{"id":106928,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integrationer\/erp\/qad-adaptive-erp\/guide\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"guide","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/da\/integrationer\/erp\/qad-adaptive-erp\/guide\/","title":{"rendered":"Guide til integration af QAD Adaptive ERP med SkyPlanner APS til produktionsplanl\u00e6gning"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/da\/integrationer\/\">Integrationer<\/a> \/ <a href=\"\/da\/integrationer\/erp\/\">ERP<\/a> \/ QAD Adaptive ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Guide til integration af QAD Adaptive ERP <span class=\"hl\">med SkyPlanner APS til produktionsplanl\u00e6gning<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Denne integrationsguide viser partnere og IT-teams, hvordan QAD Adaptive ERP forbindes med SkyPlanner APS. Det g\u00e6lder ogs\u00e5 installationer af de tidligere QAD Enterprise Edition og MFG\/PRO. SkyPlanner integreres med QAD Adaptive ERP i begge retninger via QAD&#8217;s egne gr\u00e6nseflader:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>Produktionsordrer med tilh\u00f8rende operationer, varer, produktstrukturer, ruter, arbejdscentre, produktionskalendere, lagerbeholdninger og indk\u00f8bsordrer overf\u00f8res til SkyPlanner.<\/li>\n\n\n<li>De planlagte frigivelses- og f\u00e6rdigdatoer sendes tilbage til Work Order Maintenance (16.1).<\/li>\n\n\n<li>Operat\u00f8rernes tidsregistreringer bogf\u00f8res i QAD via Labor Feedback by Work Order (16.20.1), og f\u00e6rdigmeldte m\u00e6ngder via Work Order Receipt (16.11).<\/li>\n\n\n<li>SkyPlanner-webhooks sender \u00e6ndringer i planen, s\u00e5 snart de sker.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/da\/proeveperiode\/\">Start gratis pr\u00f8veperiode<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/da\/kontakt-salg\/\">Book en demo<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Detailplanl\u00e6gning<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Gantt-tidslinje i SkyPlanner APS med opgaver fordelt p\u00e5 arbejdsstationer og en ordreliste nedenunder.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner-teamet tilpasser integrationen til jeres QAD-ops\u00e6tning under opstarten og yder support efter idrifts\u00e6ttelsen. Denne guide er til partnere og udviklere, der vil deltage eller selv bygge videre p\u00e5 SkyPlanners dokumenterede REST API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API-reference<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"qad-s-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">QAD&#8217;s integrationsgr\u00e6nseflader<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>QAD giver et eksternt planl\u00e6gningssystem tre integrationsmuligheder:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>QAD QXtend Inbound (QXI).<\/strong> QAD beskriver det som &#8220;a Web services-based, SOAP-compliant, XML framework, enabling complete platform-independent access to QAD Enterprise Applications business functionality.&#8221; (Et XML-framework baseret p\u00e5 webservices, som overholder SOAP og giver fuld, platformsuafh\u00e6ngig adgang til forretningsfunktionerne i QAD Enterprise Applications.) Hver foresp\u00f8rgsel er et <strong>QDoc<\/strong>, som k\u00f8rer et QAD-program med samme validering som i sk\u00e6rmbilledet og returnerer et QDoc som svar. De udgivne QDocs omfatter <code>maintainItemMaster<\/code>, <code>maintainRouting<\/code> og <code>maintainPurchaseOrder<\/code>. Til programmer uden et udgivet QDoc mapper QAD&#8217;s <strong>QGen<\/strong>-v\u00e6rkt\u00f8j menuprogrammet: &#8220;QGen is used to map custom programs or QAD Enterprise Applications programs that do not have released QDoc schemas and events files.&#8221; (QGen bruges til at mappe tilpassede programmer eller programmer i QAD Enterprise Applications, som ikke har udgivne QDoc-skemaer og h\u00e6ndelsesfiler.) QAD bruger selv denne integrationsvej: &#8220;QAD Production Scheduler uses QAD QXtend to update work orders.&#8221; (QAD Production Scheduler bruger QAD QXtend til at opdatere produktionsordrer.) (<a href=\"https:\/\/connect.qad.com\/documents\/2370665\/2370949\/Qxtend_UG_v0110.pdf\/093456b1-c885-de26-7e61-754987199fa7?t=1634559415409&amp;download=true\">QXtend-guide<\/a>)<\/li>\n\n\n<li><strong>QAD QXtend Outbound (QXO).