6ldent bruges, binde kapital uden at l\u00f8se et tilbagevendende forsyningsproblem.<\/p>\n\n\n<p>V\u00e6r mere forsigtig, hvis forbruget er sporadisk eller pr\u00e6get af enkelte store ordrer. \u00c9t udtag kan t\u00f8mme reserven, l\u00e6nge f\u00f8r den normale genopfyldning kan n\u00e5 tilbage. Ordrespecifikke komponenter, hyppige konstruktions\u00e6ndringer, kort holdbarhed eller strenge krav til partistyring kr\u00e6ver ogs\u00e5 mere end to praktiske kasser. Fasthold de n\u00f8dvendige procedurer for identifikation, lagerrotation og sporbarhed.<\/p>\n\n\n<p>Genopfyldning med to kasser er <a href=\"https:\/\/skyplanner.ai\/da\/ressourcer\/kanban-i-produktion\/\">besl\u00e6gtet med kanban<\/a>, men <strong>to kasser er ikke det samme som to kanbankort<\/strong>. Et produktionskredsl\u00f8b med to kort skelner mellem tilladelse til at producere og tilladelse til at flytte materialer. Tokassesystemet i denne artikel handler om den fysiske beholdning og om, hvad der sker, n\u00e5r den ene m\u00e6ngde er brugt op.<\/p>\n\n\n<p>Det er heller ikke den samme beslutning som at v\u00e6lge en <a href=\"https:\/\/skyplanner.ai\/da\/ressourcer\/min-max-lagerstyring\/\">min-max-politik<\/a>. Min-max bruger et genbestillingspunkt og et m\u00e5l for, hvor meget beholdningen skal fyldes op til. To kasser g\u00f8r en bestemt forbrugst\u00e6rskel synlig ved forbrugsstedet. En opsamlingsrute kan transportere de tomme og fyldte kasser, men ruten i sig selv hverken bekr\u00e6fter eller afslutter genopfyldningen.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Dimension\u00e9r reserven til hele genopfyldningsforl\u00f8bet<\/h2>\n\n\n<p>M\u00e5l tiden fra <strong>forbrugssignalet gives, til brugbare erstatningsdele er til r\u00e5dighed ved den angivne arbejdsstation<\/strong>. Stop ikke uret, n\u00e5r en indk\u00f8bsordre er sendt, en maskine er f\u00e6rdig med at sk\u00e6re, eller en levering n\u00e5r frem til fabriksporten.<\/p>\n\n\n<p>Forl\u00f8bet kan omfatte ventetid, f\u00f8r signalet bliver indsamlet, kontrol og frigivelse af anmodningen, plukning eller fremstilling, inspektion, transport og placering af delene p\u00e5 den korrekte lokation. For egenproducerede dele kan ventetiden p\u00e5 en maskine, der ogs\u00e5 bruges til andre opgaver, have st\u00f8rre betydning end selve bearbejdningstiden.<\/p>\n\n\n<p>Som udgangspunkt ganges det forventede forbrug pr. driftsperiode med antallet af driftsperioder, der skal d\u00e6kkes under genopfyldningen. L\u00e6g derefter ekstra til for de udsving i forbrug og genopfyldningstid, som processen skal kunne h\u00e5ndtere. Sikkerhedslageret er denne ekstra beskyttelse i den samlede m\u00e6ngde, ikke n\u00f8dvendigvis hele den anden kasse.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Et eksempel p\u00e5 et tokassesystem<\/h3>\n\n\n<p>Forestil dig en montagestation, der bruger 40 clips pr. skift med produktion. Hver kasse indeholder 240 brugbare clips. N\u00e5r den ene kasse er tom, og operat\u00f8ren skifter kasse, r\u00e6kker den fyldte kasse til seks skift med dette forbrug.<\/p>\n\n\n<p>Hvis hele genopfyldningsforl\u00f8bet tager fire skift med produktion, bruger stationen 160 clips i ventetiden. N\u00e5r de nye dele er tilbage, er der stadig 80 clips i den aktive kasse. Den resterende m\u00e6ngde er eksemplets beskyttelse mod udsving, ikke en anbefalet buffer til alle fabrikker.<\/p>\n\n\n<p>Antag nu, at det kun tager kort tid at fremstille clipsene, men at k\u00f8en ved produktionsmaskinen betyder, at de f\u00f8rst er tilbage efter mere end seks skift med produktion. S\u00e5 svigter systemet, selv om kasserne er rigtige, og signalet er synligt. I m\u00e5 forkorte genopfyldningsforl\u00f8bet, \u00f8ge bufferen eller v\u00e6lge en anden l\u00f8sning til genopfyldning.<\/p>\n\n\n<p>S\u00f8rg for, at beregningen tager h\u00f8jde for de forskellige driftskalendere. Hvis montagen bruger dele p\u00e5 natholdet, mens lageret, leverand\u00f8ren eller genopfyldningsprocessen ikke er i drift, t\u00e6res der stadig p\u00e5 bufferen i det tidsrum. Beregn ud fra det faktiske forbrug, mens nye dele ikke er til r\u00e5dighed, frem for en uafklaret blanding af kalenderdage og arbejdstimer.