{"id":111597,"date":"2026-10-28T00:43:16","date_gmt":"2026-10-28T00:43:16","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=111597"},"modified":"2026-10-28T00:43:34","modified_gmt":"2026-10-28T00:43:34","slug":"mtm-analyse","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/da\/ressourcer\/mtm-analyse\/","title":{"rendered":"MTM-analyse: Planl\u00e6g arbejdet f\u00f8r produktionsstart"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">MTM-analyse: Planl\u00e6g arbejdet f\u00f8r produktionsstart<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/da\/\">Hjem<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/da\/ressourcer\/\">Ressourcer<\/a> &raquo; MTM-analyse: Planl\u00e6g arbejdet f\u00f8r produktionsstart<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Ansl\u00e5et l\u00e6setid: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> Minutter<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Et nyt produkt er klar til montage og skal ind i produktionsplanen, men ingen har samlet det nok gange til at kunne give dig en p\u00e5lidelig gennemsnitstid. Alligevel skal du sammenligne arbejdsstationernes indretning, vurdere arbejdsbelastningen og afg\u00f8re, om der er plads til de f\u00f8rste ordrer.<\/p>\n\n\n<p>Med Methods-Time Measurement (MTM) kan du analysere den manuelle arbejdsmetode, f\u00f8r den l\u00f8bende produktion begynder. I stedet for at vente p\u00e5 historiske data fra afsluttede opgaver fastl\u00e6gger du en tid ud fra definerede bev\u00e6gelser og etablerede tidsdata. Metoden kommer f\u00f8rst: En kortere tid er kun nyttig, hvis den beskriver arbejde, som medarbejderne faktisk kan udf\u00f8re sikkert og korrekt.<\/p>\n\n\n<p>N\u00e5r tiden er godkendt til planl\u00e6gning, hj\u00e6lper SkyPlanner APS dig med at bruge den i praksis. Arcturus, systemets kunstige intelligens til produktionsplanl\u00e6gning, indpasser operationernes varighed i den f\u00e6lles produktionsplan. Dermed f\u00f8rer en bedre metode til en bedre underbygget plan frem for blot at st\u00e5 som et isoleret tal i den tekniske dokumentation.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Hvad er MTM-analyse?<\/h2>\n\n\n<p>Methods-Time Measurement er et system med forudbestemte bev\u00e6gelsestider, som bruges til at beskrive, analysere og vurdere manuelt arbejde. En analytiker opdeler en defineret metode i bev\u00e6gelser eller procesbyggesten, anvender de relevante tidsdata og regler og fastl\u00e6gger metodens tidsforbrug ved et referencepr\u00e6stationsniveau.<\/p>\n\n\n<p>I en detaljeret MTM-1-analyse indg\u00e5r blandt andet bev\u00e6gelser som at r\u00e6kke, gribe, flytte, positionere og slippe. Betingelserne har betydning: At tage en lettilg\u00e6ngelig del er ikke den samme opgave som at udv\u00e6lge og positionere en komponent, der er vanskelig at h\u00e5ndtere. MTM g\u00f8r disse forskelle synlige i stedet for at skjule dem i \u00e9t samlet sk\u00f8n.<\/p>\n\n\n<p>Tidsv\u00e6rdier i MTM angives i tidsm\u00e5leenheden TMU. \u00c9n TMU svarer til 0,036 sekunder; 1.000 TMU svarer derfor til 36 sekunder. TMU er en tidsenhed, ikke en effektivitetsprocent.<\/p>\n\n\n<p>Referencepr\u00e6stationen er ogs\u00e5 vigtig. MTM tager ikke udgangspunkt i at m\u00e5le tiden hos din hurtigste operat\u00f8r og kalde den standarden. Tidsdataene bygger allerede p\u00e5 et defineret pr\u00e6stationsniveau. Anvend derfor ikke ogs\u00e5 en tempovurdering fra et stopursstudie, blot fordi den blev brugt i et andet studie.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Hvorn\u00e5r b\u00f8r du v\u00e6lge MTM frem for en anden metode til at fastl\u00e6gge tid?