<\/strong> QXO &#8220;exports user-configurable business objects as XML QDocs out of QAD products.&#8221; (Eksporterer brugerkonfigurerbare forretningsobjekter fra QAD-produkter som XML QDocs.) Standardobjekterne omfatter Item, Product Structure, Routing, Work Center, Department, Inventory Transaction og Inventory Status.<\/li>\n\n\n<li><strong>REST API&#8217;er til forretningsdokumenter.<\/strong> Fra Adaptive ERP 2022.1 g\u00e6lder: &#8220;Query REST APIs are now available for business documents,&#8221; (Der er nu REST API&#8217;er til foresp\u00f8rgsler p\u00e5 forretningsdokumenter.) De underst\u00f8tter filtrering, sortering, sideopdeling og delvise dataudtr\u00e6k og er dokumenteret i Swagger p\u00e5 jeres instans (<a href=\"https:\/\/connect.qad.com\/documents\/2370665\/159231649\/QAD_Adaptive_ERP_Web_UI_RN_v2022_1.pdf\/602f6b29-ef47-decd-4825-127b06b25b16?t=1670945442202&amp;download=true\">versionsnoter<\/a>).<\/li>\n\n<\/ol>\n\n\n<p>Skrivning sker via QXtend. L\u00e6sning sker via QXO og REST-foresp\u00f8rgsels-API&#8217;erne.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-licensing\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentificering og licenser<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>QXtend Inbound.<\/strong> N\u00e5r Require Authentication er aktiveret p\u00e5 modtageren, indeholder hvert QDoc et Session ID eller et QAD-brugernavn og en adgangskode. QXI kontrollerer brugerens menuadgang, f\u00f8r programmet k\u00f8res.<\/li>\n\n\n<li><strong>Integrationsbruger.<\/strong> Opret en s\u00e6rskilt QAD-bruger med adgang til pr\u00e6cis de menuprogrammer, integrationen kalder: Work Order Maintenance, Labor Feedback by Work Order, Work Order Receipt og stamdataprogrammerne.<\/li>\n\n\n<li><strong>QXtend-licens.<\/strong> QXtend licenseres efter agenter og modtagere. If\u00f8lge QAD&#8217;s guide er webservicetrafik til og fra en ekstern applikation ikke gratis. F\u00e5 derfor QXtend-licensen bekr\u00e6ftet, f\u00f8r projektet starter.<\/li>\n\n<\/ul>\n\n\n<p>P\u00e5 SkyPlanner-siden bruger REST API&#8217;et et API-token i <code>Authorization-Token<\/code>-headeren til autentificering (SkyPlanner Settings &gt; API). API&#8217;et er dokumenteret i Swagger\/OpenAPI. <a href=\"\/da\/docs\/vejledning-i-integration\/\">Integrationsvejledningen<\/a> gennemg\u00e5r de f\u00f8rste kald.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-change-data\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">H\u00e6ndelser og \u00e6ndringsdata<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>QXtend Outbound er QAD&#8217;s mekanisme til at h\u00e5ndtere \u00e6ndringsdata. &#8220;A change occurs to watched data in QAD Enterprise Applications. Change notifications are written out to the qxevents database.&#8221; (N\u00e5r overv\u00e5gede data \u00e6ndres i QAD Enterprise Applications, skrives \u00e6ndringsmeddelelser til databasen qxevents.) QXO opbygger derefter QDocs og leverer dem &#8220;to a directory location where the subscriber polls for and picks up new QDocs,&#8221; (til en mappe, hvor abonnenten l\u00f8bende s\u00f8ger efter og henter nye QDocs) eller til en webservice, der lytter p\u00e5 en URL.<\/p>\n\n\n<p>SkyPlanner abonnerer som webservice p\u00e5 det, QXO publicerer, og henter l\u00f8bende data via REST-foresp\u00f8rgsels-API&#8217;erne, hvor QXO ikke d\u00e6kker. Work Order er ikke et af standardobjekterne i QXO. Derfor tilf\u00f8jer integrationen enten et QXO-forretningsobjekt baseret p\u00e5 produktionsordretabellerne (<code>wo_mstr<\/code>, <code>wr_route<\/code>) eller henter produktionsordrer via REST-foresp\u00f8rgsels-API&#8217;erne med f\u00e5 minutters mellemrum.<\/p>\n\n\n<p>SkyPlanner sender webhooks, n\u00e5r status eller planen \u00e6ndres, s\u00e5 tilbageskrivningen er h\u00e6ndelsesstyret.