{"id":77487,"date":"2025-05-09T08:57:16","date_gmt":"2025-05-09T08:57:16","guid":{"rendered":"https:\/\/skyplanner.ai\/docs\/rapport-om-alle-tidslogge\/"},"modified":"2025-10-08T07:17:09","modified_gmt":"2025-10-08T07:17:09","password":"","slug":"rapport-om-alle-tidslogge","status":"publish","type":"docs","link":"https:\/\/skyplanner.ai\/da\/docs\/rapport-om-alle-tidslogge\/","title":{"rendered":"Rapport om alle tidslogge"},"content":{"rendered":"\n<p>En <strong>All Timelogs Report<\/strong> er en detaljeret liste over alt, hvad der er registreret med <strong>SkyPlanner<\/strong>&#8216;s <strong>timer<\/strong>. Den sporer det arbejde, der udf\u00f8res p\u00e5 v\u00e6rkstedsgulvet &#8211; trin for trin, person for person &#8211; med n\u00f8jagtige tider og resultater. <\/p>\n\n<p>Den er god til at tjekke, hvordan hver opgave gik, hvor lang tid den tog, hvem der udf\u00f8rte den, og om der var problemer. Du kan endda godkende eller redigere oplysninger direkte i rapporten. <\/p>\n\n<p>Her er, hvad hver kolonne betyder:<\/p>\n\n<ul class=\"wp-block-list\">\n<li><strong>Jobstatus<\/strong>: Viser jobbets aktuelle tilstand (f.eks. i gang, afsluttet eller sat p\u00e5 pause).<\/li>\n\n\n\n<li><strong>Status for tidsloggen<\/strong>: Fort\u00e6ller dig, om loggen er aktiv, f\u00e6rdig eller skal gennemg\u00e5s.<\/li>\n\n\n\n<li><strong>Arbejdsnummer<\/strong>: ID eller kode for det job, der udf\u00f8res.<\/li>\n\n\n\n<li><strong>Kontrolnummer<\/strong>: Internt nummer, der bruges til at spore jobbet med henblik p\u00e5 kvalitet eller registreringer.<\/li>\n\n\n\n<li><strong>Trin #<\/strong>: Stadiet i processen (som trin 1, trin 2 osv.).<\/li>\n\n\n\n<li><strong>Arbejdsstation<\/strong>: Den specifikke station eller det omr\u00e5de, hvor opgaven udf\u00f8res.<\/li>\n\n\n\n<li><strong>Arbejdsfase<\/strong>: Den faktiske opgave, der udf\u00f8res (f.eks. svejsning, montering eller maling).<\/li>\n\n\n\n<li><strong>Produktkode<\/strong>: Den kode, der identificerer det produkt, der arbejdes p\u00e5.<\/li>\n\n\n\n<li><strong>Person<\/strong>: Hvem der udf\u00f8rer arbejdet.<\/li>\n\n\n\n<li><strong>Begynde<\/strong>: Hvorn\u00e5r opgaven startede.<\/li>\n\n\n\n<li><strong>Slut<\/strong>: Hvorn\u00e5r opgaven sluttede.<\/li>\n\n\n\n<li><strong>F\u00e6rdiggjort (stk):<\/strong> Hvor mange f\u00e6rdige stykker kom der ud af denne opgave.<\/li>\n\n\n\n<li><strong>Fejlbeh\u00e6ftede (stk.)<\/strong>: Hvor mange stykker havde defekter eller fejl.<\/li>\n\n\n\n<li><strong>Logget tid<\/strong>: Den tid, personen faktisk har brugt p\u00e5 opgaven.<\/li>\n\n\n\n<li><strong>Bem\u00e6rk<\/strong>: Enhver kommentar eller ekstra information tilf\u00f8jet af operat\u00f8ren.<\/li>\n\n\n\n<li><strong>Handlinger<\/strong>: Knapper eller muligheder for at godkende, redigere eller gennemg\u00e5 tidsloggen.<\/li>\n<\/ul>\n\n<p><strong>Hvorfor det er nyttigt:<\/strong><\/p>\n\n<p>SkyPlanner&#8217;s All Timelogs Report hj\u00e6lper dig med at holde styr p\u00e5, hvordan arbejdet rent faktisk bliver udf\u00f8rt. Den viser, hvad der fungerer, hvor der kan v\u00e6re problemer, og hvor lang tid opgaverne egentlig tager. Den er nyttig for ledere, supervisorer og alle, der fors\u00f8ger at forbedre workflow og teamets performance.  <\/p>\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>En All Timelogs Report er en detaljeret liste over alt, hvad der er registreret med SkyPlanner&#8216;s timer. Den sporer det arbejde, der udf\u00f8res p\u00e5 v\u00e6rkstedsgulvet &#8211; trin for trin, person for person &#8211; med n\u00f8jagtige tider og resultater. Den er god til at tjekke, hvordan hver opgave gik, hvor lang tid den tog, hvem der &#8230; <a title=\"Rapport om alle tidslogge\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/da\/docs\/rapport-om-alle-tidslogge\/\" aria-label=\"Read more about Rapport om alle tidslogge\">L\u00e6s Mere<\/a><\/p>\n","protected":false},"author":6,"featured_media":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"doc_category":[1704],"doc_tag":[],"class_list":["post-77487","docs","type-docs","status-publish","hentry","doc_category-shopfloorapp-og-timer"],"acf":[],"year_month":"2026-11","word_count":311,"total_views":"174","reactions":{"happy":"0","normal":"0","sad":"0"},"author_info":{"name":"SkyPlanner","author_nicename":"bettina","author_url":"https:\/\/skyplanner.ai\/da\/author\/bettina\/"},"doc_category_info":[{"term_name":"ShopFloorApp og timer","term_url":"https:\/\/skyplanner.ai\/da\/docs-category\/shopfloorapp-og-timer\/"}],"doc_tag_info":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Rapport om alle tidslogge &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"All Timelogs Report er en detaljeret liste over alt, hvad der registreres med SkyPlanner&#039;s timer. Den sporer det arbejde, der udf\u00f8res - trin for trin, person...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/da\/docs\/rapport-om-alle-tidslogge\/\" \/>\n<meta property=\"og:locale\" content=\"da_DK\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Rapport om alle tidslogge\" \/>\n<meta property=\"og:description\" content=\"All Timelogs Report er en detaljeret liste over alt, hvad der registreres med SkyPlanner&#039;s timer. Den sporer det arbejde, der udf\u00f8res - trin for trin, person...