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Skal begge kasser indeholde samme m\u00e6ngde?<\/h3>\n\n\n<p>Nej. Et system med forskellige m\u00e6ngder kan have en st\u00f8rre arbejdsbeholdning og en mindre reserve, der er dimensioneret til at d\u00e6kke genopfyldningstiden. Men det kr\u00e6ver en anden skriftlig regel for genopfyldningen: Ved modtagelse fyldes reserven f\u00f8rst op til den fastsatte m\u00e6ngde, og resten l\u00e6gges i arbejdskassen.<\/p>\n\n\n<p>Skift ikke mellem kasser med forskellige m\u00e6ngder, som om de gav samme beskyttelse. Ved den f\u00f8rste indf\u00f8relse g\u00f8r ens m\u00e6ngder det lettere at forst\u00e5 og kontrollere udskiftningen. V\u00e6lg kun forskellige m\u00e6ngder, hvis fordelen i form af mindre lager eller pladsforbrug opvejer kravene til ekstra disciplin.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Udpeg en ansvarlig for hvert signal om en tom kasse<\/h2>\n\n\n<p>Et kort i en bakke er en anmodning, ikke et bevis p\u00e5, at nogen har reageret. Aftal inden pilotfors\u00f8get, hvem der modtager signalet, hvor hurtigt vedkommende skal kvittere, og hvem der griber ind, hvis genopfyldningen bliver forsinket. Fordel ansvaret p\u00e5 tv\u00e6rs af skift, og udpeg en stedfortr\u00e6der, n\u00e5r den normalt ansvarlige er frav\u00e6rende.<\/p>\n\n\n<p>Signalet skal indeholde nok oplysninger til, at modtageren kan handle uden at ringe f\u00f8rst. Angiv del og eventuel revision, standardm\u00e6ngden til genopfyldning, forsyningskilde, returlokation og kasse- eller kort-ID. Den genopfyldningsansvarlige skal kunne skelne denne anmodning fra en, der allerede er under behandling.<\/p>\n\n\n<p>Brug for eksempel aftalte statusser som anmodet, accepteret og returneret. Et signal p\u00e5 papir kan fungere fint, hvis den ansvarlige modtager kvitterer for det, og \u00e5bne anmodninger forbliver synlige. Registreres den samme anmodning ogs\u00e5 elektronisk, skal de to registreringer kobles sammen i stedet for at s\u00e6tte endnu en genopfyldning i gang.<\/p>\n\n\n<p>Det fysiske kredsl\u00f8b skal ogs\u00e5 stemme overens med lagerregistreringen. At flytte en kasse medf\u00f8rer ikke i sig selv en elektronisk lagerpostering eller oprettelse af en produktionsordre. Fastl\u00e6g, hvorn\u00e5r den valgte arbejdsgang registrerer forbrug, intern overf\u00f8rsel, modtagelse og en eventuel produktionsanmodning. Hvis forbruget allerede er trukket fra lagerbeholdningen via produktionsrapporteringen, m\u00e5 det ikke tr\u00e6kkes fra igen, blot fordi den tomme kasse bliver hentet.<\/p>\n\n\n<p>N\u00e5r kassen kommer retur, skal I kontrollere antal brugbare dele, identitet og placering, f\u00f8r genopfyldningsanmodningen lukkes. Beskadigede dele i en tilsyneladende fuld kasse giver ikke den tilsigtede beskyttelse mod mangel. Genopfyldningen er f\u00f8rst afsluttet, n\u00e5r de rigtige, brugbare dele er tilg\u00e6ngelige d\u00e9r, hvor de skal bruges \u2013 ikke blot n\u00e5r nogen markerer en forudg\u00e5ende opgave som f\u00e6rdig.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Forbrug af reserven er normalt \u2013 forsinket genopfyldning er en afvigelse<\/h3>\n\n\n<p>Det er forventeligt, at den anden kasse tages i brug. At den bliver t\u00f8mt, uden at der er kommet nye dele, er det ikke.<\/p>\n\n\n<p>Fastl\u00e6g et tidspunkt for eskalering, s\u00e5 I kan n\u00e5 at handle, mens der stadig er dele tilbage. Hvis den genopfyldningsansvarlige ikke kan bekr\u00e6fte, at delene kommer retur, inden den resterende beholdning slipper op, skal I inddrage den person, der kan \u00e6ndre beslutningen om forsyning eller produktion. En hasteoverf\u00f8rsel kan v\u00e6re den rigtige l\u00f8sning, men registrer den, og s\u00f8rg bagefter for, at begge kasser igen har de fastlagte m\u00e6ngder. At l\u00e5ne fra en anden station uden at registrere det flytter blot manglen.