{"id":99224,"date":"2026-10-15T17:37:09","date_gmt":"2026-10-15T17:37:09","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=99224"},"modified":"2026-10-15T17:37:24","modified_gmt":"2026-10-15T17:37:24","slug":"planovani-kapacitnich-pozadavku","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/cs\/zdroje\/planovani-kapacitnich-pozadavku\/","title":{"rendered":"Pl\u00e1nov\u00e1n\u00ed kapacitn\u00edch po\u017eadavk\u016f: Jak \u0159e\u0161it p\u0159et\u00ed\u017een\u00ed pracovi\u0161\u0165"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Pl\u00e1nov\u00e1n\u00ed kapacitn\u00edch po\u017eadavk\u016f: Jak \u0159e\u0161it p\u0159et\u00ed\u017een\u00ed pracovi\u0161\u0165<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/cs\/\">Domov<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/\">Zdroje<\/a> &raquo; Pl\u00e1nov\u00e1n\u00ed kapacitn\u00edch po\u017eadavk\u016f: Jak \u0159e\u0161it p\u0159et\u00ed\u017een\u00ed pracovi\u0161\u0165<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Odhadovan\u00fd \u010das \u010dten\u00ed: <\/span><span class=\"yoast-reading-time__reading-time\">11<\/span><span class=\"yoast-reading-time__time-unit\"> minut<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Materi\u00e1lov\u00fd pl\u00e1n navrhuje dal\u0161\u00ed v\u00fdrobn\u00ed p\u0159\u00edkazy. O strojn\u00ed \u010das se p\u0159itom u\u017e d\u011bl\u00ed st\u00e1vaj\u00edc\u00ed zak\u00e1zky. Ne\u017e uvoln\u00edte do v\u00fdroby dal\u0161\u00ed pr\u00e1ci, pot\u0159ebujete v\u011bd\u011bt, kter\u00e1 pracovi\u0161t\u011b ji zvl\u00e1dnou a na kter\u00fdch se za\u010dne tvo\u0159it fronta zpo\u017ed\u011bn\u00fdch zak\u00e1zek.<\/p>\n\n\n<p>Pl\u00e1nov\u00e1n\u00ed kapacitn\u00edch po\u017eadavk\u016f (CRP) p\u0159ev\u00e1d\u00ed pl\u00e1novan\u00e9 a otev\u0159en\u00e9 v\u00fdrobn\u00ed p\u0159\u00edkazy na po\u017eadavky na v\u00fdrobn\u00ed zdroje v jednotliv\u00fdch obdob\u00edch a pot\u00e9 tuto z\u00e1t\u011b\u017e porovn\u00e1v\u00e1 s dostupnou kapacitou. Ukazuje, kde je t\u0159eba upravit podrobn\u00fd v\u00fdrobn\u00ed pl\u00e1n: u kter\u00e9ho zdroje, v jak\u00e9m obdob\u00ed a kv\u016fli kter\u00fdm zak\u00e1zk\u00e1m kapacita chyb\u00ed.<\/p>\n\n\n<p>U\u017eite\u010dn\u00fdm v\u00fdsledkem nen\u00ed jen \u010derven\u011b zobrazen\u00e9 procento vyt\u00ed\u017een\u00ed. Je j\u00edm rozhodnut\u00ed, co p\u0159esunout, jakou kapacitu p\u0159idat nebo kter\u00fd z\u00e1vazek upravit. SkyPlanner APS v\u00e1m pom\u016f\u017ee toto rozhodnut\u00ed prom\u00edtnout do v\u00fdrobn\u00edho rozvrhu. Arcturus vypo\u010d\u00edt\u00e1 na\u010dasov\u00e1n\u00ed operac\u00ed podle va\u0161ich v\u00fdrobn\u00edch zdroj\u016f a priorit; Gantt\u016fv diagram uk\u00e1\u017ee, jak zm\u011bna ovlivn\u00ed ostatn\u00ed pr\u00e1ci.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Co ov\u011b\u0159uje pl\u00e1nov\u00e1n\u00ed kapacitn\u00edch po\u017eadavk\u016f?<\/h2>\n\n\n<p>CRP ov\u011b\u0159uje, zda kapacita stroj\u016f a pracovn\u00edk\u016f posta\u010duje na v\u00fdrobu vypl\u00fdvaj\u00edc\u00ed z materi\u00e1lov\u00e9ho pl\u00e1nu. Podrobnosti \u010derp\u00e1 ze zak\u00e1zek a jejich operac\u00ed: z mno\u017estv\u00ed, technologick\u00fdch postup\u016f, \u010das\u016f se\u0159\u00edzen\u00ed a zpracov\u00e1n\u00ed, zb\u00fdvaj\u00edc\u00ed pr\u00e1ce a term\u00edn\u016f, kdy jsou jednotliv\u00e9 v\u00fdrobn\u00ed zdroje pot\u0159eba.<\/p>\n\n\n<p>Pracovi\u0161t\u011bm m\u016f\u017ee b\u00fdt stroj, skupina srovnateln\u00fdch stroj\u016f nebo v\u00fdrobn\u00ed t\u00fdm. Porovn\u00e1vejte kapacitu a zat\u00ed\u017een\u00ed dostate\u010dn\u011b podrobn\u011b, aby se uk\u00e1zalo skute\u010dn\u00e9 omezen\u00ed. Voln\u00e9 hodiny na kontrole kvality nevyrovnaj\u00ed p\u0159et\u00ed\u017een\u00ed obr\u00e1b\u011bc\u00edho centra.<\/p>\n\n\n<p>CRP dopl\u0148uje ostatn\u00ed pl\u00e1novac\u00ed \u010dinnosti, nenahrazuje je:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\u010cinnost<\/th><th>Co ov\u011b\u0159uje nebo o \u010dem rozhoduje<\/th><\/tr><\/thead><tbody><tr><td><a href=\"\/cs\/zdroje\/mrp-strucny-pruvodce\/\">Pl\u00e1nov\u00e1n\u00ed materi\u00e1lov\u00fdch pot\u0159eb (MRP)<\/a><\/td><td>Jak\u00e9 materi\u00e1ly a komponenty jsou pot\u0159eba, v jak\u00e9m mno\u017estv\u00ed a kdy, po zohledn\u011bn\u00ed z\u00e1sob a dod\u00e1vek<\/td><\/tr><tr><td><a href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/hrube-kapacitni-planovani\/\">Hrub\u00e9 kapacitn\u00ed pl\u00e1nov\u00e1n\u00ed (RCCP)<\/a><\/td><td>Zda kapacita kritick\u00fdch v\u00fdrobn\u00edch zdroj\u016f posta\u010duje pro hlavn\u00ed v\u00fdrobn\u00ed pl\u00e1n<\/td><\/tr><tr><td>Pl\u00e1nov\u00e1n\u00ed kapacitn\u00edch po\u017eadavk\u016f (CRP)<\/td><td>Podrobn\u00e9 zat\u00ed\u017een\u00ed v\u00fdrobn\u00edch zdroj\u016f vypl\u00fdvaj\u00edc\u00ed z pl\u00e1novan\u00fdch a otev\u0159en\u00fdch v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f<\/td><\/tr><tr><td><a href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/planovani-s-omezenou-kapacitou\/\">Rozvrhov\u00e1n\u00ed s omezen\u00fdmi kapacitami<\/a><\/td><td>Kde a kdy budou jednotliv\u00e9 operace prob\u00edhat v r\u00e1mci dostupn\u00e9ho \u010dasu v\u00fdrobn\u00edch zdroj\u016f<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Tradi\u010dn\u00ed CRP dok\u00e1\u017ee odhalit p\u0159et\u00ed\u017een\u00ed, ani\u017e by automaticky odstranilo soub\u011bh po\u017eadavk\u016f, kter\u00fd je zp\u016fsobil. P\u0159ehled, kter\u00fd ukazuje 44 po\u017eadovan\u00fdch hodin oproti 36 dostupn\u00fdm, je cenn\u00fd pr\u00e1v\u011b t\u00edm, \u017ee nedostatek kapacity z\u016fst\u00e1v\u00e1 viditeln\u00fd. K jeho vy\u0159e\u0161en\u00ed je pot\u0159eba rozhodnout o zm\u011bn\u00e1ch ve v\u00fdrob\u011b a upravit pl\u00e1n.