{"id":99747,"date":"2026-10-16T07:53:34","date_gmt":"2026-10-16T07:53:34","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=99747"},"modified":"2026-10-16T10:12:25","modified_gmt":"2026-10-16T10:12:25","slug":"capable-to-promise","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/cs\/zdroje\/capable-to-promise\/","title":{"rendered":"Capable to promise: Prov\u011b\u0159te zak\u00e1zku p\u0159ed potvrzen\u00edm"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Capable to promise: Prov\u011b\u0159te zak\u00e1zku p\u0159ed potvrzen\u00edm<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/cs\/\">Domov<\/a> &raquo; <a href=\"\/cs\/zdroje\/\">Zdroje<\/a> &raquo; Capable to promise: Prov\u011b\u0159te zak\u00e1zku p\u0159ed potvrzen\u00edm<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Odhadovan\u00fd \u010das \u010dten\u00ed: <\/span><span class=\"yoast-reading-time__reading-time\">7<\/span><span class=\"yoast-reading-time__time-unit\"> minut<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Metoda capable to promise (CTP) ov\u011b\u0159uje, zda a kdy dok\u00e1\u017eete vyrobit po\u017eadovan\u00e9 mno\u017estv\u00ed. Zohled\u0148uje p\u0159itom dostupnost materi\u00e1lu i v\u00fdrobn\u00ed kapacitu pot\u0159ebnou ke zpracov\u00e1n\u00ed zak\u00e1zky. Obchodu tak poskytuje podklad pro potvrzen\u00ed term\u00ednu dod\u00e1n\u00ed v situaci, kdy zbo\u017e\u00ed nelze jednodu\u0161e expedovat ze skladu.<\/p>\n\n\n<p>Rozhoduj\u00edc\u00ed je prov\u011b\u0159it zak\u00e1zku d\u0159\u00edv, ne\u017e ji potvrd\u00edte. Term\u00edn po\u017eadovan\u00fd z\u00e1kazn\u00edkem \u0159\u00edk\u00e1, co by v\u00e1m pomohlo zak\u00e1zku z\u00edskat. Standardn\u00ed pr\u016fb\u011b\u017en\u00e1 doba v\u00fdroby zase ukazuje, jak dlouho v\u00fdroba obvykle trv\u00e1. Ani jeden \u00fadaj ale ne\u0159ekne, zda se pr\u00e1v\u011b tato zak\u00e1zka vejde do pl\u00e1nu vedle pr\u00e1ce, kterou jste u\u017e p\u0159isl\u00edbili.<\/p>\n\n\n<p>SkyPlanner APS v\u00e1m s t\u00edmto ov\u011b\u0159en\u00edm pom\u016f\u017ee d\u00edky funkci Job Prospects pro p\u0159edb\u011b\u017en\u00e9 zak\u00e1zky: m\u016f\u017eete simulovat realistick\u00e9 term\u00edny dod\u00e1n\u00ed potenci\u00e1ln\u00edch zak\u00e1zek je\u0161t\u011b p\u0159edt\u00edm, ne\u017e se zav\u00e1\u017eete k jejich v\u00fdrob\u011b. Rozvrhn\u011bte p\u0159edb\u011b\u017enou zak\u00e1zku s ohledem na aktu\u00e1ln\u00ed vyt\u00ed\u017een\u00ed, zkontrolujte pl\u00e1novan\u00e9 \u010dasy dokon\u010den\u00ed a prohl\u00e9dn\u011bte si okoln\u00ed operace v Ganttov\u011b diagramu. M\u00edsto zji\u0161\u0165ov\u00e1n\u00ed, jak\u00e9 operace \u010dekaj\u00ed na jednotliv\u00fdch stroj\u00edch, abyste mohli odpov\u011bd\u011bt obchodn\u00edk\u016fm, se m\u016f\u017eete soust\u0159edit na nab\u00eddku, kterou v\u00e1\u0161 z\u00e1vod dok\u00e1\u017ee splnit.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Rozd\u00edl mezi capable to promise a available to promise<\/h2>\n\n\n<p>Metoda available to promise (ATP) zji\u0161\u0165uje, jak\u00e9 mno\u017estv\u00ed je po zohledn\u011bn\u00ed st\u00e1vaj\u00edc\u00ed popt\u00e1vky je\u0161t\u011b k dispozici pro novou objedn\u00e1vku. Zapo\u010d\u00edt\u00e1v\u00e1 nejen z\u00e1soby, kter\u00e9 dosud nejsou p\u0159isl\u00edben\u00e9 jin\u00fdm z\u00e1kazn\u00edk\u016fm, ale i pl\u00e1novan\u00e9 p\u0159\u00edjmy na sklad. Nejde tedy jen o to, co dnes fyzicky le\u017e\u00ed v reg\u00e1lu.<\/p>\n\n\n<p>CTP p\u0159id\u00e1v\u00e1 ot\u00e1zku v\u00fdroby: pokud hotov\u00e9 v\u00fdrobky nejsou k dispozici, dok\u00e1\u017eete je v po\u017eadovan\u00e9m \u010dase vyrobit s dostupn\u00fdm materi\u00e1lem a kapacitou?