{"id":111504,"date":"2026-10-27T22:44:45","date_gmt":"2026-10-27T22:44:45","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=111504"},"modified":"2026-10-27T22:45:02","modified_gmt":"2026-10-27T22:45:02","slug":"handtering-af-materialemangel","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/da\/ressourcer\/handtering-af-materialemangel\/","title":{"rendered":"H\u00e5ndtering af materialemangel: Hold ordrerne i gang"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">H\u00e5ndtering af materialemangel: Hold ordrerne i gang<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/da\/\">Hjem<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/da\/ressourcer\/\">Ressourcer<\/a> &raquo; H\u00e5ndtering af materialemangel: Hold ordrerne i gang<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Ansl\u00e5et l\u00e6setid: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> Minutter<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>En leverand\u00f8r lover at fremskynde leveringen af en manglende komponent. Indk\u00f8b har en plan for at indhente forsinkelsen. Produktionen mangler stadig svar p\u00e5, om komponenten kommer tidsnok til at redde ordren, og hvad der skal produceres, indtil den ankommer.<\/p>\n\n\n<p>Det er netop d\u00e9t, h\u00e5ndtering af materialemangel handler om. Hvis man bruger lige mange kr\u00e6fter p\u00e5 alle manglende dele, spreder man indsatsen over problemer med vidt forskellige konsekvenser. Den mest nyttige handling er den, der sikrer en aftalt levering eller forhindrer et stop, som stadig kan undg\u00e5s.<\/p>\n\n\n<p>SkyPlanner APS kobler materialetilg\u00e6ngelighed sammen med produktionskapacitet og prioriteter. N\u00e5r du har bekr\u00e6ftet manglen og besluttet, hvad der skal g\u00f8res, oms\u00e6tter systemet oplysningerne til en f\u00e6lles produktionsplan. Du bruger mindre tid p\u00e5 at l\u00e6gge maskinernes opgaver\u00e6kkef\u00f8lge om og mere tid p\u00e5 at l\u00f8se den afvigelse, der har betydning.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Hvad er h\u00e5ndtering af materialemangel i produktionen?<\/h2>\n\n\n<p>H\u00e5ndtering af materialemangel er arbejdet med at identificere, verificere, prioritere og afhj\u00e6lpe mangel p\u00e5 materialer eller komponenter, som truer produktionen. Det forbinder et forsyningsproblem med de ber\u00f8rte produktionsopgaver, l\u00f8ftet til kunden og en praktisk indsats for at f\u00e5 produktionen tilbage p\u00e5 sporet.<\/p>\n\n\n<p>Materialemangel betyder ikke altid, at lagerbeholdningen er nul. Der kan ligge materialer p\u00e5 hylden, men ikke nok til alle de ordrer, som skal bruge dem inden n\u00e6ste varemodtagelse. Materialer p\u00e5 lager kan ogs\u00e5 v\u00e6re utilg\u00e6ngelige, fordi de er reserveret til andre ordrer, afventer kontrol eller befinder sig et andet sted end d\u00e9r, hvor de skal bruges ved den planlagte start.<\/p>\n\n\n<p>Materialemangel skyldes heller ikke altid, at en leverand\u00f8r har svigtet. Forsinkede varemodtagelser, fejl i lagerregistreringer, uregistreret forbrug, kassation, plukfejl og \u00e6ndrede ordrebehov kan alle betyde, at en opgave mangler de n\u00f8dvendige materialer. St\u00f8rre forstyrrelser i forsyningsk\u00e6den kan f\u00f8re til materialemangel, men den umiddelbare beslutning p\u00e5 fabrikken er stadig konkret: Hvilke opgaver er ber\u00f8rt, og hvad kan vi g\u00f8re ved det?<\/p>\n\n\n<p><a href=\"\/da\/ressourcer\/mrp-en-kort-guide\/\">MRP<\/a> identificerer materialebehov og manglende d\u00e6kning. <a href=\"https:\/\/skyplanner.ai\/da\/ressourcer\/lagerdaekning\/\">Lagerd\u00e6kning<\/a> hj\u00e6lper med at vurdere, hvor l\u00e6nge forsyningen r\u00e6kker. H\u00e5ndtering af materialemangel g\u00e5r et skridt videre: Man beslutter, hvilken bekr\u00e6ftet mangel der skal afhj\u00e6lpes f\u00f8rst, og oms\u00e6tter indsatsen til opgaver, som produktionen kan udf\u00f8re.