<\/p>\n\n\n<p>Under pilotfors\u00f8get skal I gennemg\u00e5 manglende kvitteringer, de faktiske tider fra signal til returnering, den resterende reserve ved returnering og eventuelle n\u00f8dindgreb. Brug observationerne til at forbedre afhentning og genopfyldning, f\u00f8r I reducerer lageret. Vurder m\u00e6ngderne igen, n\u00e5r eftersp\u00f8rgslen, skifteholdene, leverand\u00f8rernes pr\u00e6stationer eller produktionsruten \u00e6ndrer sig.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Planl\u00e6g intern genopfyldning sammen med det arbejde, den konkurrerer med<\/h2>\n\n\n<p>For indk\u00f8bte bef\u00e6stelsesdele kan genopfyldningen prim\u00e6rt best\u00e5 af plukning, levering fra leverand\u00f8ren og intern transport. N\u00e5r clips, beslag eller afstandsstykker fremstilles internt, konkurrerer genopfyldningen ogs\u00e5 med kundeordrer om maskiner og tid. En genopfyldningsliste, der ser bort fra de \u00f8vrige forpligtelser, giver ikke et trov\u00e6rdigt grundlag for at love, hvorn\u00e5r delene er tilbage.<\/p>\n\n\n<p><strong>V\u00e6lg SkyPlanner, n\u00e5r genopfyldningen skal bruge den samme produktionskapacitet som det \u00f8vrige arbejde.<\/strong> N\u00e5r en genopfyldning er accepteret som produktionsordre, <a href=\"https:\/\/skyplanner.ai\/da\/ressourcer\/hvad-er-finplanlaegning-i-produktionen\/\">planl\u00e6gger Arcturus, SkyPlanners kunstige intelligens til finplanl\u00e6gning, ordrens operationer sammen med det \u00f8vrige arbejde<\/a>. Beregningen tager h\u00f8jde for de konfigurerede arbejdsstationer, kapacitet, skiftehold, afh\u00e6ngigheder mellem operationer og prioriteter. Gantt-planen viser den beregnede r\u00e6kkef\u00f8lge og de planlagte f\u00e6rdigg\u00f8relsestidspunkter.<\/p>\n\n\n<p>Det sparer jer for at vedligeholde \u00e9n k\u00f8 til kundeordrer og en anden til genopfyldningsserier og derefter fors\u00f8ge at f\u00e5 dem til at passe sammen manuelt. I kan se, om genopfyldningen kan n\u00e5s, inden reserven forventes at slippe op, og hvordan en \u00e6ndret prioritet p\u00e5virker de \u00f8vrige forpligtelser.<\/p>\n\n\n<p>Lad os vende tilbage til eksemplet med clips. Det relevante sp\u00f8rgsm\u00e5l i planl\u00e6gningen er, om den accepterede genopfyldningsserie kan n\u00e5 gennem produktionsruten i tide til kontrol og levering tilbage til montagen. Hvis den f\u00e6lles maskine allerede er optaget af andet arbejde, kan I tage stilling til kapacitetskonflikten, f\u00f8r montagen l\u00f8ber t\u00f8r. I fastl\u00e6gger prioriteterne; Arcturus beregner planen ud fra dem.<\/p>\n\n\n<p>N\u00e5r hensynet til materialer er aktiveret i finplanl\u00e6gningen, og lageroplysningerne holdes ajour, tager SkyPlanner ogs\u00e5 h\u00f8jde for de materialer, genopfyldningen kr\u00e6ver. En ledig maskine er ikke nok, hvis r\u00e5materialet til serien mangler. For indk\u00f8bte dele kan ajourf\u00f8rte ankomstdatoer p\u00e5 indk\u00f8bsordrer indg\u00e5 i planl\u00e6gningen af det arbejde, der skal bruge delene. Genberegn planen, n\u00e5r datoerne \u00e6ndrer sig.<\/p>\n\n\n<p>SkyPlanner kan integreres med ethvert ERP- eller MES-system via sit \u00e5bne REST API. I kan knytte eksisterende ordre- og lageroplysninger til produktionsplanen i stedet for at planl\u00e6gge genopfyldning i et isoleret system. Hold signalet fra kassen enkelt ved arbejdsstationen, og giv arbejdet bag signalet en plan, der tager h\u00f8jde for resten af fabrikken.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Hvilken forskel gjorde bedre overblik over materialerne hos Eskomatic?<\/h3>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/da\/kundehistorier\/eskomatic\/\">Eskomatic, en finsk underleverand\u00f8r inden for sp\u00e5ntagende bearbejdning<\/a>, organiserede tidligere i h\u00f8j grad sine arbejdsk\u00f8er manuelt. Begr\u00e6nset overblik over materialernes tilg\u00e6ngelighed bet\u00f8d, at mangel kunne blive opdaget for t\u00e6t p\u00e5 en opgaves planlagte start.