<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Ot\u00e1zka<\/th><th>Available to promise (ATP)<\/th><th>Capable to promise (CTP)<\/th><\/tr><\/thead><tbody><tr><td>Z \u010deho vych\u00e1z\u00ed odpov\u011b\u010f?<\/td><td>Z dosud nep\u0159isl\u00edben\u00fdch z\u00e1sob a pl\u00e1novan\u00fdch p\u0159\u00edjm\u016f<\/td><td>Z dostupnosti materi\u00e1lu a kapacity pot\u0159ebn\u00e9 pro v\u00fdrobu<\/td><\/tr><tr><td>Co pom\u00e1h\u00e1 obchodu nab\u00eddnout?<\/td><td>Mno\u017estv\u00ed a term\u00edn dod\u00e1n\u00ed podle dostupn\u00fdch z\u00e1sob a pl\u00e1novan\u00fdch p\u0159\u00edjm\u016f<\/td><td>Mno\u017estv\u00ed a term\u00edn dod\u00e1n\u00ed, kter\u00e9 lze zajistit dal\u0161\u00ed v\u00fdrobou<\/td><\/tr><tr><td>Kdy se kter\u00e1 metoda hod\u00ed?<\/td><td>Kdy\u017e lze zbo\u017e\u00ed dodat ze z\u00e1sob nebo o\u010dek\u00e1van\u00fdch p\u0159\u00edjm\u016f<\/td><td>Kdy\u017e zak\u00e1zka je\u0161t\u011b vy\u017eaduje v\u00fdrobu nebo mont\u00e1\u017e na sd\u00edlen\u00fdch v\u00fdrobn\u00edch zdroj\u00edch<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>ATP je u\u017eite\u010dn\u00e9, pokud m\u016f\u017eete objedn\u00e1vku vy\u0159\u00eddit z dostupn\u00fdch z\u00e1sob a pl\u00e1novan\u00fdch p\u0159\u00edjm\u016f. CTP m\u00e1 zvl\u00e1\u0161tn\u00ed p\u0159\u00ednos u <a href=\"\/cs\/zdroje\/zakazkova-vyroba\/\">v\u00fdroby na zak\u00e1zku<\/a> a <a href=\"\/cs\/zdroje\/montaz-na-zakazku\/\">mont\u00e1\u017ee na zak\u00e1zku<\/a>, kde p\u0159ijet\u00edm objedn\u00e1vky vznik\u00e1 pr\u00e1ce, kterou je pot\u0159eba za\u0159adit do v\u00fdrobn\u00edho pl\u00e1nu.<\/p>\n\n\n<p>To, \u017ee m\u00e1te v\u0161echny komponenty, je\u0161t\u011b neznamen\u00e1, \u017ee m\u00e1te kapacitu na jejich mont\u00e1\u017e. Stejn\u011b tak absence hotov\u00fdch v\u00fdrobk\u016f na sklad\u011b neznamen\u00e1, \u017ee mus\u00edte z\u00e1kazn\u00edka odm\u00edtnout. CTP v\u00e1m pom\u00e1h\u00e1 naj\u00edt obchodn\u00ed p\u0159\u00edle\u017eitost mezi t\u011bmito dv\u011bma p\u0159edpoklady.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Nov\u00fd p\u0159\u00edslib m\u016f\u017ee ohrozit ten p\u0159edchoz\u00ed<\/h2>\n\n\n<p>P\u0159edstavte si zak\u00e1zkovou obrobnu, kter\u00e1 p\u0159ipravuje nab\u00eddku na sadu h\u0159\u00eddel\u00ed a mont\u00e1\u017en\u00edch desek. Materi\u00e1l je k dispozici a obchod by r\u00e1d nab\u00eddl expedici v p\u00e1tek.<\/p>\n\n\n<p>H\u0159\u00eddele lze vysoustru\u017eit a zkontrolovat do \u010dtvrtka. Desky ale vy\u017eaduj\u00ed fr\u00e9zov\u00e1n\u00ed na obr\u00e1b\u011bc\u00edm centru, kter\u00e9 u\u017e je vyt\u00ed\u017een\u00e9 potvrzen\u00fdmi zak\u00e1zkami. P\u0159i sou\u010dasn\u00e9m po\u0159ad\u00ed budou hotov\u00e9 a\u017e n\u00e1sleduj\u00edc\u00ed t\u00fdden.<\/p>\n\n\n<p>Zak\u00e1zka nen\u00ed p\u0159ipraven\u00e1 k expedici jen proto, \u017ee je hotov\u00e1 jej\u00ed nejjednodu\u0161\u0161\u00ed polo\u017eka. Pokud z\u00e1kazn\u00edk pot\u0159ebuje kompletn\u00ed sadu, term\u00edn expedice ur\u010duj\u00ed desky. Pouh\u00e1 kontrola z\u00e1sob by neodhalila frontu na fr\u00e9zov\u00e1n\u00ed a standardn\u00ed pr\u016fb\u011b\u017en\u00e1 doba v\u00fdroby by nezohlednila aktu\u00e1ln\u00ed vyt\u00ed\u017een\u00ed tohoto pracovi\u0161t\u011b.<\/p>\n\n\n<p>P\u0159ed\u0159azen\u00ed desek by mohlo umo\u017enit p\u00e1te\u010dn\u00ed expedici, ale tak\u00e9 zpozdit zak\u00e1zku st\u00e1vaj\u00edc\u00edho z\u00e1kazn\u00edka. To nen\u00ed voln\u00e1 kapacita. Je to rozhodnut\u00ed, kter\u00fd z\u00e1vazek dostane p\u0159ednost.<\/p>\n\n\n<p>U\u017eite\u010dn\u00e9 ov\u011b\u0159en\u00ed pomoc\u00ed CTP proto odpov\u00edd\u00e1 na dv\u011b ot\u00e1zky sou\u010dasn\u011b: <strong>kdy m\u016f\u017ee b\u00fdt tato zak\u00e1zka hotov\u00e1 a jak se jej\u00ed za\u0159azen\u00ed projev\u00ed na ji\u017e potvrzen\u00fdch zak\u00e1zk\u00e1ch?