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Verific\u00e9r materialemanglen, f\u00f8r du eskalerer den<\/h2>\n\n\n<p>Tag udgangspunkt i den ber\u00f8rte operation, ikke kun i varenummeret. En registrering af materialemangel bliver nyttig, n\u00e5r den fort\u00e6ller, hvad der mangler, hvor det skal bruges, og hvorn\u00e5r det skal v\u00e6re klar til brug.<\/p>\n\n\n<p>Saml disse oplysninger:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>Den kr\u00e6vede materialespecifikation og m\u00e6ngde, inklusive m\u00e5leenhed.<\/li><li>Den fysiske m\u00e6ngde, der kan bruges, og hvad der allerede er disponeret til andre form\u00e5l.<\/li><li>De ber\u00f8rte ordrer og operationer samt de aftalte leveringsterminer.<\/li><li>Den indg\u00e5ende m\u00e6ngde og en realistisk dato for, hvorn\u00e5r den kan bruges, inklusive varemodtagelse, kontrol og intern transport, hvor det er relevant.<\/li><li>Eventuelle andre manglende materialer eller kapacitetsbegr\u00e6nsninger, som fortsat vil forhindre f\u00e6rdigg\u00f8relse.<\/li><li>Hvem der er ansvarlig for n\u00e6ste handling, og hvorn\u00e5r der f\u00f8lges op igen.<\/li><\/ul>\n\n\n<p>Det forhindrer dyre tiltag mod det forkerte problem. Hvis den rigtige komponent allerede er i bygningen, men endnu ikke er n\u00e5et frem til arbejdsstationen, l\u00f8ser et ekstra indk\u00f8b ikke problemet med dagens opstart. Hvis en modtaget vare er i karant\u00e6ne, er den ikke klar til brug i produktionen, blot fordi den befinder sig p\u00e5 lageret.<\/p>\n\n\n<p>Skeln mellem en forventet og en bekr\u00e6ftet varemodtagelse. Sp\u00f8rg leverand\u00f8ren, hvad der faktisk er f\u00e6rdiggjort eller afsendt, ikke blot om det oprindelige l\u00f8fte stadig g\u00e6lder. Produktionen har brug for en realistisk dato at planl\u00e6gge efter. En optimistisk dato kopieret fra sidste uges indk\u00f8bsordre kan skjule behovet for at indhente forsinkelsen, indtil endnu en planlagt opstart glipper.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Priorit\u00e9r den levering, du stadig kan sikre<\/h2>\n\n\n<p>Den st\u00f8rste manglende m\u00e6ngde har ikke automatisk h\u00f8jeste prioritet. Det har den dyreste komponent heller ikke \u2013 eller ordren fra den kunde, der ringer mest ih\u00e6rdigt.<\/p>\n\n\n<p>Sp\u00f8rg ved hver bekr\u00e6ftet materialemangel: <strong>Hvilken forskel vil det g\u00f8re for leveringen, hvis vi afhj\u00e6lper denne mangel?<\/strong> F\u00f8lg den ber\u00f8rte ordre gennem de resterende operationer. En tidligere materialeleverance hj\u00e6lper kun, hvis der stadig er tid til de relevante trin som bearbejdning, efterbehandling, montage, kontrol og afsendelse.<\/p>\n\n\n<p>Den afg\u00f8rende frist er derfor ikke kun kundens leveringsdato. Det er det seneste tidspunkt, hvor materialet skal v\u00e6re klar til brug, for at de resterende operationer kan n\u00e5s. En komponent, der ankommer onsdag, kan redde \u00e9n afsendelse torsdag, men komme for sent til en anden ordre, som stadig skal gennem en ekstern efterbehandling.<\/p>\n\n\n<p>Sammenlign materialemanglerne ud fra tre praktiske sp\u00f8rgsm\u00e5l:<\/p>\n\n\n<p>1. <strong>Hvad er i fare?<\/strong> Afklar, hvilket kundel\u00f8fte, hvilket produktionsstop eller hvilken gruppe af ordrer der er ber\u00f8rt. Tag udgangspunkt i de forretningsm\u00e6ssige prioriteter, I har aftalt i teamet.<\/p>\n\n\n<p>2. <strong>Kan den foresl\u00e5ede handling redde situationen?<\/strong> Kontroll\u00e9r de \u00f8vrige materialer, de resterende operationer og den tilg\u00e6ngelige kapacitet. Betal ikke for at fremskynde \u00e9n komponent, hvis en anden alligevel g\u00f8r leveringen umulig.