<\/h2>\n\n\n<p>MTM er s\u00e6rlig nyttig, n\u00e5r beslutningen handler om, hvordan manuelt arbejde skal tilrettel\u00e6gges: et nyt produkt, et \u00e6ndret fikstur, en anden m\u00e5de at placere materialerne p\u00e5 eller valget mellem to montager\u00e6kkef\u00f8lger. Du kan sammenligne arbejdsindholdet, f\u00f8r du l\u00e6gger dig fast p\u00e5 metoden.<\/p>\n\n\n<p>Det g\u00f8r dog ikke MTM til det rette svar p\u00e5 ethvert sp\u00f8rgsm\u00e5l om tid. V\u00e6lg det datagrundlag, der passer til beslutningen:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>MTM:<\/strong> Hvor lang tid b\u00f8r denne definerede manuelle metode kr\u00e6ve? Nyttig til at tilrettel\u00e6gge og sammenligne arbejde, f\u00f8r der findes tilstr\u00e6kkelige historiske produktionsdata.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/da\/ressourcer\/tidsstudier-i-produktionen\/\">Tidsstudie med stopur<\/a>:<\/strong> Hvor lang tid tager de observerede arbejdselementer under de angivne betingelser, og hvilken standardtid kan fastl\u00e6gges p\u00e5 det grundlag? Nyttigt, n\u00e5r operationen allerede findes og kan studeres.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/da\/ressourcer\/frekvensstudie\/\">Frekvensstudie<\/a>:<\/strong> Hvor stor en del af tiden bruges p\u00e5 montage, omstilling, ventetid eller andre aktiviteter? Nyttigt til at forst\u00e5, hvordan en arbejdsperiode fordeler sig, men ikke til at m\u00e5le tiden for hver enkelt kort bev\u00e6gelse.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/da\/ressourcer\/tidsregistrering-i-produktionen\/\">Tidsregistrering p\u00e5 opgaveniveau<\/a>:<\/strong> Hvad skete der p\u00e5 denne konkrete ordre eller operation? Nyttigt til at gennemg\u00e5 erfaringer fra produktionen og forklare afvigelser fra planen.<\/li><\/ul>\n\n\n<p>Disse tilgange kan underst\u00f8tte hinanden. En MTM-analyse kan fastl\u00e6gge et forslag til metodetid, og efterf\u00f8lgende observationer i produktionen kan afd\u00e6kke et manglende element eller \u00e6ndrede betingelser. Men et gennemsnit af registrerede timer, der omfatter ventetid p\u00e5 materialer, er ikke det samme som et forudbestemt tidsforbrug til manuelt arbejde.<\/p>\n\n\n<p>Ved en automatisk maskincyklus skal den processtyrede tid fastl\u00e6gges s\u00e6rskilt. MTM kan beskrive operat\u00f8rens arbejde med at l\u00e6gge emner i, tage dem ud og h\u00e5ndtere dem; metoden g\u00f8r ikke maskinens bearbejdningsprogram eller den n\u00f8dvendige h\u00e6rdetid til en h\u00e5ndbev\u00e6gelse.<\/p>\n\n\n<h2 class=\"wp-block-heading\">MTM-1, MTM-2 og MTM-UAS: V\u00e6lg det rette niveau<\/h2>\n\n\n<p>MTM er en familie af systemer med forskellige detaljeringsgrader. Valget har betydning for b\u00e5de, hvad analysen beskriver, og hvor meget arbejde der skal til for at udarbejde den.<\/p>\n\n\n<p><strong>MTM-1<\/strong> analyserer de enkelte grundbev\u00e6gelser. Det egner sig til en detaljeret gennemgang af kortvarigt, gentaget manuelt arbejde, hvor betingelserne for de enkelte bev\u00e6gelser har betydning for arbejdets tilrettel\u00e6ggelse.<\/p>\n\n\n<p><strong>MTM-2<\/strong> samler grundbev\u00e6gelser i st\u00f8rre grupper. Det giver mulighed for en mindre detaljeret analyse af egnet arbejde, uden at hver enkelt MTM-1-bev\u00e6gelse skal registreres s\u00e6rskilt.<\/p>\n\n\n<p><strong>MTM-UAS<\/strong>, Universal Analyzing System, anvender procesbyggesten p\u00e5 et mere overordnet niveau og forbindes med arbejde i batchproduktion. Det er ikke blot et andet navn for MTM-1.<\/p>\n\n\n<p>V\u00e6lg systemet sammen med en uddannet analytiker ud fra processen, dens gentagelser og variation samt den beslutning, resultatet skal underst\u00f8tte. Flere detaljer er v\u00e6rdifulde, n\u00e5r de kan \u00e6ndre beslutningen. Korrekt anvendelse kr\u00e6ver uddannelse i det valgte system samt g\u00e6ldende data og regler; en generel vejledning kan ikke erstatte dette.