{"id":99660,"date":"2026-10-16T05:16:05","date_gmt":"2026-10-16T05:16:05","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=99660"},"modified":"2026-10-16T05:16:17","modified_gmt":"2026-10-16T05:16:17","slug":"konfigurace-na-zakazku","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/cs\/zdroje\/konfigurace-na-zakazku\/","title":{"rendered":"Konfigurace na zak\u00e1zku: od volby z\u00e1kazn\u00edka po dod\u00e1n\u00ed"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Konfigurace na zak\u00e1zku: od volby z\u00e1kazn\u00edka po dod\u00e1n\u00ed<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/cs\/\">Domov<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/\">Zdroje<\/a> &raquo; Konfigurace na zak\u00e1zku: od volby z\u00e1kazn\u00edka po dod\u00e1n\u00ed<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Odhadovan\u00fd \u010das \u010dten\u00ed: <\/span><span class=\"yoast-reading-time__reading-time\">8<\/span><span class=\"yoast-reading-time__time-unit\"> minut<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Konfigurace na zak\u00e1zku (CTO) znamen\u00e1, \u017ee se v\u00fdrobek vyr\u00e1b\u00ed podle toho, co si z\u00e1kazn\u00edk vybere z p\u0159edem definovan\u00fdch, vz\u00e1jemn\u011b kompatibiln\u00edch mo\u017enost\u00ed. Z\u00e1kazn\u00edk z\u00edsk\u00e1 kombinaci odpov\u00eddaj\u00edc\u00ed jeho pot\u0159eb\u00e1m. V\u00fdrobce p\u0159itom vyu\u017e\u00edv\u00e1 osv\u011bd\u010den\u00e1 konstruk\u010dn\u00ed \u0159e\u0161en\u00ed a pravidla pro dan\u00fd v\u00fdrobek, m\u00edsto aby ka\u017edou zak\u00e1zku navrhoval od za\u010d\u00e1tku.<\/p>\n\n\n<p>V\u00fdhodou je mo\u017enost v\u00fdb\u011bru bez opakovan\u00fdch n\u00e1klad\u016f na stejn\u00e1 konstruk\u010dn\u00ed rozhodnut\u00ed. I schv\u00e1len\u00e1 kombinace ale pot\u0159ebuje spr\u00e1vn\u00e9 materi\u00e1ly, v\u00fdrobn\u00ed operace a \u010das ve v\u00fdrob\u011b. To, \u017ee lze v\u00fdrobek nab\u00eddnout k prodeji, je\u0161t\u011b neznamen\u00e1, \u017ee jej lze dodat p\u0159\u00ed\u0161t\u00ed p\u00e1tek.<\/p>\n\n\n<p>Pr\u00e1v\u011b s t\u00edmto druh\u00fdm \u00fakolem v\u00e1m pom\u016f\u017ee SkyPlanner APS. Jeho um\u011bl\u00e1 inteligence pro rozvrhov\u00e1n\u00ed v\u00fdroby Arcturus vypo\u010d\u00edt\u00e1, kdy lze pot\u0159ebn\u00e9 pr\u00e1ce prov\u00e9st soub\u011b\u017en\u011b s ostatn\u00edmi zak\u00e1zkami. V\u00fdsledek vid\u00edte v Ganttov\u011b diagramu a \u0159\u00edd\u00edte priority, m\u00edsto abyste p\u0159i ka\u017ed\u00e9 zm\u011bn\u011b skladby zak\u00e1zek znovu sestavovali frontu pr\u00e1ce na jednotliv\u00fdch pracovi\u0161t\u00edch.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Co mus\u00ed v\u00fdrobek spl\u0148ovat pro konfiguraci na zak\u00e1zku?<\/h2>\n\n\n<p>CTO za\u010d\u00edn\u00e1 je\u0161t\u011b p\u0159edt\u00edm, ne\u017e z\u00e1kazn\u00edk zad\u00e1 objedn\u00e1vku. Konstruk\u010dn\u00ed odd\u011blen\u00ed stanov\u00ed z\u00e1kladn\u00ed prvky v\u00fdrobku, povolen\u00e9 mo\u017enosti a pravidla jejich vz\u00e1jemn\u00e9ho kombinov\u00e1n\u00ed. Obchod pak vyb\u00edr\u00e1 v r\u00e1mci tohoto schv\u00e1len\u00e9ho rozsahu.<\/p>\n\n\n<p>P\u0159edstavte si v\u00fdrobce modul\u00e1rn\u00edch dopravn\u00edk\u016f. Z\u00e1kazn\u00edci si vyb\u00edraj\u00ed standardn\u00ed \u0161\u00ed\u0159ku a d\u00e9lku, typ p\u00e1su, materi\u00e1l r\u00e1mu, pohon a sadu sn\u00edma\u010d\u016f. Pravidla ur\u010duj\u00ed, kter\u00e9 pohony vyhovuj\u00ed dan\u00e9mu zat\u00ed\u017een\u00ed a rychlosti, kter\u00e9 p\u00e1sy se hod\u00ed pro jednotliv\u00e1 pou\u017eit\u00ed a jak\u00e1 uspo\u0159\u00e1d\u00e1n\u00ed sn\u00edma\u010d\u016f jsou k dispozici. P\u0159\u00edpustn\u00e1 volba tedy p\u0159edstavuje ji\u017e zaveden\u00e9 \u0159e\u0161en\u00ed, nikoli dosud nevy\u0159e\u0161en\u00fd konstruk\u010dn\u00ed probl\u00e9m.