{"id":104563,"date":"2026-10-20T19:34:39","date_gmt":"2026-10-20T19:34:39","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=104563"},"modified":"2026-10-20T19:34:57","modified_gmt":"2026-10-20T19:34:57","slug":"first-pass-yield","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/da\/ressourcer\/first-pass-yield\/","title":{"rendered":"First pass yield: Formel, eksempel og skjult omarbejde"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">First pass yield: Formel, eksempel og skjult omarbejde<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/da\/\">Hjem<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/da\/ressourcer\/\">Ressourcer<\/a> &raquo; First pass yield: Formel, eksempel og skjult omarbejde<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Ansl\u00e5et l\u00e6setid: <\/span><span class=\"yoast-reading-time__reading-time\">9<\/span><span class=\"yoast-reading-time__time-unit\"> Minutter<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>First pass yield (FPY) er den procentdel af emnerne, der opfylder de aftalte kvalitetskrav i f\u00f8rste fors\u00f8g gennem en afgr\u00e6nset proces \u2013 uden reparation, omarbejde eller en ny test efter en underkendelse. Tallet viser, hvor stor en del af produktionen der var i orden f\u00f8rste gang, ikke hvor meget der endte med at blive godkendt.<\/p>\n\n\n<p>Den forskel er vigtig, n\u00e5r antallet af f\u00e6rdige emner ser fornuftigt ud, men fabrikken har sv\u00e6rt ved at f\u00f8lge med. Reparerede emner kan stadig leveres, men det har kostet tid at g\u00f8re dem klar \u2013 tid, som andre ordrer havde brug for. N\u00e5r du f\u00f8lger b\u00e5de FPY og indsatsen for at f\u00e5 underkendte emner godkendt, bliver det synligt, hvad det samlede antal godkendte emner skjuler. Ved at koble det arbejde til produktionsregistreringerne og detailplanl\u00e6gningen i SkyPlanner kan du se, hvad det betyder for kapacitet og leverancer.<\/p>\n\n\n<h2 class=\"wp-block-heading\">S\u00e5dan beregner du first pass yield<\/h2>\n\n\n<p>Brug denne formel:<\/p>\n\n\n<p><strong>First pass yield (%) = Antal emner godkendt i f\u00f8rste fors\u00f8g \u00f7 Antal emner, der g\u00e5r ind i den afgr\u00e6nsede proces \u00d7 100<\/strong><\/p>\n\n\n<p>T\u00e6l hvert emne \u00e9n gang, ikke antallet af kontroller eller de enkelte fejl. Et emne, der underkendes, bliver rettet og derefter godkendes, t\u00e6ller med i det endelige antal godkendte emner, men ikke som godkendt i f\u00f8rste fors\u00f8g. Et emne med flere fejl t\u00e6ller stadig kun som \u00e9t underkendt emne i denne beregning.<\/p>\n\n\n<p>Afgr\u00e6ns processen, f\u00f8r du indsamler tallene. Du kan eksempelvis m\u00e5le p\u00e5 en bearbejdningsoperation, en teststation eller en hel produktionsrute. T\u00e6ller og n\u00e6vner skal omfatte den samme gruppe emner inden for den valgte afgr\u00e6nsning.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Eksempel: 90% first pass yield, 96% endeligt udbytte<\/h3>\n\n\n<p>Forestil dig et parti p\u00e5 500 bearbejdede emner, hvor alle kontrolresultater fra f\u00f8rste fors\u00f8g foreligger:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Resultat af f\u00f8rste fors\u00f8g<\/th><th>Antal emner<\/th><th>Det videre forl\u00f8b<\/th><\/tr><\/thead><tbody><tr><td>Godkendt uden rettelser<\/td><td>450<\/td><td>Klar til n\u00e6ste operation<\/td><\/tr><tr><td>Sendt til omarbejde<\/td><td>40<\/td><td>30 godkendes senere; 10 ender med at blive kasseret<\/td><\/tr><tr><td>Kasseret med det samme<\/td><td>10<\/td><td>Kan ikke g\u00e5 videre<\/td><\/tr><tr><td>Samlet antal emner, der g\u00e5r ind i operationen<\/td><td>500<\/td><td>Hvert emne har \u00e9t resultat fra f\u00f8rste fors\u00f8g<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>First pass