{"id":102520,"date":"2026-10-20T13:56:48","date_gmt":"2026-10-20T13:56:48","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=102520"},"modified":"2026-10-20T13:57:04","modified_gmt":"2026-10-20T13:57:04","slug":"varer-under-fremstilling","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/da\/ressourcer\/varer-under-fremstilling\/","title":{"rendered":"Varer under fremstilling: Antal, omkostninger og styring"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Varer under fremstilling: Antal, omkostninger og styring<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/da\/\">Hjem<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/da\/ressourcer\/\">Ressourcer<\/a> &raquo; Varer under fremstilling: Antal, omkostninger og styring<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Ansl\u00e5et l\u00e6setid: <\/span><span class=\"yoast-reading-time__reading-time\">9<\/span><span class=\"yoast-reading-time__time-unit\"> Minutter<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Varer under fremstilling (WIP) er varer, der er sat i produktion, men endnu ikke er f\u00e6rdige. Det omfatter b\u00e5de emner under bearbejdning og uf\u00e6rdige varer, der venter mellem operationerne. I regnskabet bruges WIP ogs\u00e5 om de produktionsomkostninger, der indtil videre er p\u00e5l\u00f8bet p\u00e5 disse uf\u00e6rdige varer.<\/p>\n\n\n<p>De to opg\u00f8relser besvarer forskellige sp\u00f8rgsm\u00e5l. En opt\u00e6lling viser, hvor mange varer der endnu ikke er f\u00e6rdige. En omkostningsopg\u00f8relse viser, hvor store produktionsomkostninger der er bundet i dem. Ingen af delene fort\u00e6ller i sig selv, hvorfor en batch har ventet siden mandag, eller hvorn\u00e5r den endelig kan forlade produktionen.<\/p>\n\n\n<p>For en produktionschef er det netop det n\u00e6ste sp\u00f8rgsm\u00e5l, der er v\u00e6rd at stille. SkyPlanner APS sammenholder de resterende operationer med kapacitet, materialetilg\u00e6ngelighed og prioriteter. Det hj\u00e6lper dig med at f\u00e6rdigg\u00f8re arbejdet i stedet for hele tiden at s\u00e6tte mere arbejde i k\u00f8. Bedre timing reducerer den un\u00f8dvendige beholdning af varer under fremstilling og den kapital, den binder.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Hvad t\u00e6ller som varer under fremstilling?<\/h2>\n\n\n<p>Se p\u00e5 lageret tre steder i produktionsflowet:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>R\u00e5varer:<\/strong> materialer og indk\u00f8bte komponenter, der venter p\u00e5 at blive brugt i produktionen.<\/li><li><strong>Varer under fremstilling:<\/strong> varer, som er sat i produktion, men stadig mangler bearbejdning, montage eller p\u00e5kr\u00e6vet slutkontrol.<\/li><li><strong>F\u00e6rdigvarer:<\/strong> f\u00e6rdige produkter, ogs\u00e5 selv om de endnu ikke er solgt eller afsendt.<\/li><\/ul>\n\n\n<p>Et bearbejdet hus, der venter p\u00e5 overfladebehandling, er WIP. Det samme g\u00e6lder en samlet enhed, der afventer den slutkontrol, som kr\u00e6ves, f\u00f8r den er f\u00e6rdig. En f\u00e6rdig og godkendt enhed, der venter p\u00e5 lastbilen, er derimod en f\u00e6rdigvare og ikke WIP.<\/p>\n\n\n<p>En uf\u00e6rdig vare t\u00e6ller stadig med, selv om den venter. K\u00f8er, transport mellem operationer og tilbageholdelser kan udg\u00f8re en stor del af den tid, et produkt tilbringer i produktionen, selv om ingen maskine bearbejder det i det tidsrum.<\/p>\n\n\n<p>Du vil ogs\u00e5 st\u00f8de p\u00e5 betegnelsen <strong>igangv\u00e6rende arbejde<\/strong>. Brugen varierer mellem virksomheder og brancher. I denne guide betyder WIP uf\u00e6rdige varer i produktionen, ikke en beregning til projektfakturering eller antallet af opgaver p\u00e5 et softwareteams opgavetavle.<\/p>\n\n\n<h2 class=\"wp-block-heading\">S\u00e5dan opg\u00f8r du den fysiske m\u00e6ngde af varer under fremstilling<\/h2>\n\n\n<p>Begynd med en klar afgr\u00e6nsning, for eksempel en produktfamilie fra f\u00f8rste produktionsoperation til endelig godkendelse. T\u00e6l de uf\u00e6rdige emner inden for denne afgr\u00e6nsning p\u00e5 et bestemt tidspunkt. Ved bulkproduktion kan kilogram eller liter v\u00e6re en mere passende enhed end styk.