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Zat\u00ed\u017een\u00ed po\u010d\u00edtejte z pr\u00e1ce, kter\u00e1 je\u0161t\u011b zb\u00fdv\u00e1<\/h2>\n\n\n<p>Za\u010dn\u011bte jednozna\u010dn\u011b vymezen\u00fdm souborem zak\u00e1zek. Zahr\u0148te posuzovan\u00e9 n\u00e1vrhy v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f i zb\u00fdvaj\u00edc\u00ed operace na otev\u0159en\u00fdch zak\u00e1zk\u00e1ch. Jakmile se n\u00e1vrh zm\u011bn\u00ed na uvoln\u011bn\u00fd v\u00fdrobn\u00ed p\u0159\u00edkaz, nesm\u00ed ve v\u00fdpo\u010dtu z\u016fstat jako druh\u00e1 kopie t\u00e9\u017ee pr\u00e1ce.<\/p>\n\n\n<p>Vych\u00e1zejte z \u010dist\u00fdch v\u00fdrobn\u00edch po\u017eadavk\u016f materi\u00e1lov\u00e9ho pl\u00e1nu a nep\u0159i\u010d\u00edtejte k nim nav\u00edc hrubou popt\u00e1vku od z\u00e1kazn\u00edk\u016f. Mno\u017estv\u00ed, kter\u00e9 u\u017e pokr\u00fdvaj\u00ed skladov\u00e9 z\u00e1soby, nen\u00ed t\u0159eba znovu vyr\u00e1b\u011bt. Otev\u0159en\u00fd v\u00fdrobn\u00ed p\u0159\u00edkaz v\u0161ak st\u00e1le spot\u0159ebov\u00e1v\u00e1 kapacitu na svou nedokon\u010denou pr\u00e1ci.<\/p>\n\n\n<p>U ka\u017ed\u00e9 operace pot\u0159ebujete zn\u00e1t:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>Zb\u00fdvaj\u00edc\u00ed mno\u017estv\u00ed a stav operace, v\u010detn\u011b v\u0161ech zn\u00e1m\u00fdch po\u017eadavk\u016f na p\u0159epracov\u00e1n\u00ed.<\/li><li>Technologick\u00fd postup, zp\u016fsobil\u00e9 pracovi\u0161t\u011b a po\u0159ad\u00ed operac\u00ed.<\/li><li>Zb\u00fdvaj\u00edc\u00ed \u010das se\u0159\u00edzen\u00ed a \u010das zpracov\u00e1n\u00ed ve shodn\u00fdch jednotk\u00e1ch.<\/li><li>Pl\u00e1novan\u00e9 term\u00edny operac\u00ed nebo \u010dasov\u00e9 posuny odvozen\u00e9 z pr\u016fb\u011b\u017en\u00e9 doby v\u00fdroby, podle kter\u00fdch po\u017eadavek za\u0159ad\u00edte do p\u0159\u00edslu\u0161n\u00e9ho obdob\u00ed.<\/li><li>Kalend\u00e1\u0159 v\u00fdrobn\u00edho zdroje, person\u00e1ln\u00ed zaji\u0161t\u011bn\u00ed a zn\u00e1m\u00e1 obdob\u00ed nedostupnosti.<\/li><\/ul>\n\n\n<p>Kusovn\u00edk \u0159\u00edk\u00e1, z \u010deho se v\u00fdrobek skl\u00e1d\u00e1. Technologick\u00fd postup ur\u010duje, kde v\u00fdroba prob\u00edh\u00e1 a kolik \u010dasu v\u00fdrobn\u00edch zdroj\u016f vy\u017eaduje. CRP pot\u0159ebuje vedle mno\u017estv\u00ed z materi\u00e1lov\u00e9ho pl\u00e1nov\u00e1n\u00ed i tento druh\u00fd pohled.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Spo\u010d\u00edtejte \u010das pot\u0159ebn\u00fd k dokon\u010den\u00ed operac\u00ed<\/h3>\n\n\n<p>Pro jednoduchou operaci s \u010dasem zpracov\u00e1n\u00ed na kus plat\u00ed:<\/p>\n\n\n<p><strong>Zb\u00fdvaj\u00edc\u00ed zat\u00ed\u017een\u00ed operace = zb\u00fdvaj\u00edc\u00ed \u010das se\u0159\u00edzen\u00ed + zb\u00fdvaj\u00edc\u00ed mno\u017estv\u00ed \u00d7 \u010das zpracov\u00e1n\u00ed na kus.<\/strong><\/p>\n\n\n<p>Se\u010dt\u011bte zat\u00ed\u017een\u00ed jednotliv\u00fdch operac\u00ed pro ka\u017ed\u00e9 pracovi\u0161t\u011b a obdob\u00ed. Ji\u017e dokon\u010den\u00e9 se\u0159\u00edzen\u00ed nen\u00ed dal\u0161\u00edm budouc\u00edm po\u017eadavkem na kapacitu. Pokud je nutn\u00e9 zbytek zak\u00e1zky rozd\u011blit do d\u00e1vek se samostatn\u00fdm se\u0159\u00edzen\u00edm, zapo\u010d\u00edtejte dodate\u010dn\u00e9 se\u0159\u00edzen\u00ed, m\u00edsto abyste p\u0159edpokl\u00e1dali, \u017ee rozd\u011blen\u00ed nevy\u017eaduje \u017e\u00e1dn\u00fd \u010das nav\u00edc.<\/p>\n\n\n<p>Ne ka\u017ed\u00fd proces se \u0159\u00edd\u00ed \u010dasem na kus. Cyklus pece m\u016f\u017ee zab\u00edrat kapacitu po pevn\u011b stanovenou dobu zpracov\u00e1n\u00ed d\u00e1vky. Pou\u017eijte skute\u010dn\u00fd zp\u016fsob stanoven\u00ed \u010dasu dan\u00e9 operace a nen\u00e1sobte ka\u017edou dobu po\u010dtem kus\u016f.<\/p>\n\n\n<p>Strojn\u00ed hodiny a \u010dlov\u011bkohodiny po\u010d\u00edtejte odd\u011blen\u011b. Stroj m\u016f\u017ee po \u010d\u00e1st operace b\u011b\u017eet bez obsluhy, zat\u00edmco mont\u00e1\u017en\u00ed \u00fakon m\u016f\u017ee vy\u017eadovat n\u011bkolik pracovn\u00edk\u016f. Tyto rozd\u00edly se nesm\u011bj\u00ed ztratit v jedin\u00e9m sou\u010dtu hodin za cel\u00fd z\u00e1vod.