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Datamapping<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>QAD-objekt (program, gr\u00e6nseflade)<\/th><th>Objekt i SkyPlanner<\/th><th>Retning<\/th><th>Hyppighed<\/th><\/tr><\/thead><tbody><tr><td>Varer (Item Master Maintenance 1.4.1; QXO Item)<\/td><td>Produkter og materialer<\/td><td>QAD \u2192 SkyPlanner<\/td><td>F\u00f8rste indl\u00e6sning, derefter ved \u00e6ndringer via QXO<\/td><\/tr><tr><td>Produktstrukturer (13.5; QXO Product Structure)<\/td><td>Produktstruktur, delprodukter, materialer pr. produkt<\/td><td>QAD \u2192 SkyPlanner<\/td><td>F\u00f8rste indl\u00e6sning, derefter ved \u00e6ndringer via QXO<\/td><\/tr><tr><td>Ruter (14.13.1; QXO Routing): k\u00f8-, opstillings-, k\u00f8rsels-, vente- og transporttid<\/td><td>Procestrin med varigheder, opstillings- og nedtagningstider<\/td><td>QAD \u2192 SkyPlanner<\/td><td>F\u00f8rste indl\u00e6sning, derefter ved \u00e6ndringer via QXO<\/td><\/tr><tr><td>Arbejdscentre (14.5) og afdelinger (14.1; QXO Work Center, Department)<\/td><td>Arbejdsstationer, arbejdsstationsgrupper, effektivitetsgrader<\/td><td>QAD \u2192 SkyPlanner<\/td><td>F\u00f8rste indl\u00e6sning, derefter sj\u00e6ldent<\/td><\/tr><tr><td>Kalendere for produktion og arbejdscentre<\/td><td>Skiftehold og arbejdsfrie dage<\/td><td>QAD \u2192 SkyPlanner<\/td><td>Dagligt, eller skiftehold vedligeholdes i SkyPlanner<\/td><\/tr><tr><td>Produktionsordrer (16.1) med ordreruter (16.13.13) og komponenter<\/td><td>Ordrer og opgaver med f\u00e6rdigdatoer og materialebehov<\/td><td>QAD \u2192 SkyPlanner<\/td><td>Tilpasset QXO-objekt eller REST-polling med f\u00e5 minutters mellemrum<\/td><\/tr><tr><td>Lager (QXO Inventory Status, Inventory Transaction)<\/td><td>Lagerbeholdninger<\/td><td>QAD \u2192 SkyPlanner<\/td><td>Ved \u00e6ndringer eller hver time<\/td><\/tr><tr><td>Indk\u00f8bsordrer med leveringsdatoer<\/td><td>Indk\u00f8bsordrer, indg\u00e5ende materialer efter leveringsdato<\/td><td>QAD \u2192 SkyPlanner<\/td><td>Polling hver time eller ved planl\u00e6gningsk\u00f8rsel<\/td><\/tr><tr><td>Frigivelses- og f\u00e6rdigdatoer for produktionsordrer (Work Order Maintenance 16.1, QXtend Inbound QDoc)<\/td><td>Planlagt start og slut pr. ordre<\/td><td>SkyPlanner \u2192 QAD<\/td><td>Ved plan\u00e6ndringer via en SkyPlanner-webhook<\/td><\/tr><tr><td>Labor Feedback by Work Order (16.20.1): opstillings- og k\u00f8rselstid pr. operation<\/td><td>Tidsregistreringer og operat\u00f8rernes tilbagemeldinger<\/td><td>SkyPlanner \u2192 QAD<\/td><td>Pr. tilbagemelding eller skift, hvis det v\u00e6lges<\/td><\/tr><tr><td>Work Order Receipt (16.11)<\/td><td>F\u00e6rdigmeldte m\u00e6ngder<\/td><td>SkyPlanner \u2192 QAD<\/td><td>Pr. tilbagemelding, hvis det v\u00e6lges<\/td><\/tr><tr><td>Findes ikke i QAD<\/td><td>Omstillingsmatrix, v\u00e6rkt\u00f8jer som ressourcer med begr\u00e6nset kapacitet, alternative maskiner og medarbejdere<\/td><td>Vedligeholdes i SkyPlanner<\/td><td>Ops\u00e6ttes under opstarten<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integrationsm\u00f8nstre<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. F\u00f8rste indl\u00e6sning af stamdata.<\/strong> Hent varer, produktstrukturer, ruter, arbejdscentre og kalendere via QXO eller REST-foresp\u00f8rgsels-API&#8217;erne. Tag bevidst stilling til, hvordan arbejdscentrene mappes: Et arbejdscenter med fire maskiner bliver til \u00e9n gruppe af arbejdsstationer eller fire arbejdsstationer. Linjer til repetitiv produktion fra Production Line Maintenance kan ogs\u00e5 blive til arbejdsstationer.<\/p>\n\n\n<p><strong>2. Synkronisering af produktionsordrer.<\/strong> Hent fast planlagte og frigivne produktionsordrer med deres ruter og komponenter samt \u00e5bne indk\u00f8bsordrer. SkyPlanner betragter bestilte materialer som tilg\u00e6ngelige p\u00e5 indk\u00f8bsordrens leveringsdato og opdaterer lagerbeholdningen, n\u00e5r indk\u00f8bsordren markeres som Delivered.<\/p>\n\n\n<p>Planl\u00e6g produktionsordrer, ikke MRP-planordrer. Planordrer skal f\u00f8rst omdannes til fast planlagte eller frigivne produktionsordrer i QAD.<\/p>\n\n\n<p><strong>3. Tilbageskrivning af planen.<\/strong> N\u00e5r planl\u00e6gningsmotoren placerer eller flytter en ordre, udl\u00f8ser en SkyPlanner-webhook et QXtend Inbound QDoc til Work Order Maintenance (16.1). Det s\u00e6tter frigivelsesdatoen til datoen for den f\u00f8rste planlagte operation og f\u00e6rdigdatoen til datoen for den sidste. QXtend k\u00f8rer programmet med QAD&#8217;s egen validering og returnerer et QDoc-svar, som integrationen kontrollerer.<\/p>\n\n\n<p>Operationsr\u00e6kkef\u00f8lgen p\u00e5 hver maskine bliver i SkyPlanner og formidles til operat\u00f8rerne via Mobile Confirmations. Dermed ber\u00f8res integrationen ikke af, at QAD l\u00e5ser ruterne p\u00e5 frigivne ordrer.<\/p>\n\n\n<p><strong>4. Tilbagemeldinger fra produktionen.