yield er:<\/p>\n\n\n<p><strong>450 \u00f7 500 \u00d7 100 = 90%<\/strong><\/p>\n\n\n<p>Efter omarbejde er 480 emner godkendt: de oprindelige 450 plus 30, der er blevet godkendt efter omarbejde. Det endelige udbytte for partiet er derfor:<\/p>\n\n\n<p><strong>480 \u00f7 500 \u00d7 100 = 96%<\/strong><\/p>\n\n\n<p>Begge procenttal er nyttige. FPY beskriver, hvor godt processen lykkes i f\u00f8rste fors\u00f8g. Det endelige udbytte viser den andel, der til sidst godkendes, inklusive vellykket omarbejde. Hvis du kun rapporterer 96%, skjuler du det arbejde, der skulle til for at f\u00e5 de 30 emner godkendt.<\/p>\n\n\n<p>De resterende 10% i FPY-beregningen er heller ikke kassationsprocenten. I dette eksempel ender 20 emner med at blive kasseret, s\u00e5 den endelige kassation er 4%. De \u00f8vrige 6% af det oprindelige parti blev godkendt gennem ekstra arbejde. Hvis du kun tr\u00e6kker kassationen fra, f\u00e5r du det endelige udbytte, ikke first pass yield.<\/p>\n\n\n<h2 class=\"wp-block-heading\">F\u00e5 styr p\u00e5 opt\u00e6llingen, f\u00f8r du stoler p\u00e5 procenttallet<\/h2>\n\n\n<p>Selve regnestykket er enkelt. Det kr\u00e6ver mere omhu at fastholde betydningen af \u00bbf\u00f8rste fors\u00f8g\u00ab, is\u00e6r n\u00e5r produktions- og kontrolregistreringer kommer fra forskellige systemer.<\/p>\n\n\n<p>1. <strong>V\u00e6lg \u00e9n proces og en sammenlignelig produktgruppe.<\/strong> Et resultat fra f\u00f8rste fors\u00f8g ved bearbejdningen er ikke det samme som en endelig godkendelse af hele den samlede enhed. Hold produktionsruter og godkendelseskrav klart definerede, s\u00e5 en \u00e6ndring i produktmixet ikke fremst\u00e5r som en kvalitetsforbedring.<\/p>\n\n\n<p>2. <strong>S\u00f8rg for, at resultaterne h\u00f8rer til den gruppe, der gik ind i processen.<\/strong> Tag udgangspunkt i et parti eller en anden sporbar gruppe, hvor resultaterne fra f\u00f8rste fors\u00f8g er kendt. Hvis du dividerer dagens f\u00e6rdiggjorte og godkendte emner med dagens igangsatte emner, kan du komme til at blande forskellige grupper sammen, is\u00e6r n\u00e5r opgaver str\u00e6kker sig over flere skift.<\/p>\n\n\n<p>3. <strong>Bevar det oprindelige resultat.<\/strong> Hold godkendelse i f\u00f8rste fors\u00f8g adskilt fra senere godkendelse efter rettelser eller gentagne test. Hvis du overskriver underkendelsen, n\u00e5r et repareret emne godkendes, ser historikken bedre ud, uden at det \u00e6ndrer p\u00e5, hvad der faktisk skete.<\/p>\n\n\n<p>4. <strong>T\u00e6l hvert emne \u00e9n gang ved den valgte procesafgr\u00e6nsning.<\/strong> Flere fejl, gentagne test og gentagne tidsregistreringer giver ikke flere oprindelige emner. Brug entydige emne-id&#8217;er eller en afstemt partiregistrering, der bevarer antal og historik for omarbejde.<\/p>\n\n\n<p>5. <strong>G\u00f8r uafklarede resultater synlige.<\/strong> Emner, der stadig afventer kontrol, er ikke automatisk godkendt eller underkendt. Vis det uafklarede antal, og f\u00e6rdigg\u00f8r f\u00f8rst gruppens FPY, n\u00e5r alle resultater fra f\u00f8rste fors\u00f8g foreligger, frem for ubem\u00e6rket at udelade de problematiske emner fra opt\u00e6llingen.<\/p>\n\n\n<p>En operation kan have flere planlagte kontroller i sit normale forl\u00f8b. At gennemf\u00f8re den aftalte r\u00e6kkef\u00f8lge korrekt f\u00f8rste gang er noget andet end at gentage en test efter en underkendelse eller rette en fejl. Beskriv den forskel i m\u00e5ledefinitionen, og anvend den konsekvent.<\/p>\n\n\n<p>Hvis din rapport kun indeholder <a href=\"https:\/\/skyplanner.ai\/da\/ressourcer\/produktionsrapport\/\">samlede antal f\u00e6rdiggjorte og fejlbeh\u00e6ftede emner<\/a>, skal du unders\u00f8ge, hvad felterne d\u00e6kker over, f\u00f8r du bruger dem til en FPY-beregning. Du skal vide, om det godkendte antal omfatter reparerede emner, og om gentagen bearbejdning er talt med mere end \u00e9n gang.