<\/p>\n\n\n<h2 class=\"wp-block-heading\">S\u00e5dan oms\u00e6tter du en MTM-analyse til en brugbar planl\u00e6gningstid<\/h2>\n\n\n<p>Et brugbart resultat er mere end en varighed. Det er en dokumenteret metode og en tid, som den n\u00e6ste planl\u00e6gger kan forst\u00e5 grundlaget for.<\/p>\n\n\n<h3 class=\"wp-block-heading\">1. Defin\u00e9r arbejdet og betingelserne<\/h3>\n\n\n<p>V\u00e6lg produktvariant, operation og metodeversion. Beskriv v\u00e6rkt\u00f8jer, fikstur, komponenternes placering, arbejdsr\u00e6kkef\u00f8lge, kvalitetskontroller samt de h\u00e6ndelser, der markerer start og slut. Angiv, om analysen omfatter \u00e9t emne, \u00e9n cyklus eller en batch.<\/p>\n\n\n<p>Inddrag de medarbejdere, der udf\u00f8rer eller skal udf\u00f8re arbejdet. De kan opdage en uhensigtsm\u00e6ssig r\u00e6kkebev\u00e6gelse, en n\u00f8dvendig kontrol eller et beholderskift, som en ellers p\u00e6n tegning ikke viser. Fasthold sikker h\u00e5ndtering og produktkvalitet i metoden; at fjerne n\u00f8dvendigt arbejde er ikke en forbedring.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Analys\u00e9r forl\u00f8bet med det valgte system<\/h3>\n\n\n<p>En uddannet analytiker beskriver arbejdet med de relevante byggesten og de betingelser, der p\u00e5virker det. Analysen skal tage h\u00f8jde for det, der faktisk sker, herunder arbejde, som kun udf\u00f8res med bestemte mellemrum.<\/p>\n\n\n<p>F\u00f8lg systemets regler for r\u00e6kkef\u00f8lge og samtidige aktiviteter. N\u00e5r to h\u00e6nder bev\u00e6ger sig samtidig, svarer det ikke n\u00f8dvendigvis til to tidsforl\u00f8b, der skal l\u00e6gges efter hinanden. Der m\u00e5 heller ikke opfindes en bev\u00e6gelsestid for at udfylde et hul i en ufuldst\u00e6ndig metodebeskrivelse.<\/p>\n\n\n<p>Hold omstilling og gentaget arbejde adskilt. Klarg\u00f8ring af et fikstur \u00e9n gang til hele batchen m\u00e5 ikke ende som en klarg\u00f8ringsopgave, der medregnes for hvert emne.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Sammenlign metoder, ikke kun samlede tider<\/h3>\n\n\n<p>Brug analysen til at unders\u00f8ge, hvorfor \u00e9n metode kr\u00e6ver mindre arbejde. Kan komponenten pr\u00e6senteres, s\u00e5 den altid vender ens? Kan et fikstur fjerne behovet for gentagen ompositionering? Kan en \u00e6ndret r\u00e6kkef\u00f8lge fjerne h\u00e5ndtering uden at fjerne en kontrol?<\/p>\n\n\n<p>Sammenlign alternativer med samme afgr\u00e6nsning og kvalitetskrav. En metode, der virker hurtigere, fordi genopfyldning eller kontrol er flyttet uden for analysen, har ikke n\u00f8dvendigvis reduceret arbejdet. Det er her, MTM bliver et v\u00e6rkt\u00f8j til at tilrettel\u00e6gge arbejdet frem for et sk\u00f8n, der blot ser formelt ud.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Fastl\u00e6g, hvad den godkendte tidsv\u00e6rdi omfatter<\/h3>\n\n\n<p>Kontroll\u00e9r tidsgrundlaget, f\u00f8r resultatet betegnes som en standardtid for produktionen. Identific\u00e9r tilbagevendende st\u00f8tteopgaver, og afklar, hvordan personlige behov, restitution og uundg\u00e5elige forsinkelser skal h\u00e5ndteres. Dokument\u00e9r, hvilke tidstill\u00e6g der indg\u00e5r, og hvordan de beregnes; g\u00e5 ikke ud fra en universel procentsats.<\/p>\n\n\n<p>Lad afbrydelser, der kan undg\u00e5s, forblive synlige som problemer, der skal l\u00f8ses. Ventetid p\u00e5 en manglende komponent m\u00e5 ikke ubem\u00e6rket blive en del af hver r\u00e6kke- og gribebev\u00e6gelse. Omvendt vil en planl\u00e6gningstid, der udelader n\u00f8dvendigt, tilbagevendende arbejde, f\u00e5 den nye metode til at se lettere ud at planl\u00e6gge, end den er.