<\/p>\n\n\n<p>3. <strong>Hvor lang tid er der tilbage til at handle?<\/strong> En ordre, der stadig kan reddes, kan ende med ikke at kunne n\u00e5s, mens alle arbejder p\u00e5 en mindre presserende afvigelse.<\/p>\n\n\n<p>Nogle materialemangler kr\u00e6ver \u00f8jeblikkelig eskalering, fordi de truer flere ordrer eller et kritisk tidsvindue i produktionen. Andre kan afvente en bekr\u00e6ftet, normal varemodtagelse, uden at det \u00e6ndrer leveringen. G\u00f8r forskellen synlig, s\u00e5 indk\u00f8b, produktion og salg arbejder efter de samme prioriteter.<\/p>\n\n\n<p>Hvis der ikke er en realistisk mulighed for at indhente forsinkelsen, skal kunden have besked tidligt, og en ny leveringstermin skal aftales. At blive ved med at kalde en umulig dato for en \u00bbhastesag\u00ab skaber ikke den produktionstid, der mangler.<\/p>\n\n\n<h2 class=\"wp-block-heading\">V\u00e6lg en indsats, der \u00e6ndrer resultatet<\/h2>\n\n\n<p>Det giver mening at fremskynde en levering, n\u00e5r tidligere adgang til brugbare materialer \u00e6ndrer, hvad I kan n\u00e5 at f\u00e6rdigg\u00f8re. Bed om den m\u00e6ngde og det ankomsttidspunkt, der g\u00f8r forskellen. En bekr\u00e6ftet delleverance kan v\u00e6re mere v\u00e6rd end et ubekr\u00e6ftet l\u00f8fte om levering af hele indk\u00f8bsordren.<\/p>\n\n\n<p>Inden I v\u00e6lger dyr ekspresfragt, skal I kontrollere, om varemodtagelsen og kvalitetskontrollen kan h\u00e5ndtere leverancen, og om de n\u00f8dvendige produktionsressourcer er tilg\u00e6ngelige bagefter. Kortere transporttid har begr\u00e6nset v\u00e6rdi, hvis materialet derefter venter p\u00e5 en maskine til efter det planlagte afsendelsestidspunkt.<\/p>\n\n\n<p>Tilg\u00e6ngelige materialer p\u00e5 et andet lager kan v\u00e6re en anden l\u00f8sning. Kontroll\u00e9r specifikation, tilstand, overf\u00f8rselstid og eksisterende reservationer, f\u00f8r brugen godkendes. At flytte en materialemangel fra \u00e9n kunde til en anden er en forretningsm\u00e6ssig beslutning, ikke en lagerkorrektion.<\/p>\n\n\n<p>Et alternativt materiale eller en alternativ komponent kr\u00e6ver de relevante godkendelser fra teknik og kvalitet samt eventuel kundegodkendelse, som \u00e6ndringen kr\u00e6ver. En lignende beskrivelse eller dimension er ikke i sig selv tilladelse til at bruge alternativet. Regn godkendelsestiden med, n\u00e5r I beslutter, hvordan forsinkelsen skal indhentes.<\/p>\n\n\n<p>En \u00e6ndret opgaver\u00e6kkef\u00f8lge kan holde produktionen i gang, mens en blokeret opgave venter. V\u00e6lg opgaver, hvor materialer og \u00f8vrige foruds\u00e6tninger er p\u00e5 plads, og kontroll\u00e9r derefter, hvilke f\u00e6lles ressourcer de vil optage. Det kan v\u00e6re forkert at fylde en ledig maskine nu, hvis opgaven optager den tid i efterbehandlingen, som den prioriterede ordre skal bruge, n\u00e5r dens materiale ankommer.<\/p>\n\n\n<p>Delvis produktion eller dellevering kan ogs\u00e5 hj\u00e6lpe, n\u00e5r processen og aftalen med kunden tillader det. G\u00f8r m\u00e6ngderne og den resterende leveringsforpligtelse tydelige. Ellers kan flere delvist f\u00e6rdige ordrer optage knappe materialer, uden at en eneste levering bliver klar til afsendelse.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Eksempel: Samme komponent, forskellige l\u00f8sninger<\/h2>\n\n\n<p>Forestil dig to ordrer, som hver skal bruge 40 stk. af den samme komponent. Kun 40 brugbare stk. er tilg\u00e6ngelige. Yderligere 40 er bekr\u00e6ftet til fredag.<\/p>\n\n\n<p>Ordre A skal afsendes torsdag. De \u00f8vrige materialer er klar, og de resterende operationer kan n\u00e5s inden afsendelse, hvis ordren f\u00e5r de tilg\u00e6ngelige komponenter. Ordre B skal leveres den f\u00f8lgende tirsdag, men en anden komponent, som den skal bruge, bliver f\u00f8rst klar til brug mandag.<\/p>\n\n\n<p><strong>Ordre A.