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Forskellen p\u00e5 first pass yield og rolled throughput yield<\/h2>\n\n\n<p>En enkelt operation kan se ud til at fungere godt, selv om den samlede produktionsrute kr\u00e6ver omfattende rettelser. Rolled throughput yield (RTY) viser det samlede udbytte i f\u00f8rste fors\u00f8g p\u00e5 tv\u00e6rs af flere procestrin i r\u00e6kkef\u00f8lge.<\/p>\n\n\n<p>For et sammenh\u00e6ngende procesforl\u00f8b ganger du trinnenes udbytte med hinanden, angivet som decimaltal:<\/p>\n\n\n<p><strong>RTY (%) = First pass yield p\u00e5 trin 1 \u00d7 First pass yield p\u00e5 trin 2 \u00d7 \u2026 \u00d7 100<\/strong><\/p>\n\n\n<p>Forestil dig, at du f\u00f8lger 1.000 emner gennem tre operationer. I dette eksempel g\u00e5r kun emner, der er godkendt i f\u00f8rste fors\u00f8g p\u00e5 alle hidtidige trin, videre i den gruppe, du f\u00f8lger. Reparerede emner kommer ikke tilbage i gruppen.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Operation<\/th><th>Emner i den fulgte gruppe ved trinets start<\/th><th>Emner godkendt i f\u00f8rste fors\u00f8g<\/th><th>Udbytte p\u00e5 trinet<\/th><\/tr><\/thead><tbody><tr><td>Bearbejdning<\/td><td>1.000<\/td><td>900<\/td><td>90%<\/td><\/tr><tr><td>Efterbehandling<\/td><td>900<\/td><td>810<\/td><td>90%<\/td><\/tr><tr><td>Test<\/td><td>810<\/td><td>729<\/td><td>90%<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>0,90 \u00d7 0,90 \u00d7 0,90 \u00d7 100 = 72,9% RTY<\/strong><\/p>\n\n\n<p>Hver operation har et udbytte p\u00e5 90%, men kun 729 af de oprindelige 1.000 emner klarer alle tre uden en underkendelse. Et gennemsnit af de tre procenttal ville give 90% og skjule den samlede effekt.<\/p>\n\n\n<p>I den faktiske produktion kan reparerede emner vende tilbage til produktionsflowet, og produkter kan f\u00f8lge forskellige ruter. Brug udbyttetal fra trin med en sammenh\u00e6ngende rute og et ensartet opt\u00e6llingsgrundlag. Gang ikke uafh\u00e6ngige afdelingsgennemsnit med hinanden, og kald resultatet en m\u00e5lt godkendelsesandel for hele forl\u00f8bet. N\u00e5r du bevarer historikken for hvert emnes f\u00f8rste fors\u00f8g, kan du kontrollere, hvor mange af de oprindelige emner der faktisk klarede hele ruten uden rettelser.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Hvad er en god first pass yield?<\/h2>\n\n\n<p>Et brugbart m\u00e5l afspejler produktet, processen, kvalitetskravene og konsekvenserne af fejl. Et generelt benchmark er ikke nok til at vurdere, om netop din operation fungerer godt.<\/p>\n\n\n<p>Start med udviklingen for sammenligneligt arbejde. Se procenttallet sammen med antallet af m\u00e5lte emner, fejl\u00e5rsagerne og omfanget af arbejdet med at rette fejl. En h\u00f8jere FPY er meningsfuld, n\u00e5r de samme godkendelsesregler g\u00e6lder. Det er ikke en forbedring, hvis teamet blot har lempet kontrolkriterierne eller fjernet problematiske emner fra n\u00e6vneren.<\/p>\n\n\n<p>Vil du forbedre processen, s\u00e5 find et tilbagevendende problem, du kan g\u00f8re noget ved. Grupp\u00e9r underkendelser i f\u00f8rste fors\u00f8g efter operation og bekr\u00e6ftet \u00e5rsag. Et tilbagevendende m\u00e5lproblem p\u00e5 \u00e9t produkt kan pege p\u00e5 v\u00e6rkt\u00f8jet, fiksturen, materialet eller metoden, men procenttallet alene fort\u00e6ller ikke, hvor \u00e5rsagen ligger. Gennemg\u00e5 dokumentationen med dem, der udf\u00f8rer arbejdet, ret \u00e5rsagen, og m\u00e5l igen p\u00e5 sammenlignelig produktion.<\/p>\n\n\n<p>Se ogs\u00e5 p\u00e5, hvor meget det kr\u00e6ver at f\u00e5 underkendte emner godkendt. To operationer med samme FPY kan have vidt forskellige konsekvenser, hvis den ene kr\u00e6ver en hurtig rettelse, mens den anden optager en f\u00e6lles maskine i timevis. Her bliver kvalitetsresultatet til en beslutning om planl\u00e6gning.