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Za\u0159a\u010fte po\u017eadavek do obdob\u00ed, kdy operace kapacitu pot\u0159ebuje<\/h3>\n\n\n<p>Neza\u0159azujte v\u0161echny operace do t\u00fddne, kdy se m\u00e1 hotov\u00e1 zak\u00e1zka dodat. Obr\u00e1b\u011bn\u00ed m\u016f\u017ee b\u00fdt pot\u0159eba prov\u00e9st d\u0159\u00edve, aby na n\u011bj mohly nav\u00e1zat dokon\u010dovac\u00ed operace a mont\u00e1\u017e. Rozlo\u017ete zat\u00ed\u017een\u00ed v \u010dase podle term\u00edn\u016f operac\u00ed nebo \u010dasov\u00fdch posun\u016f v technologick\u00e9m postupu. Pokud operace zasahuje do v\u00edce obdob\u00ed, \u0159i\u010fte se pravidly rozd\u011blen\u00ed zat\u00ed\u017een\u00ed ve sv\u00e9m pl\u00e1novac\u00edm modelu.<\/p>\n\n\n<p>Denn\u00ed obdob\u00ed odhal\u00ed kolize, kter\u00e9 se v t\u00fddenn\u00edch sou\u010dtech mohou skr\u00fdt. T\u00fddenn\u00ed obdob\u00ed zase mohou poslou\u017eit k posouzen\u00ed v\u00fdvoje zat\u00ed\u017een\u00ed v del\u0161\u00edm horizontu. Zvolte podrobnost pot\u0159ebnou pro dan\u00e9 rozhodnut\u00ed. Ne\u017e v\u0161ak na z\u00e1klad\u011b kapacitn\u011b vyv\u00e1\u017een\u00e9ho obdob\u00ed sl\u00edb\u00edte term\u00edn dod\u00e1n\u00ed, ov\u011b\u0159te skute\u010dnou n\u00e1vaznost operac\u00ed.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Porovnejte zat\u00ed\u017een\u00ed s vyu\u017eitelnou kapacitou<\/h3>\n\n\n<p>Dostupnost vypo\u010d\u00edtejte z pracovn\u00edho kalend\u00e1\u0159e pro konkr\u00e9tn\u00ed term\u00edny, nikoli z pouh\u00e9 existence stroje. Vych\u00e1zejte z napl\u00e1novan\u00fdch hodin v\u00fdrobn\u00edho zdroje a zohledn\u011bte \u00fadr\u017ebu, sv\u00e1tky, person\u00e1ln\u00ed zaji\u0161t\u011bn\u00ed i dal\u0161\u00ed zn\u00e1m\u00e1 omezen\u00ed.<\/p>\n\n\n<p>Pro jednoduch\u00e9 porovn\u00e1n\u00ed v hodin\u00e1ch plat\u00ed:<\/p>\n\n\n<p><strong>Kapacitn\u00ed bilance = dostupn\u00e9 hodiny \u2212 po\u017eadovan\u00e9 hodiny.<\/strong><\/p>\n\n\n<p><strong>M\u00edra vyt\u00ed\u017een\u00ed kapacity = po\u017eadovan\u00e9 hodiny \u00f7 dostupn\u00e9 hodiny \u00d7 100 %.<\/strong><\/p>\n\n\n<p>Z\u00e1porn\u00e1 bilance nebo vyt\u00ed\u017een\u00ed nad 100 % znamen\u00e1 p\u0159et\u00ed\u017een\u00ed. Pokud je dostupn\u00e1 kapacita nulov\u00e1, ozna\u010dte po\u017eadavek jako neza\u0159aditeln\u00fd do rozvrhu v dan\u00e9m obdob\u00ed, m\u00edsto abyste se pokou\u0161eli d\u011blit nulou.<\/p>\n\n\n<p>Pou\u017e\u00edvejte jednotn\u00fd z\u00e1klad pro v\u00fdpo\u010det \u010dasu. Pokud jsou \u010dasy zpracov\u00e1n\u00ed uvedeny v normohodin\u00e1ch a dostupnou kapacitu upravujete podle v\u00fdkonnosti, tuto \u00fapravu zdokumentujte. Jestli\u017ee \u010dasy zpracov\u00e1n\u00ed ji\u017e stejn\u00e9 o\u010dek\u00e1van\u00e9 ztr\u00e1ty zahrnuj\u00ed, neode\u010d\u00edtejte je podruh\u00e9. Historick\u00e9 \u00fadaje o skute\u010dn\u00e9 produkci pomohou ov\u011b\u0159it, zda nejsou p\u0159edpoklady o kapacit\u011b p\u0159\u00edli\u0161 optimistick\u00e9.<\/p>\n\n\n<h2 class=\"wp-block-heading\">P\u0159\u00edklad CRP: odhalte osmihodinov\u00e9 p\u0159et\u00ed\u017een\u00ed obr\u00e1b\u011bn\u00ed<\/h2>\n\n\n<p>P\u0159edstavme si v\u00fdrobce, kter\u00fd posuzuje pr\u00e1ci na jednom obr\u00e1b\u011bc\u00edm centru na p\u0159\u00ed\u0161t\u00ed t\u00fdden. V ka\u017ed\u00e9m z p\u011bti pracovn\u00edch dn\u016f m\u00e1 jednu osmihodinovou sm\u011bnu, tedy 40 strojn\u00edch hodin. Po ode\u010dten\u00ed \u010dty\u0159 hodin pl\u00e1novan\u00e9 \u00fadr\u017eby zb\u00fdv\u00e1 <strong>36 dostupn\u00fdch strojn\u00edch hodin<\/strong>. V tomto zjednodu\u0161en\u00e9m p\u0159\u00edkladu se kapacita d\u00e1le nesni\u017euje o ztr\u00e1ty \u00fa\u010dinnosti.<\/p>\n\n\n<p>V dan\u00e9m t\u00fddnu vy\u017eaduj\u00ed obr\u00e1b\u011bn\u00ed t\u0159i zak\u00e1zky:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Zak\u00e1zka<\/th><th>Stav a zb\u00fdvaj\u00edc\u00ed pr\u00e1ce<\/th><th>Zb\u00fdvaj\u00edc\u00ed \u010das se\u0159\u00edzen\u00ed<\/th><th>\u010cas zpracov\u00e1n\u00ed na kus<\/th><th>Po\u017eadovan\u00e9 hodiny obr\u00e1b\u011bn\u00ed<\/th><\/tr><\/thead><tbody><tr><td>J101<\/td><td>Otev\u0159en\u00e1 zak\u00e1zka: zb\u00fdv\u00e1 60 kus\u016f<\/td><td>0 h<\/td><td>0,25 h<\/td><td>15 h<\/td><\/tr><tr><td>J202<\/td><td>Pl\u00e1novan\u00e1 zak\u00e1zka: 80 kus\u016f<\/td><td>2 h<\/td><td>0,20 h<\/td><td>18 h<\/td><\/tr><tr><td>J203<\/td><td>Pl\u00e1novan\u00e1 zak\u00e1zka: 40 kus\u016f<\/td><td>1 h<\/td><td>0,25 h<\/td><td>11 h<\/td><\/tr><tr><td>Celkem<\/td><td><\/td><td><\/td><td><\/td><td>44 h<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Zak\u00e1zka J101 p\u016fvodn\u011b obsahovala 100 kus\u016f. \u010cty\u0159icet kus\u016f je ji\u017e obrobeno a se\u0159\u00edzen\u00ed je dokon\u010deno. Do zat\u00ed\u017een\u00ed obr\u00e1b\u011bn\u00ed vstupuje pouze zb\u00fdvaj\u00edc\u00edch 60 kus\u016f: <strong>60 \u00d7 0,25 = 15 hodin<\/strong>.<\/p>\n\n\n<p>Pro J202 je v\u00fdpo\u010det <strong>2 + (80 \u00d7 0,20) = 18 hodin<\/strong>. J203 p\u0159id\u00e1v\u00e1 <strong>1 + (40 \u00d7 0,25) = 11 hodin<\/strong>.<\/p>\n\n\n<p>Obr\u00e1b\u011bc\u00ed centrum m\u00e1 tedy 44 po\u017eadovan\u00fdch hodin oproti 36 dostupn\u00fdm. To znamen\u00e1 <strong>p\u0159et\u00ed\u017een\u00ed o osm hodin<\/strong> a <strong>vyt\u00ed\u017een\u00ed 122,2 %<\/strong>, zaokrouhlen\u00e9 na jedno desetinn\u00e9 m\u00edsto.