<\/p>\n\n\n<p>I tak mohou tyto volby znamenat zna\u010dn\u00fd objem v\u00fdrobn\u00edch prac\u00ed. R\u00e1m z nerezov\u00e9 oceli m\u016f\u017ee b\u00fdt nutn\u00e9 p\u0159ed mont\u00e1\u017e\u00ed dopravn\u00edku vyrobit a vyle\u0161tit. CTO neznamen\u00e1, \u017ee v\u0161echny d\u00edly u\u017e le\u017e\u00ed ve skladu nebo \u017ee zak\u00e1zka vy\u017eaduje pouze kone\u010dnou mont\u00e1\u017e.<\/p>\n\n\n<p>Hranici tvo\u0159\u00ed schv\u00e1len\u00fd rozsah konstruk\u010dn\u00edho \u0159e\u0161en\u00ed. Pokud z\u00e1kazn\u00edk po\u017eaduje zat\u00ed\u017een\u00ed nebo sklon mimo tento rozsah, mus\u00ed po\u017eadavek posoudit konstruk\u010dn\u00ed odd\u011blen\u00ed. M\u016f\u017eete nab\u00eddnout standardn\u00ed alternativu nebo v\u00fdjimku \u0159e\u0161it jako konstruk\u010dn\u00ed pr\u00e1ci, m\u00edsto abyste ji bez dal\u0161\u00edho protla\u010dili procesem konfigurace.<\/p>\n\n\n<h3 class=\"wp-block-heading\">CTO, ETO, MTO a ATO popisuj\u00ed r\u016fzn\u00e9 aspekty zak\u00e1zky<\/h3>\n\n\n<p>Tyto pojmy pom\u00e1haj\u00ed charakterizovat zak\u00e1zku, ale ne v\u017edy se vz\u00e1jemn\u011b vylu\u010duj\u00ed:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Konfigurace na zak\u00e1zku:<\/strong> Co si m\u016f\u017ee z\u00e1kazn\u00edk vybrat? V\u00fdrobek se vyb\u00edr\u00e1 z p\u0159edem definovan\u00fdch, vz\u00e1jemn\u011b kompatibiln\u00edch mo\u017enost\u00ed.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/engineer-to-order\/\">Konstrukce a v\u00fdroba na zak\u00e1zku (ETO)<\/a>:<\/strong> Je zapot\u0159eb\u00ed nov\u00e9 konstruk\u010dn\u00ed \u0159e\u0161en\u00ed? Je nutn\u00e9 vyvinout \u0159e\u0161en\u00ed pro konkr\u00e9tn\u00edho z\u00e1kazn\u00edka, p\u0159\u00edpadn\u011b i s vyu\u017eit\u00edm standardn\u00edch d\u00edl\u016f.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/zakazkova-vyroba\/\">V\u00fdroba na zak\u00e1zku (MTO)<\/a>:<\/strong> Co spou\u0161t\u00ed v\u00fdrobu? V\u00fdroba za\u010d\u00edn\u00e1 a\u017e po p\u0159ijet\u00ed objedn\u00e1vky z\u00e1kazn\u00edka a m\u016f\u017ee vych\u00e1zet z ji\u017e zaveden\u00e9ho konstruk\u010dn\u00edho \u0159e\u0161en\u00ed.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/montaz-na-zakazku\/\">Mont\u00e1\u017e na zak\u00e1zku (ATO)<\/a>:<\/strong> Co je p\u0159ipraveno p\u0159edem? D\u00edly nebo podsestavy jsou p\u0159ipraven\u00e9 je\u0161t\u011b p\u0159ed objedn\u00e1vkou. Vybran\u00fd fin\u00e1ln\u00ed v\u00fdrobek se smontuje a\u017e pot\u00e9.<\/li><\/ul>\n\n\n<p>Dopravn\u00edk lze nakonfigurovat na zak\u00e1zku a n\u00e1sledn\u011b na zak\u00e1zku vyrobit. U jin\u00e9 v\u00fdrobkov\u00e9 \u0159ady lze pou\u017e\u00edt stejn\u00fd princip konfigurace, ale na z\u00e1klad\u011b objedn\u00e1vky sestavovat v\u00fdrobky z modul\u016f p\u0159ipraven\u00fdch ve skladu. Konfigurace popisuje volbu z\u00e1kazn\u00edka, zat\u00edmco v\u00fdrobn\u00ed strategie ur\u010duje, jak\u00e9 pr\u00e1ce po t\u00e9to volb\u011b je\u0161t\u011b zb\u00fdvaj\u00ed.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kdy se konfigurace na zak\u00e1zku vyplat\u00ed?<\/h2>\n\n\n<p>CTO se dob\u0159e hod\u00ed tam, kde z\u00e1kazn\u00edci pot\u0159ebuj\u00ed smyslupln\u00fd v\u00fdb\u011br variant, ale velk\u00e1 \u010d\u00e1st konstruk\u010dn\u00ed pr\u00e1ce se opakuje. Nejvhodn\u011bj\u0161\u00ed jsou v\u00fdrobkov\u00e9 \u0159ady, u nich\u017e lze zvl\u00e1dnuteln\u00fdm po\u010dtem modul\u016f a pravidel pokr\u00fdt podstatnou \u010d\u00e1st popt\u00e1vky.<\/p>\n\n\n<p>Pod\u00edvejte se na ned\u00e1vn\u00e9 zak\u00e1zky. Kter\u00e9 rozd\u00edly z\u00e1kazn\u00edk\u016fm skute\u010dn\u011b p\u0159in\u00e1\u0161ej\u00ed hodnotu? Kv\u016fli kter\u00fdm se st\u00e1le vracej\u00ed stejn\u00e9 dotazy na konstruk\u010dn\u00ed odd\u011blen\u00ed? Opakuj\u00edc\u00ed se volby rozm\u011br\u016f, materi\u00e1l\u016f, v\u00fdkonu nebo p\u0159\u00edslu\u0161enstv\u00ed lze standardizovat, pokud je mo\u017en\u00e9 jejich kombinace p\u0159edem ov\u011b\u0159it.