<\/p>\n\n\n<p>Forestil dig en fabrik, der f\u00f8lger \u00e9n produktfamilie med identiske huse. Ved afslutningen af fredagens skift viser opt\u00e6llingen f\u00f8lgende:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Aktuelt trin<\/th><th>Uf\u00e6rdige huse<\/th><th>Resterende arbejde<\/th><\/tr><\/thead><tbody><tr><td>Under bearbejdning<\/td><td>20<\/td><td>F\u00e6rdigg\u00f8re bearbejdning, overfladebehandle og kontrollere<\/td><\/tr><tr><td>Venter p\u00e5 overfladebehandling<\/td><td>60<\/td><td>Overfladebehandle og kontrollere<\/td><\/tr><tr><td>Afventer slutkontrol<\/td><td>20<\/td><td>Kontrollere og godkende<\/td><\/tr><tr><td><strong>Varer under fremstilling i alt<\/strong><\/td><td><strong>100<\/strong><\/td><td><strong>M\u00e6ngden af resterende arbejde varierer<\/strong><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>T\u00e6l hvert hus \u00e9n gang p\u00e5 det trin, hvor det befinder sig. T\u00e6l ikke den samme batch igen for hver operation, der stadig mangler p\u00e5 produktionsruten.<\/p>\n\n\n<p>Du kan ogs\u00e5 afstemme til- og afgange inden for afgr\u00e6nsningen. Antag, at ugen begyndte med 120 uf\u00e6rdige huse, at yderligere 480 blev sat i produktion, og at 500 blev f\u00e6rdigvarer. Uden kassation eller andre bev\u00e6gelser bliver opg\u00f8relsen:<\/p>\n\n\n<p><strong>Varer under fremstilling ultimo = 120 + 480 \u2212 500 = 100 huse<\/strong><\/p>\n\n\n<p>Hvis resultatet ikke stemmer med den fysiske opt\u00e6lling, skal du unders\u00f8ge manglende f\u00e6rdigmeldinger, uregistrerede flytninger, kassation eller opg\u00f8relsestidspunktet, f\u00f8r du drager konklusioner om produktionens resultater.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Antal emner er ikke det samme som resterende arbejdsbelastning<\/h3>\n\n\n<p>Tabellen viser 100 uf\u00e6rdige emner, men de 20, der afventer kontrol, kr\u00e6ver langt mindre arbejde end de 20, der stadig er under bearbejdning. To lige store k\u00f8er kan derfor stille meget forskellige krav til kapaciteten.<\/p>\n\n\n<p>P\u00e5 en fabrik med et varieret produktsortiment fort\u00e6ller antallet af arbejdsordrer endnu mindre. \u00c9n ordre kan mangle en kort kontrol, mens en anden kr\u00e6ver flere dages arbejde p\u00e5 tv\u00e6rs af flere ressourcer. Opg\u00f8r m\u00e6ngderne pr. produkt eller relevant produktfamilie, og brug varigheden af de resterende operationer til at vurdere belastningen. Angiv belastningen i timer; den er hverken et andet m\u00e5l for antallet af varer under fremstilling eller deres v\u00e6rdi.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Formlen for v\u00e6rdien af varer under fremstilling<\/h2>\n\n\n<p>En forenklet afstemning af periodens omkostninger ser s\u00e5dan ud:<\/p>\n\n\n<p><strong>V\u00e6rdi af varer under fremstilling ultimo = v\u00e6rdi af varer under fremstilling primo + tilf\u00f8rte produktionsomkostninger \u2212 kostpris for f\u00e6rdigproducerede varer<\/strong><\/p>\n\n\n<p>De tilf\u00f8rte produktionsomkostninger omfatter forbrugte direkte materialer, direkte l\u00f8n og fordelte indirekte produktionsomkostninger. <strong>Kostprisen for f\u00e6rdigproducerede varer (COGM)<\/strong> er de omkostninger, der overf\u00f8res fra varer under fremstilling, n\u00e5r produktionen er afsluttet. Det er hverken salgsprisen eller kostprisen for de varer, der er solgt i perioden.<\/p>\n\n\n<p>Forestil dig et separat eksempel med en m\u00e5neds omkostninger. V\u00e6rdien af varer under fremstilling er $18.000 ved m\u00e5nedens begyndelse. Produktionen tilf\u00f8rer $72.000, og f\u00e6rdige varer med en kostpris p\u00e5 $65.000 overf\u00f8res til f\u00e6rdigvarelageret. Uden andre reguleringer bliver resultatet:<\/p>\n\n\n<p><strong>$18.000 + $72.000 \u2212 $65.000 = $25.000 i v\u00e6rdi af varer under fremstilling ultimo<\/strong><\/p>\n\n\n<p>Det er en saldo opgjort til kostpris, ikke 25.000 enheder eller $25.000 i fremtidig fortjeneste. Eksemplet er uafh\u00e6ngigt af opt\u00e6llingen af huse ovenfor.