<\/p>\n\n\n<p>Tyt\u00e9\u017e zak\u00e1zky vy\u017eaduj\u00ed na samostatn\u00e9m pracovi\u0161ti odjehlov\u00e1n\u00ed postupn\u011b 6, 8 a 4 \u010dlov\u011bkohodiny. Jeho zat\u00ed\u017een\u00ed 18 hodin se vejde do 28 dostupn\u00fdch \u010dlov\u011bkohodin. T\u011bchto deset voln\u00fdch \u010dlov\u011bkohodin je u\u017eite\u010dn\u00fdch, chyb\u011bj\u00edc\u00ed obr\u00e1b\u011bn\u00ed v\u0161ak nenahrad\u00ed.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Posuzujte skute\u010dn\u00e9 opat\u0159en\u00ed, ne jen krat\u0161\u00ed \u010derven\u00fd sloupec<\/h3>\n\n\n<p>P\u0159edpokl\u00e1dejme, \u017ee zak\u00e1zku J203 lze zpracovat na vhodn\u00e9m alternativn\u00edm stroji, kter\u00fd m\u00e1 v po\u017eadovan\u00e9m obdob\u00ed k dispozici 16 hodin. V\u00fdroba na n\u011bm ale trv\u00e1 d\u00e9le: se\u0159\u00edzen\u00ed zabere 1,5 hodiny a ka\u017ed\u00fd kus 0,30 hodiny.<\/p>\n\n\n<p>Po p\u0159esunu bude operace na alternativn\u00edm stroji vy\u017eadovat <strong>1,5 + (40 \u00d7 0,30) = 13,5 hodiny<\/strong>, nikoli p\u016fvodn\u00edch 11 hodin.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>V\u00fdrobn\u00ed zdroj<\/th><th>Zat\u00ed\u017een\u00ed po p\u0159esunu J203<\/th><th>Dostupn\u00e1 kapacita<\/th><th>Zb\u00fdvaj\u00edc\u00ed kapacita<\/th><\/tr><\/thead><tbody><tr><td>P\u016fvodn\u00ed obr\u00e1b\u011bc\u00ed centrum<\/td><td>33 h<\/td><td>36 h<\/td><td>3 h<\/td><\/tr><tr><td>Alternativn\u00ed stroj<\/td><td>13,5 h<\/td><td>16 h<\/td><td>2,5 h<\/td><\/tr><tr><td>Pracovi\u0161t\u011b odjehlov\u00e1n\u00ed<\/td><td>18 \u010dlov\u011bkohodin<\/td><td>28 \u010dlov\u011bkohodin<\/td><td>10 \u010dlov\u011bkohodin<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Zat\u00ed\u017een\u00ed obou stroj\u016f se nyn\u00ed vejde do dostupn\u00e9 kapacity. P\u0159esun ale zvy\u0161uje celkov\u00fd \u010das obr\u00e1b\u011bn\u00ed ze 44 na 46,5 hodiny. Kv\u016fli dodr\u017een\u00ed term\u00ednu dod\u00e1n\u00ed se to m\u016f\u017ee vyplatit, nejde v\u0161ak o zv\u00fd\u0161en\u00ed produktivity. Porovnejte n\u00e1klady na dodate\u010dn\u00fd strojn\u00ed \u010das, n\u00e1stroje a dal\u0161\u00ed n\u00e1klady spojen\u00e9 s p\u0159esunem s n\u00e1klady na p\u0159es\u010dasy nebo na zpo\u017ed\u011bn\u00ed zak\u00e1zky.<\/p>\n\n\n<p>Pot\u00e9 ov\u011b\u0159te n\u00e1vaznost operac\u00ed. Alternativn\u00ed stroj mus\u00ed zak\u00e1zku J203 dokon\u010dit dostate\u010dn\u011b brzy, aby p\u0159ed expedic\u00ed zbyly \u010dty\u0159i hodiny na odjehlov\u00e1n\u00ed. Voln\u00e1 kapacita a\u017e po pot\u0159ebn\u00e9m term\u00ednu p\u0159ed\u00e1n\u00ed nepom\u016f\u017ee. Vyrovnan\u00e9 kapacitn\u00ed po\u017eadavky v CRP nab\u00edzej\u00ed mo\u017en\u00e9 \u0159e\u0161en\u00ed; podrobn\u00fd rozvrh ov\u011b\u0159\u00ed, zda funguje i \u010dasov\u011b.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Rozhodn\u011bte, jak vy\u0159e\u0161it jednotliv\u00e1 p\u0159et\u00ed\u017een\u00ed<\/h2>\n\n\n<p>Ne\u017e po\u0159\u00edd\u00edte dal\u0161\u00ed kapacitu, otev\u0159ete zak\u00e1zky, kter\u00e9 zp\u016fsobuj\u00ed \u0161pi\u010dku zat\u00ed\u017een\u00ed. Zkontrolujte, zda nejsou n\u00e1vrhy duplicitn\u00ed, zda se dokon\u010den\u00e9 operace st\u00e1le nepo\u010d\u00edtaj\u00ed jako neuzav\u0159en\u00e9 a zda jsou mno\u017estv\u00ed i \u010dasy v technologick\u00fdch postupech aktu\u00e1ln\u00ed a spr\u00e1vn\u00e9. Opravou chybn\u00fdch dat se vyhnete placen\u00ed p\u0159es\u010das\u016f, kter\u00e9 ve skute\u010dnosti nebyly pot\u0159eba.<\/p>\n\n\n<p>Pokud je nedostatek kapacity skute\u010dn\u00fd, porovnejte u dot\u010den\u00fdch zak\u00e1zek mo\u017en\u00e9 zp\u016fsoby \u0159e\u0161en\u00ed:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>P\u0159esu\u0148te operaci na vhodn\u00fd alternativn\u00ed zdroj.<\/strong> Pou\u017eijte skute\u010dn\u00fd \u010das se\u0159\u00edzen\u00ed a zpracov\u00e1n\u00ed na dan\u00e9m zdroji, stejn\u011b jako v p\u0159\u00edkladu J203. Krom\u011b voln\u00fdch hodin ov\u011b\u0159te i dostupnost n\u00e1stroj\u016f a obsluhy.<\/li><li><strong>P\u0159esu\u0148te pr\u00e1ci do jin\u00e9ho obdob\u00ed.<\/strong> D\u0159\u00edv\u011bj\u0161\u00ed v\u00fdroba vy\u017eaduje d\u0159\u00edv\u011bj\u0161\u00ed dostupnost materi\u00e1lu i kapacity; pozd\u011bj\u0161\u00ed v\u00fdroba m\u016f\u017ee zm\u011bnit sl\u00edben\u00fd term\u00edn dod\u00e1n\u00ed. Znovu zkontrolujte p\u0159edch\u00e1zej\u00edc\u00ed i navazuj\u00edc\u00ed operace.<\/li><li><strong>P\u0159idejte pracovn\u00ed hodiny a zajist\u011bte obsluhu.<\/strong> Zam\u011b\u0159te se na konkr\u00e9tn\u00ed zdroj a obdob\u00ed, kde kapacita chyb\u00ed. Dal\u0161\u00ed sm\u011bna jinde v z\u00e1vod\u011b toto p\u0159et\u00ed\u017een\u00ed nevy\u0159e\u0161\u00ed.<\/li><li><strong>Zadejte vhodnou pr\u00e1ci do kooperace.<\/strong> Zapo\u010d\u00edtejte pr\u016fb\u011b\u017enou dobu v\u00fdroby u dodavatele, dopravu a p\u0159\u00edpadnou kontrolu p\u0159ed dal\u0161\u00ed intern\u00ed operac\u00ed.