<\/strong> Skal bruge 40 komponenter. De \u00f8vrige materialer er klar, og ordren kan f\u00e6rdigg\u00f8res torsdag, hvis den n\u00f8dvendige kapacitet til de resterende operationer holdes fri. Godkend, at A f\u00e5r den tilg\u00e6ngelige m\u00e6ngde, og s\u00f8rg for plads til resten af produktionsruten.<\/p>\n\n\n<p><strong>Ordre B.<\/strong> Skal bruge 40 komponenter, men et andet materiale blokerer fremdriften indtil mandag. Kontroll\u00e9r, om fredagens leverance kan v\u00e6re klar til brug mandag, og om de resterende operationer kan n\u00e5s inden levering tirsdag.<\/p>\n\n\n<p><strong>Ordre C er klar.<\/strong> Den kr\u00e6ver ikke den knappe komponent, men konkurrerer om ressourcen til f\u00e6rdigbearbejdning. Plac\u00e9r den kun i planen, hvor den ikke optager den kapacitet til f\u00e6rdigbearbejdning, som A har brug for.<\/p>\n\n\n<p>Her er det det samlede billede af produktionsklarhed og leveringsmuligheder, der begrunder at tildele den tilg\u00e6ngelige m\u00e6ngde til A \u2013 ikke blot at A har den tidligste leveringsfrist. En fremskyndet levering af flere af den f\u00e6lles komponent til B ville ikke fjerne den anden materialemangel, som blokerer B indtil mandag.<\/p>\n\n\n<p>Samme r\u00e6sonnement forklarer, hvorfor r\u00e5det \u00bbk\u00f8r alt, der er klar\u00ab ikke er tilstr\u00e6kkeligt. Det kan v\u00e6re nyttigt at producere C, men ordren m\u00e5 ikke optage den kapacitet, der g\u00f8r det muligt at sikre leveringen af A.<\/p>\n\n\n<p>Hvis den anden komponent bliver forsinket i forhold til mandag, skal der tr\u00e6ffes en ny beslutning om B. Mangellisten, materialereservationerne og produktionsplanen skal alle opdateres, s\u00e5 de afspejler \u00e6ndringen.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Oms\u00e6t beslutningen om at sikre leveringen til en plan i SkyPlanner<\/h2>\n\n\n<p>En mangelliste kan vise, hvad der kr\u00e6ver opm\u00e6rksomhed. Men den kan ikke i sig selv f\u00e5 det resterende arbejde til at passe ind mellem alle fabrikkens \u00f8vrige ordrer. Det er her, SkyPlanner giver en praktisk fordel.<\/p>\n\n\n<p>N\u00e5r detailplanl\u00e6gning med hensyn til materialer er aktiveret, beregner SkyPlanner planen ud fra de materialer, der er knyttet til produktionen, og de vedligeholdte oplysninger om deres tilg\u00e6ngelighed. Ankomstdatoer p\u00e5 indk\u00f8bsordrer g\u00f8r det muligt at tage h\u00f8jde for forventede leverancer ved placeringen af det arbejde, der kr\u00e6ver materialerne. N\u00e5r en forsinket ankomst opdateres, og planen genberegnes, indg\u00e5r \u00e6ndringen i produktionsplanl\u00e6gningen i stedet for blot at st\u00e5 i en indk\u00f8bsnote.<\/p>\n\n\n<p>Arcturus, den kunstige intelligens bag SkyPlanners detailplanl\u00e6gning, planl\u00e6gger arbejdet ud fra den konfigurerede kapacitet, skiftehold, afh\u00e6ngigheder mellem operationer og prioriteter. Resultatet vises i <a href=\"https:\/\/skyplanner.ai\/da\/ressourcer\/hvad-er-finplanlaegning-i-produktionen\/\">Gantt-planen<\/a>. Her kan du gennemg\u00e5, hvorn\u00e5r det ber\u00f8rte arbejde er planlagt, hvordan de resterende operationer passer ind, og hvad der har \u00e6ndret sig for andre ordrer.<\/p>\n\n\n<p>I eksemplet ovenfor bekr\u00e6fter planl\u00e6ggeren f\u00f8rst, hvor stor en m\u00e6ngde der kan bruges, og godkender beslutningen om fordelingen af materialet. De vedligeholdte materialeoplysninger og de valgte prioriteter danner derefter grundlag for at genberegne produktionsplanen. Planl\u00e6ggeren gennemg\u00e5r A&#8217;s produktionsrute, det senere tidspunkt, hvor B er klar, og C&#8217;s placering i planen for den f\u00e6lles ressource. Det er ikke n\u00f8dvendigt at opbygge hver maskines k\u00f8 p\u00e5 ny for at forst\u00e5 den samlede effekt p\u00e5 produktionen.