<\/strong> Kdy\u017e vid\u00edte oboj\u00ed, m\u016f\u017eete z\u00edskat novou zak\u00e1zku, ani\u017e byste jej\u00ed skute\u010dnou cenu zjistili a\u017e po potvrzen\u00ed.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Prov\u011b\u0159te popt\u00e1vanou zak\u00e1zku ve SkyPlanner<\/h2>\n\n\n<p>SkyPlanner v\u00e1m na tuto ot\u00e1zku odpov\u00ed konkr\u00e9tn\u00edm rozvrhem. Arcturus, jeho um\u011bl\u00e1 inteligence pro rozvrhov\u00e1n\u00ed, vypo\u010d\u00edt\u00e1 um\u00edst\u011bn\u00ed operac\u00ed podle nastaven\u00fdch <a href=\"\/cs\/zdroje\/co-je-planovani-vyroby\/\">v\u00fdrobn\u00edch zdroj\u016f, n\u00e1vaznost\u00ed a priorit<\/a>. M\u00edsto ru\u010dn\u00edho p\u0159i\u0159azov\u00e1n\u00ed ka\u017ed\u00e9 operace rovnou vid\u00edte v\u00fdsledn\u00fd rozvrh.<\/p>\n\n\n<p>P\u0159i rozhodov\u00e1n\u00ed o tom, co z\u00e1kazn\u00edkovi p\u0159isl\u00edbit, je postup jednoduch\u00fd.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Rozvrhn\u011bte p\u0159esn\u011b to, co obchod nab\u00edz\u00ed<\/h3>\n\n\n<p>Vytvo\u0159te zak\u00e1zku a ozna\u010dte jej\u00ed navrhovan\u00e9 polo\u017eky jako p\u0159edb\u011b\u017en\u00e9. Zadejte po\u017eadovan\u00e9 polo\u017eky, mno\u017estv\u00ed a pot\u0159ebn\u00e9 kroky v\u00fdrobn\u00edho postupu, m\u00edsto abyste zkou\u0161eli obecnou operaci s pr\u016fm\u011brnou dobou trv\u00e1n\u00ed. Rozvrhn\u011bte operace a p\u0159ed p\u0159ijet\u00edm pl\u00e1nu zkontrolujte jejich navrhovan\u00e9 um\u00edst\u011bn\u00ed na \u010dasov\u00e9 ose. Realistick\u00fd term\u00edn dokon\u010den\u00ed tak m\u016f\u017eete posoudit je\u0161t\u011b u p\u0159edb\u011b\u017en\u00e9 zak\u00e1zky, ne\u017e potvrd\u00edte prodej.<\/p>\n\n\n<p>D\u016fle\u017eit\u00e9 jsou vstupy, kter\u00e9 mohou zm\u011bnit v\u00fdsledek: kter\u00e9 v\u00fdrobn\u00ed zdroje mohou pr\u00e1ci prov\u00e9st, doby operac\u00ed a se\u0159\u00edzen\u00ed, pracovn\u00ed sm\u011bny, p\u0159ipravenost materi\u00e1lu i zak\u00e1zky, kter\u00e9 u\u017e kapacitu vyu\u017e\u00edvaj\u00ed. Pokud je zapnut\u00e9 rozvrhov\u00e1n\u00ed se zohledn\u011bn\u00edm materi\u00e1lu, Arcturus zahrne jeho dostupnost do v\u00fdpo\u010dtu.<\/p>\n\n\n<p>V p\u0159\u00edkladu obrobny to znamen\u00e1 rozvrhnout h\u0159\u00eddele i desky. Kdybyste vynechali pomalej\u0161\u00ed v\u00fdrobn\u00ed postup, navrhovan\u00fd term\u00edn by sice vypadal l\u00e1kav\u011b, ale celou zak\u00e1zku by v n\u011bm p\u0159esto nebylo mo\u017en\u00e9 dodat.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Sledujte \u010dasy dokon\u010den\u00ed, nejen po\u017eadovan\u00fd term\u00edn<\/h3>\n\n\n<p>Po rozvr\u017een\u00ed p\u0159edb\u011b\u017en\u00e9 zak\u00e1zky zkontrolujte u ka\u017ed\u00e9 jej\u00ed polo\u017eky pl\u00e1novan\u00fd \u010das dokon\u010den\u00ed. Nejpozd\u011bj\u0161\u00ed z t\u011bchto \u010das\u016f ur\u010duje, kdy bude p\u0159i sou\u010dasn\u00e9m vyt\u00ed\u017een\u00ed dokon\u010dena v\u00fdroba cel\u00e9 zak\u00e1zky. Z tohoto \u00fadaje m\u016f\u017eete vych\u00e1zet p\u0159i p\u0159\u00edslibu term\u00ednu dod\u00e1n\u00ed cel\u00e9 zak\u00e1zky.<\/p>\n\n\n<p>Tento v\u00fdsledek nezam\u011b\u0148ujte s datem, kdy z\u00e1kazn\u00edk zbo\u017e\u00ed p\u0159evezme. P\u0159ipo\u010dt\u011bte \u010das na kontrolu, balen\u00ed, expedici nebo dopravu, pokud u\u017e nen\u00ed zahrnut\u00fd v pl\u00e1nu. Obchod i v\u00fdroba mus\u00ed m\u00edt jasno, zda nab\u00edzen\u00fd term\u00edn znamen\u00e1 p\u0159ipravenost k vyzvednut\u00ed, expedici, nebo doru\u010den\u00ed.