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Hvorfor antallet af enheder ikke fort\u00e6ller dig v\u00e6rdien<\/h3>\n\n\n<p>En uf\u00e6rdig vare har kun opsamlet de omkostninger, der hidtil er henf\u00f8rt til den. Hvis du ganger hvert uf\u00e6rdigt emne med den fulde kostpris for det f\u00e6rdige produkt, kan du overvurdere saldoen. At en vare er \u00bbhalvvejs gennem produktionsruten\u00ab, betyder heller ikke n\u00f8dvendigvis, at halvdelen af de samlede omkostninger er p\u00e5l\u00f8bet. Dyre materialer kan indg\u00e5 tidligt, mens l\u00f8n- og bearbejdningsomkostninger p\u00e5l\u00f8ber senere.<\/p>\n\n\n<p>Brug de omkostningsregistreringer og den regnskabspraksis, som jeres \u00f8konomiafdeling anvender. Afstemningen fra primo til ultimo forklarer bev\u00e6gelserne i omkostningerne. Den finansielle rapportering kan desuden kr\u00e6ve v\u00e6rdireguleringer efter de g\u00e6ldende regnskabsregler.<\/p>\n\n\n<p>N\u00e5r du skal tr\u00e6ffe beslutninger i produktionen, er den vigtige forskel mere enkel: De p\u00e5l\u00f8bne omkostninger viser, hvad der allerede er lagt i arbejdet. Den resterende produktionsrute viser, hvad der stadig mangler, f\u00f8r det er f\u00e6rdigt. Du har brug for begge perspektiver; det ene kan ikke erstatte det andet.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Hvad en h\u00f8j eller lav beholdning af varer under fremstilling faktisk fort\u00e6ller<\/h2>\n\n\n<p>En stor beholdning af varer under fremstilling er en grund til at unders\u00f8ge forholdene, ikke en f\u00e6rdig diagnose. Den kan skyldes h\u00f8jere eftersp\u00f8rgsel, et \u00e6ndret produktmix, bevidst beskyttet kapacitet eller arbejde, der hober sig op som f\u00f8lge af en afbrydelse. En lille beholdning kan v\u00e6re tegn p\u00e5 et j\u00e6vnt flow, men ogs\u00e5 p\u00e5, at en kritisk ressource har for lidt arbejde klar.<\/p>\n\n\n<p>M\u00e5let er ikke at have nul uf\u00e6rdige varer i produktionen. Det er at have tilstr\u00e6kkeligt af det rigtige arbejde i gang til at sikre p\u00e5lidelig f\u00e6rdigg\u00f8relse uden un\u00f8dvendigt tidlige opstarter, ventetid og h\u00e5ndtering.<\/p>\n\n\n<p>Lad os vende tilbage til de 60 huse, der venter p\u00e5 overfladebehandling. Hvis de blev bearbejdet i morges og skal overfladebehandles som planlagt i eftermiddag, kan k\u00f8en v\u00e6re helt rimelig. Hvis de har st\u00e5et der i en uge, mens ressourcen til overfladebehandling behandler andre ordrer, d\u00e6kker det samme antal over et andet problem.<\/p>\n\n\n<p>For at vurdere k\u00f8en skal du afklare f\u00f8lgende:<\/p>\n\n\n<p>1. <strong>Alder:<\/strong> Hvorn\u00e5r blev batchen sat i produktion, og hvor l\u00e6nge har den ventet her?<\/p>\n\n\n<p>2. <strong>N\u00e6ste operation:<\/strong> Hvilken ressource, hvilket materiale eller hvilken godkendelse kr\u00e6ves der for at komme videre?<\/p>\n\n\n<p>3. <strong>Planlagt f\u00e6rdigg\u00f8relse:<\/strong> Hvorn\u00e5r er der plads til de resterende operationer, og kan ordren dermed f\u00e6rdigg\u00f8res som lovet?<\/p>\n\n\n<p>4. <strong>\u00c5rsag til ventetiden:<\/strong> Er der tale om en planlagt buffer, konkurrence om kapaciteten, manglende materialer, tilbageholdelse p\u00e5 grund af kvalitet eller en anden afbrydelse?<\/p>\n\n\n<p>S\u00e5 bliver \u00bbvi har for mange varer under fremstilling\u00ab til en konkret beslutning, som nogen kan handle p\u00e5. En manglende indk\u00f8bt komponent kr\u00e6ver en anden indsats end en overbelastet station til overfladebehandling. At sende endnu en batch gennem bearbejdningen l\u00f8ser ingen af problemerne.