<\/p>\n\n\n<p>P\u0159\u00ednosy vych\u00e1zej\u00ed z odstran\u011bn\u00ed opakovan\u00e9 pr\u00e1ce. Obchod m\u016f\u017ee nab\u00edzet schv\u00e1len\u00e9 kombinace s men\u0161\u00ed pot\u0159ebou dal\u0161\u00edho vyjas\u0148ov\u00e1n\u00ed. Konstruk\u010dn\u00ed odd\u011blen\u00ed m\u016f\u017ee v\u011bnovat v\u00edce \u010dasu nov\u00fdm \u0159e\u0161en\u00edm a skute\u010dn\u00fdm v\u00fdjimk\u00e1m. N\u00e1kup a v\u00fdroba dost\u00e1vaj\u00ed po\u017eadavky, kter\u00e9 se \u010dast\u011bji opakuj\u00ed. M\u016f\u017eete tak nab\u00edzet \u0161ir\u0161\u00ed sortiment, ani\u017e byste ka\u017ed\u00fd prodej \u0159e\u0161ili jako nov\u00fd v\u00fdvojov\u00fd projekt.<\/p>\n\n\n<p>Tyto p\u0159\u00ednosy ale vy\u017eaduj\u00ed investici. N\u011bkdo mus\u00ed navrhnout moduly, udr\u017eovat pravidla kompatibility a p\u0159i zm\u011bn\u00e1ch d\u00edl\u016f \u010di konstrukce zajistit, aby v\u00fdrobn\u00ed informace z\u016fstaly v souladu. Varianta, kter\u00e1 se prod\u00e1v\u00e1 jen z\u0159\u00eddka, ale vy\u017eaduje zvl\u00e1\u0161tn\u00ed dodavatelsk\u00fd \u0159et\u011bzec a samostatn\u00fd v\u00fdrobn\u00ed postup, m\u016f\u017ee st\u00e1t v\u00edce, ne\u017e vyd\u011bl\u00e1. V\u011bt\u0161\u00ed v\u00fdb\u011br automaticky neznamen\u00e1 lep\u0161\u00ed nab\u00eddku.<\/p>\n\n\n<p>Za\u010dn\u011bte jednou v\u00fdrobkovou \u0159adou, u n\u00ed\u017e je opakov\u00e1n\u00ed z\u0159ejm\u00e9. Vymezte podporovan\u00e9 mo\u017enosti a postup pro \u0159e\u0161en\u00ed v\u00fdjimek. Pot\u00e9 ov\u011b\u0159te, \u017ee obchod, konstrukce i v\u00fdroba ch\u00e1pou stejnou volbu stejn\u011b. Standardizujte to, co z\u00e1kazn\u00edci opakovan\u011b kupuj\u00ed, nikoli ka\u017ed\u00fd zvl\u00e1\u0161tn\u00ed po\u017eadavek, kter\u00fd jste kdy obdr\u017eeli.<\/p>\n\n\n<p>CTO je m\u00e9n\u011b v\u00fdhodn\u00e9, pokud v\u011bt\u0161ina zak\u00e1zek vy\u017eaduje skute\u010dn\u011b nov\u00e9 konstruk\u010dn\u00ed \u0159e\u0161en\u00ed nebo pokud z\u00e1kazn\u00edci nejsou ochotni \u010dekat na zb\u00fdvaj\u00edc\u00ed v\u00fdrobn\u00ed pr\u00e1ce. Obl\u00edben\u00e9 v\u00fdrobky, kter\u00e9 z\u00e1kazn\u00edci pot\u0159ebuj\u00ed ihned, m\u016f\u017ee b\u00fdt vhodn\u011bj\u0161\u00ed dod\u00e1vat ze skladu hotov\u00fdch v\u00fdrobk\u016f. R\u016fzn\u00e9 v\u00fdrobkov\u00e9 \u0159ady mohou vyu\u017e\u00edvat r\u016fzn\u00e9 p\u0159\u00edstupy, ani\u017e by t\u00edm utrp\u011bla soudr\u017enost celkov\u00e9 v\u00fdrobn\u00ed strategie.<\/p>\n\n\n<h2 class=\"wp-block-heading\">P\u0159eve\u010fte vybran\u00e9 mo\u017enosti do zak\u00e1zky p\u0159ipraven\u00e9 k v\u00fdrob\u011b<\/h2>\n\n\n<p>Konfigurace m\u00e1 v\u00fdrob\u011b jasn\u011b \u0159\u00edci, co vyrobit. Pl\u00e1nova\u010d by to nem\u011bl muset zp\u011btn\u011b zji\u0161\u0165ovat z cenov\u00e9 nab\u00eddky. P\u0159i p\u0159ed\u00e1n\u00ed mus\u00ed b\u00fdt k dispozici zvolen\u00e1 specifikace a odpov\u00eddaj\u00edc\u00ed materi\u00e1lov\u00e9 po\u017eadavky, sled operac\u00ed, jejich d\u00e9lky a zp\u016fsobil\u00e9 v\u00fdrobn\u00ed zdroje.<\/p>\n\n\n<p>Produktov\u00fd konfigur\u00e1tor ov\u011b\u0159uje p\u0159\u00edpustnost zvolen\u00fdch mo\u017enost\u00ed. Software CPQ pro konfiguraci, stanoven\u00ed ceny a tvorbu nab\u00eddek m\u016f\u017ee nav\u00edc podpo\u0159it cenotvorbu a p\u0159\u00edpravu nab\u00eddky. Syst\u00e9m ERP m\u016f\u017ee evidovat p\u0159ijatou objedn\u00e1vku a v\u00fdrobn\u00ed data. Detailn\u00ed rozvrhov\u00e1n\u00ed pak um\u00edst\u00ed pot\u0159ebn\u00e9 pr\u00e1ce do dostupn\u00fdch \u010dasov\u00fdch \u00fasek\u016f. Tyto \u00fakoly na sebe navazuj\u00ed: samotn\u00e9 ov\u011b\u0159en\u00ed kombinace je\u0161t\u011b nerezervuje v\u00fdrobn\u00ed kapacitu.