<\/p>\n\n\n<p>Pr\u00e1v\u011b v tom je rozd\u00edl mezi zad\u00e1n\u00edm po\u017eadovan\u00e9ho term\u00ednu a ov\u011b\u0159en\u00edm, zda ho v\u00fdroba dok\u00e1\u017ee splnit. Za z\u00e1vazek v\u016f\u010di z\u00e1kazn\u00edkovi odpov\u00edd\u00e1te vy. SkyPlanner poskytuje pl\u00e1novan\u00e9 \u010dasy dokon\u010den\u00ed, o kter\u00e9 m\u016f\u017eete v\u011brohodn\u00fd p\u0159\u00edslib op\u0159\u00edt.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Zkontrolujte dopad na ostatn\u00ed z\u00e1vazky<\/h3>\n\n\n<p>V <a href=\"\/cs\/zdroje\/ganttuv-diagram-pro-planovani-vyroby\/\">Ganttov\u011b diagramu<\/a> si prohl\u00e9dn\u011bte navrhovanou pr\u00e1ci vedle st\u00e1vaj\u00edc\u00edch zak\u00e1zek. Pokud zm\u011bn\u00edte jej\u00ed prioritu, abyste dos\u00e1hli d\u0159\u00edv\u011bj\u0161\u00edho dokon\u010den\u00ed, nechte rozvrh p\u0159epo\u010d\u00edtat. Ne\u017e nab\u00eddku potvrd\u00edte, zkontrolujte, co dal\u0161\u00edho se posunulo.<\/p>\n\n\n<p>Priority ur\u010dujete vy a pomoc\u00ed z\u00e1mk\u016f m\u016f\u017eete zachovat vybran\u00e1 rozhodnut\u00ed v rozvrhu. Arcturus provede v\u00fdpo\u010det v mez\u00edch t\u011bchto pokyn\u016f. P\u0159i jedn\u00e1n\u00ed se tak m\u016f\u017eete v\u011bnovat tomu, zda se vyplat\u00ed p\u0159ijmout zak\u00e1zku se zkr\u00e1cen\u00fdm term\u00ednem, m\u00edsto abyste ru\u010dn\u011b p\u0159estavovali fronty a zji\u0161\u0165ovali, kter\u00e9 zak\u00e1zky by odsunula.<\/p>\n\n\n<p>SkyPlanner lze prost\u0159ednictv\u00edm <a href=\"\/cs\/integrace\/\">otev\u0159en\u00e9ho REST API<\/a> integrovat s libovoln\u00fdm ERP nebo MES. M\u016f\u017eete si ponechat st\u00e1vaj\u00edc\u00ed syst\u00e9m pro spr\u00e1vu zak\u00e1zek a propojit ho s rozvrhem, kter\u00fd pot\u0159ebujete pro rozhodov\u00e1n\u00ed o term\u00ednech dod\u00e1n\u00ed.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Vyu\u017eijte v\u00fdsledek k nab\u00eddce, ne jen k odpov\u011bdi ano \u010di ne<\/h2>\n\n\n<p>Pokud lze po\u017eadovan\u00e9 mno\u017estv\u00ed dokon\u010dit v po\u017eadovan\u00e9m term\u00ednu bez nep\u0159ijateln\u00fdch dopad\u016f na st\u00e1vaj\u00edc\u00ed zak\u00e1zky, m\u00e1te pro potvrzen\u00ed pevn\u011bj\u0161\u00ed podklad. Pokud ne, pom\u016f\u017ee nab\u00eddnout alternativu, kterou z\u00e1kazn\u00edk m\u016f\u017ee p\u0159ijmout.<\/p>\n\n\n<p>U na\u0161\u00ed modelov\u00e9 zak\u00e1zky pro obrobnu to m\u016f\u017ee znamenat n\u00e1sleduj\u00edc\u00ed:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Nab\u00eddn\u011bte pozd\u011bj\u0161\u00ed dod\u00e1n\u00ed cel\u00e9 zak\u00e1zky.<\/strong> Zachovejte st\u00e1vaj\u00edc\u00ed z\u00e1vazky a nab\u00eddn\u011bte term\u00edn, kter\u00fd odpov\u00edd\u00e1 pomalej\u0161\u00edmu postupu v\u00fdroby desek.<\/li><li><strong>Proberte mo\u017enost rozd\u011blen\u00ed dod\u00e1vky.<\/strong> Pokud z\u00e1kazn\u00edk dok\u00e1\u017ee vyu\u017e\u00edt h\u0159\u00eddele samostatn\u011b, nab\u00eddn\u011bte je jako prvn\u00ed a desky pozd\u011bji. Ne\u017e p\u0159id\u00e1te dal\u0161\u00ed manipulaci a p\u0159epravu, ov\u011b\u0159te, \u017ee \u010d\u00e1ste\u010dn\u00e1 dod\u00e1vka m\u00e1 pro z\u00e1kazn\u00edka hodnotu.<\/li><li><strong>Prov\u011b\u0159te d\u0159\u00edv\u011bj\u0161\u00ed term\u00edn p\u0159i zm\u011bn\u011b pl\u00e1nu.<\/strong> Pomoci m\u016f\u017ee schv\u00e1len\u00e1 sm\u011bna nav\u00edc nebo jin\u00fd vhodn\u00fd v\u00fdrobn\u00ed zdroj. Ne\u017e d\u0159\u00edv\u011bj\u0161\u00ed term\u00edn nab\u00eddnete, aktualizujte kapacitn\u00ed vstupy a nechte rozvrh p\u0159epo\u010d\u00edtat.<\/li><li><strong>V\u00fdslovn\u011b dohodn\u011bte, co zm\u011bna priorit znamen\u00e1.<\/strong> Pokud veden\u00ed rozhodne o p\u0159ed\u0159azen\u00ed t\u00e9to zak\u00e1zky, ur\u010dete, kter\u00fdch z\u00e1vazk\u016f se zm\u011bna dotkne, a v\u011bdom\u011b vy\u0159e\u0161te jej\u00ed d\u016fsledky.