<\/p>\n\n\n<p>Vurder varer under fremstilling sammen med <a href=\"https:\/\/skyplanner.ai\/da\/ressourcer\/produktionsrate\/\">m\u00e6ngden af f\u00e6rdigproducerede varer<\/a> og leveringspr\u00e6cisionen. Hvis mere arbejde s\u00e6ttes i produktion, end der forlader den som f\u00e6rdigvarer, og der ikke er andre afgange, vokser beholdningen af uf\u00e6rdige varer. Hvis beholdningen kun falder, fordi produktionen ikke l\u00e6ngere modtager ordrer, er det ikke et tegn p\u00e5 en bedre proces. Sammenlign tilsvarende perioder og produktfamilier, s\u00e5 en \u00e6ndring i produktmixet ikke fremst\u00e5r som en forbedring.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Brug SkyPlanner til at planl\u00e6gge vejen fra uf\u00e6rdige til f\u00e6rdige varer<\/h2>\n\n\n<p>N\u00e5r du ved, hvor arbejdet venter, bliver planl\u00e6gningssp\u00f8rgsm\u00e5let konkret: Hvordan f\u00e5r du plads til de resterende operationer sammen med alt det andet, fabrikken skal f\u00e6rdigg\u00f8re?<\/p>\n\n\n<p>SkyPlanner samler arbejdsstationer, skift, operat\u00f8rer, procestrin og varigheder i en <a href=\"https:\/\/skyplanner.ai\/da\/ressourcer\/hvad-er-finplanlaegning-i-produktionen\/\">f\u00e6lles produktionsplan<\/a>. Arcturus, systemets kunstige intelligens til finplanl\u00e6gning, placerer operationerne ud fra den konfigurerede kapacitet, afh\u00e6ngighederne og prioriteterne. Gantt-visningen viser den planlagte r\u00e6kkef\u00f8lge p\u00e5 tv\u00e6rs af ressourcer, s\u00e5 hver afdeling ikke beh\u00f8ver at vedligeholde sin egen k\u00f8.<\/p>\n\n\n<p>For de ventende huse kan du se operationen til overfladebehandling i sammenh\u00e6ng med arbejdet f\u00f8r og efter den. Er ressourcen optaget af en tidligere aftalt ordre? Er der plads til kontrollen bagefter? Vil det blot skabe mere ventende arbejde, hvis du starter endnu en batch huse nu?<\/p>\n\n\n<p>N\u00e5r planl\u00e6gning med hensyn til materialetilg\u00e6ngelighed er aktiveret, tager Arcturus ogs\u00e5 h\u00f8jde for lagerbeholdningen og tilg\u00e6ngeligheden af indg\u00e5ende materialer. Det er vigtigt, n\u00e5r en senere operation kr\u00e6ver en indk\u00f8bt komponent: Det er ikke nok, at den f\u00f8rste maskine er ledig, hvis ordren ikke kan forts\u00e6tte gennem montagen.<\/p>\n\n\n<p>Oplysninger om fremdriften holder planen brugbar. Timer i SkyPlanner registrerer start og stop p\u00e5 arbejdet samt producerede m\u00e6ngder, mens systemets \u00e5bne REST API giver forbindelse til ethvert ERP- eller MES-system. N\u00e5r fremdrift, tilg\u00e6ngelighed eller prioriteter \u00e6ndrer sig, kan Arcturus genberegne planen ud fra de opdaterede oplysninger. Du fastl\u00e6gger prioriteterne; den kunstige intelligens st\u00e5r for selve planl\u00e6gningsberegningen.<\/p>\n\n\n<p>Fordelen er mindre dagligt arbejde med at rette k\u00f8erne ved de enkelte maskiner og et klarere grundlag for at beslutte, hvad der skal videre i produktionen. Du kan undg\u00e5 at binde flere materialer og mere arbejde i ordrer for tidligt og samtidig holde fokus p\u00e5 de uf\u00e6rdige emner, der skal g\u00f8res klar til levering.<\/p>\n\n\n<p>F\u00e6rdigg\u00f8relse frig\u00f8r ikke i sig selv likviditet: N\u00e5r varer flyttes fra varer under fremstilling til f\u00e6rdigvarelageret, \u00e6ndrer de status, men de er stadig p\u00e5 lager. Den \u00f8konomiske gevinst kommer af at reducere un\u00f8dvendige lagre og f\u00e5 de rigtige ordrer gennem produktionen, s\u00e5 de d\u00e6kker kundernes eftersp\u00f8rgsel \u2013 ikke blot af at nedbringe posten for varer under fremstilling.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Hvad bedre timing bet\u00f8d hos Mamec<\/h2>\n\n\n<p>Mamec er en finsk producent af industrielt blandeudstyr og fremstiller desuden h\u00f8jteknologiske produkter som underleverand\u00f8r. Tidligere prioriterede virksomheden tusindvis af indbyrdes afh\u00e6ngige arbejdsordrer ud fra leveringsdatoer p\u00e5 papirordrer. Planl\u00e6gningen i ERP-systemet gav ikke et samlet overblik, og ledelsens billede af produktionsbelastningen byggede p\u00e5 subjektive sk\u00f8n.<\/p>\n\n\n<p>Med SkyPlanner integreret i sit Oscar ERP fik Mamec finplanl\u00e6gning med begr\u00e6nset kapacitet og et f\u00e6lles overblik over ordrernes status, og hvordan de var planlagt. Medarbejderne kunne sl\u00e5 en ordre op i stedet for at v\u00e6re afh\u00e6ngige af forskellige fortolkninger af situationen.