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Oms\u00e6t omarbejdet bag FPY til et realistisk kapacitetsbehov<\/h2>\n\n\n<p>Lad os vende tilbage til partiet p\u00e5 500 emner. Forestil dig, at hvert af de 40 fors\u00f8g p\u00e5 omarbejde kr\u00e6ver yderligere 12 minutter p\u00e5 det samme bearbejdningscenter, uanset om emnet til sidst godkendes eller kasseres.<\/p>\n\n\n<p><strong>40 fors\u00f8g \u00d7 12 minutter = 480 minutter = 8 maskintimer<\/strong><\/p>\n\n\n<p>Rapporten over det endelige udbytte viser 480 godkendte emner. Produktionsplanen skal ogs\u00e5 tage h\u00f8jde for de otte ekstra timer. Yderligere omstilling, kontrol eller h\u00e5ndtering kan kr\u00e6ve mere tid andre steder.<\/p>\n\n\n<p>Du kan ikke g\u00e5 ud fra, at en fejlrate p\u00e5 10% ved f\u00f8rste genneml\u00f8b betyder pr\u00e6cis 10% tabt kapacitet. Ruterne for udbedring og deres varighed varierer. Beregn det faktiske arbejde p\u00e5 de ressourcer, der skal udf\u00f8re det. Maskintimer og operat\u00f8rtimer skal ogs\u00e5 holdes adskilt, n\u00e5r de beskriver forskellige begr\u00e6nsninger.<\/p>\n\n\n<p>Hvis bearbejdningscentret allerede er fuldt booket frem til en vigtig afsendelse, skaber det ikke mere kapacitet at presse omarbejde ind i en s\u00e6rskilt k\u00f8. Det \u00e6ndrer, hvilken ordre der kan blive f\u00e6rdig f\u00f8rst. N\u00e5r du opdager konflikten tidligt, f\u00e5r du tid til at prioritere, bruge en anden egnet ressource eller genoverveje en lovet leveringsdato, f\u00f8r problemet kommer som en overraskelse i sidste \u00f8jeblik.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Brug SkyPlanner til at f\u00e5 registreret omarbejde med i den n\u00e6ste produktionsplan<\/h2>\n\n\n<p>SkyPlanner samler tidsregistrering i produktionen, detaljerede rapporter og detailplanl\u00e6gning med kunstig intelligens. P\u00e5 en fabrik, hvor omarbejde igen og igen forstyrrer leverancerne, er det et nyttigt n\u00e6ste skridt: G\u00f8r arbejdet med at udbedre fejl synligt, og giv det godkendte udbedringsarbejde en realistisk plads i planen sammen med kundeordrerne.<\/p>\n\n\n<p>Med Timer i SkyPlanner registrerer du arbejdstid samt antal producerede eller fejlbeh\u00e6ftede emner. Rapporten All Timelogs Report knytter registreringerne til opgave, procestrin, arbejdsstation, person, start- og sluttidspunkt, f\u00e6rdige og fejlbeh\u00e6ftede emner, registreret tid og noter. Her kan registreringerne gennemg\u00e5s, redigeres og godkendes.<\/p>\n\n\n<p>N\u00e5r udbedringsarbejdet er identificeret i opgave- og tidsregistreringerne, kan du unders\u00f8ge, hvad den registrerede tid er brugt p\u00e5, frem for at den forsvinder i dagens samlede tal. Bevar historikken over godkendelse ved f\u00f8rste fors\u00f8g og omarbejde fra dine kvalitets- eller MES-registreringer til beregningen af FPY. De registreringer forklarer kvalitetsresultatet, mens de tilh\u00f8rende tidsregistreringer forklarer, hvor meget arbejde udbedringen kr\u00e6vede.<\/p>\n\n\n<p>L\u00e6g derefter de <a href=\"https:\/\/skyplanner.ai\/da\/ressourcer\/produktionsordre\/\">godkendte udbedringsoperationer<\/a> ind i planen med deres varighed og de ressourcer, der kan udf\u00f8re dem. Arcturus, SkyPlanners kunstige intelligens til detailplanl\u00e6gning, beregner planen ud fra den konfigurerede kapacitet, afh\u00e6ngighederne mellem operationer og prioriteterne. Gantt-tidslinjen viser den beregnede r\u00e6kkef\u00f8lge og f\u00e6rdigg\u00f8relsesdatoerne. Du styrer prioriteterne og de beslutninger, der skal fastholdes; Arcturus h\u00e5ndterer den samlede planl\u00e6gningsberegning.