<\/li><li><strong>Upravte dohodnut\u00e9 podm\u00ednky dod\u00e1n\u00ed.<\/strong> Pokud se pr\u00e1ce st\u00e1le nevejde do dostupn\u00e9 kapacity, dohodn\u011bte jin\u00fd term\u00edn, mno\u017estv\u00ed nebo d\u00edl\u010d\u00ed dod\u00e1vky, m\u00edsto abyste potvrdili nesplniteln\u00fd slib.<\/li><\/ul>\n\n\n<p>Zvl\u00e1\u0161tn\u00ed pozornost v\u011bnujte zm\u011bn\u00e1m priorit. Mohou pomoci dodr\u017eet term\u00edn d\u016fle\u017eit\u00e9 zak\u00e1zky t\u00edm, \u017ee jin\u00e1 po\u010dk\u00e1; novou kapacitu ale nevytvo\u0159\u00ed. Ne\u017e urgentn\u00ed zak\u00e1zku ozna\u010d\u00edte za vy\u0159e\u0161enou, ov\u011b\u0159te, kter\u00e9 dal\u0161\u00ed sl\u00edben\u00e9 term\u00edny se t\u00edm posunou.<\/p>\n\n\n<p>Zaznamenejte zvolen\u00e9 opat\u0159en\u00ed u dot\u010den\u00fdch zak\u00e1zek \u010di operac\u00ed, aktualizujte p\u0159\u00edslu\u0161n\u00e9 \u00fadaje o zak\u00e1zk\u00e1ch nebo kapacit\u011b a prove\u010fte nov\u00fd v\u00fdpo\u010det. Pokud zm\u011bny term\u00edn\u016f \u010di mno\u017estv\u00ed ovlivn\u00ed materi\u00e1lov\u00e9 pot\u0159eby, prom\u00edtn\u011bte rozhodnut\u00ed tak\u00e9 do materi\u00e1lov\u00e9ho pl\u00e1nov\u00e1n\u00ed. CRP funguje jako zp\u011btnovazebn\u00ed proces, nikoli jako report, kter\u00fd po porad\u011b zalo\u017e\u00edte.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Prom\u00edtn\u011bte rozhodnut\u00ed o kapacit\u011b do rozvrhu v syst\u00e9mu SkyPlanner<\/h2>\n\n\n<p>SkyPlanner vyu\u017eijete tam, kde pl\u00e1nova\u010di dok\u00e1\u017eou p\u0159et\u00ed\u017een\u00ed odhalit, ale n\u00e1sledn\u00fdm sestavov\u00e1n\u00edm nov\u00e9ho po\u0159ad\u00ed operac\u00ed tr\u00e1v\u00ed p\u0159\u00edli\u0161 velkou \u010d\u00e1st dne. P\u0159\u00ednosem je m\u00e9n\u011b ru\u010dn\u00ed koordinace, lep\u0161\u00ed vyu\u017eit\u00ed st\u00e1vaj\u00edc\u00ed kapacity a jasn\u011bj\u0161\u00ed podklady pro rozhodnut\u00ed, zda se dodate\u010dn\u00e9 hodiny vyplat\u00ed.<\/p>\n\n\n<p>V\u00e1\u0161 ERP m\u016f\u017ee i nad\u00e1le z\u016fstat zdrojem obchodn\u00edch a v\u00fdrobn\u00edch dat. <strong><a href=\"https:\/\/skyplanner.ai\/cs\/integrace\/\">SkyPlanner lze propojit s libovoln\u00fdm ERP nebo MES prost\u0159ednictv\u00edm otev\u0159en\u00e9ho REST API<\/a><\/strong>. T\u00edm se zak\u00e1zky a \u00fadaje o operac\u00edch propoj\u00ed s podrobn\u00fdm rozvrhov\u00e1n\u00edm.<\/p>\n\n\n<p>Z\u00e1kladem rozvrhov\u00e1n\u00ed ve SkyPlanner jsou pracovi\u0161t\u011b, sm\u011bny, obsluha, operace a priority. Pl\u00e1novan\u00e1 \u00fadr\u017eba blokuje dostupnost p\u0159\u00edslu\u0161n\u00e9ho zdroje. Arcturus vypo\u010d\u00edt\u00e1v\u00e1 rozvrh podle nastaven\u00e9 kapacity, n\u00e1vaznost\u00ed operac\u00ed a priorit. Pokud je zapnut\u00e9 rozvrhov\u00e1n\u00ed se zohledn\u011bn\u00edm materi\u00e1lu, ovliv\u0148uje term\u00edny tak\u00e9 evidovan\u00e1 dostupnost materi\u00e1lu.<\/p>\n\n\n<p>V p\u0159\u00edkladu s obr\u00e1b\u011bn\u00edm je vhodn\u00e9 nejprve do rozvrhu zadat schv\u00e1len\u00fd zdroj a dostupn\u00e9 sm\u011bny, p\u0159epo\u010d\u00edtat rozvrh a pot\u00e9 v Ganttov\u011b diagramu spole\u010dn\u011b zkontrolovat obr\u00e1b\u011bn\u00ed i odjehlov\u00e1n\u00ed. Uvid\u00edte, kdy operace skon\u010d\u00ed a kter\u00fdch dal\u0161\u00edch zak\u00e1zek se zm\u011bna dotkne. Pokud bude alternativn\u00ed stroj dostupn\u00fd a\u017e koncem t\u00fddne, dopad na dod\u00e1n\u00ed m\u016f\u017eete posoudit v rozvrhu, m\u00edsto abyste spol\u00e9hali na p\u0159edpoklad skryt\u00fd v sou\u010dtech hodin.<\/p>\n\n\n<p>Vy rozhodnete, zda tento dopad p\u0159ijmete, zm\u011bn\u00edte priority, nebo zajist\u00edte dal\u0161\u00ed kapacitu. Arcturus se postar\u00e1 o v\u00fdpo\u010det rozvrhu. Proto je SkyPlanner pro navazuj\u00edc\u00ed \u0159\u00edzen\u00ed v\u00fdroby lep\u0161\u00edm \u0159e\u0161en\u00edm ne\u017e samostatn\u00fd report zat\u00ed\u017een\u00ed a ru\u010dn\u00ed \u00fapravy v\u0161ech front pr\u00e1ce po ka\u017ed\u00e9 zm\u011bn\u011b.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Co se zm\u011bnilo ve spole\u010dnosti Mamec<\/h3>\n\n\n<p>Finsk\u00e1 spole\u010dnost Mamec, kter\u00e1 vyr\u00e1b\u00ed m\u00edchac\u00ed techniku a zak\u00e1zkov\u00e9 v\u00fdrobky s vysokou technologickou n\u00e1ro\u010dnost\u00ed, \u0159e\u0161ila tis\u00edce vz\u00e1jemn\u011b prov\u00e1zan\u00fdch pracovn\u00edch p\u0159\u00edkaz\u016f. Nepru\u017en\u00e9 pl\u00e1novac\u00ed funkce jej\u00edho ERP neposkytovaly t\u00fdmu pot\u0159ebn\u00fd celkov\u00fd p\u0159ehled. Mist\u0159i ve v\u00fdrobn\u00edm provozu ur\u010dovali priority podle term\u00edn\u016f dod\u00e1n\u00ed na pap\u00edrov\u00fdch p\u0159\u00edkazech, zat\u00edmco veden\u00ed si vytv\u00e1\u0159elo p\u0159edstavu o zat\u00ed\u017een\u00ed na z\u00e1klad\u011b subjektivn\u00edch odhad\u016f.