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/da\/kundehistorier\/mamec\/\">Mamec fort\u00e6ller om<\/a> mere realistiske genneml\u00f8bstider, mindre arbejde med planl\u00e6gningen og mindre driftskapital bundet un\u00f8dvendigt i varer under fremstilling, fordi arbejdet s\u00e6ttes i gang p\u00e5 det rigtige tidspunkt. Det er den praktiske sammenh\u00e6ng mellem varer under fremstilling og finplanl\u00e6gning: Fabrikken har stadig varer i produktion, men har et bedre grundlag for at afg\u00f8re, hvorn\u00e5r de skal v\u00e6re der.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Start med \u00e9n batch, der har ventet for l\u00e6nge<\/h2>\n\n\n<p>V\u00e6lg en uf\u00e6rdig ordre, hvor dit team kender forsinkelsen godt. Tag oplysninger om ordrens aktuelle stade, resterende produktionsrute, materialebehov og lovede leveringsdato med til en demonstration af SkyPlanner. Den relevante test er, om du kan se en sammenh\u00e6ngende plan for at f\u00e6rdigg\u00f8re ordren, hvor der ogs\u00e5 er taget h\u00f8jde for de andre ordrer, som konkurrerer om de samme ressourcer.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/da\/kontakt-salg\/\">Book en demonstration af SkyPlanner<\/a> for at udforske planen med udgangspunkt i din egen produktion, eller <a href=\"https:\/\/skyplanner.ai\/da\/proeveperiode\/\">pr\u00f8v SkyPlanner med demodata<\/a> f\u00f8rst. Vejen til en mere hensigtsm\u00e6ssig beholdning af varer under fremstilling begynder med at forst\u00e5 det uf\u00e6rdige arbejde. En bedre produktionsplan hj\u00e6lper dig med at g\u00f8re noget ved det.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Varer under fremstilling: Antal, omkostninger og styring Hjem &raquo; Ressourcer &raquo; Varer under fremstilling: Antal, omkostninger og styring Varer under fremstilling (WIP) er varer, der er sat i produktion, men endnu ikke er f\u00e6rdige. Det omfatter b\u00e5de emner under bearbejdning og uf\u00e6rdige varer, der venter mellem operationerne. I regnskabet bruges WIP ogs\u00e5 om de produktionsomkostninger, &#8230; <a title=\"Varer under fremstilling: Antal, omkostninger og styring\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/da\/ressourcer\/varer-under-fremstilling\/\" aria-label=\"Read more about Varer under fremstilling: Antal, omkostninger og styring\">L\u00e6s Mere<\/a><\/p>\n","protected":false},"author":3,"featured_media":102580,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2547,307],"tags":[],"class_list":["post-102520","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-effektiv-produktion","category-ressourcer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Varer under fremstilling: Antal, omkostninger og styring<\/title>\n<meta name=\"description\" content=\"F\u00e5 overblik over varer under fremstilling, beregn v\u00e6rdien, og find \u00e5rsager til ventetid. Se, hvordan SkyPlanner hj\u00e6lper med at reducere un\u00f8dvendig WIP.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/da\/ressourcer\/varer-under-fremstilling\/\" \/>\n<meta property=\"og:locale\" content=\"da_DK\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Varer under fremstilling: Antal, omkostninger og styring\" \/>\n<meta property=\"og:description\" content=\"F\u00e5 overblik over varer under fremstilling, beregn v\u00e6rdien, og find \u00e5rsager til ventetid. Se, hvordan SkyPlanner hj\u00e6lper med at reducere un\u00f8dvendig WIP.