<\/p>\n\n\n<p>For batchen i det t\u00e6nkte eksempel bliver sp\u00f8rgsm\u00e5let konkret: Hvor er der plads til otte ekstra maskintimer, og hvad sker der med de ordrer, der allerede bruger ressourcen? N\u00e5r den <a href=\"https:\/\/skyplanner.ai\/da\/ressourcer\/hvad-er-finplanlaegning-i-produktionen\/\">f\u00e6lles plan<\/a> genberegnes, bliver konsekvenserne af valget synlige, uden at du manuelt skal rette en s\u00e6rskilt k\u00f8 for hver ber\u00f8rt arbejdsstation.<\/p>\n\n\n<p>SkyPlanner kan integreres med ethvert ERP- eller MES-system via sin \u00e5bne REST API. Du kan beholde de systemer, der rummer dine ordrer og din kvalitetshistorik, og samtidig f\u00e5 det arbejde, de genererer, med i en detailplanl\u00e6gning med begr\u00e6nset kapacitet.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Se, hvad fejl ved f\u00f8rste genneml\u00f8b betyder for leveringen<\/h2>\n\n\n<p>V\u00e6lg en operation, hvor det endelige antal godkendte emner ofte skjuler ekstraarbejde. Tag resultaterne fra f\u00f8rste fors\u00f8g, en typisk godkendt rute for udbedring og en ber\u00f8rt kundeordre med til en SkyPlanner-demo.<\/p>\n\n\n<p>Det giver dig et konkret udgangspunkt for at se, hvordan produktionsregistreringer og en f\u00e6lles plan kan hj\u00e6lpe dit team med at reagere: F\u00e5 overblik over udbedringsarbejdet, vurder kapacitetskonflikten, og tr\u00e6f den n\u00e6ste leveringsbeslutning ud fra en plan, der omfatter det arbejde, som stadig mangler. <a href=\"https:\/\/skyplanner.ai\/da\/kontakt-salg\/\">Book en SkyPlanner-demo<\/a> for at se n\u00e6rmere p\u00e5 din proces, eller <a href=\"https:\/\/skyplanner.ai\/da\/proeveperiode\/\">pr\u00f8v f\u00f8rst SkyPlanner med demodata<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>First pass yield: Formel, eksempel og skjult omarbejde Hjem &raquo; Ressourcer &raquo; First pass yield: Formel, eksempel og skjult omarbejde First pass yield (FPY) er den procentdel af emnerne, der opfylder de aftalte kvalitetskrav i f\u00f8rste fors\u00f8g gennem en afgr\u00e6nset proces \u2013 uden reparation, omarbejde eller en ny test efter en underkendelse. Tallet viser, hvor &#8230; <a title=\"First pass yield: Formel, eksempel og skjult omarbejde\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/da\/ressourcer\/first-pass-yield\/\" aria-label=\"Read more about First pass yield: Formel, eksempel og skjult omarbejde\">L\u00e6s Mere<\/a><\/p>\n","protected":false},"author":3,"featured_media":104594,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2547,307],"tags":[],"class_list":["post-104563","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-effektiv-produktion","category-ressourcer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>First pass yield: Formel, eksempel og skjult omarbejde<\/title>\n<meta name=\"description\" content=\"Beregn first pass yield uden at t\u00e6lle reparerede emner som godkendt f\u00f8rste gang. Se, hvordan omarbejde bruger kapacitet, og SkyPlanner hj\u00e6lper med planl\u00e6gningen.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/da\/ressourcer\/first-pass-yield\/\" \/>\n<meta property=\"og:locale\" content=\"da_DK\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"First pass yield: Formel, eksempel og skjult omarbejde\" \/>\n<meta property=\"og:description\" content=\"Beregn first pass yield uden at t\u00e6lle reparerede emner som godkendt f\u00f8rste gang. Se, hvordan omarbejde bruger kapacitet, og SkyPlanner hj\u00e6lper med planl\u00e6gningen.