<\/p>\n\n\n<p>U na\u0161eho hypotetick\u00e9ho v\u00fdrobce dopravn\u00edk\u016f by dopady na pl\u00e1nov\u00e1n\u00ed mohly vypadat takto:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Volba z\u00e1kazn\u00edka<\/th><th>Dopad na v\u00fdrobu nebo z\u00e1sobov\u00e1n\u00ed<\/th><th>Co mus\u00ed rozvrh zohlednit<\/th><\/tr><\/thead><tbody><tr><td>R\u00e1m z nerezov\u00e9 oceli<\/td><td>Jin\u00fd materi\u00e1l, v\u00fdroba r\u00e1mu a le\u0161t\u011bn\u00ed<\/td><td>Dostupnost odpov\u00eddaj\u00edc\u00edho materi\u00e1lu a pot\u0159ebn\u00e9 operace<\/td><\/tr><tr><td>Ocelov\u00fd r\u00e1m s povrchovou \u00fapravou<\/td><td>V\u00fdroba r\u00e1mu a n\u00e1sledn\u00e1 povrchov\u00e1 \u00faprava schv\u00e1len\u00fdm postupem<\/td><td>\u010cas zpracov\u00e1n\u00ed, se\u0159\u00edzen\u00ed a p\u0159\u00edpadn\u00e9 nutn\u00e9 \u010dek\u00e1n\u00ed<\/td><\/tr><tr><td>V\u011bt\u0161\u00ed pohon ze schv\u00e1len\u00e9 nab\u00eddky<\/td><td>Jin\u00fd nakupovan\u00fd d\u00edl a jin\u00e9 po\u017eadavky na mont\u00e1\u017e<\/td><td>P\u0159ipravenost d\u00edlu a odpov\u00eddaj\u00edc\u00ed d\u00e9lky operac\u00ed<\/td><\/tr><tr><td>Voliteln\u00e1 sada sn\u00edma\u010d\u016f<\/td><td>Dodate\u010dn\u00e1 instalace a kontrola<\/td><td>Dodate\u010dn\u00e9 pr\u00e1ce a v\u00fdrobn\u00ed zdroje pot\u0159ebn\u00e9 p\u0159ed dokon\u010den\u00edm<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Prom\u00edtn\u011bte do zak\u00e1zky d\u016fsledky ka\u017ed\u00e9 volby. Pokud zm\u011bn\u00edte pouze popis a v\u00fdchoz\u00ed v\u00fdrobn\u00ed postup ponech\u00e1te beze zm\u011bny, skryjete t\u00edm pr\u00e1ci, kterou jste pr\u00e1v\u011b prodali.<\/p>\n\n\n<p>Zajist\u011bte, aby bylo mo\u017en\u00e9 zvolenou konfiguraci jednozna\u010dn\u011b ur\u010dit p\u0159i uvoln\u011bn\u00ed do v\u00fdroby i p\u0159i pozd\u011bj\u0161\u00edch zm\u011bn\u00e1ch. Dohodn\u011bte se, kdo aktualizuje po\u017eadavky na materi\u00e1l a v\u00fdrobn\u00ed pr\u00e1ce, pokud z\u00e1kazn\u00edk n\u011bkterou volbu zm\u011bn\u00ed. Zm\u011bna p\u00e1su nebo r\u00e1mu m\u016f\u017ee ovlivnit nakupovan\u00e9 d\u00edly, ji\u017e zah\u00e1jenou pr\u00e1ci i term\u00edn dokon\u010den\u00ed. Berte ji jako zm\u011bnu zak\u00e1zky, kterou je nutn\u00e9 posoudit, ne jen jako nov\u00fd \u0159\u00e1dek v nab\u00eddce.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Rozvrhujte konkr\u00e9tn\u00ed variantu, ne pr\u016fm\u011brn\u00fd v\u00fdrobek<\/h2>\n\n\n<p>Vra\u0165me se k v\u00fdrobci dopravn\u00edk\u016f. Obchod p\u0159ijme n\u011bkolik objedn\u00e1vek na nerezovou verzi. Po\u010det dopravn\u00edk\u016f odpov\u00edd\u00e1 b\u011b\u017en\u00e9mu objemu, ale v\u00edce z nich nyn\u00ed vy\u017eaduje le\u0161t\u011bn\u00ed. Standardn\u00ed pr\u016fb\u011b\u017en\u00e1 doba v\u00fdroby se nezm\u011bnila, zat\u00ed\u017een\u00ed pracovi\u0161t\u011b le\u0161t\u011bn\u00ed ano.<\/p>\n\n\n<p>Pokud pl\u00e1nova\u010d rozvrhuje ka\u017ed\u00fd dopravn\u00edk jako pr\u016fm\u011brn\u00fd kus, mohou tyto dodate\u010dn\u00e9 operace z\u016fstat skryt\u00e9, dokud na n\u011b ve v\u00fdrob\u011b nedojde \u0159ada. R\u00e1my mohou b\u00fdt rychle vyroben\u00e9, ale pak \u010dekaj\u00ed na le\u0161t\u011bn\u00ed. Zah\u00e1jen\u00edm v\u00fdroby dal\u0161\u00edch r\u00e1m\u016f se kapacita le\u0161t\u011bn\u00ed nezv\u00fd\u0161\u00ed.<\/p>\n\n\n<p>Pro ur\u010den\u00ed term\u00ednu dod\u00e1n\u00ed je tedy podstatn\u00e1 ot\u00e1zka: kdy lze dokon\u010dit skute\u010dn\u011b pot\u0159ebn\u00e9 pr\u00e1ce na t\u00e9to zak\u00e1zce s ohledem na materi\u00e1ly a <a href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/planovani-s-omezenou-kapacitou\/\">kapacitu ji\u017e vyhrazenou pro jin\u00e9 z\u00e1kazn\u00edky<\/a>?<\/p>\n\n\n<p>SkyPlanner za\u0159ad\u00ed tyto pr\u00e1ce do prov\u00e1zan\u00e9ho v\u00fdrobn\u00edho rozvrhu. Vy ur\u010d\u00edte jednotliv\u00e9 kroky postupu, jejich d\u00e9lky, pracovi\u0161t\u011b, sm\u011bny a po\u017eadavky na v\u00fdrobn\u00ed zdroje. Opakovan\u011b pou\u017e\u00edvan\u00e9 produkty mohou m\u00edt p\u0159i\u0159azen\u00e9 zaveden\u00e9 v\u00fdrobn\u00ed postupy a polo\u017eky zak\u00e1zek p\u0159edstavuj\u00ed pr\u00e1ci, kterou je t\u0159eba rozvrhnout. Nakonfigurovan\u00e1 zak\u00e1zka mus\u00ed do pl\u00e1nov\u00e1n\u00ed vstoupit s operacemi a materi\u00e1ly odpov\u00eddaj\u00edc\u00edmi zvolen\u00e9 variant\u011b.