<\/p>\n\n\n<p>Mamec propojila SkyPlanner se sv\u00fdm syst\u00e9mem Oscar ERP a zavedla rozvrhov\u00e1n\u00ed s omezen\u00fdmi kapacitami podporovan\u00e9 um\u011blou inteligenc\u00ed. V jej\u00edm nasazen\u00ed se fronty pr\u00e1ce uzamykaj\u00ed v\u017edy na t\u00fdden. Zam\u011bstnanci si mohou vyhledat pr\u016fb\u011bh i rozvrh zak\u00e1zky a veden\u00ed sleduje zat\u00ed\u017een\u00ed v\u00fdroby na z\u00e1klad\u011b stejn\u00fdch sd\u00edlen\u00fdch informac\u00ed.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/cs\/pribehy-zakazniku\/mamec\/\">Mamec uv\u00e1d\u00ed<\/a> v\u00fdrazn\u011b men\u0161\u00ed pracnost pl\u00e1nov\u00e1n\u00ed, m\u00e9n\u011b prostoj\u016f na pracovi\u0161t\u00edch d\u00edky lep\u0161\u00edmu po\u0159ad\u00ed pr\u00e1ce a lep\u0161\u00ed v\u010dasnost dod\u00e1vek. Jej\u00ed zku\u0161enost ukazuje, jak\u00fd p\u0159\u00ednos m\u00e1 propojen\u00ed p\u0159ehledu o zat\u00ed\u017een\u00ed s konkr\u00e9tn\u00ed prac\u00ed: pl\u00e1nova\u010di mus\u00ed m\u00e9n\u011b v\u011bc\u00ed koordinovat ru\u010dn\u011b a zm\u011bny se sn\u00e1ze vysv\u011btluj\u00ed lidem, kte\u0159\u00ed na pl\u00e1nu z\u00e1visej\u00ed.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Prom\u011b\u0148te p\u0159\u00ed\u0161t\u00ed vyhodnocen\u00ed CRP v realizovateln\u00fd pl\u00e1n<\/h2>\n\n\n<p>Vyberte z aktu\u00e1ln\u00edho materi\u00e1lov\u00e9ho pl\u00e1nu jedno p\u0159et\u00ed\u017een\u00e9 pracovi\u0161t\u011b. Ur\u010dete, kter\u00e9 neuzav\u0159en\u00e9 zak\u00e1zky a n\u00e1vrhy zak\u00e1zek ho zat\u011b\u017euj\u00ed, ov\u011b\u0159te zb\u00fdvaj\u00edc\u00ed hodiny jejich operac\u00ed a porovnejte praktick\u00e9 mo\u017enosti \u0159e\u0161en\u00ed. Pot\u00e9 zkontrolujte upraven\u00e9 operace v r\u00e1mci prov\u00e1zan\u00e9ho rozvrhu, v\u010detn\u011b operac\u00ed navazuj\u00edc\u00edch na p\u0159et\u00ed\u017een\u00fd zdroj.<\/p>\n\n\n<p>SkyPlanner v\u00e1m s t\u00edmto rozvrhov\u00e1n\u00edm pom\u016f\u017ee, ani\u017e byste museli rozvrh opakovan\u011b sestavovat ru\u010dn\u011b. <a href=\"https:\/\/skyplanner.ai\/cs\/zkusebni-verze\/\">Vyzkou\u0161ejte si pr\u00e1ci s uk\u00e1zkov\u00fdmi daty<\/a> a seznamte se s funkcemi Arcturus a Ganttov\u00fdm diagramem, nebo si <a href=\"https:\/\/skyplanner.ai\/cs\/kontaktni-prodej\/\">objednejte uk\u00e1zku<\/a> zam\u011b\u0159enou na va\u0161e p\u0159et\u00ed\u017een\u00e9 pracovi\u0161t\u011b. P\u0159ipravte si jeho sm\u011bny, typick\u00fd technologick\u00fd postup a rozhodnut\u00ed ohledn\u011b dod\u00e1n\u00ed, kter\u00e9 pot\u0159ebujete u\u010dinit. To je spr\u00e1vn\u00fd v\u00fdchoz\u00ed bod pro ov\u011b\u0159en\u00ed, jak m\u016f\u017ee SkyPlanner prom\u011bnit va\u0161e rozhodnut\u00ed o kapacit\u011b ve v\u00fdrobn\u00ed pl\u00e1n pou\u017eiteln\u00fd pro cel\u00fd t\u00fdm.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Pl\u00e1nov\u00e1n\u00ed kapacitn\u00edch po\u017eadavk\u016f: Jak \u0159e\u0161it p\u0159et\u00ed\u017een\u00ed pracovi\u0161\u0165 Domov &raquo; Zdroje &raquo; Pl\u00e1nov\u00e1n\u00ed kapacitn\u00edch po\u017eadavk\u016f: Jak \u0159e\u0161it p\u0159et\u00ed\u017een\u00ed pracovi\u0161\u0165 Materi\u00e1lov\u00fd pl\u00e1n navrhuje dal\u0161\u00ed v\u00fdrobn\u00ed p\u0159\u00edkazy. O strojn\u00ed \u010das se p\u0159itom u\u017e d\u011bl\u00ed st\u00e1vaj\u00edc\u00ed zak\u00e1zky. Ne\u017e uvoln\u00edte do v\u00fdroby dal\u0161\u00ed pr\u00e1ci, pot\u0159ebujete v\u011bd\u011bt, kter\u00e1 pracovi\u0161t\u011b ji zvl\u00e1dnou a na kter\u00fdch se za\u010dne tvo\u0159it fronta zpo\u017ed\u011bn\u00fdch zak\u00e1zek. Pl\u00e1nov\u00e1n\u00ed &#8230; <a title=\"Pl\u00e1nov\u00e1n\u00ed kapacitn\u00edch po\u017eadavk\u016f: Jak \u0159e\u0161it p\u0159et\u00ed\u017een\u00ed pracovi\u0161\u0165\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/planovani-kapacitnich-pozadavku\/\" aria-label=\"Read more about Pl\u00e1nov\u00e1n\u00ed kapacitn\u00edch po\u017eadavk\u016f: Jak \u0159e\u0161it p\u0159et\u00ed\u017een\u00ed pracovi\u0161\u0165\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":99251,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2518,303],"tags":[],"class_list":["post-99224","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-a-rozvrhovani","category-zdroje","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Pl\u00e1nov\u00e1n\u00ed kapacitn\u00edch po\u017eadavk\u016f: Jak \u0159e\u0161it p\u0159et\u00ed\u017een\u00ed pracovi\u0161\u0165<\/title>\n<meta name=\"description\" content=\"MRP navrhuje v\u00fdrobu. Zvl\u00e1dnou ji va\u0161e pracovi\u0161t\u011b? V\u00fdpo\u010dtem CRP odhalte p\u0159et\u00ed\u017een\u00ed, zvolte opat\u0159en\u00ed a sestavte provediteln\u00fd v\u00fdrobn\u00ed rozvrh.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/planovani-kapacitnich-pozadavku\/\" \/>\n<meta property=\"og:locale\" content=\"cs_CZ\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Pl\u00e1nov\u00e1n\u00ed kapacitn\u00edch po\u017eadavk\u016f: Jak \u0159e\u0161it p\u0159et\u00ed\u017een\u00ed pracovi\u0161\u0165\" \/>\n<meta property=\"og:description\" content=\"MRP navrhuje v\u00fdrobu. Zvl\u00e1dnou ji va\u0161e pracovi\u0161t\u011b? V\u00fdpo\u010dtem CRP odhalte p\u0159et\u00ed\u017een\u00ed, zvolte opat\u0159en\u00ed a sestavte provediteln\u00fd v\u00fdrobn\u00ed rozvrh.