<\/strong> Operat\u00f8rerne registrerer arbejdet med SkyPlanner Mobile Confirmations eller Production Timer, og tidsregistreringerne holder planen ajour. I v\u00e6lger, om de faktiske tider skal bogf\u00f8res i QAD. Hvis ja, overf\u00f8res opstillings- og k\u00f8rselstid pr. operation til Labor Feedback by Work Order og f\u00e6rdigmeldte m\u00e6ngder til Work Order Receipt. Hvis nej, registreres arbejdstiden i QAD som hidtil.<\/p>\n\n\n<p><strong>5. Regler for dataejerskab og konflikter.<\/strong> Skriv dem ned inden idrifts\u00e6ttelsen:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Data<\/th><th>Dataejer<\/th><\/tr><\/thead><tbody><tr><td>Varer, produktstrukturer, ruter, m\u00e6ngder, status p\u00e5 produktionsordrer<\/td><td>QAD<\/td><\/tr><tr><td>Operationsr\u00e6kkef\u00f8lge, start- og sluttidspunkter, maskintildeling<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Frigivelses- og f\u00e6rdigdatoer for produktionsordrer<\/td><td>SkyPlanner skriver, QAD gemmer<\/td><\/tr><tr><td>Omstillingstidsmatrix, krav til v\u00e6rkt\u00f8jer og operat\u00f8rer, alternative ressourcer<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Skift og arbejdsfrie dage<\/td><td>\u00c9t system, valgt under afklaringen<\/td><\/tr><tr><td>Arbejdstid, komponentudtag og varemodtagelser<\/td><td>QAD, registreret d\u00e9r eller bogf\u00f8rt fra SkyPlanners tidsregistreringer<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>V\u00e6lg \u00e9t system, der skriver datoerne p\u00e5 produktionsordrerne. SkyPlanner kr\u00e6ver ikke et planl\u00e6gningsmodul i QAD og overtager derfor skrivningen af datoer fra planl\u00e6gningsv\u00e6rkt\u00f8jerne eller andre planl\u00e6gningssystemer for de ordrer, det planl\u00e6gger.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Typiske projekttrin<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Implementeringen afsluttes normalt inden for f\u00e5 uger efter opstarten. Valid\u00e9r inden da planen i den gratis pr\u00f8veperiode p\u00e5 30 dage med arbejdscentre, ruter og \u00e5bne produktionsordrer eksporteret fra QAD som CSV eller Excel.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Mapping.<\/strong> Fastl\u00e6g mappingtabellen, reglerne for dataejerskab, hvilke lokationer og dom\u00e6ner der er omfattet, synkroniseringsfrekvenserne, og om arbejdstid skal bogf\u00f8res i QAD.<\/li>\n\n\n<li><strong>Adgang til QAD.<\/strong> Opret integrationsbrugeren, f\u00e5 QXtend-licensen bekr\u00e6ftet, og ops\u00e6t QXtend-modtageren og QXO-abonnenten. Test f\u00f8rst i et testdom\u00e6ne.<\/li>\n\n\n<li><strong>Ops\u00e6tning af QDocs.<\/strong> Brug udgivne QDocs, hvor de findes, og gener\u00e9r efter behov QDocs med QGen til Work Order Maintenance, Labor Feedback by Work Order og Work Order Receipt.<\/li>\n\n\n<li><strong>F\u00f8rste indl\u00e6sning.<\/strong> Varer, produktstrukturer, ruter, arbejdscentre og kalendere.<\/li>\n\n\n<li><strong>Synkronisering af produktions- og indk\u00f8bsordrer.<\/strong> QXO-h\u00e6ndelser eller REST-polling med filtre, sideopdeling og genfors\u00f8g.<\/li>\n\n\n<li><strong>Ops\u00e6tning af begr\u00e6nsninger i SkyPlanner.<\/strong> Omstillingstidsmatrix, v\u00e6rkt\u00f8jer, antal operat\u00f8rer pr. opgave og alternative maskiner eller medarbejdere.<\/li>\n\n\n<li><strong>Tilbageskrivning af planen og paralleltest.<\/strong> Skriv datoer tilbage via SkyPlanner-webhooks, k\u00f8r parallelt med den nuv\u00e6rende plan, sammenlign datoer, og ret stamdata.<\/li>\n\n\n<li><strong>Idrifts\u00e6ttelse.<\/strong> Aktiv\u00e9r tilbageskrivning, n\u00e5r dataene stemmer overens.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-qad-adaptive-erp-integrati\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Det skal I tage h\u00f8jde for ved en integration med QAD Adaptive ERP<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Genk\u00f8rsel af CRP.<\/strong> CRP omplanl\u00e6gger alle \u00e5bne operationer p\u00e5 de valgte produktionsordrer. QAD bevarer kun manuelt angivne datoer, n\u00e5r &#8220;you also adjusted the work order release and due date to match,&#8221; (I ogs\u00e5 har tilpasset produktionsordrens frigivelses- og f\u00e6rdigdato, s\u00e5 de stemmer overens), og det er netop de datoer, SkyPlanner skriver. K\u00f8r CRP efter tilbageskrivningen, eller udelad de ordrer, som SkyPlanner planl\u00e6gger.<\/li>\n\n\n<li><strong>Frigivne ruter er l\u00e5st.