<\/p>\n\n\n<p><strong>Du beslutter, hvilke leveringsaftaler der skal sikres; SkyPlanner beregner planen ud fra dine beslutninger.<\/strong> Kundernes prioritet kan p\u00e5virke r\u00e6kkef\u00f8lgen i planen, n\u00e5r ressourcerne er begr\u00e6nsede. Det sparer planl\u00e6gningsarbejde, mens den forretningsm\u00e6ssige vurdering forbliver hos dem, der har ansvaret for kunderelationen.<\/p>\n\n\n<p>SkyPlanner kan integreres med ethvert ERP- eller MES-system via sit \u00e5bne REST API. Du kan koble eksisterende ordre- og materialedata til produktionsplanl\u00e6gning, der tager h\u00f8jde for den tilg\u00e6ngelige kapacitet, i stedet for at udskifte et velfungerende ERP-system blot for at koordinere indsatsen for at indhente forsinkelsen.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Hvad et bedre materialeoverblik \u00e6ndrede hos Eskomatic<\/h2>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/da\/kundehistorier\/eskomatic\/\">Eskomatic, der udf\u00f8rer maskinbearbejdning som underleverand\u00f8r<\/a>, organiserede tidligere i vid udstr\u00e6kning opgavek\u00f8erne manuelt i et \u00e6ldre ERP- og produktionsstyringssystem. Det begr\u00e6nsede overblik over materialernes tilg\u00e6ngelighed bet\u00f8d, at materialemangel kunne blive opdaget for t\u00e6t p\u00e5 en opgaves planlagte start.<\/p>\n\n\n<p>Med SkyPlanner fik Eskomatic en mere overskuelig opgavek\u00f8 i Gantt-diagrammet og overblik over materialemangler sammen med den kommende belastning i produktionen. Virksomheden fort\u00e6ller om f\u00e6rre produktionsstop p\u00e5 grund af manglende materialer og mere pr\u00e6cis fasts\u00e6ttelse af leveringsdatoer som f\u00f8lge af automatisk planl\u00e6gning ud fra produktionsbelastningen.<\/p>\n\n\n<p>For en planl\u00e6gger, der h\u00e5ndterer materialemangel, er det netop den praktiske gevinst: mindre tid brugt p\u00e5 at finde ud af, hvorfor arbejdet ikke kan starte, og et klarere grundlag for at vurdere, hvad der stadig kan leveres.<\/p>\n\n\n<h2 class=\"wp-block-heading\">F\u00f8lg handlingen til d\u00f8rs \u2013 luk ikke blot linjen i mangellisten<\/h2>\n\n\n<p>Udpeg en ansvarlig for hver handling, der skal sikre leveringen, og aftal n\u00e6ste opf\u00f8lgning. Indk\u00f8b bekr\u00e6fter l\u00f8sningen p\u00e5 forsyningsproblemet; lager og kvalitet bekr\u00e6fter, hvilke m\u00e6ngder der er tilg\u00e6ngelige og kan bruges; produktionsplanl\u00e6gningen opdaterer r\u00e6kkef\u00f8lgen; og salg kommunikerer eventuelle \u00e6ndringer i den lovede levering. P\u00e5 en lille fabrik kan \u00e9n person varetage flere roller, men oplysningerne skal stadig overdrages mellem funktionerne.<\/p>\n\n\n<p>Luk ikke en afvigelse, blot fordi leverand\u00f8ren siger, at varerne er afsendt. Bekr\u00e6ft, at den n\u00f8dvendige m\u00e6ngde kan bruges, at det ber\u00f8rte arbejde har en realistisk plads i planen, og at de medarbejdere, der skal udf\u00f8re det, har den aktuelle plan.<\/p>\n\n\n<p>L\u00e6r derefter af de problemer, der gentager sig. F\u00f8lg op p\u00e5 stoptid for\u00e5rsaget af materialemangel, p\u00e5 hvor godt l\u00f8fterne om at l\u00f8se manglerne holder, og p\u00e5 hvilke leveringsaftaler handlingerne faktisk sikrede. Find \u00e5rsagerne til tilbagevendende registreringsfejl, uplanlagt forbrug eller leverancer, man ikke kan regne med. F\u00e6rre \u00e5bne linjer i mangellisten er ikke en succes, hvis uf\u00e6rdige ordrer blot st\u00e5r og venter et andet sted.<\/p>\n\n\n<p>For fabrikker, der j\u00e6vnligt skal h\u00e5ndtere forsinkede materialer og maskiner, som flere ordrer deler, er SkyPlanner APS en praktisk m\u00e5de at oms\u00e6tte beslutninger om at sikre leveringerne til en gennemf\u00f8rlig produktionsplan. Det reducerer den manuelle afstemning mellem materialelister og maskink\u00f8er, s\u00e5 teamet kan fokusere p\u00e5 at sikre leveringerne.