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/da\/ressourcer\/varer-under-fremstilling\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-20T13:56:48+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-20T13:57:04+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1984\" \/>\n\t<meta property=\"og:image:height\" content=\"1116\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Skrevet af\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimeret l\u00e6setid\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/varer-under-fremstilling\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/varer-under-fremstilling\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Varer under fremstilling: Antal, omkostninger og styring\",\"datePublished\":\"2026-10-20T13:56:48+00:00\",\"dateModified\":\"2026-10-20T13:57:04+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/varer-under-fremstilling\\\/\"},\"wordCount\":2158,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/varer-under-fremstilling\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/work-in-process-inventory-hero-1.png\",\"articleSection\":[\"Effektiv produktion\",\"ressourcer\"],\"inLanguage\":\"da-DK\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/varer-under-fremstilling\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/varer-under-fremstilling\\\/\",\"name\":\"Varer under fremstilling: Antal, omkostninger og styring\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/varer-under-fremstilling\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/varer-under-fremstilling\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/work-in-process-inventory-hero-1.png\",\"datePublished\":\"2026-10-20T13:56:48+00:00\",\"dateModified\":\"2026-10-20T13:57:04+00:00\",\"description\":\"F\u00e5 overblik over varer under fremstilling, beregn v\u00e6rdien, og find \u00e5rsager til ventetid. Se, hvordan SkyPlanner hj\u00e6lper med at reducere un\u00f8dvendig WIP.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/varer-under-fremstilling\\\/#breadcrumb\"},\"inLanguage\":\"da-DK\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/varer-under-fremstilling\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"da-DK\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/varer-under-fremstilling\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/work-in-process-inventory-hero-1.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/work-in-process-inventory-hero-1.png\",\"width\":1984,\"height\":1116,\"caption\":\"Unfinished metal housings wait between machining and finishing, illustrating work-in-process inventory.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/ressourcer\\\/varer-under-fremstilling\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Varer under fremstilling: Antal, omkostninger og styring\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"da-DK\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"da-DK\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"da-DK\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Varer under fremstilling: Antal, omkostninger og styring","description":"F\u00e5 overblik over varer under fremstilling, beregn v\u00e6rdien, og find \u00e5rsager til ventetid. Se, hvordan SkyPlanner hj\u00e6lper med at reducere un\u00f8dvendig WIP.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/da\/ressourcer\/varer-under-fremstilling\/","og_locale":"da_DK","og_type":"article","og_title":"Varer under fremstilling: Antal, omkostninger og styring","og_description":"F\u00e5 overblik over varer under fremstilling, beregn v\u00e6rdien, og find \u00e5rsager til ventetid. Se, hvordan SkyPlanner hj\u00e6lper med at reducere un\u00f8dvendig WIP.","og_url":"https:\/\/skyplanner.ai\/da\/ressourcer\/varer-under-fremstilling\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-20T13:56:48+00:00","article_modified_time":"2026-10-20T13:57:04+00:00","og_image":[{"width":1984,"height":1116,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Skrevet af":"Jussi M\u00e4ntyl\u00e4","Estimeret l\u00e6setid":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/varer-under-fremstilling\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/varer-under-fremstilling\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/da\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Varer under fremstilling: Antal, omkostninger og