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Valid\u00e9r og godkend metoden til brug<\/h3>\n\n\n<p>Inden frigivelsen skal du kontrollere, at den foresl\u00e5ede metode kan udf\u00f8res med det tilt\u00e6nkte udstyr, den planlagte placering af materialer og de g\u00e6ldende kvalitetskrav. N\u00e5r der foreligger en pilotk\u00f8rsel eller en tidlig produktionsk\u00f8rsel, skal du unders\u00f8ge afvigelser med udgangspunkt i sammenligneligt arbejde. Indl\u00e6ring, et \u00e6ndret fikstur og et manglende element i analysen kr\u00e6ver forskellige reaktioner.<\/p>\n\n\n<p>Gem analysen, det anvendte system, metodens revisionsnummer, foruds\u00e6tningerne, de indregnede tidstill\u00e6g, godkendelsen og ikrafttr\u00e6delsesdatoen. Vurder tiden p\u00e5 ny, n\u00e5r metoden eller dens foruds\u00e6tninger \u00e6ndrer sig. Form\u00e5let er ikke at fastholde et imponerende tal p\u00e5 ubestemt tid, men at bevare en p\u00e5lidelig sammenh\u00e6ng mellem arbejdet og planen.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Eksempel: En bedre montagemetode finder ikke selv plads i planen<\/h2>\n\n\n<p>Forestil dig en manuel montagestation, hvor emnerne ankommer vendt i forskellige retninger. Den foresl\u00e5ede metode bruger en forbedret emnebakke og et positioneringsfikstur, s\u00e5 der er mindre behov for at udv\u00e6lge og ompositionere emnerne. Teamet kontrollerer metoden og godkender den til brug.<\/p>\n\n\n<p>Antag, at den tid, der bruges i planl\u00e6gningen, dermed falder fra to minutter til halvandet minut pr. emne. Tiderne er illustrative eksempler p\u00e5 godkendte planl\u00e6gningsdata, ikke v\u00e6rdier hentet fra et MTM-datakort. Vi foruds\u00e6tter, at \u00e9n person udf\u00f8rer arbejdet i r\u00e6kkef\u00f8lge ved \u00e9n station uden en overlappende maskincyklus, og at tidstill\u00e6ggene er afstemt mellem tiderne og kalenderens tilg\u00e6ngelige arbejdstid.<\/p>\n\n\n<p>For en ordre p\u00e5 120 emner med en u\u00e6ndret omstillingstid p\u00e5 30 minutter:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Tidligere metode:<\/strong> 120 \u00d7 2 minutter + 30 minutter = 270 minutter, alts\u00e5 fire og en halv time.<\/li><li><strong>Ny metode:<\/strong> 120 \u00d7 1,5 minutter + 30 minutter = 210 minutter, alts\u00e5 tre og en halv time.<\/li><\/ul>\n\n\n<p>Ordren kr\u00e6ver \u00e9n time mindre ved denne station. Det frig\u00f8r brugbar kapacitet, men betyder ikke automatisk, at ordren kan afsendes en time tidligere. Det monterede produkt kan stadig skulle vente p\u00e5 en testb\u00e6nk, en anden ordre kan optage kapaciteten ved n\u00e6ste operation, eller den frigjorte time kan ligge uden for det tidsrum, hvor en anden opgave har brug for den.<\/p>\n\n\n<p>N\u00e6ste skridt er derfor ikke at tr\u00e6kke en time fra leveringstidspunktet. Det er at genberegne, hvordan denne ordre og det \u00f8vrige arbejde kan afvikles med de tilg\u00e6ngelige ressourcer. Den beregning klarer SkyPlanner for dig.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Brug godkendte metodetider i planl\u00e6gningen med SkyPlanner<\/h2>\n\n\n<p>I SkyPlanner kan du angive en operations varighed som tid pr. emne, en produktionsrate eller en fast tid. Tid til klarg\u00f8ring og efterf\u00f8lgende nedtagning angives separat. I det rent manuelle eksempel kan den godkendte planl\u00e6gningstid pr. emne derfor holdes adskilt fra seriens omstillingstid, n\u00e5r ordrem\u00e6ngden \u00e6ndrer sig.