<\/strong> &#8220;Once the work order status is Exploded, Allocated, or Released, no more changes can be made to the routing.&#8221; (N\u00e5r produktionsordren har status Exploded, Allocated eller Released, kan ruten ikke l\u00e6ngere \u00e6ndres.) Indl\u00e6s ruten ved frigivelse, og \u00e6ndr kun ruter p\u00e5 planlagte eller fast planlagte ordrer.<\/li>\n\n\n<li><strong>Tidsenheder i ruter.<\/strong> Opstillings- og k\u00f8retid belaster kapaciteten, mens &#8220;queue, wait, and move times are excluded from load calculations.&#8221; (K\u00f8-, vente- og transporttider indg\u00e5r ikke i belastningsberegningerne.) Modell\u00e9r k\u00f8, ventetid og transport som trin, der kun optager tid, i SkyPlanner, og kontroll\u00e9r, om k\u00f8retiden er angivet pr. enhed eller pr. ordre.<\/li>\n\n\n<li><strong>QXtends behandlingskapacitet.<\/strong> QAD advarer om, at &#8220;UI API adapter performance may be unacceptable when processing high volumes of data or real-time transactions.&#8221; (UI API-adapterens ydeevne kan v\u00e6re uacceptabel ved behandling af store datam\u00e6ngder eller realtidstransaktioner). Send kun \u00e6ndrede ordrer, saml dem i batches, og brug native QDocs, hvor de findes.<\/li>\n\n\n<li><strong>Dom\u00e6ner og produktionssteder.<\/strong> QAD-installationer med flere dom\u00e6ner holder arbejdscentre og produktionsordrer adskilt pr. dom\u00e6ne og produktionssted. Knyt hvert produktionssted, der indg\u00e5r i integrationen, til sin egen gruppe af arbejdsstationer.<\/li>\n\n\n<li><strong>Blanding af repetitiv og diskret produktion.<\/strong> Linjer med Advanced Repetitive bruger repetitive produktionsplaner, ikke produktionsordrer. Aftal under afklaringen, hvilke linjer SkyPlanner skal planl\u00e6gge.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-and-supports-the-qad-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Hvem ops\u00e6tter og supporterer QAD-integrationen?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>SkyPlanner-teamet ops\u00e6tter integrationen under opstarten og yder support efter idrifts\u00e6ttelsen.<\/strong> Det g\u00e6lder de aftalte QDocs, QXO-abonnementer og REST-foresp\u00f8rgsler. Hver fabrik bruger QAD p\u00e5 sin egen m\u00e5de, og den viden indg\u00e5r i arbejdet.<\/li>\n\n\n<li><strong>Jeres QAD-partner kan deltage.<\/strong> Partneren kender jeres dom\u00e6ner, tilpasninger og licensforhold og kan ops\u00e6tte QXtend, QGen QDocs og integrationsbrugeren sammen med SkyPlanner-teamet.<\/li>\n\n\n<li><strong>Jeres egne udviklere kan bygge videre p\u00e5 integrationen<\/strong> via SkyPlanners REST API med et API-token. Et API-token er nok til at komme i gang, og SkyPlanner-teamet hj\u00e6lper efter behov. I finder dokumentationen i <a href=\"\/da\/docs\/vejledning-i-integration\/\">SkyPlanners integrationsdokumentation<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanner f\u00e5s fra 199 \u20ac pr. m\u00e5ned med 5 arbejdsstationer inkluderet og m\u00e5nedlig fakturering. I f\u00e5r p\u00e5 forh\u00e5nd et tilbud p\u00e5 integrationen sammen med jeres abonnement, tilpasset jeres proces og behov. Se <a href=\"\/da\/prisfastsaettelse\/\">priser<\/a>, <a href=\"\/da\/integrationer\/erp\/qad-adaptive-erp\/produktionsplanlaegning\/\">produktionsplanl\u00e6gning med QAD Adaptive ERP inden for den faktiske kapacitet<\/a>, <a href=\"\/da\/integrationer\/erp\/qad-adaptive-erp\/\">siden om QAD Adaptive ERP<\/a> og <a href=\"\/da\/integrationer\/erp\/\">oversigten over ERP-integrationer<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/da\/proeveperiode\/\">Start gratis pr\u00f8veperiode<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/da\/kontakt-salg\/\">Book en demo<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Produktionsvirksomheders erfaringer med SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialist i forsyningsk\u00e6den hos UTU, i eltavleproduktionen i Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>sparet hver uge<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner har flyttet vores produktionsplanl\u00e6gning fra Excel-regneark til optimering af produktionen i realtid.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialist i forsyningsk\u00e6den<\/b><br>UTU \u00b7 Eltavler og koblingsanl\u00e6g<\/p>\n\n\n<p class=\"ind-cust__result\">Produktionsplanl\u00e6gningen sparer 2 timers arbejdstid hver uge, og en ny opgavek\u00f8 n\u00e5r ud til linjen p\u00e5 f\u00e5 sekunder.