styring","datePublished":"2026-10-20T13:56:48+00:00","dateModified":"2026-10-20T13:57:04+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/varer-under-fremstilling\/"},"wordCount":2158,"publisher":{"@id":"https:\/\/skyplanner.ai\/da\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/varer-under-fremstilling\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png","articleSection":["Effektiv produktion","ressourcer"],"inLanguage":"da-DK"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/varer-under-fremstilling\/","url":"https:\/\/skyplanner.ai\/da\/ressourcer\/varer-under-fremstilling\/","name":"Varer under fremstilling: Antal, omkostninger og styring","isPartOf":{"@id":"https:\/\/skyplanner.ai\/da\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/varer-under-fremstilling\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/varer-under-fremstilling\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png","datePublished":"2026-10-20T13:56:48+00:00","dateModified":"2026-10-20T13:57:04+00:00","description":"F\u00e5 overblik over varer under fremstilling, beregn v\u00e6rdien, og find \u00e5rsager til ventetid. Se, hvordan SkyPlanner hj\u00e6lper med at reducere un\u00f8dvendig WIP.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/varer-under-fremstilling\/#breadcrumb"},"inLanguage":"da-DK","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/da\/ressourcer\/varer-under-fremstilling\/"]}]},{"@type":"ImageObject","inLanguage":"da-DK","@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/varer-under-fremstilling\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png","width":1984,"height":1116,"caption":"Unfinished metal housings wait between machining and finishing, illustrating work-in-process inventory."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/da\/ressourcer\/varer-under-fremstilling\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/da\/"},{"@type":"ListItem","position":2,"name":"Varer under fremstilling: Antal, omkostninger og styring"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/da\/#website","url":"https:\/\/skyplanner.ai\/da\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/da\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/da\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"da-DK"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/da\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/da\/","logo":{"@type":"ImageObject","inLanguage":"da-DK","@id":"https:\/\/skyplanner.ai\/da\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/da\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/da\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"da-DK","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png",1984,1116,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png",1984,1116,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/da\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Varer under fremstilling: Antal, omkostninger og styring Hjem &raquo; Ressourcer &raquo; Varer under fremstilling: Antal, omkostninger og styring Varer under fremstilling (WIP) er varer, der er sat i produktion, men endnu ikke er f\u00e6rdige. Det omfatter b\u00e5de emner under bearbejdning og uf\u00e6rdige varer, der venter mellem operationerne. I regnskabet bruges WIP ogs\u00e5 om de produktionsomkostninger,&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/posts\/102520","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/comments?post=102520"}],"version-history":[{"count":2,"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/posts\/102520\/revisions"}],"predecessor-version":[{"id":102639,"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/posts\/102520\/revisions\/102639"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/media\/102580"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/media?parent=102520"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/categories?post=102520"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/tags?post=102520"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}