<\/p>\n\n\n<p>Afklar f\u00f8rst, hvilke ressourcer der skal reserveres i det angivne tidsrum. Manuelt arbejdsindhold, den tid en maskine er optaget, og operationens samlede varighed er forskellige m\u00e5l. Hvis en maskine k\u00f8rer, mens operat\u00f8ren forbereder et andet emne, kan en sammenl\u00e6gning af alle aktiviteter f\u00f8re til, at maskinen reserveres for l\u00e6nge. Medregner du kun det manuelle arbejde, kan du derimod overse den tid, hvor udstyret ikke er tilg\u00e6ngeligt for en anden opgave. Knyt metoden til de ressourcer, operationen faktisk kr\u00e6ver.<\/p>\n\n\n<p>Afstem ogs\u00e5 varighedens tidstill\u00e6g med kalenderen. En pause, der allerede er trukket fra den tilg\u00e6ngelige kapacitet, m\u00e5 ikke tr\u00e6kkes fra igen gennem et tidstill\u00e6g for den samme pause. Gem den godkendte studiedokumentation, og dokument\u00e9r samtidig, hvordan dens enkelte dele oms\u00e6ttes til planl\u00e6gningsdata.<\/p>\n\n\n<p>Arcturus planl\u00e6gger operationerne ud fra deres varighed og de konfigurerede arbejdsstationer, skift, afh\u00e6ngigheder og prioriteter. Gantt-diagrammet viser, hvordan arbejdet h\u00e6nger sammen. N\u00e5r du indf\u00f8rer en godkendt metode\u00e6ndring, skal du opdatere de ber\u00f8rte planl\u00e6gningsdata og <a href=\"https:\/\/skyplanner.ai\/da\/ressourcer\/hvad-er-finplanlaegning-i-produktionen\/\">genberegne produktionsplanen<\/a> for at se virkningen p\u00e5 efterf\u00f8lgende operationer og ordrer, der konkurrerer om kapaciteten.<\/p>\n\n\n<p>Du slipper for manuelt at opbygge separate opgavek\u00f8er p\u00e5 ny efter hver revision. Endnu vigtigere kan du bruge en fagligt begrundet tid for en ny metode i den fremadrettede planl\u00e6gning, f\u00f8r der findes en lang historik med afsluttede opgaver. Du afg\u00f8r, hvilken metode der er godkendt, og hvilke leveringsforpligtelser der har f\u00f8rsteprioritet. SkyPlanner beregner den sammenh\u00e6ngende produktionsplan.<\/p>\n\n\n<p>Senere giver den faktiske produktion dig yderligere viden. SkyPlanner underst\u00f8tter ogs\u00e5 estimater for operationers varighed baseret p\u00e5 historiske tidsregistreringer. Hold denne kilde adskilt fra MTM: Den ene estimerer ud fra registreret produktion, mens den anden vurderer en defineret manuel arbejdsmetode ved hj\u00e6lp af forudbestemte data.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Derfor er den f\u00e6lles produktionsplan vigtig<\/h3>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/da\/kundehistorier\/utu\/\">UTU, en finsk producent af eltavler og koblingsudstyr<\/a>, planlagde tidligere i separate regneark for hver afdeling. \u00c6ndringer i r\u00e6kkef\u00f8lgen i ERP-systemet n\u00e5ede ikke altid ud p\u00e5 produktionsgulvet, og det var sv\u00e6rt at f\u00e5 et realistisk overblik over kapaciteten.<\/p>\n\n\n<p>Med SkyPlanner koblet til Oracle NetSuite samlede UTU linjerne og afdelingerne p\u00e5 fabrikken i Ulvila i \u00e9t system. Teamet fort\u00e6ller, at en opdateret opgavek\u00f8 n\u00e5r frem til mont\u00f8rerne p\u00e5 f\u00e5 sekunder, og at projektleverancerne planl\u00e6gges mere pr\u00e6cist. Erfaringen viser v\u00e6rdien af at samle hele arbejdsbelastningen i en f\u00e6lles plan frem for at lade hver afdeling afstemme sin egen k\u00f8.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Fra en p\u00e5lidelig metodetid til en p\u00e5lidelig produktionsplan<\/h2>\n\n\n<p>Brug MTM, n\u00e5r du skal tilrettel\u00e6gge og fagligt begrunde manuelt arbejde, f\u00f8r produktionshistorikken kan give svaret. V\u00e6lg derefter SkyPlanner, n\u00e5r den godkendte tid skal have en realistisk plads i planl\u00e6gningen af ordrebeholdningen. En velunderbygget metode fort\u00e6ller, hvad arbejdet kr\u00e6ver. Planl\u00e6gning med begr\u00e6nset kapacitet viser, hvor og hvorn\u00e5r der er plads til det.