<\/p>\n\n\n<p>Arcturus vypo\u010d\u00edt\u00e1 po\u0159ad\u00ed prac\u00ed nap\u0159\u00ed\u010d zak\u00e1zkami podle kapacit, z\u00e1vislost\u00ed a pravidel rozvrhov\u00e1n\u00ed, kter\u00e9 jste definovali. V Ganttov\u011b diagramu m\u016f\u017eete sledovat pr\u00e1ci na jednotliv\u00fdch v\u00fdrobn\u00edch zdroj\u00edch a vid\u011bt vliv ostatn\u00edch zak\u00e1zek, kter\u00e9 o n\u011b soupe\u0159\u00ed. Frontu p\u0159ed le\u0161t\u011bn\u00edm tak zohledn\u00edte p\u0159i posuzov\u00e1n\u00ed term\u00ednu dod\u00e1n\u00ed d\u0159\u00edve, ne\u017e v\u00e1s p\u0159ekvap\u00ed ve v\u00fdrobn\u00edm provozu.<\/p>\n\n\n<p>Pokud je zapnut\u00e9 rozvrhov\u00e1n\u00ed se zohledn\u011bn\u00edm materi\u00e1lu, vstupuje do v\u00fdpo\u010dtu tak\u00e9 jeho dostupnost. S nakupovan\u00fdm pohonem, jeho\u017e dod\u00e1n\u00ed se o\u010dek\u00e1v\u00e1 pozd\u011bji, nelze po\u010d\u00edtat stejn\u011b jako s pohonem, kter\u00fd je ji\u017e k dispozici. Udr\u017eujte \u00fadaje o dod\u00e1vk\u00e1ch aktu\u00e1ln\u00ed a p\u0159i jejich zm\u011bn\u011b rozvrh p\u0159epo\u010d\u00edtejte.<\/p>\n\n\n<p>O priorit\u00e1ch rozhodujete vy a pomoc\u00ed z\u00e1mk\u016f chr\u00e1n\u00edte sv\u00e1 rozhodnut\u00ed v rozvrhu. Pokud dostane p\u0159ednost urgentn\u00ed dopravn\u00edk, Arcturus rozvrh p\u0159epo\u010d\u00edt\u00e1 podle t\u011bchto pokyn\u016f. Vy pak posoud\u00edte i v\u00fdsledn\u00e9 term\u00edny ostatn\u00edch zak\u00e1zek. P\u0159\u00ednosem je m\u00e9n\u011b ru\u010dn\u00edch \u00faprav front pr\u00e1ce a jasn\u011bj\u0161\u00ed podklad pro rozhodov\u00e1n\u00ed, kter\u00e9 z\u00e1vazky v\u016f\u010di z\u00e1kazn\u00edk\u016fm ochr\u00e1nit.<\/p>\n\n\n<p>SkyPlanner se prost\u0159ednictv\u00edm sv\u00e9ho <a href=\"https:\/\/skyplanner.ai\/cs\/integrace\/\">otev\u0159en\u00e9ho REST API<\/a> integruje s jak\u00fdmkoli syst\u00e9mem ERP nebo MES. M\u00edsto v\u00fdm\u011bny ERP propojte st\u00e1vaj\u00edc\u00ed data o zak\u00e1zk\u00e1ch, produktech a v\u00fdrob\u011b s detailn\u00edm rozvrhov\u00e1n\u00edm. P\u0159i zav\u00e1d\u011bn\u00ed CTO zmapujte, jak se v tomto toku dat zvolen\u00e1 varianta prom\u00edtne do spr\u00e1vn\u00fdch \u00fadaj\u016f o materi\u00e1lech a operac\u00edch. Pr\u00e1v\u011b tak se v praxi propoj\u00ed prodan\u00fd v\u00fdrobek s prac\u00ed, kterou Arcturus rozvrhuje.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Co prov\u00e1zan\u00e9 rozvrhov\u00e1n\u00ed zm\u011bnilo ve spole\u010dnosti UTU<\/h2>\n\n\n<p>UTU vyr\u00e1b\u00ed elektrick\u00e9 rozv\u00e1d\u011b\u010de a sp\u00ednac\u00ed za\u0159\u00edzen\u00ed. P\u0159ed zaveden\u00edm SkyPlanner si jednotliv\u00e1 odd\u011blen\u00ed vedla samostatn\u00e9 pl\u00e1ny v Excelu a zm\u011bny po\u0159ad\u00ed v ERP se ne v\u017edy dostaly a\u017e do v\u00fdrobn\u00edho provozu. Re\u00e1lnou kapacitu bylo obt\u00ed\u017en\u00e9 zjistit, tak\u017ee dodr\u017eov\u00e1n\u00ed sl\u00edben\u00fdch term\u00edn\u016f vy\u017eadovalo opakovan\u00e9 p\u0159esouv\u00e1n\u00ed prac\u00ed.<\/p>\n\n\n<p>D\u00edky propojen\u00ed SkyPlanner s Oracle NetSuite a mzdov\u00fdm syst\u00e9mem sjednotila spole\u010dnost UTU pl\u00e1nov\u00e1n\u00ed sv\u00fdch v\u00fdrobn\u00edch linek a odd\u011blen\u00ed v jednom syst\u00e9mu. Jej\u00ed t\u00fdm oce\u0148uje p\u0159edev\u0161\u00edm kombinaci automatick\u00e9ho rozvrhov\u00e1n\u00ed a Ganttova diagramu: kapacity, jejich vyt\u00ed\u017een\u00ed i po\u0159ad\u00ed prac\u00ed jsou vid\u011bt na jednom m\u00edst\u011b.<\/p>\n\n\n<p>V <a href=\"https:\/\/skyplanner.ai\/cs\/pribehy-zakazniku\/utu\/\">hodnocen\u00ed syst\u00e9mu SkyPlanner od UTU<\/a> spole\u010dnost uv\u00e1d\u00ed, \u017ee t\u00fddn\u011b u\u0161et\u0159\u00ed p\u0159ibli\u017en\u011b dv\u011b hodiny, kter\u00e9 d\u0159\u00edve v\u011bnovala aktualizaci tabulek. Popisuje tak\u00e9 p\u0159esn\u011bj\u0161\u00ed pl\u00e1nov\u00e1n\u00ed term\u00edn\u016f dod\u00e1n\u00ed projektov\u00fdch zak\u00e1zek a p\u0159ed\u00e1v\u00e1n\u00ed aktualizovan\u00fdch front pr\u00e1ce na v\u00fdrobn\u00ed linku b\u011bhem n\u011bkolika sekund. Pr\u00e1v\u011b v tom spo\u010d\u00edv\u00e1 p\u0159\u00ednos propojen\u00ed zak\u00e1zky se skute\u010dn\u011b prov\u00e1d\u011bnou prac\u00ed: m\u00e9n\u011b \u00fasil\u00ed p\u0159i udr\u017eov\u00e1n\u00ed samostatn\u00fdch pl\u00e1n\u016f a p\u0159ehledn\u011bj\u0161\u00ed koordinace p\u0159i zm\u011bn\u00e1ch po\u0159ad\u00ed.