<\/p>\n\n\n<p>Ved at forbinde SkyPlanner med sit eksisterende ERP-system fik virksomheden en mere overskuelig, visuel arbejdsk\u00f8 og automatisk planl\u00e6gning af belastningen. Eskomatic fort\u00e6ller om mere pr\u00e6cise leveringsdatoer og f\u00e6rre produktionsstop som f\u00f8lge af materialemangel.<\/p>\n\n\n<p>Virksomhedens erfaring viser v\u00e6rdien af at koble materialernes tilg\u00e6ngelighed til den daglige finplanl\u00e6gning: Planl\u00e6ggerne kan reagere tidligere i stedet for at l\u00f8se problemet, n\u00e5r arbejdet allerede burde v\u00e6re i gang. N\u00e5r dele til et tokassesystem fremstilles p\u00e5 maskiner, der ogs\u00e5 bruges til andet arbejde, er det praktiske behov det samme \u2013 en forventet returtid, der er underbygget af den faktiske produktionsplan.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Start med \u00e9n del, og afpr\u00f8v hele kredsl\u00f8bet<\/h2>\n\n\n<p>Lav et pilotfors\u00f8g med \u00e9n del, der bruges regelm\u00e6ssigt, p\u00e5 \u00e9t forbrugssted. Bekr\u00e6ft startm\u00e6ngden i begge kasser, afstem eventuelle \u00e5bne genopfyldninger, m\u00e6rk placeringerne, og \u00f8v udskiftningen af den tomme kasse sammen med operat\u00f8rerne og de genopfyldningsansvarlige. F\u00f8lg flere komplette kredsl\u00f8b, inklusive vagtoverleveringer, f\u00f8r I udvider.<\/p>\n\n\n<p>Bevar det, der g\u00f8r tokassesystemet v\u00e6rdifuldt: et tydeligt signal og en enkel rutine for operat\u00f8ren. L\u00e6g planl\u00e6gningsindsatsen d\u00e9r, hvor den g\u00f8r en forskel \u2013 i at sikre, at processen bag signalet faktisk kan levere.<\/p>\n\n\n<p>Vil I se, hvordan SkyPlanner kan planl\u00e6gge jeres interne genopfyldning, s\u00e5 <a href=\"https:\/\/skyplanner.ai\/da\/kontakt-salg\/\">book en demo<\/a> med udgangspunkt i \u00e9n del, der bruges regelm\u00e6ssigt, reservens lagerd\u00e6kning og en kundeopgave, der konkurrerer om samme ressource. I kan unders\u00f8ge genopfyldningens plads i den f\u00e6lles plan, og hvordan den p\u00e5virker det \u00f8vrige arbejde. Eller <a href=\"https:\/\/skyplanner.ai\/da\/proeveperiode\/\">pr\u00f8v SkyPlanner med demodata<\/a>, og brug den AI-underst\u00f8ttede kom godt i gang-vejledning i Assistant, hvis I foretr\u00e6kker en guidet introduktion.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Tokassesystem: Hold sm\u00e5dele klar til produktionen Hjem &raquo; Ressourcer &raquo; Tokassesystem: Hold sm\u00e5dele klar til produktionen En montagestation l\u00f8ber t\u00f8r for en lille del. Der er flere p\u00e5 lager et sted p\u00e5 fabrikken, men nogen skal finde dem, bede om genopfyldning og bringe dem hen til operat\u00f8ren. En billig komponent har netop kostet v\u00e6rdifuld produktionstid. &#8230; <a title=\"Tokassesystem: Hold sm\u00e5dele klar til produktionen\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/da\/ressourcer\/tokassesystem\/\" aria-label=\"Read more about Tokassesystem: Hold sm\u00e5dele klar til produktionen\">L\u00e6s Mere<\/a><\/p>\n","protected":false},"author":3,"featured_media":111722,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2547,307],"tags":[],"class_list":["post-111690","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-effektiv-produktion","category-ressourcer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Tokassesystem: Hold sm\u00e5dele klar til produktionen<\/title>\n<meta name=\"description\" content=\"En tom kasse skal udl\u00f8se genopfyldning, ikke produktionsstop. Skab et stabilt tokassesystem, og brug SkyPlanner til at planl\u00e6gge de dele, I selv fremstiller.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/da\/ressourcer\/tokassesystem\/\" \/>\n<meta property=\"og:locale\" content=\"da_DK\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Tokassesystem: Hold sm\u00e5dele klar til produktionen\" \/>\n<meta property=\"og:description\" content=\"En tom kasse skal udl\u00f8se genopfyldning, ikke produktionsstop. Skab et stabilt tokassesystem, og brug SkyPlanner til at planl\u00e6gge de dele, I selv fremstiller.