<\/p>\n\n\n<p>SkyPlanner kan integreres med ethvert ERP- eller MES-system via sit \u00e5bne REST API, s\u00e5 en bedre produktionsplanl\u00e6gning kan bygge p\u00e5 dine eksisterende produktionsdata.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/da\/kontakt-salg\/\">Book en demo af SkyPlanner<\/a>, og tag en godkendt metodetid, den tilh\u00f8rende operationsrute og andre ordrer, der konkurrerer om samme kapacitet, med som udgangspunkt. Se, hvordan en metode\u00e6ndring p\u00e5virker produktionsplanen og leveringsdatoerne \u2013 ikke kun varigheden af \u00e9n operation. Vil du hellere g\u00e5 p\u00e5 opdagelse f\u00f8rst, kan du <a href=\"https:\/\/skyplanner.ai\/da\/proeveperiode\/\">pr\u00f8ve SkyPlanner med demodata<\/a> eller bruge assistentens KI-underst\u00f8ttede introduktion.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>MTM-analyse: Planl\u00e6g arbejdet f\u00f8r produktionsstart Hjem &raquo; Ressourcer &raquo; MTM-analyse: Planl\u00e6g arbejdet f\u00f8r produktionsstart Et nyt produkt er klar til montage og skal ind i produktionsplanen, men ingen har samlet det nok gange til at kunne give dig en p\u00e5lidelig gennemsnitstid. Alligevel skal du sammenligne arbejdsstationernes indretning, vurdere arbejdsbelastningen og afg\u00f8re, om der er plads &#8230; <a title=\"MTM-analyse: Planl\u00e6g arbejdet f\u00f8r produktionsstart\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/da\/ressourcer\/mtm-analyse\/\" aria-label=\"Read more about MTM-analyse: Planl\u00e6g arbejdet f\u00f8r produktionsstart\">L\u00e6s Mere<\/a><\/p>\n","protected":false},"author":3,"featured_media":111623,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2547,307],"tags":[],"class_list":["post-111597","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-effektiv-produktion","category-ressourcer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>MTM-analyse: Planl\u00e6g arbejdet f\u00f8r produktionsstart<\/title>\n<meta name=\"description\" content=\"Skal du fastl\u00e6gge tidsforbruget for en ny manuel metode? L\u00e6r at bruge MTM f\u00f8r produktionsstart og oms\u00e6tte godkendte tider til en brugbar plan med SkyPlanner.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/da\/ressourcer\/mtm-analyse\/\" \/>\n<meta property=\"og:locale\" content=\"da_DK\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"MTM-analyse: Planl\u00e6g arbejdet f\u00f8r produktionsstart\" \/>\n<meta property=\"og:description\" content=\"Skal du fastl\u00e6gge tidsforbruget for en ny manuel metode? L\u00e6r at bruge MTM f\u00f8r produktionsstart og oms\u00e6tte godkendte tider til en brugbar plan med SkyPlanner.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/da\/ressourcer\/mtm-analyse\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-28T00:43:16+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-28T00:43:34+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1774\" \/>\n\t<meta property=\"og:image:height\" content=\"887\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Skrevet af\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimeret l\u00e6setid\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/mtm-analyse\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/mtm-analyse\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"MTM-analyse: Planl\u00e6g arbejdet f\u00f8r produktionsstart\",\"datePublished\":\"2026-10-28T00:43:16+00:00\",\"dateModified\":\"2026-10-28T00:43:34+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/mtm-analyse\\\/\"},\"wordCount\":2375,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/mtm-analyse\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/methods-time-measurement-hero.png\",\"articleSection\":[\"Effektiv