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/da\/kundehistorier\/utu\/\">L\u00e6s UTUs anmeldelse<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operat\u00f8rer i renrumsdragter ved en flaskep\u00e5fyldningslinje p\u00e5 Laboratory &amp; Allieds l\u00e6gemiddelfabrik i Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>produktionseffektivitet<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cEffektiviteten i produktionen er steget med 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT-chef<\/b><br>Laboratory &amp; Allied \u00b7 L\u00e6gemiddelproduktion<\/p>\n\n\n<p class=\"ind-cust__result\">Produktionseffektiviteten er steget med 90%, og det tager under 30 minutter at lave en optimeret plan for tre m\u00e5neder p\u00e5 tv\u00e6rs af alle arbejdsstationer.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/da\/kundehistorier\/laboratory-allied\/\">L\u00e6s anmeldelsen fra Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, direkt\u00f8r for Mamec, i virksomhedens produktionshal i Lohja\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1.000-vis af<\/b><span>produktionsordrer planlagt automatisk<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cVi har styr p\u00e5 produktionen p\u00e5 en anden m\u00e5de, og vores forst\u00e5else af kapaciteten er p\u00e5 et helt andet niveau.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, direkt\u00f8r<\/b><br>Mamec \u00b7 Industrielle blandere, pumper og h\u00f8jteknologisk kontraktproduktion<\/p>\n\n\n<p class=\"ind-cust__result\">Tusindvis af produktionsordrer planl\u00e6gges automatisk, og hele organisationen har overblik over produktionen i realtid.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/da\/kundehistorier\/mamec\/\">L\u00e6s Mamecs anmeldelse<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Luftfoto af Piristeels fabrik for tagsikkerhedsudstyr i Kauhava\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>leveringssikkerhed<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner har gjort det lettere at se flaskehalse og skabt mere overblik i produktionsstyringen.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, produktionschef<\/b><br>Piristeel \u00b7 Tagsikkerhed og regnvandssystemer<\/p>\n\n\n<p class=\"ind-cust__result\">Leveringssikkerheden n\u00e5ede op p\u00e5 99,2% i \u00e5r, og planl\u00e6gningen sparer op til fire timers arbejdstid om dagen.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/da\/kundehistorier\/piristeel\/\">L\u00e6s Piristeels anmeldelse<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ofte stillede sp\u00f8rgsm\u00e5l<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Har QAD Adaptive ERP et API til produktionsordrer?<\/summary>\n<p class=\"sp-faq__a\">Ja. QXtend Inbound k\u00f8rer Work Order Maintenance og programmerne til produktionsgulvet via SOAP og XML QDocs. Hvor der ikke findes en frigivet QDoc, genereres den med QGen. REST API&#8217;erne til forretningsdokumenter giver desuden adgang til foresp\u00f8rgsler med filtrering og sideinddeling.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Underst\u00f8tter QAD webhooks?<\/summary>\n<p class=\"sp-faq__a\">QAD h\u00e5ndterer data\u00e6ndringer med QXtend Outbound: Triggere p\u00e5 tabellerne registrerer \u00e6ndringer, og QXO leverer QDocs til en webservice-URL eller en mappe, der afl\u00e6ses l\u00f8bende. SkyPlanners egne webhooks sender \u00e6ndringer i planen, s\u00e5 snart de sker.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Hvordan skrives planlagte datoer tilbage til QAD?<\/summary>\n<p class=\"sp-faq__a\">Via en QXtend Inbound QDoc til Work Order Maintenance (16.1), som s\u00e6tter produktionsordrens frigivelses- og forfaldsdato ud fra planen i SkyPlanner. QAD validerer QDoc med de samme regler som i sk\u00e6rmbilledet og returnerer en QDoc med svaret.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Hvordan n\u00e5r operat\u00f8rernes tilbagemeldinger frem til QAD?<\/summary>\n<p class=\"sp-faq__a\">Opstillings- og k\u00f8retid registreres via Labor Feedback by Work Order (16.20.1), og f\u00e6rdigproducerede m\u00e6ngder via Work Order Receipt (16.11), begge som QXtend Inbound QDocs. Om data skal skrives tilbage, aftales under afklaringen.