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/da\/kontakt-salg\/\">Book en demo af SkyPlanner<\/a>, og tag udgangspunkt i en konkret materialemangel, de ordrer, der bruger materialet, og en bekr\u00e6ftet ankomstdato. Brug demoen til at dr\u00f8fte, hvad der kan produceres nu, hvad der m\u00e5 vente, og hvordan beslutningen p\u00e5virker resten af produktionen. Vil du hellere udforske mulighederne f\u00f8rst, kan du <a href=\"https:\/\/skyplanner.ai\/da\/proeveperiode\/\">pr\u00f8ve SkyPlanner med demodata<\/a> eller bruge det AI-underst\u00f8ttede kom godt i gang-forl\u00f8b i SkyPlanner Assistant.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>H\u00e5ndtering af materialemangel: Hold ordrerne i gang Hjem &raquo; Ressourcer &raquo; H\u00e5ndtering af materialemangel: Hold ordrerne i gang En leverand\u00f8r lover at fremskynde leveringen af en manglende komponent. Indk\u00f8b har en plan for at indhente forsinkelsen. Produktionen mangler stadig svar p\u00e5, om komponenten kommer tidsnok til at redde ordren, og hvad der skal produceres, indtil &#8230; <a title=\"H\u00e5ndtering af materialemangel: Hold ordrerne i gang\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/da\/ressourcer\/handtering-af-materialemangel\/\" aria-label=\"Read more about H\u00e5ndtering af materialemangel: Hold ordrerne i gang\">L\u00e6s Mere<\/a><\/p>\n","protected":false},"author":3,"featured_media":111530,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2519,307],"tags":[],"class_list":["post-111504","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-og-planlaegning","category-ressourcer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>H\u00e5ndtering af materialemangel: Hold ordrerne i gang<\/title>\n<meta name=\"description\" content=\"Priorit\u00e9r materialemangler, beskyt leveringer, og brug SkyPlanner til at oms\u00e6tte tilg\u00e6ngelige materialer til en produktionsplan, der kan gennemf\u00f8res.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/da\/ressourcer\/handtering-af-materialemangel\/\" \/>\n<meta property=\"og:locale\" content=\"da_DK\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"H\u00e5ndtering af materialemangel: Hold ordrerne i gang\" \/>\n<meta property=\"og:description\" content=\"Priorit\u00e9r materialemangler, beskyt leveringer, og brug SkyPlanner til at oms\u00e6tte tilg\u00e6ngelige materialer til en produktionsplan, der kan gennemf\u00f8res.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/da\/ressourcer\/handtering-af-materialemangel\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-27T22:44:45+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-27T22:45:02+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1774\" \/>\n\t<meta property=\"og:image:height\" content=\"887\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Skrevet af\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimeret l\u00e6setid\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/handtering-af-materialemangel\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/handtering-af-materialemangel\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"H\u00e5ndtering af materialemangel: Hold ordrerne i gang\",\"datePublished\":\"2026-10-27T22:44:45+00:00\",\"dateModified\":\"2026-10-27T22:45:02+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/handtering-af-materialemangel\\\/\"},\"wordCount\":2497,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/handtering-af-materialemangel\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/material-shortages-manufacturing-hero.png\",\"articleSection\":[\"APS og planl\u00e6gning\",\"ressourcer\"],\"inLanguage\":\"da-DK\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/handtering-af-materialemangel\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/handtering-af-materialemangel\\\/\",\"name\":\"H\u00e5ndtering