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/da\/ressourcer\/first-pass-yield\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-20T19:34:39+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-20T19:34:57+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Skrevet af\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimeret l\u00e6setid\" \/>\n\t<meta name=\"twitter:data2\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/first-pass-yield\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/first-pass-yield\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"First pass yield: Formel, eksempel og skjult omarbejde\",\"datePublished\":\"2026-10-20T19:34:39+00:00\",\"dateModified\":\"2026-10-20T19:34:57+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/first-pass-yield\\\/\"},\"wordCount\":2017,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/first-pass-yield\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/first-pass-yield-hero.png\",\"articleSection\":[\"Effektiv produktion\",\"ressourcer\"],\"inLanguage\":\"da-DK\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/first-pass-yield\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/first-pass-yield\\\/\",\"name\":\"First pass yield: Formel, eksempel og skjult omarbejde\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/first-pass-yield\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/first-pass-yield\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/first-pass-yield-hero.png\",\"datePublished\":\"2026-10-20T19:34:39+00:00\",\"dateModified\":\"2026-10-20T19:34:57+00:00\",\"description\":\"Beregn first pass yield uden at t\u00e6lle reparerede emner som godkendt f\u00f8rste gang. Se, hvordan omarbejde bruger kapacitet, og SkyPlanner hj\u00e6lper med planl\u00e6gningen.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/first-pass-yield\\\/#breadcrumb\"},\"inLanguage\":\"da-DK\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/first-pass-yield\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"da-DK\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/first-pass-yield\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/first-pass-yield-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/first-pass-yield-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Machined flanges pass inspection directly or take a correction loop, illustrating first-pass yield and rework.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/first-pass-yield\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"First pass yield: Formel, eksempel og skjult omarbejde\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"da-DK\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"da-DK\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"da-DK\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"First pass yield: Formel, eksempel og skjult omarbejde","description":"Beregn first pass yield uden at t\u00e6lle reparerede emner som godkendt f\u00f8rste gang. Se, hvordan omarbejde bruger kapacitet, og SkyPlanner hj\u00e6lper med planl\u00e6gningen.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/da\/ressourcer\/first-pass-yield\/","og_locale":"da_DK","og_type":"article","og_title":"First pass yield: Formel, eksempel og skjult omarbejde","og_description":"Beregn first pass yield uden at t\u00e6lle reparerede emner som godkendt f\u00f8rste gang. Se, hvordan omarbejde bruger kapacitet, og SkyPlanner hj\u00e6lper med planl\u00e6gningen.","og_url":"https:\/\/skyplanner.ai\/da\/ressourcer\/first-pass-yield\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-20T19:34:39+00:00","article_modified_time":"2026-10-20T19:34:57+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Skrevet af":"Jussi M\u00e4ntyl\u00e4","Estimeret l\u00e6setid":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/first-pass-yield\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/first-pass-yield\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/da\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"First pass yield: Formel, eksempel og skjult