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/da\/docs\/rapport-om-alle-tidslogge\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:modified_time\" content=\"2025-10-08T07:17:09+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Estimeret l\u00e6setid\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/docs\\\/rapport-om-alle-tidslogge\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/docs\\\/rapport-om-alle-tidslogge\\\/\",\"name\":\"Rapport om alle tidslogge &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#website\"},\"datePublished\":\"2025-05-09T08:57:16+00:00\",\"dateModified\":\"2025-10-08T07:17:09+00:00\",\"description\":\"All Timelogs Report er en detaljeret liste over alt, hvad der registreres med SkyPlanner's timer. Den sporer det arbejde, der udf\u00f8res - trin for trin, person...\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/docs\\\/rapport-om-alle-tidslogge\\\/#breadcrumb\"},\"inLanguage\":\"da-DK\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/da\\\/docs\\\/rapport-om-alle-tidslogge\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/docs\\\/rapport-om-alle-tidslogge\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Docs\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/docs\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Rapport om alle tidslogge\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"da-DK\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"da-DK\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/da\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Rapport om alle tidslogge &#8211; SkyPlanner","description":"All Timelogs Report er en detaljeret liste over alt, hvad der registreres med SkyPlanner's timer. Den sporer det arbejde, der udf\u00f8res - trin for trin, person...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/da\/docs\/rapport-om-alle-tidslogge\/","og_locale":"da_DK","og_type":"article","og_title":"Rapport om alle tidslogge","og_description":"All Timelogs Report er en detaljeret liste over alt, hvad der registreres med SkyPlanner's timer. Den sporer det arbejde, der udf\u00f8res - trin for trin, person...","og_url":"https:\/\/skyplanner.ai\/da\/docs\/rapport-om-alle-tidslogge\/","og_site_name":"SkyPlanner","article_modified_time":"2025-10-08T07:17:09+00:00","twitter_card":"summary_large_image","twitter_misc":{"Estimeret l\u00e6setid":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/da\/docs\/rapport-om-alle-tidslogge\/","url":"https:\/\/skyplanner.ai\/da\/docs\/rapport-om-alle-tidslogge\/","name":"Rapport om alle tidslogge &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/da\/#website"},"datePublished":"2025-05-09T08:57:16+00:00","dateModified":"2025-10-08T07:17:09+00:00","description":"All Timelogs Report er en detaljeret liste over alt, hvad der registreres med SkyPlanner's timer. Den sporer det arbejde, der udf\u00f8res - trin for trin, person...","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/da\/docs\/rapport-om-alle-tidslogge\/#breadcrumb"},"inLanguage":"da-DK","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/da\/docs\/rapport-om-alle-tidslogge\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/da\/docs\/rapport-om-alle-tidslogge\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/da\/"},{"@type":"ListItem","position":2,"name":"Docs","item":"https:\/\/skyplanner.ai\/da\/docs\/"},{"@type":"ListItem","position":3,"name":"Rapport om alle tidslogge"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/da\/#website","url":"https:\/\/skyplanner.ai\/da\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/da\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/da\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"da-DK"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/da\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/da\/","logo":{"@type":"ImageObject","inLanguage":"da-DK","@id":"https:\/\/skyplanner.ai\/da\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/da\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"SkyPlanner","author_link":"https:\/\/skyplanner.ai\/da\/author\/bettina\/"},"uagb_comment_info":0,"uagb_excerpt":"En All Timelogs Report er en detaljeret liste over alt, hvad der er registreret med SkyPlanner&#8216;s timer. Den sporer det arbejde, der udf\u00f8res p\u00e5 v\u00e6rkstedsgulvet &#8211; trin for trin, person for person &#8211; med n\u00f8jagtige tider og resultater. Den er god til at tjekke, hvordan hver opgave gik, hvor lang tid den tog, hvem der&hellip;","knowledge_base_info":[],"knowledge_base_slug":[],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/docs\/77487","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/docs"}],"about":[{"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/types\/docs"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/comments?post=77487"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/docs\/77487\/revisions"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/media?parent=77487"}],"wp:term":[{"taxonomy":"doc_category","embeddable":true,"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/doc_category?post=77487"},{"taxonomy":"doc_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/da\/wp-json\/wp\/v2\/doc_tag?post=77487"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}