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/cs\/zdroje\/planovani-kapacitnich-pozadavku\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-15T17:37:09+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-15T17:37:24+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capacity-requirements-planning-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1774\" \/>\n\t<meta property=\"og:image:height\" content=\"887\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Napsal(a)\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Odhadovan\u00e1 doba \u010dten\u00ed\" \/>\n\t<meta name=\"twitter:data2\" content=\"15 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/planovani-kapacitnich-pozadavku\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/planovani-kapacitnich-pozadavku\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Pl\u00e1nov\u00e1n\u00ed kapacitn\u00edch po\u017eadavk\u016f: Jak \u0159e\u0161it p\u0159et\u00ed\u017een\u00ed pracovi\u0161\u0165\",\"datePublished\":\"2026-10-15T17:37:09+00:00\",\"dateModified\":\"2026-10-15T17:37:24+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/planovani-kapacitnich-pozadavku\\\/\"},\"wordCount\":3042,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/planovani-kapacitnich-pozadavku\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/capacity-requirements-planning-hero.png\",\"articleSection\":[\"APS a rozvrhov\u00e1n\u00ed\",\"zdroje\"],\"inLanguage\":\"cs\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/planovani-kapacitnich-pozadavku\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/planovani-kapacitnich-pozadavku\\\/\",\"name\":\"Pl\u00e1nov\u00e1n\u00ed kapacitn\u00edch po\u017eadavk\u016f: Jak \u0159e\u0161it p\u0159et\u00ed\u017een\u00ed pracovi\u0161\u0165\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/planovani-kapacitnich-pozadavku\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/planovani-kapacitnich-pozadavku\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/capacity-requirements-planning-hero.png\",\"datePublished\":\"2026-10-15T17:37:09+00:00\",\"dateModified\":\"2026-10-15T17:37:24+00:00\",\"description\":\"MRP navrhuje v\u00fdrobu. Zvl\u00e1dnou ji va\u0161e pracovi\u0161t\u011b? V\u00fdpo\u010dtem CRP odhalte p\u0159et\u00ed\u017een\u00ed, zvolte opat\u0159en\u00ed a sestavte provediteln\u00fd v\u00fdrobn\u00ed rozvrh.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/planovani-kapacitnich-pozadavku\\\/#breadcrumb\"},\"inLanguage\":\"cs\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/planovani-kapacitnich-pozadavku\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/planovani-kapacitnich-pozadavku\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/capacity-requirements-planning-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/capacity-requirements-planning-hero.png\",\"width\":1774,\"height\":887,\"caption\":\"A batch moves from an overloaded machining center to an available alternative during a capacity requirements review\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/planovani-kapacitnich-pozadavku\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Pl\u00e1nov\u00e1n\u00ed kapacitn\u00edch po\u017eadavk\u016f: Jak \u0159e\u0161it p\u0159et\u00ed\u017een\u00ed pracovi\u0161\u0165\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"cs\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Pl\u00e1nov\u00e1n\u00ed kapacitn\u00edch po\u017eadavk\u016f: Jak \u0159e\u0161it p\u0159et\u00ed\u017een\u00ed pracovi\u0161\u0165","description":"MRP navrhuje v\u00fdrobu. Zvl\u00e1dnou ji va\u0161e pracovi\u0161t\u011b? V\u00fdpo\u010dtem CRP odhalte p\u0159et\u00ed\u017een\u00ed, zvolte opat\u0159en\u00ed a sestavte provediteln\u00fd v\u00fdrobn\u00ed rozvrh.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/cs\/zdroje\/planovani-kapacitnich-pozadavku\/","og_locale":"cs_CZ","og_type":"article","og_title":"Pl\u00e1nov\u00e1n\u00ed kapacitn\u00edch po\u017eadavk\u016f: Jak \u0159e\u0161it p\u0159et\u00ed\u017een\u00ed pracovi\u0161\u0165","og_description":"MRP navrhuje v\u00fdrobu. Zvl\u00e1dnou ji va\u0161e pracovi\u0161t\u011b? V\u00fdpo\u010dtem CRP odhalte p\u0159et\u00ed\u017een\u00ed, zvolte opat\u0159en\u00ed a sestavte provediteln\u00fd v\u00fdrobn\u00ed rozvrh.","og_url":"https:\/\/skyplanner.ai\/cs\/zdroje\/planovani-kapacitnich-pozadavku\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-15T17:37:09+00:00","article_modified_time":"2026-10-15T17:37:24+00:00","og_image":[{"width":1774,"height":887,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capacity-requirements-planning-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Napsal(a)":"Jussi M\u00e4ntyl\u00e4","Odhadovan\u00e1 doba \u010dten\u00ed":"15 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/planovani-kapacitnich-pozadavku\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/planovani-kapacitnich-pozadavku\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Pl\u00e1nov\u00e1n\u00ed kapacitn\u00edch po\u017eadavk\u016f: Jak \u0159e\u0161it