produktion\",\"ressourcer\"],\"inLanguage\":\"da-DK\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/mtm-analyse\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/mtm-analyse\\\/\",\"name\":\"MTM-analyse: Planl\u00e6g arbejdet f\u00f8r produktionsstart\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/mtm-analyse\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/mtm-analyse\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/methods-time-measurement-hero.png\",\"datePublished\":\"2026-10-28T00:43:16+00:00\",\"dateModified\":\"2026-10-28T00:43:34+00:00\",\"description\":\"Skal du fastl\u00e6gge tidsforbruget for en ny manuel metode? L\u00e6r at bruge MTM f\u00f8r produktionsstart og oms\u00e6tte godkendte tider til en brugbar plan med SkyPlanner.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/mtm-analyse\\\/#breadcrumb\"},\"inLanguage\":\"da-DK\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/mtm-analyse\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"da-DK\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/mtm-analyse\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/methods-time-measurement-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/methods-time-measurement-hero.png\",\"width\":1774,\"height\":887,\"caption\":\"Loose assembly parts contrast with oriented parts and a locating fixture in an MTM method comparison.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/mtm-analyse\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"MTM-analyse: Planl\u00e6g arbejdet f\u00f8r produktionsstart\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"da-DK\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"da-DK\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"da-DK\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"MTM-analyse: Planl\u00e6g arbejdet f\u00f8r produktionsstart","description":"Skal du fastl\u00e6gge tidsforbruget for en ny manuel metode? L\u00e6r at bruge MTM f\u00f8r produktionsstart og oms\u00e6tte godkendte tider til en brugbar plan med SkyPlanner.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/da\/ressourcer\/mtm-analyse\/","og_locale":"da_DK","og_type":"article","og_title":"MTM-analyse: Planl\u00e6g arbejdet f\u00f8r produktionsstart","og_description":"Skal du fastl\u00e6gge tidsforbruget for en ny manuel metode? L\u00e6r at bruge MTM f\u00f8r produktionsstart og oms\u00e6tte godkendte tider til en brugbar plan med SkyPlanner.","og_url":"https:\/\/skyplanner.ai\/da\/ressourcer\/mtm-analyse\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-28T00:43:16+00:00","article_modified_time":"2026-10-28T00:43:34+00:00","og_image":[{"width":1774,"height":887,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Skrevet af":"Jussi M\u00e4ntyl\u00e4","Estimeret l\u00e6setid":"12 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/mtm-analyse\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/mtm-analyse\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/da\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"MTM-analyse: Planl\u00e6g arbejdet f\u00f8r produktionsstart","datePublished":"2026-10-28T00:43:16+00:00","dateModified":"2026-10-28T00:43:34+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/mtm-analyse\/"},"wordCount":2375,"publisher":{"@id":"https:\/\/skyplanner.ai\/da\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/mtm-analyse\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png","articleSection":["Effektiv produktion","ressourcer"],"inLanguage":"da-DK"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/mtm-analyse\/","url":"https:\/\/skyplanner.ai\/da\/ressourcer\/mtm-analyse\/","name":"MTM-analyse: Planl\u00e6g arbejdet f\u00f8r produktionsstart","isPartOf":{"@id":"https:\/\/skyplanner.ai\/da\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/mtm-analyse\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/mtm-analyse\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png","datePublished":"2026-10-28T00:43:16+00:00","dateModified":"2026-10-28T00:43:34+00:00","description":"Skal du fastl\u00e6gge tidsforbruget for en ny manuel metode? L\u00e6r at bruge MTM f\u00f8r produktionsstart og oms\u00e6tte godkendte tider til en brugbar plan med SkyPlanner.