af materialemangel: Hold ordrerne i gang\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/handtering-af-materialemangel\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/handtering-af-materialemangel\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/material-shortages-manufacturing-hero.png\",\"datePublished\":\"2026-10-27T22:44:45+00:00\",\"dateModified\":\"2026-10-27T22:45:02+00:00\",\"description\":\"Priorit\u00e9r materialemangler, beskyt leveringer, og brug SkyPlanner til at oms\u00e6tte tilg\u00e6ngelige materialer til en produktionsplan, der kan gennemf\u00f8res.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/handtering-af-materialemangel\\\/#breadcrumb\"},\"inLanguage\":\"da-DK\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/handtering-af-materialemangel\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"da-DK\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/handtering-af-materialemangel\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/material-shortages-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/material-shortages-manufacturing-hero.png\",\"width\":1774,\"height\":887,\"caption\":\"An assembly waits for a missing component while available parts keep another assembly moving.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/handtering-af-materialemangel\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"H\u00e5ndtering af materialemangel: Hold ordrerne i gang\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"da-DK\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"da-DK\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"da-DK\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"H\u00e5ndtering af materialemangel: Hold ordrerne i gang","description":"Priorit\u00e9r materialemangler, beskyt leveringer, og brug SkyPlanner til at oms\u00e6tte tilg\u00e6ngelige materialer til en produktionsplan, der kan gennemf\u00f8res.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/da\/ressourcer\/handtering-af-materialemangel\/","og_locale":"da_DK","og_type":"article","og_title":"H\u00e5ndtering af materialemangel: Hold ordrerne i gang","og_description":"Priorit\u00e9r materialemangler, beskyt leveringer, og brug SkyPlanner til at oms\u00e6tte tilg\u00e6ngelige materialer til en produktionsplan, der kan gennemf\u00f8res.","og_url":"https:\/\/skyplanner.ai\/da\/ressourcer\/handtering-af-materialemangel\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-27T22:44:45+00:00","article_modified_time":"2026-10-27T22:45:02+00:00","og_image":[{"width":1774,"height":887,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Skrevet af":"Jussi M\u00e4ntyl\u00e4","Estimeret l\u00e6setid":"12 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/handtering-af-materialemangel\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/handtering-af-materialemangel\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/da\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"H\u00e5ndtering af materialemangel: Hold ordrerne i gang","datePublished":"2026-10-27T22:44:45+00:00","dateModified":"2026-10-27T22:45:02+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/handtering-af-materialemangel\/"},"wordCount":2497,"publisher":{"@id":"https:\/\/skyplanner.ai\/da\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/handtering-af-materialemangel\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero.png","articleSection":["APS og planl\u00e6gning","ressourcer"],"inLanguage":"da-DK"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/handtering-af-materialemangel\/","url":"https:\/\/skyplanner.ai\/da\/ressourcer\/handtering-af-materialemangel\/","name":"H\u00e5ndtering af