<\/li><\/ul>\n\n\n<p>To jsou obchodn\u00ed rozhodnut\u00ed, nejen \u00fapravy rozvrhu. Zak\u00e1zka se zkr\u00e1cen\u00fdm term\u00ednem, kter\u00e1 vyvol\u00e1 nezapo\u010d\u00edtan\u00e9 p\u0159es\u010dasy, dra\u017e\u0161\u00ed dopravu nebo naru\u0161en\u00ed v\u00fdroby, m\u016f\u017ee b\u00fdt m\u00e9n\u011b ziskov\u00e1, ne\u017e vypad\u00e1. Ov\u011b\u0159en\u00ed p\u0159ed p\u0159ijet\u00edm v\u00e1m d\u00e1v\u00e1 prostor prom\u00edtnout pr\u00e1ci nav\u00edc do ceny nebo vyjednat vhodn\u011bj\u0161\u00ed term\u00edn.<\/p>\n\n\n<h2 class=\"wp-block-heading\">P\u0159isl\u00edben\u00fd term\u00edn mus\u00ed vych\u00e1zet z aktu\u00e1ln\u00edho vyt\u00ed\u017een\u00ed<\/h2>\n\n\n<p>Nab\u00eddka zalo\u017een\u00e1 na v\u010derej\u0161\u00edm rozvrhu u\u017e nemus\u00ed b\u00fdt provediteln\u00e1, pokud mezit\u00edm p\u0159ijmete dal\u0161\u00ed zak\u00e1zku nebo se zpozd\u00ed dod\u00e1vka materi\u00e1lu. Jestli\u017ee se p\u0159ed potvrzen\u00edm z\u00e1kazn\u00edkem zm\u011bn\u00ed p\u0159edpoklady, ze kter\u00fdch term\u00edn vych\u00e1zel, prov\u011b\u0159te popt\u00e1vanou zak\u00e1zku znovu.<\/p>\n\n\n<p>Rozvr\u017een\u00e9 p\u0159edb\u011b\u017en\u00e9 zak\u00e1zky se zapo\u010d\u00edt\u00e1vaj\u00ed do pl\u00e1novan\u00e9ho vyt\u00ed\u017een\u00ed a rezervuj\u00ed kapacitu. Obchodn\u00edci tak mohou zohlednit potenci\u00e1ln\u00ed zak\u00e1zky, m\u00edsto aby u ka\u017ed\u00e9 nab\u00eddky po\u010d\u00edtali se stejn\u00fdm zd\u00e1nliv\u011b voln\u00fdm term\u00ednem. Dohodn\u011bte se, kter\u00e9 potenci\u00e1ln\u00ed zak\u00e1zky budete rozvrhovat, kdo je bude udr\u017eovat aktu\u00e1ln\u00ed a kdy m\u00e1 nep\u0159ijat\u00e1 nab\u00eddka p\u0159estat ovliv\u0148ovat pl\u00e1n. Jakmile z\u00e1kazn\u00edk zak\u00e1zku potvrd\u00ed, zru\u0161te ozna\u010den\u00ed p\u0159edb\u011b\u017en\u00e9 zak\u00e1zky a rozvrhn\u011bte ji jako potvrzenou. Nab\u00eddka tak z\u016fstane prov\u00e1zan\u00e1 se z\u00e1vazkem v\u00fdroby, ani\u017e by neaktu\u00e1ln\u00ed nab\u00eddky zkreslovaly p\u0159ehled o vyu\u017eiteln\u00e9 kapacit\u011b.<\/p>\n\n\n<p>Po potvrzen\u00ed zak\u00e1zky pr\u016fb\u011b\u017en\u011b aktualizujte priority, dostupnost v\u00fdrobn\u00edch zdroj\u016f a \u00fadaje o materi\u00e1lu. Term\u00edn podlo\u017een\u00fd v\u00fdpo\u010dtem m\u00e1 smysl tehdy, kdy\u017e ho ov\u011b\u0159ujete podle skute\u010dn\u00fdch podm\u00ednek v\u00fdroby, nikoli podle pl\u00e1nu, kter\u00fd p\u0159edpokl\u00e1d\u00e1, \u017ee ka\u017ed\u00e1 sm\u011bna a dod\u00e1vka prob\u011bhne p\u0159esn\u011b podle p\u016fvodn\u00edch o\u010dek\u00e1v\u00e1n\u00ed.<\/p>\n\n\n<h2 class=\"wp-block-heading\">P\u0159esn\u011bj\u0161\u00ed stanovov\u00e1n\u00ed term\u00edn\u016f dod\u00e1n\u00ed v ka\u017edodenn\u00ed praxi<\/h2>\n\n\n<p>Finsk\u00e1 spole\u010dnost Eskomatic, kter\u00e1 se zab\u00fdv\u00e1 zak\u00e1zkov\u00fdm obr\u00e1b\u011bn\u00edm, d\u0159\u00edve spravovala po\u0159ad\u00ed v\u00fdrobn\u00edch operac\u00ed p\u0159ev\u00e1\u017en\u011b ru\u010dn\u011b ve star\u0161\u00edm syst\u00e9mu ERP a \u0159\u00edzen\u00ed v\u00fdroby. Z\u00edskat celkov\u00fd p\u0159ehled trvalo dlouho a kv\u016fli omezen\u00e9mu p\u0159ehledu o materi\u00e1lu mohly nedostatky vyj\u00edt najevo a\u017e t\u011bsn\u011b p\u0159ed zah\u00e1jen\u00edm operace.<\/p>\n\n\n<p>Se SkyPlanner z\u00edskal t\u00fdm p\u0159ehledn\u00e9 zobrazen\u00ed po\u0159ad\u00ed v\u00fdrobn\u00edch operac\u00ed v Ganttov\u011b diagramu a automatick\u00e9 rozvrhov\u00e1n\u00ed podle vyt\u00ed\u017een\u00ed, propojen\u00e9 se st\u00e1vaj\u00edc\u00edmi daty ERP. <a href=\"\/cs\/pribehy-zakazniku\/eskomatic\/\">Eskomatic uv\u00e1d\u00ed<\/a>, \u017ee d\u00edky lep\u0161\u00edmu p\u0159ehledu o vyt\u00ed\u017een\u00ed v\u00fdroby sn\u00e1ze ur\u010duje re\u00e1ln\u00e9 dodac\u00ed lh\u016fty a m\u016f\u017ee z\u00e1kazn\u00edk\u016fm sd\u011blovat p\u0159esn\u011bj\u0161\u00ed term\u00edny. Vedouc\u00ed pl\u00e1nov\u00e1n\u00ed v\u00fdroby Tommi M\u00e4nnist\u00f6 pova\u017euje stanovov\u00e1n\u00ed term\u00edn\u016f dod\u00e1n\u00ed za jednu z hlavn\u00edch p\u0159ednost\u00ed p\u0159i ka\u017edodenn\u00edm pou\u017e\u00edv\u00e1n\u00ed.