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/mtm-analyse\/#breadcrumb"},"inLanguage":"da-DK","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/da\/ressourcer\/mtm-analyse\/"]}]},{"@type":"ImageObject","inLanguage":"da-DK","@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/mtm-analyse\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png","width":1774,"height":887,"caption":"Loose assembly parts contrast with oriented parts and a locating fixture in an MTM method comparison."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/mtm-analyse\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/da\/"},{"@type":"ListItem","position":2,"name":"MTM-analyse: Planl\u00e6g arbejdet f\u00f8r produktionsstart"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/da\/#website","url":"https:\/\/skyplanner.ai\/da\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/da\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/da\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"da-DK"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/da\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/da\/","logo":{"@type":"ImageObject","inLanguage":"da-DK","@id":"https:\/\/skyplanner.ai\/da\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/da\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/da\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"da-DK","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png",1774,887,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero-300x150.png",300,150,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero-768x384.png",768,384,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero-1024x512.png",1024,512,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero-1536x768.png",1536,768,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png",1774,887,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero-360x180.png",360,180,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/da\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"MTM-analyse: Planl\u00e6g arbejdet f\u00f8r produktionsstart Hjem &raquo; Ressourcer &raquo; MTM-analyse: Planl\u00e6g arbejdet f\u00f8r produktionsstart Et nyt produkt er klar til montage og skal ind i produktionsplanen, men ingen har samlet det nok gange til at kunne give dig en p\u00e5lidelig gennemsnitstid. Alligevel skal du sammenligne arbejdsstationernes indretning, vurdere arbejdsbelastningen og afg\u00f8re, om der er plads&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/posts\/111597","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/comments?post=111597"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/posts\/111597\/revisions"}],"predecessor-version":[{"id":111661,"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/posts\/111597\/revisions\/111661"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/media\/111623"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/media?parent=111597"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/categories?post=111597"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/tags?post=111597"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}