materialemangel: Hold ordrerne i gang","isPartOf":{"@id":"https:\/\/skyplanner.ai\/da\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/handtering-af-materialemangel\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/handtering-af-materialemangel\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero.png","datePublished":"2026-10-27T22:44:45+00:00","dateModified":"2026-10-27T22:45:02+00:00","description":"Priorit\u00e9r materialemangler, beskyt leveringer, og brug SkyPlanner til at oms\u00e6tte tilg\u00e6ngelige materialer til en produktionsplan, der kan gennemf\u00f8res.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/handtering-af-materialemangel\/#breadcrumb"},"inLanguage":"da-DK","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/da\/ressourcer\/handtering-af-materialemangel\/"]}]},{"@type":"ImageObject","inLanguage":"da-DK","@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/handtering-af-materialemangel\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero.png","width":1774,"height":887,"caption":"An assembly waits for a missing component while available parts keep another assembly moving."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/handtering-af-materialemangel\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/da\/"},{"@type":"ListItem","position":2,"name":"H\u00e5ndtering af materialemangel: Hold ordrerne i gang"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/da\/#website","url":"https:\/\/skyplanner.ai\/da\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/da\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/da\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"da-DK"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/da\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/da\/","logo":{"@type":"ImageObject","inLanguage":"da-DK","@id":"https:\/\/skyplanner.ai\/da\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/da\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/da\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"da-DK","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero.png",1774,887,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero-300x150.png",300,150,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero-768x384.png",768,384,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero-1024x512.png",1024,512,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero-1536x768.png",1536,768,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero.png",1774,887,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero-360x180.png",360,180,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/da\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"H\u00e5ndtering af materialemangel: Hold ordrerne i gang Hjem &raquo; Ressourcer &raquo; H\u00e5ndtering af materialemangel: Hold ordrerne i gang En leverand\u00f8r lover at fremskynde leveringen af en manglende komponent. Indk\u00f8b har en plan for at indhente forsinkelsen. Produktionen mangler stadig svar p\u00e5, om komponenten kommer tidsnok til at redde ordren, og hvad der skal produceres, indtil&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/posts\/111504","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/comments?post=111504"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/posts\/111504\/revisions"}],"predecessor-version":[{"id":111568,"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/posts\/111504\/revisions\/111568"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/media\/111530"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/media?parent=111504"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/categories?post=111504"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/tags?post=111504"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}