omarbejde","datePublished":"2026-10-20T19:34:39+00:00","dateModified":"2026-10-20T19:34:57+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/first-pass-yield\/"},"wordCount":2017,"publisher":{"@id":"https:\/\/skyplanner.ai\/da\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/first-pass-yield\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png","articleSection":["Effektiv produktion","ressourcer"],"inLanguage":"da-DK"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/first-pass-yield\/","url":"https:\/\/skyplanner.ai\/da\/ressourcer\/first-pass-yield\/","name":"First pass yield: Formel, eksempel og skjult omarbejde","isPartOf":{"@id":"https:\/\/skyplanner.ai\/da\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/first-pass-yield\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/first-pass-yield\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png","datePublished":"2026-10-20T19:34:39+00:00","dateModified":"2026-10-20T19:34:57+00:00","description":"Beregn first pass yield uden at t\u00e6lle reparerede emner som godkendt f\u00f8rste gang. Se, hvordan omarbejde bruger kapacitet, og SkyPlanner hj\u00e6lper med planl\u00e6gningen.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/first-pass-yield\/#breadcrumb"},"inLanguage":"da-DK","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/da\/ressourcer\/first-pass-yield\/"]}]},{"@type":"ImageObject","inLanguage":"da-DK","@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/first-pass-yield\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png","width":1672,"height":941,"caption":"Machined flanges pass inspection directly or take a correction loop, illustrating first-pass yield and rework."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/first-pass-yield\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/da\/"},{"@type":"ListItem","position":2,"name":"First pass yield: Formel, eksempel og skjult omarbejde"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/da\/#website","url":"https:\/\/skyplanner.ai\/da\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/da\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/da\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"da-DK"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/da\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/da\/","logo":{"@type":"ImageObject","inLanguage":"da-DK","@id":"https:\/\/skyplanner.ai\/da\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/da\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/da\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"da-DK","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/da\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"First pass yield: Formel, eksempel og skjult omarbejde Hjem &raquo; Ressourcer &raquo; First pass yield: Formel, eksempel og skjult omarbejde First pass yield (FPY) er den procentdel af emnerne, der opfylder de aftalte kvalitetskrav i f\u00f8rste fors\u00f8g gennem en afgr\u00e6nset proces \u2013 uden reparation, omarbejde eller en ny test efter en underkendelse. Tallet viser, hvor&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/posts\/104563","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/comments?post=104563"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/posts\/104563\/revisions"}],"predecessor-version":[{"id":104625,"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/posts\/104563\/revisions\/104625"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/media\/104594"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/media?parent=104563"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/categories?post=104563"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/tags?post=104563"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}