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>B\u00f8r en QAD-partner foresl\u00e5 QAD Advanced Scheduling eller SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner, n\u00e5r kunden arbejder med diskrete produktionsordrer og vil have en fungerende produktionsplan, der tager h\u00f8jde for den faktiske kapacitet, i l\u00f8bet af uger. QAD beskriver Advanced Scheduling som en produktionsplan for hver linje p\u00e5 den enkelte fabrik og pr\u00e6senterer l\u00f8sningen sammen med DSCP Production Planning og Redzone (<a href=\"https:\/\/www.qad.com\/blog\/2024\/11\/supercharge-qad-redzone-with-production-planning-and-advanced-scheduling\">QAD<\/a>). SkyPlanner integreres via QXtend, planl\u00e6gger alle maskiner, operat\u00f8rer, v\u00e6rkt\u00f8jer og materialer, omplanl\u00e6gger automatisk og har et ubegr\u00e6nset antal brugere fra 199 \u20ac pr. m\u00e5ned.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kan vi teste SkyPlanner, f\u00f8r vi bygger integrationen?<\/summary>\n<p class=\"sp-faq__a\">Ja. Den gratis pr\u00f8veperiode p\u00e5 30 dage underst\u00f8tter op til 20 arbejdsstationer med CSV- eller Excel-import fra QAD. Der kr\u00e6ves intet kreditkort. <a href=\"\/da\/proeveperiode\/\">Start pr\u00f8veperioden<\/a>, eller <a href=\"\/da\/kontakt-salg\/\">tal med salg<\/a> for at afklare integrationen.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integrationer \/ ERP \/ QAD Adaptive ERP Guide til integration af QAD Adaptive ERP med SkyPlanner APS til produktionsplanl\u00e6gning Denne integrationsguide viser partnere og IT-teams, hvordan QAD Adaptive ERP forbindes med SkyPlanner APS. Det g\u00e6lder ogs\u00e5 installationer af de tidligere QAD Enterprise Edition og MFG\/PRO. SkyPlanner integreres med QAD Adaptive ERP i begge retninger via &#8230; <a title=\"Guide til integration af QAD Adaptive ERP med SkyPlanner APS til produktionsplanl\u00e6gning\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/da\/integrationer\/erp\/qad-adaptive-erp\/guide\/\" aria-label=\"Read more about Guide til integration af QAD Adaptive ERP med SkyPlanner APS til produktionsplanl\u00e6gning\">L\u00e6s Mere<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106174,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106928","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>QAD APS: Integrationsguide til produktionsplanl\u00e6gning<\/title>\n<meta name=\"description\" content=\"Forbind QAD Adaptive ERP og SkyPlanner APS: QXtend Inbound QDocs til Work Order Maintenance, QXtend Outbound-h\u00e6ndelser, tidsregistrering, mapping og projekttips.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/da\/integrationer\/erp\/qad-adaptive-erp\/guide\/\" \/>\n<meta property=\"og:locale\" content=\"da_DK\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Guide til integration af QAD Adaptive ERP med SkyPlanner APS til produktionsplanl\u00e6gning\" \/>\n<meta property=\"og:description\" content=\"Forbind QAD Adaptive ERP og SkyPlanner APS: QXtend Inbound QDocs til Work Order Maintenance, QXtend Outbound-h\u00e6ndelser, tidsregistrering, mapping og projekttips.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/da\/integrationer\/erp\/qad-adaptive-erp\/guide\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Estimeret l\u00e6setid\" \/>\n\t<meta name=\"twitter:data1\" content=\"12 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/integrationer\\\/erp\\\/qad-adaptive-erp\\\/guide\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/integrationer\\\/erp\\\/qad-adaptive-erp\\\/guide\\\/\",\"name\":\"QAD APS: Integrationsguide til produktionsplanl\u00e6gning\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"Forbind QAD Adaptive ERP og SkyPlanner APS: QXtend Inbound QDocs til Work Order Maintenance, QXtend Outbound-h\u00e6ndelser, tidsregistrering, mapping og projekttips.