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/da\/ressourcer\/tokassesystem\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-28T03:02:21+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-28T03:02:38+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1536\" \/>\n\t<meta property=\"og:image:height\" content=\"864\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Skrevet af\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimeret l\u00e6setid\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/tokassesystem\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/tokassesystem\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Tokassesystem: Hold sm\u00e5dele klar til produktionen\",\"datePublished\":\"2026-10-28T03:02:21+00:00\",\"dateModified\":\"2026-10-28T03:02:38+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/tokassesystem\\\/\"},\"wordCount\":2468,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/tokassesystem\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/two-bin-system-manufacturing-hero.png\",\"articleSection\":[\"Effektiv produktion\",\"ressourcer\"],\"inLanguage\":\"da-DK\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/tokassesystem\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/tokassesystem\\\/\",\"name\":\"Tokassesystem: Hold sm\u00e5dele klar til produktionen\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/tokassesystem\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/tokassesystem\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/two-bin-system-manufacturing-hero.png\",\"datePublished\":\"2026-10-28T03:02:21+00:00\",\"dateModified\":\"2026-10-28T03:02:38+00:00\",\"description\":\"En tom kasse skal udl\u00f8se genopfyldning, ikke produktionsstop. Skab et stabilt tokassesystem, og brug SkyPlanner til at planl\u00e6gge de dele, I selv fremstiller.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/tokassesystem\\\/#breadcrumb\"},\"inLanguage\":\"da-DK\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/tokassesystem\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"da-DK\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/tokassesystem\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/two-bin-system-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/two-bin-system-manufacturing-hero.png\",\"width\":1536,\"height\":864,\"caption\":\"Two equal parts bins hold assembly clips: one supplies the workstation while the full second bin waits in reserve.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/tokassesystem\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Tokassesystem: Hold sm\u00e5dele klar til produktionen\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"da-DK\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"da-DK\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"da-DK\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Tokassesystem: Hold sm\u00e5dele klar til produktionen","description":"En tom kasse skal udl\u00f8se genopfyldning, ikke produktionsstop. Skab et stabilt tokassesystem, og brug SkyPlanner til at planl\u00e6gge de dele, I selv fremstiller.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/da\/ressourcer\/tokassesystem\/","og_locale":"da_DK","og_type":"article","og_title":"Tokassesystem: Hold sm\u00e5dele klar til produktionen","og_description":"En tom kasse skal udl\u00f8se genopfyldning, ikke produktionsstop. Skab et stabilt tokassesystem, og brug SkyPlanner til at planl\u00e6gge de dele, I selv fremstiller.","og_url":"https:\/\/skyplanner.ai\/da\/ressourcer\/tokassesystem\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-28T03:02:21+00:00","article_modified_time":"2026-10-28T03:02:38+00:00","og_image":[{"width":1536,"height":864,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Skrevet af":"Jussi M\u00e4ntyl\u00e4","Estimeret l\u00e6setid":"12 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/tokassesystem\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/tokassesystem\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/da\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Tokassesystem: Hold sm\u00e5dele klar til produktionen","datePublished":"2026-10-28T03:02:21+00:00","dateModified":"2026-10-28T03:02:38+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/tokassesystem\/"},"wordCount":2468,"publisher":{"@id":"https:\/\/skyplanner.ai\/da\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/tokassesystem\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero.png","articleSection":["Effektiv produktion","ressourcer"],"inLanguage":"da-DK"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/tokassesystem\/","url":"https:\/\/skyplanner.ai\/da\/ressourcer\/tokassesystem\/","name":"Tokassesystem: Hold sm\u00e5dele klar til produktionen","isPartOf":{"@id":"https:\/\/skyplanner.ai\/da\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/tokassesystem\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/tokassesystem\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero.png","datePublished":"2026-10-28T03:02:21+00:00","dateModified":"2026-10-28T03:02:38+00:00","description":"En tom kasse skal udl\u00f8se genopfyldning, ikke produktionsstop. Skab et stabilt tokassesystem, og brug SkyPlanner til at planl\u00e6gge de dele, I selv fremstiller.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/tokassesystem\/#breadcrumb"},"inLanguage":"da-DK","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/da\/ressourcer\/tokassesystem\/"]}]},{"@type":"ImageObject","inLanguage":"da-DK","@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/tokassesystem\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero.png","width":1536,"height":864,"caption":"Two equal parts bins hold assembly clips: one supplies the workstation while the full second bin waits in reserve."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/tokassesystem\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/da\/"},{"@type":"ListItem","position":2,"name":"Tokassesystem: Hold sm\u00e5dele klar til produktionen"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/da\/#website","url":"https:\/\/skyplanner.ai\/da\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/da\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/da\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"da-DK"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/da\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/da\/","logo":{"@type":"ImageObject","inLanguage":"da-DK","@id":"https:\/\/skyplanner.ai\/da\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/da\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/da\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"da-DK","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero.png",1536,864,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero.png",1536,864,false],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero.png",1536,864,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/da\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Tokassesystem: Hold sm\u00e5dele klar til produktionen Hjem &raquo; Ressourcer &raquo; Tokassesystem: Hold sm\u00e5dele klar til produktionen En montagestation l\u00f8ber t\u00f8r for en lille del. Der er flere p\u00e5 lager et sted p\u00e5 fabrikken, men nogen skal finde dem, bede om genopfyldning og bringe dem hen til operat\u00f8ren. En billig komponent har netop kostet v\u00e6rdifuld produktionstid.&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/posts\/111690","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/comments?post=111690"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/posts\/111690\/revisions"}],"predecessor-version":[{"id":111753,"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/posts\/111690\/revisions\/111753"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/media\/111722"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/media?parent=111690"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/categories?post=111690"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/tags?post=111690"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}