<\/p>\n\n\n<p>Pr\u00e1v\u011b proto se pro \u0159e\u0161en\u00ed tohoto probl\u00e9mu vyplat\u00ed zvolit SkyPlanner: obchod dostane odpov\u011b\u010f podlo\u017eenou rozvrhem v\u00fdroby a pl\u00e1nova\u010d ji nemus\u00ed poka\u017ed\u00e9 pracn\u011b sestavovat ru\u010dn\u011b.<\/p>\n\n\n<p><a href=\"\/cs\/kontaktni-prodej\/\">Rezervujte si uk\u00e1zku SkyPlanner<\/a> a p\u0159ipravte si popt\u00e1vanou zak\u00e1zku, po\u017eadovan\u00fd term\u00edn a v\u00fdrobn\u00ed zdroj, kter\u00fd ji nejsp\u00ed\u0161 zdr\u017e\u00ed. Spole\u010dn\u011b probereme, jak byste mohli nab\u00eddku p\u0159ed potvrzen\u00edm prov\u011b\u0159it s ohledem na st\u00e1vaj\u00edc\u00ed z\u00e1vazky. Pokud si chcete nejd\u0159\u00edv ud\u011blat vlastn\u00ed p\u0159edstavu, <a href=\"\/cs\/zkusebni-verze\/\">vyzkou\u0161ejte SkyPlanner s uk\u00e1zkov\u00fdmi daty<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Capable to promise: Prov\u011b\u0159te zak\u00e1zku p\u0159ed potvrzen\u00edm Domov &raquo; Zdroje &raquo; Capable to promise: Prov\u011b\u0159te zak\u00e1zku p\u0159ed potvrzen\u00edm Metoda capable to promise (CTP) ov\u011b\u0159uje, zda a kdy dok\u00e1\u017eete vyrobit po\u017eadovan\u00e9 mno\u017estv\u00ed. Zohled\u0148uje p\u0159itom dostupnost materi\u00e1lu i v\u00fdrobn\u00ed kapacitu pot\u0159ebnou ke zpracov\u00e1n\u00ed zak\u00e1zky. Obchodu tak poskytuje podklad pro potvrzen\u00ed term\u00ednu dod\u00e1n\u00ed v situaci, kdy zbo\u017e\u00ed nelze &#8230; <a title=\"Capable to promise: Prov\u011b\u0159te zak\u00e1zku p\u0159ed potvrzen\u00edm\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/capable-to-promise\/\" aria-label=\"Read more about Capable to promise: Prov\u011b\u0159te zak\u00e1zku p\u0159ed potvrzen\u00edm\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":99840,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2518,303],"tags":[],"class_list":["post-99747","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-a-rozvrhovani","category-zdroje","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Capable to promise: Prov\u011b\u0159te zak\u00e1zku p\u0159ed potvrzen\u00edm<\/title>\n<meta name=\"description\" content=\"Zvl\u00e1dnete novou zak\u00e1zku bez zpo\u017ed\u011bn\u00ed ostatn\u00edch? S metodou capable to promise a SkyPlanner prov\u011b\u0159te kapacity, ne\u017e potvrd\u00edte term\u00edn dod\u00e1n\u00ed.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/capable-to-promise\/\" \/>\n<meta property=\"og:locale\" content=\"cs_CZ\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Capable to promise: Prov\u011b\u0159te zak\u00e1zku p\u0159ed potvrzen\u00edm\" \/>\n<meta property=\"og:description\" content=\"Zvl\u00e1dnete novou zak\u00e1zku bez zpo\u017ed\u011bn\u00ed ostatn\u00edch? S metodou capable to promise a SkyPlanner prov\u011b\u0159te kapacity, ne\u017e potvrd\u00edte term\u00edn dod\u00e1n\u00ed.