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/integrationer\\\/erp\\\/qad-adaptive-erp\\\/guide\\\/#breadcrumb\"},\"inLanguage\":\"da-DK\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/da\\\/integrationer\\\/erp\\\/qad-adaptive-erp\\\/guide\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/integrationer\\\/erp\\\/qad-adaptive-erp\\\/guide\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP- og MES-softwareintegrationer med SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/integrationer\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS til dit ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/integrationer\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS til QAD Adaptive ERP: Produktionsplanl\u00e6gning efter reel kapacitet\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/integrationer\\\/erp\\\/qad-adaptive-erp\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Guide til integration af QAD Adaptive ERP med SkyPlanner APS til produktionsplanl\u00e6gning\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"da-DK\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"da-DK\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"QAD APS: Integrationsguide til produktionsplanl\u00e6gning","description":"Forbind QAD Adaptive ERP og SkyPlanner APS: QXtend Inbound QDocs til Work Order Maintenance, QXtend Outbound-h\u00e6ndelser, tidsregistrering, mapping og projekttips.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/da\/integrationer\/erp\/qad-adaptive-erp\/guide\/","og_locale":"da_DK","og_type":"article","og_title":"Guide til integration af QAD Adaptive ERP med SkyPlanner APS til produktionsplanl\u00e6gning","og_description":"Forbind QAD Adaptive ERP og SkyPlanner APS: QXtend Inbound QDocs til Work Order Maintenance, QXtend Outbound-h\u00e6ndelser, tidsregistrering, mapping og projekttips.","og_url":"https:\/\/skyplanner.ai\/da\/integrationer\/erp\/qad-adaptive-erp\/guide\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Estimeret l\u00e6setid":"12 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/da\/integrationer\/erp\/qad-adaptive-erp\/guide\/","url":"https:\/\/skyplanner.ai\/da\/integrationer\/erp\/qad-adaptive-erp\/guide\/","name":"QAD APS: Integrationsguide til produktionsplanl\u00e6gning","isPartOf":{"@id":"https:\/\/skyplanner.ai\/da\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"Forbind QAD Adaptive ERP og SkyPlanner APS: QXtend Inbound QDocs til Work Order Maintenance, QXtend Outbound-h\u00e6ndelser, tidsregistrering, mapping og projekttips.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/da\/integrationer\/erp\/qad-adaptive-erp\/guide\/#breadcrumb"},"inLanguage":"da-DK","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/da\/integrationer\/erp\/qad-adaptive-erp\/guide\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/da\/integrationer\/erp\/qad-adaptive-erp\/guide\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/da\/"},{"@type":"ListItem","position":2,"name":"ERP- og MES-softwareintegrationer med SkyPlanner","item":"https:\/\/skyplanner.ai\/da\/integrationer\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS til dit ERP","item":"https:\/\/skyplanner.ai\/da\/integrationer\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS til QAD Adaptive ERP: Produktionsplanl\u00e6gning efter reel kapacitet","item":"https:\/\/skyplanner.ai\/da\/integrationer\/erp\/qad-adaptive-erp\/"},{"@type":"ListItem","position":5,"name":"Guide til integration af QAD Adaptive ERP med SkyPlanner APS til produktionsplanl\u00e6gning"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/da\/#website","url":"https:\/\/skyplanner.ai\/da\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/da\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/da\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"da-DK"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/da\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/da\/","logo":{"@type":"ImageObject","inLanguage":"da-DK","@id":"https:\/\/skyplanner.ai\/da\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/da\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/da\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integrationer \/ ERP \/ QAD Adaptive ERP Guide til integration af QAD Adaptive ERP med SkyPlanner APS til produktionsplanl\u00e6gning Denne integrationsguide viser partnere og IT-teams, hvordan QAD Adaptive ERP forbindes med SkyPlanner APS. Det g\u00e6lder ogs\u00e5 installationer af de tidligere QAD Enterprise Edition og MFG\/PRO. SkyPlanner integreres med QAD Adaptive ERP i begge retninger via&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/pages\/106928","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/comments?post=106928"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/pages\/106928\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/pages\/106174"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/media?parent=106928"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}