p\u0159et\u00ed\u017een\u00ed pracovi\u0161\u0165","datePublished":"2026-10-15T17:37:09+00:00","dateModified":"2026-10-15T17:37:24+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/planovani-kapacitnich-pozadavku\/"},"wordCount":3042,"publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/planovani-kapacitnich-pozadavku\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capacity-requirements-planning-hero.png","articleSection":["APS a rozvrhov\u00e1n\u00ed","zdroje"],"inLanguage":"cs"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/planovani-kapacitnich-pozadavku\/","url":"https:\/\/skyplanner.ai\/cs\/zdroje\/planovani-kapacitnich-pozadavku\/","name":"Pl\u00e1nov\u00e1n\u00ed kapacitn\u00edch po\u017eadavk\u016f: Jak \u0159e\u0161it p\u0159et\u00ed\u017een\u00ed pracovi\u0161\u0165","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/planovani-kapacitnich-pozadavku\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/planovani-kapacitnich-pozadavku\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capacity-requirements-planning-hero.png","datePublished":"2026-10-15T17:37:09+00:00","dateModified":"2026-10-15T17:37:24+00:00","description":"MRP navrhuje v\u00fdrobu. Zvl\u00e1dnou ji va\u0161e pracovi\u0161t\u011b? V\u00fdpo\u010dtem CRP odhalte p\u0159et\u00ed\u017een\u00ed, zvolte opat\u0159en\u00ed a sestavte provediteln\u00fd v\u00fdrobn\u00ed rozvrh.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/planovani-kapacitnich-pozadavku\/#breadcrumb"},"inLanguage":"cs","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/cs\/zdroje\/planovani-kapacitnich-pozadavku\/"]}]},{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/planovani-kapacitnich-pozadavku\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capacity-requirements-planning-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capacity-requirements-planning-hero.png","width":1774,"height":887,"caption":"A batch moves from an overloaded machining center to an available alternative during a capacity requirements review"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/planovani-kapacitnich-pozadavku\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/cs\/"},{"@type":"ListItem","position":2,"name":"Pl\u00e1nov\u00e1n\u00ed kapacitn\u00edch po\u017eadavk\u016f: Jak \u0159e\u0161it p\u0159et\u00ed\u017een\u00ed pracovi\u0161\u0165"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/cs\/#website","url":"https:\/\/skyplanner.ai\/cs\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/cs\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"cs"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/cs\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/cs\/","logo":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capacity-requirements-planning-hero.png",1774,887,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capacity-requirements-planning-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capacity-requirements-planning-hero-300x150.png",300,150,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capacity-requirements-planning-hero-768x384.png",768,384,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capacity-requirements-planning-hero-1024x512.png",1024,512,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capacity-requirements-planning-hero-1536x768.png",1536,768,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capacity-requirements-planning-hero.png",1774,887,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capacity-requirements-planning-hero-360x180.png",360,180,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/cs\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Pl\u00e1nov\u00e1n\u00ed kapacitn\u00edch po\u017eadavk\u016f: Jak \u0159e\u0161it p\u0159et\u00ed\u017een\u00ed pracovi\u0161\u0165 Domov &raquo; Zdroje &raquo; Pl\u00e1nov\u00e1n\u00ed kapacitn\u00edch po\u017eadavk\u016f: Jak \u0159e\u0161it p\u0159et\u00ed\u017een\u00ed pracovi\u0161\u0165 Materi\u00e1lov\u00fd pl\u00e1n navrhuje dal\u0161\u00ed v\u00fdrobn\u00ed p\u0159\u00edkazy. O strojn\u00ed \u010das se p\u0159itom u\u017e d\u011bl\u00ed st\u00e1vaj\u00edc\u00ed zak\u00e1zky. Ne\u017e uvoln\u00edte do v\u00fdroby dal\u0161\u00ed pr\u00e1ci, pot\u0159ebujete v\u011bd\u011bt, kter\u00e1 pracovi\u0161t\u011b ji zvl\u00e1dnou a na kter\u00fdch se za\u010dne tvo\u0159it fronta zpo\u017ed\u011bn\u00fdch zak\u00e1zek. Pl\u00e1nov\u00e1n\u00ed&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/99224","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/comments?post=99224"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/99224\/revisions"}],"predecessor-version":[{"id":99282,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/99224\/revisions\/99282"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media\/99251"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media?parent=99224"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/categories?post=99224"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/tags?post=99224"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}