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/cs\/zdroje\/capable-to-promise\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-16T07:53:34+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-16T10:12:25+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1536\" \/>\n\t<meta property=\"og:image:height\" content=\"864\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Napsal(a)\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Odhadovan\u00e1 doba \u010dten\u00ed\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/capable-to-promise\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/capable-to-promise\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Capable to promise: Prov\u011b\u0159te zak\u00e1zku p\u0159ed potvrzen\u00edm\",\"datePublished\":\"2026-10-16T07:53:34+00:00\",\"dateModified\":\"2026-10-16T10:12:25+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/capable-to-promise\\\/\"},\"wordCount\":2337,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/capable-to-promise\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/capable-to-promise-hero-1.png\",\"articleSection\":[\"APS a rozvrhov\u00e1n\u00ed\",\"zdroje\"],\"inLanguage\":\"cs\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/capable-to-promise\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/capable-to-promise\\\/\",\"name\":\"Capable to promise: Prov\u011b\u0159te zak\u00e1zku p\u0159ed potvrzen\u00edm\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/capable-to-promise\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/capable-to-promise\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/capable-to-promise-hero-1.png\",\"datePublished\":\"2026-10-16T07:53:34+00:00\",\"dateModified\":\"2026-10-16T10:12:25+00:00\",\"description\":\"Zvl\u00e1dnete novou zak\u00e1zku bez zpo\u017ed\u011bn\u00ed ostatn\u00edch? S metodou capable to promise a SkyPlanner prov\u011b\u0159te kapacity, ne\u017e potvrd\u00edte term\u00edn dod\u00e1n\u00ed.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/capable-to-promise\\\/#breadcrumb\"},\"inLanguage\":\"cs\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/capable-to-promise\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/capable-to-promise\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/capable-to-promise-hero-1.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/capable-to-promise-hero-1.png\",\"width\":1536,\"height\":864,\"caption\":\"Turned shafts await a mounting plate beside a milling machine before the complete order can ship.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/capable-to-promise\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Capable to promise: Prov\u011b\u0159te zak\u00e1zku p\u0159ed potvrzen\u00edm\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"cs\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Capable to promise: Prov\u011b\u0159te zak\u00e1zku p\u0159ed potvrzen\u00edm","description":"Zvl\u00e1dnete novou zak\u00e1zku bez zpo\u017ed\u011bn\u00ed ostatn\u00edch? S metodou capable to promise a SkyPlanner prov\u011b\u0159te kapacity, ne\u017e potvrd\u00edte term\u00edn dod\u00e1n\u00ed.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/cs\/zdroje\/capable-to-promise\/","og_locale":"cs_CZ","og_type":"article","og_title":"Capable to promise: Prov\u011b\u0159te zak\u00e1zku p\u0159ed potvrzen\u00edm","og_description":"Zvl\u00e1dnete novou zak\u00e1zku bez zpo\u017ed\u011bn\u00ed ostatn\u00edch? S metodou capable to promise a SkyPlanner prov\u011b\u0159te kapacity, ne\u017e potvrd\u00edte term\u00edn dod\u00e1n\u00ed.","og_url":"https:\/\/skyplanner.ai\/cs\/zdroje\/capable-to-promise\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-16T07:53:34+00:00","article_modified_time":"2026-10-16T10:12:25+00:00","og_image":[{"width":1536,"height":864,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Napsal(a)":"Jussi M\u00e4ntyl\u00e4","Odhadovan\u00e1 doba \u010dten\u00ed":"12 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/capable-to-promise\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/capable-to-promise\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Capable to promise: Prov\u011b\u0159te zak\u00e1zku p\u0159ed