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Usnadn\u011bte dod\u00e1n\u00ed varianty, kterou si z\u00e1kazn\u00edk vybral<\/h2>\n\n\n<p>P\u0159\u00ednos CTO spo\u010d\u00edv\u00e1 v tom, \u017ee opakuj\u00edc\u00ed se pot\u0159eby z\u00e1kazn\u00edk\u016f p\u0159ev\u00e1d\u00ed na p\u0159edem dan\u00e9 mo\u017enosti v\u00fdb\u011bru. Zachovejte tuto v\u00fdhodu i v cel\u00e9m pr\u016fb\u011bhu v\u00fdroby: vych\u00e1zejte z odpov\u00eddaj\u00edc\u00edch po\u017eadavk\u016f na pr\u00e1ci pro zvolenou variantu a posuzujte term\u00edn dod\u00e1n\u00ed s ohledem na v\u00fdrobn\u00ed zdroje sd\u00edlen\u00e9 s ostatn\u00edmi zak\u00e1zkami.<\/p>\n\n\n<p>Zvolte SkyPlanner, pokud tato koordinace znamen\u00e1 ka\u017edodenn\u00ed n\u00e1ro\u010dn\u00e9 p\u0159epl\u00e1nov\u00e1v\u00e1n\u00ed. Arcturus zajist\u00ed v\u00fdpo\u010det rozvrhu, Gantt\u016fv diagram uk\u00e1\u017ee jeho dopady a priority z\u016fst\u00e1vaj\u00ed ve va\u0161ich rukou. M\u016f\u017eete tak v\u011bnovat v\u00edce \u010dasu \u0159e\u0161en\u00ed skute\u010dn\u00e9ho omezen\u00ed v\u00fdroby a m\u00e9n\u011b \u010dasu p\u0159esouv\u00e1n\u00ed prac\u00ed jen proto, aby jednotliv\u00e9 fronty z\u016fstaly slad\u011bn\u00e9.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/cs\/kontaktni-prodej\/\">Domluvte si uk\u00e1zku SkyPlanner<\/a> a p\u0159ipravte si dv\u011b b\u011b\u017en\u00e9 konfigurace, operace, kter\u00fdmi se li\u0161\u00ed, a v\u00fdrobn\u00ed zdroj, kter\u00fd sd\u00edlej\u00ed. Na t\u011bchto podkladech lze dob\u0159e uk\u00e1zat, jak by va\u0161e varianty v\u00fdrobku zapadly do realistick\u00e9ho v\u00fdrobn\u00edho rozvrhu. Pokud si chcete syst\u00e9m nejprve prohl\u00e9dnout sami, <a href=\"https:\/\/skyplanner.ai\/cs\/zkusebni-verze\/\">vyzkou\u0161ejte SkyPlanner s uk\u00e1zkov\u00fdmi daty<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Konfigurace na zak\u00e1zku: od volby z\u00e1kazn\u00edka po dod\u00e1n\u00ed Domov &raquo; Zdroje &raquo; Konfigurace na zak\u00e1zku: od volby z\u00e1kazn\u00edka po dod\u00e1n\u00ed Konfigurace na zak\u00e1zku (CTO) znamen\u00e1, \u017ee se v\u00fdrobek vyr\u00e1b\u00ed podle toho, co si z\u00e1kazn\u00edk vybere z p\u0159edem definovan\u00fdch, vz\u00e1jemn\u011b kompatibiln\u00edch mo\u017enost\u00ed. Z\u00e1kazn\u00edk z\u00edsk\u00e1 kombinaci odpov\u00eddaj\u00edc\u00ed jeho pot\u0159eb\u00e1m. V\u00fdrobce p\u0159itom vyu\u017e\u00edv\u00e1 osv\u011bd\u010den\u00e1 konstruk\u010dn\u00ed \u0159e\u0161en\u00ed a pravidla &#8230; <a title=\"Konfigurace na zak\u00e1zku: od volby z\u00e1kazn\u00edka po dod\u00e1n\u00ed\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/konfigurace-na-zakazku\/\" aria-label=\"Read more about Konfigurace na zak\u00e1zku: od volby z\u00e1kazn\u00edka po dod\u00e1n\u00ed\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":99687,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2518,303],"tags":[],"class_list":["post-99660","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-a-rozvrhovani","category-zdroje","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Konfigurace na zak\u00e1zku: od volby z\u00e1kazn\u00edka po dod\u00e1n\u00ed<\/title>\n<meta name=\"description\" content=\"Nab\u00eddn\u011bte v\u00fdb\u011br bez navrhov\u00e1n\u00ed ka\u017ed\u00e9 zak\u00e1zky od nuly. Zjist\u011bte, kdy se hod\u00ed CTO a jak SkyPlanner rozvrhuje v\u00fdrobu pro jednotliv\u00e9 konfigurace.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/konfigurace-na-zakazku\/\" \/>\n<meta property=\"og:locale\" content=\"cs_CZ\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Konfigurace na zak\u00e1zku: od volby z\u00e1kazn\u00edka po dod\u00e1n\u00ed\" \/>\n<meta property=\"og:description\" content=\"Nab\u00eddn\u011bte v\u00fdb\u011br bez navrhov\u00e1n\u00ed ka\u017ed\u00e9 zak\u00e1zky od nuly. Zjist\u011bte, kdy se hod\u00ed CTO a jak SkyPlanner rozvrhuje v\u00fdrobu pro jednotliv\u00e9 konfigurace.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/cs\/zdroje\/konfigurace-na-zakazku\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-16T05:16:05+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-16T05:16:17+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Napsal(a)\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Odhadovan\u00e1 doba \u010dten\u00ed\" \/>\n\t<meta name=\"twitter:data2\" content=\"13 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/konfigurace-na-zakazku\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/konfigurace-na-zakazku\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Konfigurace na zak\u00e1zku: od volby z\u00e1kazn\u00edka po dod\u00e1n\u00ed\",\"datePublished\":\"2026-10-16T05:16:05+00:00\",\"dateModified\":\"2026-10-16T05:16:17+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/konfigurace-na-zakazku\\\/\"},\"wordCount\":2600,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/konfigurace-na-zakazku\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/configure-to-order-hero.png\",\"articleSection\":[\"APS a rozvrhov\u00e1n\u00ed\",\"zdroje\"],\"inLanguage\":\"cs\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/konfigurace-na-zakazku\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/konfigurace-na-zakazku\\\/\",\"name\":\"Konfigurace na zak\u00e1zku: od volby z\u00e1kazn\u00edka po dod\u00e1n\u00ed\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/konfigurace-na-zakazku\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/konfigurace-na-zakazku\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/configure-to-order-hero.png\",\"datePublished\":\"2026-10-16T05:16:05+00:00\",\"dateModified\":\"2026-10-16T05:16:17+00:00\",\"description\":\"Nab\u00eddn\u011bte v\u00fdb\u011br bez navrhov\u00e1n\u00ed ka\u017ed\u00e9 zak\u00e1zky od nuly. Zjist\u011bte, kdy se hod\u00ed CTO a jak SkyPlanner rozvrhuje v\u00fdrobu pro jednotliv\u00e9 konfigurace.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/konfigurace-na-zakazku\\\/#breadcrumb\"},\"inLanguage\":\"cs\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/konfigurace-na-zakazku\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/konfigurace-na-zakazku\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/configure-to-order-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/configure-to-order-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"A modular conveyor with alternative belts, drive modules and a sensor bracket for predefined product choices.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/konfigurace-na-zakazku\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Konfigurace na zak\u00e1zku: od volby z\u00e1kazn\u00edka po dod\u00e1n\u00ed\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"cs\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Konfigurace na zak\u00e1zku: od volby z\u00e1kazn\u00edka po dod\u00e1n\u00ed","description":"Nab\u00eddn\u011bte v\u00fdb\u011br bez navrhov\u00e1n\u00ed ka\u017ed\u00e9 zak\u00e1zky od nuly. Zjist\u011bte, kdy se hod\u00ed CTO a jak SkyPlanner rozvrhuje v\u00fdrobu pro jednotliv\u00e9 konfigurace.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/cs\/zdroje\/konfigurace-na-zakazku\/","og_locale":"cs_CZ","og_type":"article","og_title":"Konfigurace na zak\u00e1zku: od volby z\u00e1kazn\u00edka po dod\u00e1n\u00ed","og_description":"Nab\u00eddn\u011bte v\u00fdb\u011br bez navrhov\u00e1n\u00ed ka\u017ed\u00e9 zak\u00e1zky od nuly. Zjist\u011bte, kdy se hod\u00ed CTO a jak SkyPlanner rozvrhuje v\u00fdrobu pro jednotliv\u00e9 konfigurace.","og_url":"https:\/\/skyplanner.ai\/cs\/zdroje\/konfigurace-na-zakazku\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-16T05:16:05+00:00","article_modified_time":"2026-10-16T05:16:17+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Napsal(a)":"Jussi