potvrzen\u00edm","datePublished":"2026-10-16T07:53:34+00:00","dateModified":"2026-10-16T10:12:25+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/capable-to-promise\/"},"wordCount":2337,"publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/capable-to-promise\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png","articleSection":["APS a rozvrhov\u00e1n\u00ed","zdroje"],"inLanguage":"cs"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/capable-to-promise\/","url":"https:\/\/skyplanner.ai\/cs\/zdroje\/capable-to-promise\/","name":"Capable to promise: Prov\u011b\u0159te zak\u00e1zku p\u0159ed potvrzen\u00edm","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/capable-to-promise\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/capable-to-promise\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png","datePublished":"2026-10-16T07:53:34+00:00","dateModified":"2026-10-16T10:12:25+00:00","description":"Zvl\u00e1dnete novou zak\u00e1zku bez zpo\u017ed\u011bn\u00ed ostatn\u00edch? S metodou capable to promise a SkyPlanner prov\u011b\u0159te kapacity, ne\u017e potvrd\u00edte term\u00edn dod\u00e1n\u00ed.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/capable-to-promise\/#breadcrumb"},"inLanguage":"cs","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/cs\/zdroje\/capable-to-promise\/"]}]},{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/capable-to-promise\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png","width":1536,"height":864,"caption":"Turned shafts await a mounting plate beside a milling machine before the complete order can ship."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/capable-to-promise\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/cs\/"},{"@type":"ListItem","position":2,"name":"Capable to promise: Prov\u011b\u0159te zak\u00e1zku p\u0159ed potvrzen\u00edm"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/cs\/#website","url":"https:\/\/skyplanner.ai\/cs\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/cs\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"cs"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/cs\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/cs\/","logo":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png",1536,864,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png",1536,864,false],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png",1536,864,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/cs\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Capable to promise: Prov\u011b\u0159te zak\u00e1zku p\u0159ed potvrzen\u00edm Domov &raquo; Zdroje &raquo; Capable to promise: Prov\u011b\u0159te zak\u00e1zku p\u0159ed potvrzen\u00edm Metoda capable to promise (CTP) ov\u011b\u0159uje, zda a kdy dok\u00e1\u017eete vyrobit po\u017eadovan\u00e9 mno\u017estv\u00ed. Zohled\u0148uje p\u0159itom dostupnost materi\u00e1lu i v\u00fdrobn\u00ed kapacitu pot\u0159ebnou ke zpracov\u00e1n\u00ed zak\u00e1zky. Obchodu tak poskytuje podklad pro potvrzen\u00ed term\u00ednu dod\u00e1n\u00ed v situaci, kdy zbo\u017e\u00ed nelze&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/99747","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/comments?post=99747"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/99747\/revisions"}],"predecessor-version":[{"id":99870,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/99747\/revisions\/99870"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media\/99840"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media?parent=99747"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/categories?post=99747"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/tags?post=99747"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}