M\u00e4ntyl\u00e4","Odhadovan\u00e1 doba \u010dten\u00ed":"13 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/konfigurace-na-zakazku\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/konfigurace-na-zakazku\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Konfigurace na zak\u00e1zku: od volby z\u00e1kazn\u00edka po dod\u00e1n\u00ed","datePublished":"2026-10-16T05:16:05+00:00","dateModified":"2026-10-16T05:16:17+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/konfigurace-na-zakazku\/"},"wordCount":2600,"publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/konfigurace-na-zakazku\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png","articleSection":["APS a rozvrhov\u00e1n\u00ed","zdroje"],"inLanguage":"cs"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/konfigurace-na-zakazku\/","url":"https:\/\/skyplanner.ai\/cs\/zdroje\/konfigurace-na-zakazku\/","name":"Konfigurace na zak\u00e1zku: od volby z\u00e1kazn\u00edka po dod\u00e1n\u00ed","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/konfigurace-na-zakazku\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/konfigurace-na-zakazku\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png","datePublished":"2026-10-16T05:16:05+00:00","dateModified":"2026-10-16T05:16:17+00:00","description":"Nab\u00eddn\u011bte v\u00fdb\u011br bez navrhov\u00e1n\u00ed ka\u017ed\u00e9 zak\u00e1zky od nuly. Zjist\u011bte, kdy se hod\u00ed CTO a jak SkyPlanner rozvrhuje v\u00fdrobu pro jednotliv\u00e9 konfigurace.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/konfigurace-na-zakazku\/#breadcrumb"},"inLanguage":"cs","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/cs\/zdroje\/konfigurace-na-zakazku\/"]}]},{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/konfigurace-na-zakazku\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png","width":1672,"height":941,"caption":"A modular conveyor with alternative belts, drive modules and a sensor bracket for predefined product choices."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/konfigurace-na-zakazku\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/cs\/"},{"@type":"ListItem","position":2,"name":"Konfigurace na zak\u00e1zku: od volby z\u00e1kazn\u00edka po dod\u00e1n\u00ed"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/cs\/#website","url":"https:\/\/skyplanner.ai\/cs\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/cs\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"cs"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/cs\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/cs\/","logo":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/cs\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Konfigurace na zak\u00e1zku: od volby z\u00e1kazn\u00edka po dod\u00e1n\u00ed Domov &raquo; Zdroje &raquo; Konfigurace na zak\u00e1zku: od volby z\u00e1kazn\u00edka po dod\u00e1n\u00ed Konfigurace na zak\u00e1zku (CTO) znamen\u00e1, \u017ee se v\u00fdrobek vyr\u00e1b\u00ed podle toho, co si z\u00e1kazn\u00edk vybere z p\u0159edem definovan\u00fdch, vz\u00e1jemn\u011b kompatibiln\u00edch mo\u017enost\u00ed. Z\u00e1kazn\u00edk z\u00edsk\u00e1 kombinaci odpov\u00eddaj\u00edc\u00ed jeho pot\u0159eb\u00e1m. V\u00fdrobce p\u0159itom vyu\u017e\u00edv\u00e1 osv\u011bd\u010den\u00e1 konstruk\u010dn\u00ed \u0159e\u0161en\u00ed a pravidla&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/99660","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/comments?post=99660"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/99660\/revisions"}],"predecessor-version":[{"id":99718,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/99660\/revisions\/99718"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media\/99687"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media?parent=99660"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/categories?post=99660"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/tags?post=99660"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}